Space Shuttle Missions Summary

Space Shuttle Missions Summary

Revision S May 2002 SPACE SHUTTLE MISSIONS SUMMARY Page 9 - STS-9 LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (6) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S WINDS ENG. S.N. STS-9 OV-102 CDR: KSC 39A EDW 17, LAKEBED 104/104 A55/60 57.028° STANDARD OI-2 CARGO: KSC W / D : OPF 82 (2), VAB 12 (3), PAD 34 (2) = 128 days (EDW 8, LKBD 4) 33264 lbs (STS 41-A) Flight 6 John W. Young 332:15:59:59.99Z (107) (1) INSERTION (1) Columbia (FLT 2 - STS-1) 11:00:00 AM EST (P) MTR: LAUNCH POSTPONEMENTS : S/L1 15:47:24 PM PST PAYLOAD P27/R1/V3/M1 11:00:00 AM EST (A) 100/104/ HPM START: INSERTION CHARGEABLE: -10/30/83 Launch postponed 29 days to 11/28/83. Rolled Thursday 1 back from pad and changed SRB nozzles subsequent to SEQ Spacelab 1 Monday 3 12/8/83 (1) 78/104/65 -58.0° ALTITUDE: 33131 lbs LM (1) PLT: 11/28/83 (3) CASE: STS-8 excessive nozzle erosion. 29-day slip. FLT # 9 PAYLOAD Brewster H. Shaw, Jr. XRANGE: 69 NM 1 = 2011 (1) STD END: POST OMS -2 WEIGHT: LAUNCH SCRUBS : None. KSC 9 OMS PODS P28/R25/M24 LAUNCH WINDOW : 2 = 2018 (1) -79.0° 136.75 X 33,131 lbs LVO1 - 6 14 Minutes ORB DIR : DL (5) 3 = 2019 (1) LWT-4 132.79 NM (includes 870 lbs LAUNCH DELAYS : None. PAD RVO1 - 6 M / S 1 : (TAL Lighting) MAX: cryo tank) AIM PT : NOM 39A-9 FRC2 - 6 Owen K. Garriott ET-11 -79.9° P29/R26/M25 TAL - ZARAGOZA DEPLOYED: TAL WX : Zaragoza no go - winds, Koln-Bonn no go - 0 lbs PLS - EDW MLGTD: 1649 FT ET clouds. 342:23:47:24Z M / S 2 : SLS - NOR BR / UP NON - DEPLOYED : VEL: 200 KGS FLIGHT DURATION CHANGE : Robert A. R. Parker TAL - ZARAGOZA 185 KEAS 199K 32261 lbs P30/R27/M26 IN PLANE TAL - 1:01:00 - Flight extended 1 day for additional science. HDOT: -1.7 FPS MIDDECK: - Landing delay 5 revs after GPC 1 and GPC 2 hard COLOGNE/BONN MET 0 lbs P / S 1 : AOA - NOR TD NORM 195 : failures Byron K. Lichtenberg AOA WX - NONE 749 FT ET RETURNED: - Total extension - 1 day + 5 revs. P31/R28/M27 IMPACT 32394 lbs MAX Q = 676 NLGTD: 5897 FT LAT: FIRSTS: SHUTTLE - First flight with 6 crewmen. P / S 2 : M = 1.52 342:23:47:37Z 59.96°S ACCUMULATED VEL: 146 KGS - First flight of Spacelab after Spacelab only Ulf Merbold HDOT: -9.9 FPS LONG: WEIGHTS : (Germany) SRB SEP : 149.9°E DEPLOYED: modifications to OV-102. - First flight with non-astronauts (P/S) and first non- P32/R29/M28 2:06.24 MET BRK INIT : 126 KGS 74525 lbs NON - DEPLOYED : Americans. AVE BRK DECEL : 147736 lbs - First use of two shifts of 12 hours (red and blue shifts). MECO: CARGO TOTAL : 8:29.18 MET 6.8 FPS/S - First flight with galley and sleep station. 256318 lbs - First flight with 3 substack fuel cells. WHEELS STOP : ET SEP : 342:23:48:17Z PERFORMANCE 8:47.32 MET MARGINS ( LBS ) : SIGNIFICANT ANOMALIES : 10105 FT FPR: 5404 - GPC SV time tag to S/L incremented by 1 day. FUEL BIAS: 1084 OMS -1 : ROLLOUT: - Ku-band TWT failed to come on (low temp problem). 8556 FT FINAL TDDP: 841 - Spacelab RAU 21/cooling problem. 10:29.3 MET RECON: -411 68.5 Seconds (10105 FROM M 3 EOM - Excessive GH2 in water. THRESHOLD) SPACELAB-1/LM - S-band power amp no. 2 failed. 53 SEC OMS -2 : WEIGHT: - Noises and oscillations reported by crew. SPACELAB 1 - GPC 1 hard failure GPC 2 failure, re-IPL’ed, memory 40:37.4 MET WINDS: 220288 WITH 73 EXP: 101.6 Seconds 0 H/T, O X KNOTS DEORBIT - ASTRONOMY altered, failed again at NLG contact (delayed landing 7- MCC FCR-2 (5) OFFICIAL: 1T, OX X CG: 1085.8 129 X - SOLAR PHYSICS 3/4 hours). 124 NM - SPACE PLASMA - IMU 1 failed (power supply failure). FLIGHT DIRECTORS : DENS ALT : 1900 FT LANDING - ATMOSPHERIC - APU 1 and 2 hydrazine leak/fire shutdown after landing Ascent - J. H. Greene VELOCITY PHYSICS (APU 1 and 2 damaged). FLT DURATION : - EARTH - Right outboard brakes damaged. Ld/Orb 1 - C. R. Lewis 10:07:47:24 WEIGHT: 25696 FPS OBSERVATIONS Orb 2 - J. T. Cox 247:47:24 220027 - LH OMS pod TPS damage during entry. - LIFE SCIENCES - Mission extended one day. 8 hours extension to Orb 3 - L. S. Bourgeois RANGE - MATERIAL Team4/Ent - G. E. Coen S / T : 52:03:46:44 X CG: 1087.1 4349 NM SCIENCES analyze GPC and IMU failures. - LH OMS pod removed for repair after burn-through OV -102 : 5 CRYO TANKS (missing tile). 34:23:50:20 NO RMS RADIATORS DEPLOYED #7 (stowed for 34 hours) DISTANCE: 3,330,000 sm.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us