City Within a City

Total Page:16

File Type:pdf, Size:1020Kb

City Within a City AIRPORT CITY BELGRADE “ Awarded as THE BEST OFFICE DEVELOPMENT PROJECT of the year IN SOUTHEASTERN EUROPE “ Airport City Belgrade newsletter June / 2015 n ° 17 City within a city It has already become customary for June to be the month when the Već je postalo uobičajeno da jun bude mesec kada se Avenue is “happening”; the month during which many companies “dešava” Avenija, mesec u kome mnoge kompanije slave celebrate their anniversaries or mark their successes. It was on the godišnjice ili obeležavaju svoje uspehe. Prvu zgradu ACB- last day of June in 2006 that we officially opened ACB’s first -buil a smo svečano otvorili poslednjeg dana juna 2006 i tada ding and at the same time placed a Megillah, with signatures and smo u temelje sledeće faze položili Megilu s potpisima i good wishes for the prosperity of Airport City, in the foundations dobrim željama za prosperitet Airport City-ja. Ovog juna of the next phase. This June we are launching the fourth phase of započinjemo četvrtu fazu izgradnje, zakoračićemo preko construction and will step beyond the 75,000m2 mark, which has oznake 75.000m2 koliko je bilo ovde već izvesno vreme i EXPANDING been the limit here for some time, and look ahead to the future radujemo se i budućem izgledu ovog dela projekta pre- appearance of this part of the project towards Tošin bunar and the ma Tošinom bunaru, užurbanoj atmosferi gradilišta koja wards busy atmosphere of the construction site which, regardless of how bez obzira koliko nosi sa sobom žamor ili buku predstav- noisy it may be, represents a sign that there’s something new on the lja znak da je nešto novo na pomolu - kranovi su uvek TO morrow horizon – cranes are a symbol of new beginnings. simbol novih početaka. 02 Airport City Belgrade newsletter Airport City Belgrade newsletter 03 > Interview Editor’ s word RecV urednika Adir El Al Airport City Belgrade CEO In such an atmosphere, I remembered a fairytale about U takvoj atmosferi setila sam se bajke o toplim pufnama warm fluff ballsA ( warm fuzzy tale, by Claude M. Steiner). (A warm fuzzy tale , Claude M. Steiner). Without a desire to get into serious analysis, compari- Bez ambicije da ulazim u ozbiljniju analizu, poredjenja itd sons, etc., my inspiration in the context of ACB was the inspiracija u kontekstu ACBa mi je bila atmosfera ovog Persistence of a atmosphere of this working area in relation to others radnog prostora u odnosu na ostale u kojima sam imala that I have had the opportunity to experience. I do not prilike da budem. Ne znam tačno čime i ne znam tačno know precisely which or exactly when, but this place be- kada, ali ovo mesto je počelo da emituje jednu dobru Marathon Runner gan to emit a good atmosphere of smiles, as though atmosferu punu osmeha i kao da ljudi u Aveniji daju tople people in the Avenue gave each other warm balls of fluff pufne jedni drugima i osmehuju se šaljući i primajući do- and sent smiles while receiving good energy ... and, don’t bru energiju... I ne brinem, meni se čini da će tako i ostati. worry, it seems to me it will remain like that. > Airport City - a place with soul Marina Deleon Marina Deleon Communication Advisor Communication Advisor With Marina DeLeon, ACBs Communication Advisor, we tried to define the spirit or special atmosphere of this place. AIRPORT CITY - a place with a soul “I would like to thank all of our clients and partners, them in my field, they must surely exist in other areas. And third stage than was the case, for instance, between the because it is thanks to their support that we have also there are certainly people among them who have perseve- second and third phases. This was due to the lack of demand been able to develop successfully all these years. We rance and vision. At the end of the day, what remains and for new office space. Today we believe that need is present have just started construction works on the new part provides the possibility of success of an economy is not great and that is why we have launched phase four, which will al- of the business park, which will see Airport City almost leaps or even overnight success, but rather a persistent path most double the capacity of Airport City. And this is a direct double in size,” says Airport City CEO Adir El Al, speak- to success and daily progress. This is true for both the co- response to the question of what we predict will happen in ing at the beginning of this interview for Whats up. untry and for individuals. Even though today’s dream is one Belgrade. And we’re not in this alone. Recently, more and of gaining success and wealth overnight and without effort, more companies from completely different areas have disco- Providing the occasion for this interview is the official -la I do not believe in that, and I certainly do not believe that vered this market, where they have a relatively educated la- unch of the fourth phase of construction of Airport City, a society can base its economic future on such foundations. bour force under more favourable conditions than elsewhere which has left everyone a little excited. After a long break, in Europe. Such companies are interested in several thousand the construction site is again in overdrive, with cranes again Does this mean that it is possible to place the success square metres of highly equipped space. visible as a sure sign of a new beginning and preparations of Airport City in the above-mentioned context? Our new buildings will, I hope, provide the right response underway for a celebration to thank all those who have con- Certainly, because the success of such a project is only po- to that need. tributed to the success achieved to date by our City within ssible with a great concept. Without that we would not the City, including clients and many friends and associates. have achieved recognition of the product that we call our What will be new in this area, compared to the exi- This provides good opportunity to look back on the previous City within the City, nor would we have managed to rema- sting park? period… in, even in the time of crisis, a space with extremely high In phase four we will build four new office buildings that will occupancy rates. The image of this place, and recognition of be similar to the existing structures only in terms of appe- You have been in Belgrade for thirteen years already. the exceptional offer that ACB represents, is something we arance. In reality, they are completely different in terms of When you look back on this period, do you feel like your built through persistence on a daily basis from the beginning. structure and standards of construction. In building Airport experience in Serbia has changed and enriched you? And, in the end, investors believed all the time in the success City we have learned many lessons about the introduction It has certainly enriched and changed me. It has brought of such a project right here and on this market. of new standards to construction in the early stages and we Airport City is unique to Belgrade and Serbia in terms engaged in completely different sectors. kind of happy hour with live music and we will continue me a lot of experience, knowledge and intercultural experi- have now applied all this additional value in the construction of real estate developments, but what sets it apart from Airport City is not showy and grand, which can be burde- with that popular activity. ence. And perhaps it finally brought me understanding for Phase 4 of new buildings. They will be the best combination of expe- other Class A business parks elsewhere in the world? ning in itself. Rather, it is “normal” and has that touch of the bureaucracy or at least conciliation with a definite lack of rience gained here and novelties introduced on the basis of From my perspective, as someone’s whose field of exper- sophisticated flavour of success that is recognisable. What have been the happiest and most beautiful times understanding for bureaucracy... it is tough to decide! Phase 4 means another 63.000 sqm of high our international experience and knowhow. tise is ACB’s image, I would say that what makes our on the Avenue? It brought me a different perspective, a different way of quality A space and expanding of Airport city business park unique among the many I’ve seen is the The central ACB Avenue is undoubtedly the heart There was the kids’ carnival and red nose comic relief thinking and insight into relations than the one I grew up towards Toshin bunar. What is the construction plan for the new section of atmosphere it has developed over the last years. And that and soul of the business park. Was that intentional event, which was wonderful and probably showed the with. All my professional and personal experience in Belgrade It means another 4 building as addition to exi- the business park? image is one of a “city within a city”, which began as a or inevitable? Avenue at its most beautiful – with laughing children and environment has brought me new confidence – confidence sting 7 and existing 87.000 sqm GLA. The new office buildings will be significantly larger than the slogan but has grown into a reality. We have an image of The space was created for the Avenue to become the li- clowns and stilt walkers and jugglers and lots of colour that is based on success.
Recommended publications
  • Belgrade Rocks - New York Times
    Belgrade Rocks - New York Times http://travel.nytimes.com/2005/10/16/travel/16belgrade.html?ei=5070... October 16, 2005 Belgrade Rocks By SETH SHERWOOD Correction Appended NIGHT falls in the capital of the former Yugoslavia, and music fills the air. Everywhere. Along the banks of the Danube and Sava Rivers, serpentine chains of music-blasting splavovi - floating raft clubs - snake into the inky Balkan night. Fortified by huge meat-kebab dinners and Turkish coffees from Belgrade's myriad cafes, crowds of night owls line up to partake variously of Gypsy bands, electronic mixes, rock 'n' roll and a distinctly Serbian hybrid known as Turbofolk. As a parade of Puma-clad feet files down the metal gangway to a club called Exile, the night's marquee D.J., the New York City-based techno producer John Selway, prepares for his 2-to-6 a.m. set. "The most fun places to play are here, South America and Japan!" he shouts over rapid-fire industrial beats, praising the energy of the night life in the capital of Serbia and Montenegro, the name for what is left of Yugoslavia after its unraveling in the early 90's. "They're interested in new music and in building a scene!" Across the water, the lighted dome of St. Sava Church and illuminated stone walls of the centuries-old Kalemegdan Fortress hover over the capital's skyline. Just six years ago, during 78 days of NATO bombings intended to quell President Slobodan Milosevic's attacks on ethnic Albanians in the nation's Kosovo province, that same panorama exploded routinely in flame and debris.
    [Show full text]
  • Conference Abstracts
    Belgrade University World Association of Soil and Water Faculty of Forestry Conservation (WASWC) INTERNATIONAL CONFERENCE ON “LAND CONSERVATION” – LANDCON 1209 SUSTAINABLE LAND MANAGEMENT AND CLIMATE CHANGES September 17-21, 2012 Danube Region/Republic of Serbia Conference Abstracts World Association for International Sediment European Society for Soil Water Management Institute Sedimentation and Erosion Initiative (ISI-UNESCO) Conservation (ESSC) “JAROSLAV ČERNI” Research (WASER) International Conference: Land Conservation – LANDCON 1209 INTERNATIONAL CONFERENCE ON „LAND CONSERVATION” – LANDCON 1209 SUSTAINABLE LAND MANAGEMENT AND CLIMATE CHANGES September 17-21, 2012 Danube Region/Republic of Serbia CONFERENCE ABSTRACTS Editors: Miodrag ZLATIĆ Stanimir KOSTADINOV Belgrade, 2012 1 International Conference on Land Conservation – LANDCON 1209 INTERNATIONAL CONFERENCE ON „LAND CONSERVATION” – LANDCON 1209 SUSTAINABLE LAND MANAGEMENT AND CLIMATE CHANGES September 17-21, 2012 Danube Region/Republic of Serbia Conference Abstracts Publisher: University of Belgrade, Faculty of Forestry Editors: Miodrag ZLATIĆ Stanimir KOSTADINOV Editorial Board: Miodrag ZLATIĆ - University of Belgrade, Faculty of Forestry, Belgrade, Serbia Stanimir KOSTADINOV - University of Belgrade, Faculty of Forestry, Belgrade, Serbia Nada Dragović - University of Belgrade,Faculty of Forestry, Belgrade, Serbia Slobodan PETKOVIĆ - University of Belgrade, Faculty of Forestry, Belgrade, Serbia Editorial Office: Faculty of Forestry Phone: +381 11 3053-990 Kneza Višeslava 1 Fax:
    [Show full text]
  • Referenc Lista
    Referenc lista Marija OSTOJIĆ - dipl.inž.šum. za pejzažnu arhitekturu odgovorni projektant – licenca br. 373 3934 03 odgovorni izvodjač radova - licenca br. 474 H503 13 Referenc lista uradjenih projekata, tehničkih kontrola, Poslova stručnog nadzora, izvedenih radova PROJEKTOVANJE 2002 *Objekat: Tržni centar ‘Mercator’, blok 31,Novi Beograd Investitor: “Mercator” d.o.o. Pasterova 14a, Beograd Projekat: Izmena projekta za ozelenjavanje terena oko objekta Projketna org.: “ARP” d.o.o., Beograd Datum: Novembar 2002. *Objekat: Poslovno – proizvodni centar Bulevar kralja Aleksandra, Beograd Investitor: “OKRUGLICA - IGM” , Beograd Projekat: Glavni projekat ozelenjavanja Projketna org.: “ARP” d.o.o., Beograd Datum: Novembar 2002. 2003 *Objekat: Benzinska stanica, blok 63, Novi Beograd Investitor: Korać Slobodan , Beograd Projekat: Glavni projekat ozelenjavanja Projketna org.: “ARP” d.o.o., Beograd Datum: Februar 2003. *Objekat: Poslovni objekat GTC,blok 30, Novi Beograd Investitor: GTC INTERNACIONAL DEVELOPMENTS, M. Pupina 165a, N. Beograd Projekat: Glavni projekat ozelenjavanja Projketna org.: “ARP” d.o.o., Beograd Datum: Mart 2003. *Objekat: Porodični stambeni objekat Investitor: G-din. Dragan Karadžić, Beograd Neznanog Junaka 21,Beograd Projekat: Glavni projekat ozelenjavanja sa analizom postojećeg stanja Projketna org.: Kompanija “KOLING” a.d., Beograd Datum: April 2003. *Objekat: O-1,G-1, Miljakovac III, Beograd Investitor: Građevinska Direkcija Srbije d.o.o., Beograd Projekat: Glavni projekat uređenja terena sa ozelenjavanjem Projketna
    [Show full text]
  • A New Identity for a Prosperous Future? 42Nd Isocarp Congress 2006
    Aleksandra Stupar, (Re)Symbolizing the Modern Heritage: A New Identity for a Prosperous Future? 42nd ISoCaRP Congress 2006 (Re)Symbolizing the Modern Heritage: A New Identity for a Prosperous Future? Introduction Built on the deserted marshlands between the historical cores of Belgrade and Zemun, New Belgrade was transmitting a strong political message of the new post-war Yugoslav society. Therefore, it accepted a ritual pattern well known for centuries and played an important role in a symbolical initiation of the newly established communist system. As the offspring of the Athens Charter and the huge political aspirations of President Tito, New Belgrade was established upon the principles of the Radian City project and Brasilia, although with its own uniqueness. Besides its competitive advantages over other parts of Belgrade metropolitan area, it was, from the beginning of its construction, the pivotal point of regime propaganda, accepted with great enthusiasm by the masses. Consequently, some of the first proposals for its development and the concept of the final project, clearly underline the importance of this urban entity in the modern life of the State and the Community. At the same time, a number of architectural sketches, models and photographs, used to document the impressive planning and building process, offer an interesting multi- layered story which expresses the ideals, values and imperatives of the state and its leader. However, after decades of more or less successful existence, this Modern (anti)utopia became a scene for a new 21st century experiment - the (re)symbolization of the modernist vocabulary, this time caused by the strong global forces.
    [Show full text]
  • Serbia Real Estate Today
    CONTENTS Contents 04,05 SERBIA AT A GLANCE 06,07 ECONOMY 08,09,10 EDUCATION 11 MOTIVATION PLATFORM 12,13 ACQUISITION OF REAL ESTATE 14,15 SERBIA OFFICE MARKET 16,17 BELGRADE SUBMARKETS 18,19 NEW TRENDS IN OFFICE SPACES 20,21,22 RETAIL MARKET 23 RETAIL WAREHOUSE MARKET 24,25,26 RESIDENTIAL MARKET 27 RESIDENTIAL LEASE 28 INDUSTRIAL MARKET 29 LAND 30,31 HOTEL MARKET 32,33 INVESTMENT MARKET 34,35,36,37 TAXATION ON REAL ESTATE IN SERBIA 38,39 CONTACT 40 MARKET PRACTICE 01 FOREWORD Dragan Radulovic, Managing Director With the very active first half of the year and throughout Serbia. In addition, a couple of globally announced projects by key international known brands are currently putting a lot of effort developers some being already present, the trying to secure the position within the existing others just watching for the opportunity to enter, shopping schemes, especially in larger cities like we could be optimistic at least when it comes to Belgrade, Nis and Novi Sad. the end of 2014 and the start of the year 2015. Residential market has for the past two years Serbian property market being as underdeveloped stabilized, both in terms of the sales prices and as as it is, becomes more attractive for the per the demand vs. supply ratio. Overall, the developers, seeing the present moment as most demand has been picking up from the second half favourable, especially having in mind the absence of 2013, and the well-defined residential concepts of the construction activity in the last couple of at key city locations, sell out within one year from years throughout all industry sectors, causing the end of construction.
    [Show full text]
  • Real Estate Industry in Serbia
    Serbia Investment and Export Promotion Agency Vlajkoviceva 3 11000 Belgrade phone: +381 11 3398 550 fax: +381 11 3398 814 [email protected] www.siepa.gov.rs Real Estate Industry in Serbia Contents Plaza Centers in Serbia .................................. 2 Key Information on Serbia .............................. 3 Why Invest in the Real Estate Industry in Serbia ....... 4 Overview of the Real Estate Industry Basic Industry Indicators .............................. 6 Office Market Trends .................................. 7 Residential Market Trends ............................. 9 Retail Market Trends .................................10 FDI in the Real Estate Industry .......................11 Africa-Israel Corporation & Tidhar Group in Serbia ...12 Acquiring Construction Land Land Classification ...................................14 Leasing Municipality Land ...........................15 Acquiring the Right to Use Land .....................16 Conversion of Agricultural Land .....................17 GTC International in Serbia ............................18 Construction Procedure Assessment of Urban Conditions ....................19 Construction Approval ...............................19 Land Development Fee Payment and Main Project Preparation .............................20 Notice of the Start of Construction...................20 Construction .........................................20 Occupancy Permit ...................................20 Registration in the Cadastre..........................21 Financing Options ...................................22
    [Show full text]
  • Resi Lease 011.Cdr
    RESIDENTIAL LEASING SERVICES 2019 © CBS INTERNATIONAL CBS International has in its offer Main Residential Areas Efficient analysis of Full support throughout the leasing process more than 2,500 high-quality client’s needs Ÿ Approaching the landlords and negotiations houses and apartments. Ÿ Vračar area offers contemporary Ÿ Market survey apartments and penthouses as well as Ÿ Evaluation of the achieved agreement terms elegant traditional villas Ÿ Sourcing out the for selected offers properties that Ÿ Dedinje/Senjak area offers residential Ÿ Reaching the final decision match the houses with spacious gardens along with Residential requirements Ÿ large apartments Leasing Final negotiation and signing the contract Ÿ Offers evaluation Ÿ Ÿ City Center offers one to four-bedroom 24/7 support We provide our clients with and short-listing salon type apartments and penthouses a thorough insight into Ÿ New Belgrade offers a range from Belgrade Residential Market, one-bedroom apartments to thus enabling them to find four-bedroom penthouses the right property that would WE COVER IT meet their residential needs. As our client, you will enjoy full support during and after Ø Tenant Representation negotiation process with the prospective landlord. Ø Landlord Representation CBS International has in its offer Main Residential Areas Efficient analysis of Full support throughout the leasing process more than 2,500 high-quality client’s needs Ÿ Approaching the landlords and negotiations houses and apartments. Ÿ Vračar area offers contemporary Ÿ Market survey apartments and
    [Show full text]
  • Investment in Our Clients' Best Interest
    Investment in our clients’ best interest The focus of our efforts and engagement is pri- Fokus na{ih napora i anga`ovanja usmeren je prvenstveno na zado- marily on client satisfaction, and hence our com- voljstvo na{ih klijenata ali i pokazuje na{u poslovnu filozofiju da pany philosophy is to be always one step ahead. We budemo uvek jedan korak ispred. To je razlog {to stalno usavr{avamo are continually perfecting the systems that underpin the function- sisteme na kojima po~iva funkcionisanje Airport City-ja i u kontinu- ality of Airport City and constantly investing strategically in their itetu zna~ajno investiramo u njihov razvoj, pre svega da bismo na{im development, primarily in order to allow our clients to reduce their klijentima omogu}ili smanjenje tro{kova i u{tedeli zna~ajna costs and save significant resources. Together with ACPM we are cur- sredstva. U ovom trenutku zajedno sa ACPM-om postavili rently focusing on an energy efficiency project as our top priority. We smo projekat energetske efikasnosti u `i`u na{ih aktivnosti. will endeavour to continue constantly launching new projects in the Trudi}emo se da i ubudu}e stalno pokre}emo nove projek- interests of maintaining ACB at the level of the best business com- te u interesu odr`avanja ACB-a na nivou najboljeg plex, Airport City CEO, Adir Elal, told Whats up. poslovnog kompleksa, kazao je za Whats up, direktor Airport continued on pg 04>> City-ja, Adir Elal. nastavak na strani 04>> 02 03 Your positive response to the 2011 Vizila Calendar reinforced Va{e pozitivne reakcije na kalendar Vizila 2011 u~vrstila su our belief that the environment we have here at Airport City nas u uverenju da je na{a sredina u Airport City-ju otvore- ACB supporting is open to both change and positive exchanges of the tradi- na za promene i pozitivnu razmenu tradicija i kultura koje tions and cultures that coalesce at our business park.
    [Show full text]
  • Belgrade Rocks
    October 16, 2005 Belgrade Rocks By SETH SHERWOOD Correction Appended NIGHT falls in the capital of the former Yugoslavia, and music fills the air. Everywhere. Along the banks of the Danube and Sava Rivers, serpentine chains of music-blasting splavovi - floating raft clubs - snake into the inky Balkan night. Fortified by huge meat- kebab dinners and Turkish coffees from Belgrade's myriad cafes, crowds of night owls line up to partake variously of Gypsy bands, electronic mixes, rock 'n' roll and a distinctly Serbian hybrid known as Turbofolk. As a parade of Puma-clad feet files down the metal gangway to a club called Exile, the night's marquee D.J., the New York City-based techno producer John Selway, prepares for his 2-to-6 a.m. set. "The most fun places to play are here, South America and Japan!" he shouts over rapid- fire industrial beats, praising the energy of the night life in the capital of Serbia and Montenegro, the name for what is left of Yugoslavia after its unraveling in the early 90's. "They're interested in new music and in building a scene!" Across the water, the lighted dome of St. Sava Church and illuminated stone walls of the centuries-old Kalemegdan Fortress hover over the capital's skyline. Just six years ago, during 78 days of NATO bombings intended to quell President Slobodan Milosevic's attacks on ethnic Albanians in the nation's Kosovo province, that same panorama exploded routinely in flame and debris. This night, with Mr. Milosevic on trial in The Hague and Belgrade's doors open to the West, it's only the lights from Exile's open-air dance floor that flash in the night sky.
    [Show full text]
  • SINGIDUNUM UNIVERSITY Department of Postgraduates Studies
    SINGIDUNUM UNIVERSITY Department of Postgraduates Studies Study Program Business Systems in Tourism and Hospitality MASTER THESIS MICE Tourism and Sustainable Development - The Challenge and Potential for Belgrade Mentor: Candidate: Professor Jovan Popesku, PhD Sladjana Skopljak Kresović 405638/2013 Belgrade, July 2015 TABLE OF CONTENTS Introduction ......................................................................................................................................3 Subject of the research .....................................................................................................................5 Goal of the research .........................................................................................................................5 Research hypotheses ........................................................................................................................6 Research methods ............................................................................................................................6 PART ONE – MICE TOURISM IN THEORY AND PRACTICE 1.1. Definition of MICE tourism.................................................................................................6 1.2. The MICE industry in figures ..............................................................................................7 1.3. Typology of MICE tourism .................................................................................................8 1.3.1. Meetings ...................................................................................................................9
    [Show full text]
  • Valuation & Advisory
    Regional Capabilities VALUATION & ADVISORY COVERING THE REGION CBS International is a member of Cushman & Wakefield Alliance, a leading global real estate services firm, operating with 53,000 employees in more than 60 countries worldwide. Cushman & Wakefield is among the largest commercial real estate services firm with revenue of $8.8 billion across core services. It is present through fully owned and affiliate offices in all capital cities in the SEE region. CBS International as a regional leader enters 2nd decade of impeccable performance, covering a broad rangeof integrated services including: office agency, retail agency, residential sales and lease agency, industrial& land agency, valuation & development advisory, capital markets, market research, project management,property and facilities management, marketing. CBS International is managing offices in Serbia, Croatia, Montenegro and North Macedonia with 120+ employees. Hall of Fame Awards 2020 / The Best Real Estate Consultancy in Central and Southeast Europe / The Best Retail Real Estate Agency in Central and Southeast Europe. 2019 Euromoney Awards / Top Real Estate Advisor Overall, Top Valuation Consultant, Top Letting/Agency, Top Research Consultant. 2019 CIJ Awards / Best Commercial Real Estate Agency SEE / Best Commercial Real Estate Agency Serbia / Best Project Management Company of the Year 120+ EMPLOYEES 4 COUNTRIES 12+ YEARS MARKET PRESENCE IN THE REGION 280,000 sq m LEASED IN THE LAST 3 YEARS CORE SERVICES • Property valuations in accordance with International • Bank
    [Show full text]
  • RESEARCH REPORT Belgrade Office Market Q2 2014
    RESEARCH REPORT Belgrade Office Market www.cbre.rs Q2 2014 HOT TOPICS BELGRADE OFFICE STOCK • In Q2 2014, the vacancy rate The speculative office stock of half a million sq m of GLA remained unchanged further dropped below 10% (as during H1 2014. At the moment, Belgrade contemporary supply exceeds 734,000 compared to the total stock) sq m of GLA, out of which 70% is speculative, i.e. 513,000 sq m and 28% owner • Due to the lack of new supply, the occupied space, or 221,000 sq m. market becomes undersupplied of quality office spaces as at the BELGRADE OFFICE STOCK (SQ M GLA) moment only few office buildings may accommodate requests of Speculative Class A Stock Speculative Class B Stock Owner-Ocuppied stock Total Completions over 500 sq m as a compound 600,000 unit 500,000 400,000 m GLA m Sq 300,000 200,000 Serbia essentials 100,000 Population 7,186,862 (Census 2011) 0 Average salary (EUR) 388 2005 2006 2007 2008 2009 2010 2011 2012 2013 June 2014 Total completions include Speculative Completions and Owner-Occupied Completions Average Household Source: CBS International, part of the CBRE Affiliate Network, locally prepared 477 Expenditure (EUR) Q1 2014 Unemployment rate (Labor Force 20.3% Survey – Q2 2014) At the moment, the office market faces the lack of new supply and no large GDP -1.1% projects have commenced construction. Only small-scale projects are either under Q2 2014 (y-o-y) construction, either being done in shall and core condition, waiting for the future CPI 2.1% tenants for the final completion.
    [Show full text]