2.4 Pending OMs on account of COMMENTS of various Dtes As On 08.06.2011 SN Acc. Date Rly Particulars of Accident Date Of Issue Of Railway Dte whose remarks are still awaited Preliminary CRS’ Final CCRS’ Final M/o Rlys.’ Board File DTE Date of Date Of Reminders Report Report Note O.M. No. of forwarding 1 25.08.05 CR Unusual occurrence of fire to the Pantograph of coach of L-13 Dn 12.09.05 25.10.05 18.07.06 Pending 2005/Safety(Safety(A&R) AMCE 20.07.06 20.03.07, 17.07.08, Lonavala-Pune local train between Vadgaon and Talegaon A&R)/1/18 05.11.08, 03.03.09, stations of Pune Division of Central Railway on 25.08.2005. 12.05.09, 15.07.09, 24.02.10, 27.04.10, 2 26.02.06 SWR Unusual iincidence of train No. 234 down Bangalore City – 29.03.06 23.05.06 11.09.06 Pending 2006/Safety AM(W) 13.12.06 20.03.07,11.06.10, 06.03.09,10.09.10, Mysore passenger being grazed by a tipper lorry No. KA 03 – (A&R)/1/03 12.05.09, 02.07.09, 2675 belonging to construction department of South Western 08.01.10, 24.02.10, Railway at km 36/700 – 800 between Bidadi and Ramanagaram 27.04.10, 11.06.10, stations in Bangalore – Mysore single line non-electrified BG 10.09.10, 20.09.10, section of Bangalore division of South Western Railway at about 24.01.11, 20.04.11, 17.30 hrs on 26.02.2006. 24.05.11

3 12.01.07 ECR Derailment of Panipath Goods Up Special between Kumandih & 01.02.07 10.07.08 30.06.10 Pending 2007/Safety( DG(RPF) 02.07.10 10.09.10, 20.05.11, Hehegara at the bridge 297 on Barkakana-Gharwa Road section A&R)/1/2 24.05.11 of Dhanbad Division of East Central Railway on 12.01.2007.

4 09.12.07 NFR Derailment of 14 coaches of 4055 Dn Brahmaputra Mail between ------23.04.08 19.11.10 Pending 2008/Safety( AMCE 19.01.011 09.02.11, 15.0.4.11 Rangapani and Nijbari Stations on New Jalpaiguri-Barsoi Junction A&R)/1/5 section of Katihar Division of Northeast Frontier Railway on 09.12.2007. 5 14.12.07 NR Collision of 4629 Up Ludhiana Firozpur Sutlej Express with a mini 30.01.08 12.05.08 29.08.08 Pending 2008/Safety( AMCE 02.09.08 05.03.09, 23.06.09, bus No. PB-29 E 9482 at Manned Engineering Level Crossing A&R)/1/2 07.01.09, 15.01.101, gate No.40-C Class located at Km. 48/8-9 between Jagraon and 22.07.10, 14.09.10, Ajitwal Railway station on Ludhiana-Firozpur sections of Firozpur 20.09.10, 24.01.11, Division of Northern Railway which took placed at about 08.20 20.04.11, 24.05.11 hrs on 14.12.2007.

6 23.12.07 CR Derailment of TL-17 Dn CSTM-Titwala EMU Suburban Local 28.01.08 18.02.08 11.08.08 Pending 2008/Safety( between Kurla and Vidyavihar stations on DN slow line on Cross A&R)/1/1 over No.168 of Kurla-Kalyan BG/DC electrified quadruple line section of Mumbai Division of Central Railway at Km. 16/03-04 at about 11.23 hrs on 23.12.2007.

7 20.03.08 SR Derailment of train No.727 Madurai-Kollam Up Passengerat Km. 08.04.08 08.04.08 29.07.09 Pending 2008/Safety( 315/800-316/300 between Valliyur and Aralvaymoli Stations on A&R)/1/4 Tirunelveli-Nagrcoil BG /Non electrified single Section of Trivandrum Division on Southern Railway at about 03.55 hrs on 20.03.2008. 2.4 Pending OMs on account of COMMENTS of various Dtes As On 08.06.2011 SN8 08.06.08Acc. Date ECR Rly Dashing of tractor trolleyParticulars with 318 of DnAccident Darbhanga – katihar 10.07.08 13.02.09Date Of Issue12.05.11 Of Pending 2008/Safety/Railway Dte whose remarks are still awaited passenger train at construction/work site at Km. 133/11-12 (A&R)/1/09Board File between sahibpur Kamal and Umesh Nagar Railway stations on No. of Barauni – Katihar B.G. single Line ,Non Electrified section of Safety(A&R) Sonpur Division of East Central Railway at about 09.50hrs on 08.06.08. 9 07.07.08 CR Head on Collision between two Multiple Unit Locomotives 31.07.08 23.09.08 28.07.09 Pending 2008/Safety( between Ghorpuri Yard and Hadapsar station near gate No.68 at A&R)/1/11 Km.194/8 on Non-Electrified BG Double Line of Pune-Daund Section of Pune Division of Central Railway at o4.50 hrs. on 07.07.08. 10 01.08.08 SCR Fire in 5 coaches of Train No.2738 DN Goutami Express at 12.09.08 24.04.09 01.01.10 Pending 2008/Safety( Km.425/12-16 between Kesamudra –Tadlapusapalli stations on A&R)/1/15 Kazipet - Vijayawada BG Electrified Double Line Section Group ‘A’ Route of Secunderabad Division, South Central Railway at 01.02 hrs on 01-08-2008. 11 31.08.08 NCR Unusual Occurrence of dashing of tractor trolley with 4005 Up 08.09.08 10.11.08 11.05.10 Pending 2008/Safety( Lichchavi Express at West Cabin of Sikandarpur Station of Tundla- A&R)/1/16 Ghaziabad Section of Division of North Central Railway on 31.8.2008. 12 05.02.09 NR Unusual occurrence to the passengers of train no.5 LCM LJN 02.03.09 28.10.09 06.04.11 Pending 2009/Safety( –CNB MEMU passenger train at construction/ worksite at A&R)/1/4 unmanned level crossing no.8-C at KM 12/7-9between Amausi and piparsand railway stations on -, Broad Gauge double line, Electrified Section of Lucknow Division of Northern Railway at about 19.05 hours on 05.02.09.

13 29.04.09 SR Head on Collision of rake of MT 3 Chennai – Tiruvallur Down 20.05.09 04.11.09 11.05.10 Pending 2009/Safety( EMU local with 350 UP Pilot on up slow line at Vysarpadi – A&R)/1/8 Jeeva station in Chennai–Arakkonam Quadruple Electrified Line in Chennai Division of Southern Railway on 29.4.2009 at 05.01 hours. 14 12.05.09 CR Unusual occurrence of Flashingof Pantograph resulting in 10.06.09 17.07.09 27.12.10 Pending 2009/Safety( sparking in N4 Up suburban local train between Shahad and A&R)/1/11 Kalyan stations on Electrified BG Double Line of Kasara- Kalyan section of Mumbai Division of Central Railway at 7.25 Hrs. on 12.05.2009. 15 11.11.09 CR Derailment of 6210 UP Mysore – Ajmer Express at Kms 57/4 at 26.11.12 17.02.10 04.05.11 Pending 2009/Safety/ Jejuri station of Pune –Miraj Section of Pune Division of Central (A&R)/1/21 Railway at 18.34 hrs on 11.11.2009 2.4 Pending OMs on account of COMMENTS of various Dtes As On 08.06.2011 SN16 14.11.09Acc. Date NWR Rly Derailment of 2462 DnParticulars Jodhpur – of Accident Mandore Express at Km. 10.12.09 15.12.10Date Of Issue01.03.11 Of Pending 2009/Safety/Railway Dte whose remarks are still awaited 199/4-199/0 between Jhir & Jatwara stations of Jaipur – Bandikui (A&R)/1/23Board File BG single line non electrified section of jaipur Divion of North No. of Western Railway at about 01.30 hrs of 14.11.2009. Safety(A&R)

17 04.12.09 SWR Unusual Incident of tractor /JCB hitting Train No. 237 Mysore 01.01.10 07.06.10 07.02.11 Pending 2009/Safety( –Bangalore passenger between Channapatna and Ramanagaram A&R)/1/26 stationsof BG Non Electrified Single line section in Bangalore Divion of south Western Railway on 04.12.09.

18 02.01.10 NCR Rear–end collision of 2418 Dn at Km.1030/22- 22.01.10 08.04.10 02.11.10 Pending 2010/Safety( 20 between Bhaupur and Panki stations with 2556 Dn A&R)/1/2 at about 08.46 hrs on 02.01.10 on Tundla – Kanpur, section of Allahabad Division of North Central Railway.