Switzerland by Rail 2 Switzerland by Rail | ABB Review 2/2010 - Reprint Switzerland by Rail
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
A Construction Project Serving Europe – Factfigures
NEW RAIL LINK NEDERLAND THROUGH Rotterdam THE ALPS (NRLA) Duisburg Zeebrugge Düsseldorf A ONCE-IN-A- Antwerpen Köln CENTURY PROJECT Gent Mechelen Aachen FOR EUROPE Montzen DEUTSCHLAND BELGIË Mannheim Karlsruhe FRANCE Freiburg im Breisgau Basel SWITZERLAND Gotthard Base Tunnel Lötschberg Base Tunnel Domodossola Luino Ceneri Base Tunnel Chiasso Novara Milano ITALIA Genova © Federal office of transport FOT transport office of © Federal FACTS AND FIGURES NRLA The New Rail Link through the Alps (NRLA) is the largest railway construction project ever undertaken in Swiss history. It includes the expansion of two north- south axes for the rail link. The main components of the NRLA are the Lötsch- berg Base Tunnel, the Gotthard Base Tunnel and the Ceneri Base Tunnel. Since 2007 Successful operation of the Lötschberg Base Tunnel 11 December 2016 Commissioning of the Gotthard Base Tunnel The world’s longest railway tunnel will be commissioned on schedule on 11 December 2016. Up to 250 freight trains a day will then travel on the Gotthard axis instead of 180 previously. Transalpine rail transport will become more cost-effective, flexible and rapid. 2020 Opening of the Ceneri Base Tunnel 2020 Four-metre corridor on the Gotthard axis The expansion of the Gotthard axis to create a larger tunnel profile is a key part of the Swiss policy of transferring freight from road to rail. It will enable semi- trailers with a four-metre corner height to also be loaded onto railway wagons for transport on the Gotthard axis on a continuous basis. This further fosters the transfer of transalpine freight transport from road to rail. -
Thought Leadership Award 2019
Press Release July 19, 2021 Swiss Federal Railways CEO Vincent Ducrot defends top position in CEO Image Ranking − Vincent Ducrot, CEO of Swiss Federal Railways (SBB), once again wins Sonntagszeitung‘s Swiss CEO Image Ranking. His results are positive after one year in office. − Glencore CEO Ivan Glasenberg remains on second place towards the end of his term and scores points with climate protection targets. Holcim CEO Jan Jenisch climbs to the third place in the ranking. − However, the CEOs on the lower places of the ranking are increasingly facing criticism. Vincent Ducrot, CEO of Swiss Federal Railways (SBB), defends his top position in the CEO Image Ranking in the second quarter of 2021. The ranking was published by Sonntagszeitung. He thus repeatedly leads the ranking, for which UNICEPTA analyzed the media presence of the CEOs of all Swiss companies on the SMI as well as Coop, Glencore, Migros, SBB and Swiss Post. The result is positive overall after more than one year in office. Ducrot has changed the corporate culture to the better, among other things by being a “railwayman”, Basler Zeitung sums up. Tages-Anzeiger adds: “The employees were suddenly more satisfied and motivated. And most importantly, trust in the leadership grew strongly." An extensive employee survey that strengthened Ducrot's image in the first quarter is still resonating positively. Glasenberg (Glencore) scores points towards the end of his term, Jenisch (Holcim) reorganizes the company There is no change on the second place in the second quarter of the year either. Glencore CEO Ivan Glasenberg, who was succeeded by Gary Nagle on July 1, scores with the company’s dedicated climate protection targets. -
500-Year-Old Sturgeon Found in Danish Royal Shipwreck
12 Established 1961 Lifestyle Features Sunday, September 6, 2020 An Italian military attache stands as Swiss President Simonetta Sommaruga (right) attends a press conference on the A picture taken in Camorino, southern Switzerland during the inauguration of the Ceneri Base railway tunnel shows a eve of the inauguration of the Ceneri Base railway tunnel. — AFP photos train arriving. witzerland opened its Ceneri tunnel on the border before crossing the landlocked country. between the north and south of the mountainous Friday-completing a mammoth project cut- “This is the final link that gives us a flat line country. Sommaruga cut the ribbon at the northern Sting a new route through the Alps which straight through the Alps,” Swiss Federal Railways end as the first freight train passed through, head- should transform rail links between northern and chief executive Vincent Ducrot told AFP at the tun- ing south. southern Europe. After opening the Lotschberg nel’s media launch on Thursday. “In the future, we “This new train line through the Alps is the Base Tunnel in 2007 and the Gotthard Base Tunnel will be able to have freight trains 750 meters long project of the century for our country,” the presi- in 2016, the Ceneri in Switzerland’s southern Ticino that can carry up to 2,100 tons of goods” per con- dent told AFP. “It is the biggest investment we region is the final stage of the New Railway Link voy, he said, highlighting the environmental bene- have ever made,”, she said, calling it “a strong through the Alps project. The route should ease fits. -
Case Study Elasticity for the Slab Track in the Gotthard Base Tunnel, (CH)
Case Study Elasticity for the Slab Track in the Gotthard Base Tunnel, (CH) The project of the century: With 57 kilometres the world's longest railway tunnel Highest requirements: Outstanding material properties over the entire service life Optimised solution, comprehensive project support and just-in-time logistics Elastic Sylodyn® Insertion Pads for Sleeper Boots in the World's longest Railway Tunnel Description of the project Prestigious project with highest Gotthard Base Tunnel requirements in terms of railway Altdorf Overall length 57 km technology Altdorf/Rynächt Length 4.4 km t 57 kilometres in length, the A Gotthard Base Tunnel is cur rently Erstfeld the longest railway tunnel in the world. Erstfeld Length 7.8 km It links the Swiss communities of Erst- feld and Bodio. The tunnel forms part Amsteg of the New Railway Link through the Alps (NRLA), which is at present the Amsteg largest construction project in Swit- Length 11.3 km zerland. With the construction of this "project of the century", north/south railway transit trafic will be further Sedrun improved, meaning that transit trafic Sedrun can be moved off the roads and onto Length 9.2 km the railways. More over, travel time for public transport services will be sig- Andermatt niicantly reduced – in conjunction with the Ceneri Base Tunnel which is currently being constructed – (the Faido travel time from Zurich to Milan will be Length 12.9 km cut by one hour), thereby considerably increasing the attractiveness of rail- way travel compared with taking the Ariolo car or plane. In future, passenger and freight trains will pass through the Faido tunnel at speeds of up to 250 km/h. -
Railway Stations Adapting to Future Society Railway Stations Adapting to Future Society
Railway Stations ADAPTING TO FUTURE SOCIETY Railway Stations ADAPTING TO FUTURE SOCIETY CONTENTS 3 FOREWORD BY UIC DIRECTOR-GENERAL 5 UIC STATION MANAGERS GLOBAL GROUP 7 HISTORY OF STATIONS: EVOLUTION OF THE CONCEPT 03 MODEL OF STATION CONCEPT 11 OPERATION faCELIFT: MAJOR PROJECTS STATION RENOvaTION POLICIES, TRENDS AND CHALLENGES 60 A QUICK LOOK AT SOME STATIONS AROUND THE WORLD... 70 BIBLIOGRAPHY Railway Stations ADAPTING TO FUTURE SOCIETY FOREWORD BY UIC DIRECTOR-GENERAL JEAN-PIERRE LOUBINOUX tations emerged alongside railways, as the Stations have gradually become organised, transfor- In the visual representations you will see the chan- staging-posts of this new industrial era. med and developed to host all those passing through ging relationships between station stakeholders. They increased in number as railways deve- – whether travellers or not – and to offer board, lod- As well as a depiction of how the concept of a “sta- loped into networks that, in turn, could only ging, or other everyday services. And since we must tion” has changed over time and the interaction Sdevelop alongside stations. From the outset, stations always go via somewhere in order to go anywhere, between stations and their urban environment, two 3 have been essential to the departure, the passage stations have become an interface between all the slides explain complex phenomena which vary ac- and the arrival of trains, and to the ebb and flow of various modes of mobility – trains, metro, buses, cars cording to the context and reality of each country all the travellers they carry. A railway network can and bicycles. They have thus become mediators and and even each station, all focusing on a complex web be seen as lines irrigating a geographical area in the organisers of daily mobility. -
Gotthard Base Tunnel the World's Longest Railway Tunnel
Gotthard Base Tunnel The world's longest railway tunnel Dr. Renzo Simoni AlpTransit Gotthard AG LZ01-371164 1 The NRLA under the Gotthard Final breakthrough LZ01-371164 2 The NRLA under the Gotthard Transalpine goods traffic LZ01-371164 3 The NRLA under the Gotthard Journey times Zurich − Lugano / Basel − Lugano LZ01-371164 4 The NRLA under the Gotthard FinöV (Financing Public Transport) decision 1998 LZ01-371164 5 The NRLA under the Gotthard A flat railway route through the Alps LZ01-371164 6 The NRLA under the Gotthard Key features of the only flat railway route through the Alps • Newly constructed twin-track route • Mixed operation • Maximum speed passenger trains: 250 km/h • Maximum speed goods trains: 160 km/h • 50 – 80 passenger trains per day • 220 – 260 goods trains per day • Loaded vehicles: max. height 4.2 m • Max. Gradient: ≤ 12.5 ‰ • Min. Radius: ≥ 5,000 metres • Useful life: 100 years • Max. temperature: 40° C LZ01-371164 7 The NRLA under the Gotthard Challenge – Implementation of organisation • Direct management, simple control • Transparency through direct parliamentary control • Clear allocation of responsibilities, best governance • Efficiency thanks to lean organisation (short paths, simple decision processes) LZ01-371164 8 The NRLA under the Gotthard Interest partners LZ01-371164 9 The NRLA under the Gotthard Allocation of Public Transport Financial Fund (FinöV) NRLA (45%) Heavy road vehicle New Rail Link through the Alps tax (64%) Rail 2000 Phase 1 and ZEB (44%) ZEB: Future Development of the Railway Infrastructure Fund for the Oil tax financing of (23%) public transport HSR (4%) European High-Speed Rail Network Value added tax Noise mitigation (VAT) (13%) (7%) LZ01-371164 10 The NRLA under the Gotthard Swiss Government Decision c. -
Swiss Railway Company Improves Train Reliability with Trusted
Case Study © SBB CFF FFS Swiss Railway Company Swiss Federal Railways SBB CFF FFS (commonly known as Swiss Federal Improves Train Reliability Railways), the largest railway company in Switzerland, With Trusted Hirschmann upgraded its onboard vehicle Ethernet network services Solution with a breakthrough solution to carry it into the future. Industry-leading railway company continues 10+ year relationship with Hirschmann for stronger Ethernet network reliability. Project Overview To continually push industry frontiers and remain competitive, innovative companies rely on partners who are willing to take the journey with them. The transportation industry is no exception and relies heavily upon partners and suppliers that allow them to innovate and stay ahead of industry trends and capabilities. Rail travel is in the middle of an industrywide renaissance, requiring railway operators to get ahead just to stay in the game. Improvements to onboard safety, entertainment and information access are just a few of the services rail companies are upgrading to deliver a comfortable and productive travel experience to passengers. Operating the densest public transportation network in the world, SBB CFF FFS is the largest railway company in Switzerland and handles most of the country’s national and international traffic. In 2017 alone, the rail operator provided 19 billion passenger kilometers and transported an average of 210,000 net tons of cargo per day, equating to the management of 10,000 trains per day. To ensure they continued to push the • Train passengers expect to be comfortable switches through its channel partner, innovation envelope for modern rail and connected, with consistent access ANNAX, to the railway operator – many travel, SBB turned to its trusted supplier, to schedule information and high-quality of which are still in service. -
Chronology of a Project of the Century Milestones in the Construction History up to 2010
13.08.2010 LZ01-210755-v3 Chronology of a Project of the Century Milestones in the Construction History up to 2010 1947 Carl Eduard Gruner, engineer and urban planner from Basel, sketches the visionary idea of a Gotthard Base Tunnel as an element of a rapid transit system. 1960s In 1963, the Swiss Federal Government establishes a committee for a "Railway Tunnel through the Alps". It evaluates various base-tunnel solutions and in 1970 recommends construction of a Gotthard base tunnel from Erstfeld to Biasca. 1970s A new committee is set up to review the proposed variants again. However, political disagreement between the proponents of the Gotthard, Simplon and Splügen routes, as well as an economic recession, block the tunnel project. In 1971, the Swiss Federal Council assigns to Swiss Federal Railways (SBB) the task of elaborating the construction project for the Gotthard base route Erstfeld-Biasca to allow rapid implementation of construction work. The construction project is presented in 1975. 1980s In 1983, the Swiss Federal Council concludes in a report that a new rail link through the Alps is "not urgent". In 1986, new evaluation studies investigate variants for a continuous flat route from the northern edge of the Alps to the southern border of Switzerland. After formal consultation with the cantons, in 1989 the Federal Council decides on implementation of a so-called "network variant", which proposes a combination of a Gotthard base tunnel, a Lötschberg base tunnel, and a Hirzel tunnel to provide a link to eastern Switzerland. 1992 May 2 In the Through Traffic Agreement with the European Union, Switzerland commits to providing the agreed traffic capacities. -
Update on Investments in Large TEN-T Projects ______
Update on Investments in Large TEN-T Projects ____________________________________________________________________________________________ DIRECTORATE GENERAL FOR INTERNAL POLICIES POLICY DEPARTMENT B: STRUCTURAL AND COHESION POLICIES TRANSPORT AND TOURISM UPDATE ON INVESTMENTS IN LARGE TEN-T PROJECTS STUDY Policy Department B: Structural and Cohesion Policies ____________________________________________________________________________________________ This document was commissioned by the European Parliament's Committee on Transport and Tourism. AUTHORS Fraunhofer, Institut für System- und Innovationsforschung, Germany - Wolfgang Schade, Lucia Mejia-Dorantes Karlsruhe Institute of Technology, Germany - Werner Rothengatter ProgTrans, Switzerland - Olaf Meyer-Rühle, Stephan Kritzinger RESPONSIBLE ADMINISTRATOR Marc Thomas Policy Department B: Structural and Cohesion Policies European Parliament B-1047 Brussels E-mail: [email protected] LINGUISTIC VERSIONS Original: EN EDITORIAL ASSISTANCE Adrienn Borka ABOUT THE EDITOR To contact the Policy Department or to subscribe to its monthly newsletter please write to: [email protected] Manuscript completed in December 2014 © European Union, 2014. This document is available on the Internet at: http://www.europarl.europa.eu/studies DISCLAIMER The opinions expressed in this document are the sole responsibility of the author and do not necessarily represent the official position of the European Parliament. Reproduction and translation for non-commercial purposes are -
The NRLA Via Lötschberg, Gotthard and Ceneri, the New Rail Link Through the Alps
The NRLA Via Lötschberg, Gotthard and Ceneri, the New Rail Link through the Alps The NRLA The New Rail Link through the Alps (NRLA) is the centrepiece of Swiss transport policy. Switzerland has constructed a se- ries of high-performance rail links through the Alps, compris- ing three base tunnels and several auxiliary structures. Thanks to the NRLA, more trains can run through the Alps and with much shorter travel times. The high quality of passenger and freight travel is assured. The NRLA provides the basis for transferring traffic from road to rail, with the aim of protecting the Alpine environment. Close international cooperation is required in order to achieve the best possible availability, punctuality and quality in rail trans- port through Europe. Passenger transport The new north-south axis creates shorter travel times and more connections for passengers. Once finished, the NRLA will shorten travel time on the Gotthard route to just over two hours between Zurich and Lugano and around three hours between Zurich and Milan. On the Simplon route, which includes the Lötschberg Base Tunnel, the NRLA has reduced travel times by up to one hour. The Ceneri Base Tunnel will transform public transport con- nections in the canton of Ticino, with much shorter travel times in the Bellinzona – Locarno – Lugano triangle. There will be a direct connection between Lugano and Locarno, cutting up to 30 minutes off the journey. Freight transport The Ceneri Base Tunnel completes the NRLA project, a flat, faster rail link through the Alps that brings the north and south closer together. Freight transport capacity is in- creased, and gentler gradients on the Gotthard axis mean that trains no longer require additional traction. -
Challenges and Chances for SBB in Small and Mid-Sized Communities
Challenges and Chances for SBB in Small and Mid-sized Communities Railway Stations and Spatial Development in Small and Mid-sized Communities in Switzerland IRL – Institut für Raum- und Landschaftsentwicklung Professur für Raumentwicklung Imprint Editor ETH Zurich Institute for Spatial and Landscape Development Chair of Spatial Development Prof. Dr. Bernd Scholl Stefano-Franscini-Platz 5 8093 Zurich Authors Mahdokht Soltaniehha Mathias Niedermaier Rolf Sonderegger English editor WordsWork, Beverly Zumbühl Project partners at the SBB Stephan Osterwald Michael Loose SBB Research Advisory Board Prof. Dr. rer.pol. Thomas Bieger, University of St.Gallen Prof. Dr. Michel Bierlaire, EPFL Lausanne Prof. Dr. Dr. Matthias P. Finger, EPFL Lausanne Prof. Dr. Christian Laesser, University of St.Gallen Prof. Dr. Rico Maggi, University of Lugano (USI) Prof. Dr. Ulrich Weidmann, ETH Zurich Andreas Meyer, CEO of Schweizerische Bundesbahnen AG (Swiss Federal Railways, SBB). Project management Mahdokht Soltaniehha Mathias Niedermaier (Deputy) Print Druckzentrum ETH Hönggerberg, Zurich Photo credit Mahdokht Soltaniehha: Pages 8, 36 and cover photo Rolf Sonderegger: Pages 28 and 56 Data sources Amt für Raumentwicklung (ARE) Bundesamt für Statistik (BFS) Kantonale Geodaten AG, BE, SO, ZH Professur für Raumentwicklung, ETH Zürich - Raum+ Daten Schweizerische Bundesbahnen (SBB) swisstopo © 2015 (JA100120 JD100042) Wüest & Partner (W+P) 1 Final Report: SBB research fund Challenges and Chances for SBB in Small and Mid-sized Communities Railway Stations and Spatial Development in Small and Mid-sized Communities in Switzerland Citation suggestion: Scholl, B., Soltaniehha, M., Niedermaier, M. and Sonderegger, R. (2016). Challenges and Chances for SBB in Small and Mid-sized Communities: Railway Stations and Spatial Development in Small and Mid-sized Communities in Switzerland. -
Railway Base Tunnel Projects in Switzerland
Federal Department of the Environment, Transport, Energy and Communications Federal Office of Transport RAILWAY BASE TUNNEL PROJECTS IN SWITZERLAND Dr. Rudolf Sperlich Swiss Federal Office of Transport Zaragoza, October 31 th 2008 Introduction • Traffic policy CH • Financing: Public transport fund • Most important project: New Rail Link through the Alps (NRLA) • Supervision • Conclusions Dr. R. Sperlich / Zaragoza 31 th October 2008 2 The Alps A barrier for transportation Dr. R. Sperlich / Zaragoza 31 th October 2008 3 Transalpine Swiss freight traffic: subdivision and modal split Road 36.1 25.2 12.9 11.5 Rail 6.1 71.6 Mio. Net Tonnes / year Status: 2008 Dr. R. Sperlich / Zaragoza 31 th October 2008 4 Swiss Traffic evolution until 2030 + 54% 50 40 30 20 10 + 24% 0 2005 2010 2015 2020 2025 2030 Personenverkehr Güterverkehr Dr. R. Sperlich / Zaragoza 31 th October 2008 5 Elements of the Swiss transport policy Heavy vehicle Railway reform fee Shift from Modernization Agreement road to rail of railway Switzerland-EU Large railway infrastructure projects: Railway 2000 NRLA (NEAT) FDR (ZEB) Noise abatement High Speed Links Agglo-projects Dr. R. Sperlich / Zaragoza 31 th October 2008 6 Expenses for infrastructure 5000 4000 3000 Mio. sFr. sFr. Mio. Mio. 2000 Road 1000 Rail 0 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Dr. R. Sperlich / Zaragoza 31 th October 2008 7 Improvement of the railway network (large-scale projects until 2030) Public Transport Fund (FinöV) Ordinary Budget 2007-2010 Infrastructure Fund for Agglomeration Projects Dr. R. Sperlich / Zaragoza 31 th October 2008 8 New Railway link through the Alps: The first voting Information booklet 1992 Dr.