Cycling Strategy Implementation Plan As of October 2008 (New Information Provided in Bold)

Total Page:16

File Type:pdf, Size:1020Kb

Cycling Strategy Implementation Plan As of October 2008 (New Information Provided in Bold) Appendix A: Cycling Strategy Implementation Plan as of October 2008 (New information provided in bold) Staging 1= first Financial Responsible Council ID Strategic Issue Proposal and Actions stage, and Other Department / Branch 5=5th Partners Status stage A – Management and Implementation The Steering Group: Transport Management • To develop management Darebin Cycling Steering Group – Council to and Planning (TMP), Open COMPLETED A1 structures and processes form a cross party steering group and 1 - 5 Space, Bushland, within Council that support coordinate implementation of the Strategy Community and Safety, and realise the Engineering Design, implementation of the Leisure Services Cycling Strategy. Asset Management Plan – Council to extend • To integrate cycling into the Road Management Plan to encompass ONGOING – COUNCIL WORKING transport and land use A2 off road cycle and shared path facilities. 1 - 5 Asset Strategy INTERNALLY ON ASSET planning at all levels of Maintenance and Capital Improvements MANAGEMENT DATABASE Government, through sections to coordinate works. Council’s own actions and lobbying for change to the Integrated Planning Approach to Infrastructure – Improve cross departmental A3 State planning system. 1 - 5 The Steering Group discussion on projects through a regular ONGOING THROUGH REGULAR formal cross departmental project review. STEERING GROUP MEETINGS A – Advocacy and Leadership • To advocate for improved Promotion of Best Practice – Council to cycle facilities, an increased promote their considerable experience widely recognition of cyclists in through conferences and seminars (to A4 1 - 5 All departments ONGOING planning transport and land increase profile and assists in lobbying use and changes to activities) and raise awareness of skills and legislation (in particular best practice, internally. relating to Fringe Benefits In abeyance due to DEVELOPMENT Tax) to encourage cycling Advocate for the Completion of the PBN – OF NEW MELBOURNE CYCLE A5 at both a Federal and State Council to take an active role in advocating 1 - 5 TMP NETWORK EXPECTED AS PART OF level. the completion of PBN. MELBOURNE TRANSPORT PLAN • To develop partnerships and work with those State Level Integrated Planning – Council to In abeyance due to DEVELOPMENT advocate for an increased and explicit TMP, Open Space, OF NEW MELBOURNE CYCLE A6 partners to provide 1 - 5 improved cycle facilities, inclusion of cyclists in planning at a State Strategic Planning NETWORK EXPECTED AS PART OF develop cycle skills and level. MELBOURNE TRANSPORT PLAN 1 Appendix A: Cycling Strategy Implementation Plan as of October 2008 (New information provided in bold) Staging 1= first Financial Responsible Council ID Strategic Issue Proposal and Actions stage, and Other Department / Branch 5=5th Partners Status stage increase cycle ownership. WORKING THROUGH Federal Government – Council to advocate TMP, Strategic Planning, METROPOLITAN TRANSPORT A7 for policy decision that impact on cycling and 1 - 5 • To make cycling within Infrastructure Maintenance FORUM TO ADVOCATE FOR the take up of cycling. Darebin as safe as possible FEDERAL FUNDING FOR CYCLING through the implementation of this strategy by Council Partnerships – Council to develop existing A8 and by working in and established partnerships and form new 1 - 5 Various partnership with others. ones relating to the Strategy. ONGOING B - Education and Promotion • To actively promote cycling Mapping and General Information Provision – as a healthy, safe and Council to develop section of Council’s web B1 legitimate form of transport page to promote cycling events and activities 1 - 5 Coordinator, TMP DoT COMPLETED to the whole community and and include links to cycle websites and cycle in doing so improve the maps. relationship between Cycle Skills Training – Council to work in motorists and cyclists and Private partnership with cycle training providers in B2 pedestrians and cyclists. 1 - 5 Coordinator Sector ONGOING order to promote these courses and provide Providers • To ensure information, from assistance (e.g. venues) where possible. a range of sources, is widely available to the local Driver/Cyclist Awareness Education – community to support Council to actively identify and nominate cycling for transport, leisure Community Health and ONGOING B3 target localities and user groups and work in 1 - 5 VicRoads and tourism at all levels. Safety, coordinator partnership with VicRoads and others to deliver Share the Road programs. Cyclist/Pedestrian Awareness Education – Community Health and B4 Council to provide signing on shared paths to 1 - 5 VicRoads Safety, coordinator ONGOING raise awareness of general path rules. Older Adult Cycling Promotion – Council to Bicycle COMPLETED B5 support Bicycle Victoria initiative to increase 1 - 5 TMP Victoria cycling in the over 50 age group. B6 Social Rides and Events – Council to work 2 - 5 Leisure Bicycle ONGOING with Darebin BUG to promote social rides to Victoria a wider audience, including those attending Darebin 2 Appendix A: Cycling Strategy Implementation Plan as of October 2008 (New information provided in bold) Staging 1= first Financial Responsible Council ID Strategic Issue Proposal and Actions stage, and Other Department / Branch 5=5th Partners Status stage cycle training. BUG Route Specific Advice and Cycle Buddies – Council, in conjunction with Darebin BUG, to Darebin B7 1 - 5 Coordinator identify routes to specific destinations for BUG cyclists of varying abilities and confidences. Travel Planning in Schools – Council to Community Health and B8 commence a new Safe Routes To School 2 - 5 DoT Safety, coordinator ONGOING program. Cycle Hire – Council to work with cycle stores and recreational facilities in order to Cycle B9 1 - 5 Leisure, coordinator introduce cycle hire facilities for adults and Stores children. Central Facility - Council to trial a central impractical within Darebin, however Cycle facility that combines secure cycle parking, Economic Development, we support similar initiatives within B10 3 - 5 Stores lockers, showers, change rooms and cycle coordinator Melbourne CBD and will monitor of DOI maintenance. economic viability C - Generic Network Recommendations Local Area Traffic Management (LATM) C1 Schemes – Review future LATM proposals to 1 - 5 TMP ensure cyclists are not disadvantaged. ONGOING On Road Cycle Lanes – Consider provision C2 1 - 5 TMP, Engineering Design • To extend both on road and for cyclist in all aspects of road management. ONGOING off road facilities within Treatment at Intersections – Provide physical C3 Darebin to provide a measures at new intersections and at 1 - 5 TMP, Engineering Design comprehensive and existing intersections where necessary. ONGOING connected network that meets the needs of cyclists Coloured Surfacing on Cycle Lanes – C4 of all abilities and ages and Provide more prominent lanes especially at 1 - 5 TMP, Engineering Design ONGOING links with the wider intersections and other conflict points. metropolitan network Off Road Path Surfaces – Council to ensure Open Space, Bushland, Parks C5 level and safe connections where two paths 1 - 5 ONGOING TMP Victoria of different materials meet. C6 Off Road Path Design – Council to adopt a 1 - 5 Open Space, Bushland, Parks ONGOING higher standard of off road paths to allow for TMP Victoria 3 Appendix A: Cycling Strategy Implementation Plan as of October 2008 (New information provided in bold) Staging 1= first Financial Responsible Council ID Strategic Issue Proposal and Actions stage, and Other Department / Branch 5=5th Partners Status stage increased use of the network e.g. minimum 3m wide for all new paths. Cycle Path Planting and Landscaping – C7 Council to ensure appropriate and safe 1 - 5 Open Space, Bushland ONGOING planting adjacent to cycle paths. Cycling in Shopping Strips – Council to Shopping Cycle lanes and cycle parking develop a multi-faceted program to address Economic Development, Centre C8 1 - 5 improving in Broadway and the dangers of cycling through shopping TMP Manageme Edwardes Street, Reservoir strips. nt Off Road Trail Facilities – Council to provide major and minor pause places along off road Open Space, Bushland, Parks C9 1 - 5 ONGOING paths, incorporating shelter, seating, water TMP Victoria fountains and interpretative signing. Laneways – Council to evaluate the C10 importance of laneways as cycle routes prior 1 - 5 Asset Strategy, TMP ONGOING to laneway sale and closure. 4 Appendix A: Cycling Strategy Implementation Plan as of October 2008 (New information provided in bold) Priority Funding Indicative Timescale and/or cost ID Location Proposals and Actions 1=High; Status Key party 2=Medium; 3=Low 1. Transport Management and Planning Projects Cycle lanes between Regent St and Edwardes St. F2 Gilbert Road Completed Clearway lanes between Miller St and Regent St. F15 Chiffley Drive Cycle lanes between Dundas Road and Murray Road. Completed Albert Street to Darebin Creek. Eastbound use service G13 Wood Street road, then shared cycle/parking lane. Westbound use Completed shared cycle/parking lane for whole section. Gilbert Road to High Street via Railway – shared G15 Regent Street Completed cycle/parking lanes in both directions. Fairfield Station to Alphington Station – cycle lanes where G17 Wingrove Street road is ‘no stopping’ and shared cycle/parking lanes Completed where parking permitted. High Street to Arthur Street – section of shared G19 Mitchell Street Completed cycle/parking lanes where appropriate. Designate western footpath
Recommended publications
  • Draft 10 Year Bicycle and Pedestrian Projects
    Project Type Description Effect on Network Beneficiary Project Current 2019_20 2020_21 2021_22 2022_23 2023_24 2024_25 2025_26 2026_27 2027_28 2028_29 2029_30 manager Status Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Responsible for Delivery Annual DDA Upgrades/Improvements Footpath Upgrade of the pedestrian network to Improve access for people with mobility issues or Pedestrians Moreland Proposed Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Upgrade meet DDA standards requirements Council Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Annual Pedestrian Threshold Intersection Install threshold treatments to improve Pedestrians Moreland Proposed Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Treatments upgrade prestrian access and slow traffic Council Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Annual Bus Stop Improvements Public Upgrade of bus stops to improve access Pedestrians Moreland Proposed Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Transport Council Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Annual Bicycle Parking Bicycle Provide
    [Show full text]
  • Environmental Infrastructure Inquiry Submission S157 Received 28/09/2020
    Hume City Council – submission to Environment and Planning Committee Inquiry into Environmental Infrastructure for Growing Populations Terms of Reference: An inquiry into the current and future arrangements to secure environmental infrastructure, particularly parks and open space, for a growing population in Melbourne and across regional centres to the Environment and Planning Committee for consideration and report no later than 31 December 2020. 1. Introduction Hume City Council welcomes the opportunity to submit into the Environment and Planning Committee Inquiry into Environmental Infrastructure for Growing Populations in Victoria. To address the terms of reference for this inquiry Hume City Council submits on three key areas, these are: Section 2 - Community-focussed Open Space Mapping Section 3 - Delivery of effective walking and cycling infrastructure Section 4 - Delivery of Regional Parks Section 5 - Delivery of Waterway Corridors Section 6 - Protecting existing canopy cover in developments Section 7 - Funding opportunities for pipeline projects Section 8 - Addressing issues with the implementation of the Melbourne Strategic Impact Assessment. Section 9 - Implementation of Integrated Water Management For the purposes of this submission, Environmental Infrastructure has been defined to include all passive and active open space, conservation areas and waterway reserves, plus the infrastructure to support and connect those reserves including paths, trails, vegetation, and the management practices to support them. The submission will highlight contemporary policy and implementation concerns that need to be addressed, to pave the way for an integrated, sustainable, and socially responsible approach to environmental infrastructure. Council recently submitted into the Inquiry into Ecosystem Decline – many of the points covered in this submission are rearticulated here, as the issues cross over significantly.
    [Show full text]
  • Response 1 I Am Writing to You Regarding the Latest Agenda Item for the 23 June Council Meeting Regarding the Trial Transport Projects
    Response 1 I am writing to you regarding the latest agenda item for the 23 June council meeting regarding the trial transport projects. I have submitted a response for tomorrow's meeting but am messaging you here as my full submission is longer than allowed and seek some further information. The proposed transport, movement and access trials are a good initiative for public safety, health and improving the current road hierarchy, particularly to support cycling. The strategic move of not letting a good crisis go to waste is also appreciated and I fully support these trials in these times. However, a comprehensive analysis of traffic conditions (before and after), community consultation and transparent process must be adhered too. Traffic surveys and evidence to justify their permanency post-trial needs to be transparent and open for discussion via good community consultation. Concerns: Trenerry Crescent closure: - It is expected that this will cause significant delays to local community traffic in the Clifton Hill pocket bordered by Heidelberg Road to the north and Hoddle Street to the west. Without any southern access point, it will divert all traffic towards these major arterials. Whilst I understand this is the desired outcome and will prevent rat-running through this pocket (which there is a substantial amount of), it does require serious consideration of the impact to this community. It will cause significant delays for local traffic which will now be funneled towards these state arterial routes which already experience substantial congestion particularly at peak times. Further, there are 3 main exits for residents from this pocket, being Roseneath, Ramsden and Fenwick.
    [Show full text]
  • Recreational Activity Surveys During COVID-19 and Comparison with Pre-Lockdown Activity Levels
    More people out on bicycles: Recreational activity surveys during COVID-19 and comparison with pre-lockdown activity levels May 2020 Measuring recreational activity in unprecedented times Lockdown in Victoria On 30 March 2020, the Minister for Health and Medical Research signed an Order for stage 3 lockdown measures to be put in place across Australian states, following a national outbreak of the novel coronavirus. The Order, which in Victoria falls under section 200 of the Public Health and Wellbeing Act (2008)1, 2, places legally enforceable restrictions on all non-essential gatherings, as a means of minimising the spread of the deadly virus. During the stage 3 restrictions, there are only four reasons for Victorian residents to be outside: • purchasing food and essential supplies; • medical, care or compassionate needs; • exercise; and • work and study if they cannot be undertaken remotely2. How has this affected our recreational activities? An arising question is how these restrictions have affected the recreational needs of residents in Victoria and elsewhere. A recent survey by Bicycle Network3 found that, in response to stage 3 restrictions across Australian states: • 73 per cent [of respondents] are planning to use a bicycle to access essential services (shops, healthcare, work and education) in the coming weeks and months; • 84 per cent of healthcare workers said they would ride bicycles more or the same amount; and • Most respondents (39 per cent) said that they will be riding a bicycle outdoors to get their daily exercise. In addition, emerging data suggests an increase in bicycle purchases during lockdown restrictions4. These findings suggest that, given these increased needs for bicycle-related transport, exercise and recreation; Australian roads and shared paths may be exhibiting major deviations from normal bicycle traffic volumes.
    [Show full text]
  • Newsletter October 2010
    Newsletter October 2010 Boroondara BUG meetings are normally held on the 2nd Thursday of each month except January. Our next meeting is on Thursday 14 th October. It will be held in the function room at the Elgin Inn, cnr Burwood Rd and Elgin St, Hawthorn (Melway 45 B10). Optional dinner at 6.30pm, meeting starts at 7.30pm. The Boroondara BUG is a voluntary group working to promote the adoption of a safe and practical environment for utility and recreational cyclists in the City of Boroondara. We have close links with the City of Boroondara, Bicycle Victoria, and other local Bicycle Users Groups. Two of the positions on the Boroondara Bicycle Advisory Committee, which meets quarterly, are assigned to Boroondara BUG members. Boroondara BUG has a website at http://www.boroondarabug.org that contains interesting material related to cycling, links to other cycle groups, recent Boroondara BUG Newsletters and breaking news. Our email address for communications to the BUG is [email protected] We also have a Yahoo Group: Send a blank email to: [email protected] to receive notification when the latest monthly newsletter and rides supplement have been placed on the web site and very occasional important messages. All articles in this newsletter are the views and opinions of the authors and do not necessarily represent the views of any other members of Boroondara BUG. All rides publicised in the Rides Supplement are embarked upon at your own risk. Features Bicycle SA Annual Tour 2010 Introduction The Overland train is a comfortable and easy way of travelling to Adelaide with a bike.
    [Show full text]
  • Diamond Valley Bushwalking Club Inc
    DIAMOND VALLEY BUSHWALKING CLUB INC. VIC ASSOC No. A 0010907B WALKS PROGRAM J a n u a r y - J u n e 2 0 1 9 January 2019 Revd. 15 Jan. 2 Wed 6 Sun 9 Wed Walk: Start at Lysterfield Lake main car park. Follow Cassuarina Track through to Granite Track crossing Wellington Road up hill to Monbulk Creek Lookout, Dargon Homestead Site for lunch back via Granite Track visiting Boys Farm site on way back with variation of track return as voted on at the time. 12K approximately Easy/Medium walking on nice wide tracks. Meet Mullum Mullum car Park 8.00 for 8.15 departure. 12 Sat Winery Walk. Short 3 hour (9 kms) easy /medium walk through Panton Hill Bushland reserves ending up at Nillumbik Estate Winery for lunch. Maximum 20 people for lunch at $30 per head for pizza, nibbles and tea/coffee. Must purchase own wine/softdrink/beer etc. When booking state whether you are coming for walk only or for lunch as well. Prefer online bookings. Mel 264H6 16 Wed Ramble – Breakfast BBQ. 8.15am. Finns Reserve, near Wombat Bend Playspace. Bring everything! Orange juice & Champagne supplied. Ramble 5km. Weather dependent. Walk: Stiggants Reserve to Blue Tongue Bend. A favourite walk along the Yarra through Warrandyte State Park. Many scenic views of the river. E/M. 13 km. 20 Sun NB***Sunday Ramble. Herring Island, City of Melbourne. We follow the Yarra along the south side to the Island. A ferry trip across to the island, then a circular route is followed around this lovely area, after lunch we will return to city, on the north side of the Yarra.
    [Show full text]
  • Bicycle Volumes 2005-2013
    Bicycle Data Report (2005-2013 ) Bicycle Routes Daily Average Bicycle Volumes - Individual Site Within Inner Cordon - Group 1 [ Non Holiday - 5 Weekday, Seasonally Adjusted] Group 1 Sites 2,000 St Georges Road No.1 1,770 1,800 Main Yarra Trail, North Bank 1,640 ] 1,600 Main Yarra Trail, South Bank 1,600 1,530 1,460 Canning Street, Carlton 1,350 1,400 Upfield Railway Line 1,150 1,180 1,200 Footscray Road Path Gardiners Creek Trail No.1 1,000 840 Tram 109 Trail 800 Bicycle Volume Bicycle Royal Pde N Bound Lane 600 Royal Pde S Bound Lane St Kilda Rd N Bound Lane Average Daily Volume Per Year PerVolume Daily Average [ 400 St Kilda Rd S Bound Lane 200 Moreland St Path, Maribyrnong City Merri Creek Trail, Moreland City 0 2005 2006 2007 2008 2009 2010 2011 2012 2013* Napier St Path, Yarra City Year Albert St E Bound Lane, Melbourne City 2013* results are based on data collected between Jan 2013 to Aug 2013 Albert St W Bound Lane, Melbourne City Sum of Average Daily Bicycles on Major Bike Routes - Group 1 [ NOTE: Some of the selected sites in group1 were initiated in early 2008 and mid 2011 ] Group 2 Sites Anniversary Trail No.1 35,000 Main Yarra Trail No.1 30,000 Koonung Trail, Balwyn North 25,000 Capital City Trail, Princes Hill Bay Trail in St Kilda 20,000 Anniversary Trail No.2 Kew Bicycle Volume Per Year] PerVolume Bicycle 15,000 St Georges Road No.2 Gardiners Creek Trail No.
    [Show full text]
  • COTA (Council on the Aging) Cycling Group Seniors Bike Rides in 2021
    COTA (Council on the Aging) cycling group Seniors Bike rides in 2021 PLEASE READ We ride every Wednesday of each month except January. • The 1st and 3rd Wednesday rides are short (20- 30km) to encourage less experienced riders to join us and the route is mostly chosen on the day. The 2nd and 4th Wednesday rides are longer (50-60km), more challenging and for experienced riders. Rides on the 5th Wednesday are generally longer. • We generally meet at 10am at the ‘Place to meet’ (see below). A coffee stop is found midmorning and we take our own lunch and picnic together on longer rides. Riders are welcome to join the ride along the way or cut the ride short at any point. • If the temperature is 30°C or above on the day, the long rides will be cut short. • If a ride is to be altered from the published program, including cancelling the ride, you will be notified by e-mail before 8pm the night before. Please check your e-mail on Tuesday evening after 8pm. All riders are required to register with COTA and accept the group riding conditions—go to: http://cotavic.org.au/programs-events/physical-education/cota-cycling/. We also recommend that riders consider joining Bicycle Victoria for the insurance and service they offer. Please contact Cathy Mead by email [email protected] or on 0412 688 930 to discuss details. Date Place to meet Description Grade Feb 3rd Southbank Short ride footbridge Feb 10th Lilydale Station Warburton Rail Trail Medium David and Janet to lead Feb 17th Southbank Short ride footbridge Feb 24th Craigieburn Station Craigieburn to the city via the Glada Tamboore Trail and Merri Creek trail.
    [Show full text]
  • The Melbourne Dreaming, Which Later Inspired and Ancient History
    Melbourne Dreaming A GUIDE TO IMPORTANT PLACES OF THE PAST AND PRESENT Meyer Eidelson i CONTENTS Dedication xx About the author xx About this book xx Foreword xx Acknowledgments xx Introduction xx Precincts xx Organisations xx Images xx Further reading xx Index xx Barak by Florence Ada Fuller, 1885. Reproduced with permission of the State Library of Victoria. Precinct contents City centre and surrounds 1. Birrarung (Yarra) art and heritage walk xx Of interest: Yarra Yarra Falls xx 2. Indigenous art collection xx Dedicated to William Barak, Ngurungaeta (clan leader) of the 3. Koorie Heritage Trust xx Wurundjeri, who died at Coranderrk, Healesville in 1903. As 4. Freedom Fighters execution site xx a boy, he was present at the signing of John Batman’s treaty 5. Old Melbourne Cemetery site xx (the Melbourne Treaty). An outstanding leader in the struggle 6. Bunjilaka Cultural Centre xx for Aboriginal rights and justice, he guided his people with 7. Billibellary’s Walk xx courage and wisdom through extraordinary times. 8. Fitzroy Gardens scarred tree xx 9. Melbourne Cricket Ground xx 10. Kings Doman Resting Place xx 11. Aboriginal reserve site xx and Aboriginal heritage walk ii iii East Morington Peninsula 12. Stonnington Indigenous History Trail xx 33. Baluk Arts xx 13. Ngargee (corroboree) tree xx 34. Collins Settlement xx Of interest: Wurundjeri Council xx 35. Bunjil’s Cave xx 14. Merri Creek Aboriginal School Native Police xx 36. Coolart xx and the Protectorate Station Of interest: Bunyips at Tooradin xx 15. Bolin Bolin Billabong xx 16. Scarred Tree xx 17. Dandenong Police Paddocks Reserve xx Inner north 18.
    [Show full text]
  • Newsletter September 2004 BBUG Meetings Are on the 2Nd Thursday of Each Month, Except January
    Newsletter September 2004 BBUG meetings are on the 2nd Thursday of each month, except January. Next meeting: 7.30pm Thursday 9th September at Swinburne, Hawthorn Campus, TD building (between Park and Wakefield Streets) room TD246. Bikes can be taken upstairs and safely parked near meeting room. At the September meeting we welcome guest Duncan McGregor, chairman of the City of Whitehorse Bicycle Advisory Committee. We have lots in common – Mont Albert Road cycle route in particular. The Boroondara Bicycle Users’ Group (BBUG) is a voluntary group working to promote the adoption of a safe and practical environment for community and recreational cyclists in the City of Boroondara. We have close links with the City of Boroondara, Bicycle Victoria, Bicycle Federation of Australia and other local Bicycle Users’ Groups. BBUG has a web site www.vicnet.net.au/~bdarabug that contains interesting material related to cycling, links to other cycle groups and recent BBUG Newsletters. We also have two Yahoo Groups: Send a blank e-mail to [email protected] to receive this monthly newsletter and occasional important messages. Send a blank e-mail to [email protected] to monitor or join in an ongoing discussion of bike related issues both local and general. All articles in this newsletter are the views and opinions of the authors and do not necessarily represent the views of any other members of BBUG. All rides publicised in this newsletter are embarked upon at your own risk. Boroondara News Boroondara Council votes to implement Principal Bicycle Network in Boroondara On Monday 23 August 2004 Boroondara Council voted to support a plan for the development of the Principal bicycle Network (PBN) in the municipality.
    [Show full text]
  • Northern Regional Trails Strategy 2016
    Northern Regional Trails Strategy 2016 Councils of Banyule, Darebin, Hume, Moreland, Nillumbik and Whittlesea Councils of Banyule, Darebin, Hume, Moreland, Nillumbik, Whittlesea and Yarra Northern Regional Trails Strategy Final Report Final | 6 June 2016 Councils of Banyule, Darebin, Hume, Moreland, Nillumbik, Whittlesea and Yarra Northern Regional Trails Strategy Final Report Final | 6 June 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 237101-00 Arup Arup Pty Ltd ABN 18 000 966 165 Arup Level 17 1 Nicholson Street Melbourne VIC 3000 Australia www.arup.com This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 237101-00 Arup Arup Pty Ltd ABN 18 000 966 165 Arup Level 17 1 Nicholson Street Melbourne VIC 3000 Australia www.arup.com Councils of Banyule, Darebin, Hume, Moreland, Nillumbik, Whittlesea Northern Regional Trails Strategy and Yarra Contents Page Executive Summary 2 1 Introduction 7 2 Value of recreation trail networks 10 2.1 Social value 10 2.2 Transport value 11 2.3 Economic value 12 2.4 Environmental value 13 2.5 Network scale benefits 14 3 Approach 16 3.1 GIS database compilation 16 3.2 Design guidelines 17 3.3 Verification of existing trails 20 4 Multi-criteria analysis
    [Show full text]
  • Bulleen Precinct Plan Stormwater Report Department of Environment, Land, Water and Planning 10 May 2019 Revision: 2 Reference: 1828
    Bulleen Precinct Plan Stormwater Report Department of Environment, Land, Water and Planning 10 May 2019 Revision: 2 Reference: 1828 Document control Document prepared by: Incitus Pty Ltd ABN 55 285 448 851 PO Box 7142 Richmond VIC 3121 T 0414 404 730 E [email protected] W www.incitus.com.au Disclaimer A person using Incitus documents or data accepts the risk of: . Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version. Using the documents or data for any purpose not agreed to in writing by Incitus or Department of Environment, Land, Water and Planning Document control Report title Stormwater Report Project number 1828 File path D:\Incitus\Barich Consulting - Incitus\Projects\1800\1828 Bulleen Precinct Plan SW\Documents\Bulleen Precinct Plan SW Rev2.docx Client Department of Environment, Land, Water and Planning Rev Date Revision details/status Author Reviewed Approver 0 15 April 2019 Issued to client NJB / CB Reviewed 15.04.19 NJB 1 17 April 2019 Issued to client NJB / CB Reviewed 17.04.19 NJB 2 10 May 2019 Minor Amendments NJB / CB Reviewed 10.05.19 NJB Project 1828 File Bulleen Precinct Plan SW Rev2.docx 10 May 2019 Revision 2 Contents 1 Introduction 1 2 Previous Reports 4 3 Existing Cond itions 6 3.1 Flood Behaviour 6 3.2 Cultural Significance Overlays 9 3.3 River and Billabong Health 9 4 Bulleen Precinct Plan 11 4.1 Bulleen Precinct Plan Overview 11 4.2 Development within the Bulleen Precinct Plan 12 5 Recommendations 25 6 References 26 Appendix A – Yarra Action Plan Significant Landscape – Riparian Area Protections 27 Appendix B – Healthy Waterway Strategy Waterway and Billabong Health 28 Appendix C – Flood Maps Based on Latest LiDar Data 29 Project 1828 File Bulleen Precinct Plan SW Rev2.docx 10 May 2019 Revision 2 Page i 1 Introduction The Department of Environment, Land, Water and Planning (DELWP) are leading the preparation of the draft Bulleen Precinct Plan.
    [Show full text]