Bicycle Volumes 2005-2013
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
West Gate Tunnel Project GTA Review
21 August 2017 Title West Gate Tunnel Project Transport Expert Evidence #1John Kiriakidis – 22 August 2017 GTA Review (GTA Section 1.3) 1. Consider project’s strategic transport alignment with planning policy. 2. A peer review of analytics contained in the Transport Impact Assessment (TIAR) relied on to inform the EES in support of the Project. 3. Adoption of transport modelling forecasts prepared by VLC. #2 1 21 August 2017 GTA Strategic Alignment Methodology 1. Validate the transport challenges identified in the EES (and Business Case) which form the basis of need for the project by identifying their pre-existence in established policies and studies. 2. Review strategic planning policies to determine the extent of alignment with established policy and planning for Greater Melbourne, 3. Examine the EES as it relates to transport by exploring the project’s consistency with objectives set out in the Transport Integration Act (2010). #3 EES Project Scoping Objective EES Scoping Requirement (for Transport): • ‘To increase transport capacity and improve connectivity to and from the west of Melbourne, and, in particular, increase freight movement via the freeway network instead of local and arterial roads, while adequately managing the effects of the project on the broader and local road network, public transport, cycling and pedestrian transport networks’. • Key themes within the Objective: – Transport capacity – Improving connectivity (with emphasis on areas West of Melbourne) – Moving freight via a higher order road system – Adequately managing effects on public transport and active travel #4 2 21 August 2017 High Level Project Plan #5 Legislation / Policy Framework • The Transport Integration Act 2010 came into effect on 1 July 2010 and is Victoria's principal transport statute. -
Draft 10 Year Bicycle and Pedestrian Projects
Project Type Description Effect on Network Beneficiary Project Current 2019_20 2020_21 2021_22 2022_23 2023_24 2024_25 2025_26 2026_27 2027_28 2028_29 2029_30 manager Status Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Deliverable Responsible for Delivery Annual DDA Upgrades/Improvements Footpath Upgrade of the pedestrian network to Improve access for people with mobility issues or Pedestrians Moreland Proposed Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Upgrade meet DDA standards requirements Council Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Annual Pedestrian Threshold Intersection Install threshold treatments to improve Pedestrians Moreland Proposed Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Treatments upgrade prestrian access and slow traffic Council Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Annual Bus Stop Improvements Public Upgrade of bus stops to improve access Pedestrians Moreland Proposed Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Design and Transport Council Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Construct Annual Bicycle Parking Bicycle Provide -
Wyndham Pedestrian & Cycle Strategy
dd Wyndham Pedestrian & Cycle Strategy Cyclist Feedback, Identified network expansion requirements and missing links Wyndham City Council has received a great deal of feedback on cycling within the municipality. The identified issues were considered in writing the 2019 Pedestrian and Cycling Strategy. The feedback has been grouped under common categories in the tables below, to keep like comments together. Table-1 Safety and Blackspot feedback Location Type Comment Derrimut Road Crossing Points crossings at Sayers and Leakes Roads – but I believe these are going to be dealt with by VicRoads Cycle lane Cycle lane on the Eastern side is in one direction only. It’s a busy Derrimut Road road so lanes on both sides of the road need to be two way. Also, going under the railway bridge near the Princess Highway Obstacles There are many obstacles within the shared paths – e.g. Derrimut SUP Road, adjacent to Aqualink – a no standing sign (I think) way too close to the middle of the Shared path. Cyclists could easily crash into it; Cnr Derrimut Road and Willmott Cres – many signs Derrimut Road obstructing the path – traffic lights, bike path sign (!!), no standing or something. Not at all safe. Also a shared path sign on cnr of Kookaburra and Derrimut – in middle of path instead of off to the side. Kookaburra Ave Cycle Path Paths on Kookaburra Ave have speed cushions in them. At night Obstacles they are invisible (even with bicycle lights). No need – could have treatment similar to Shaw’s Road. Also path disappears before T intersection with Derrimut Road. -
Environmental Infrastructure Inquiry Submission S157 Received 28/09/2020
Hume City Council – submission to Environment and Planning Committee Inquiry into Environmental Infrastructure for Growing Populations Terms of Reference: An inquiry into the current and future arrangements to secure environmental infrastructure, particularly parks and open space, for a growing population in Melbourne and across regional centres to the Environment and Planning Committee for consideration and report no later than 31 December 2020. 1. Introduction Hume City Council welcomes the opportunity to submit into the Environment and Planning Committee Inquiry into Environmental Infrastructure for Growing Populations in Victoria. To address the terms of reference for this inquiry Hume City Council submits on three key areas, these are: Section 2 - Community-focussed Open Space Mapping Section 3 - Delivery of effective walking and cycling infrastructure Section 4 - Delivery of Regional Parks Section 5 - Delivery of Waterway Corridors Section 6 - Protecting existing canopy cover in developments Section 7 - Funding opportunities for pipeline projects Section 8 - Addressing issues with the implementation of the Melbourne Strategic Impact Assessment. Section 9 - Implementation of Integrated Water Management For the purposes of this submission, Environmental Infrastructure has been defined to include all passive and active open space, conservation areas and waterway reserves, plus the infrastructure to support and connect those reserves including paths, trails, vegetation, and the management practices to support them. The submission will highlight contemporary policy and implementation concerns that need to be addressed, to pave the way for an integrated, sustainable, and socially responsible approach to environmental infrastructure. Council recently submitted into the Inquiry into Ecosystem Decline – many of the points covered in this submission are rearticulated here, as the issues cross over significantly. -
Response 1 I Am Writing to You Regarding the Latest Agenda Item for the 23 June Council Meeting Regarding the Trial Transport Projects
Response 1 I am writing to you regarding the latest agenda item for the 23 June council meeting regarding the trial transport projects. I have submitted a response for tomorrow's meeting but am messaging you here as my full submission is longer than allowed and seek some further information. The proposed transport, movement and access trials are a good initiative for public safety, health and improving the current road hierarchy, particularly to support cycling. The strategic move of not letting a good crisis go to waste is also appreciated and I fully support these trials in these times. However, a comprehensive analysis of traffic conditions (before and after), community consultation and transparent process must be adhered too. Traffic surveys and evidence to justify their permanency post-trial needs to be transparent and open for discussion via good community consultation. Concerns: Trenerry Crescent closure: - It is expected that this will cause significant delays to local community traffic in the Clifton Hill pocket bordered by Heidelberg Road to the north and Hoddle Street to the west. Without any southern access point, it will divert all traffic towards these major arterials. Whilst I understand this is the desired outcome and will prevent rat-running through this pocket (which there is a substantial amount of), it does require serious consideration of the impact to this community. It will cause significant delays for local traffic which will now be funneled towards these state arterial routes which already experience substantial congestion particularly at peak times. Further, there are 3 main exits for residents from this pocket, being Roseneath, Ramsden and Fenwick. -
Cycling Into the Future 2013–23
DECEMBER 2012 CYCLING INTO THE FUTURE 2013–23 VICTORIA’s cyCLING STRATEGY Published by the Victorian Government, Melbourne, December 2012. © State of Victoria 2012 This publication is copyright. No part may be reproduced in any process except in accordance with the provisions of the Copyright Act 1968. Authorised by the Victorian Government Melbourne Printing managed by Finsbury Green For more information contact 03 9655 6096 PAGE III CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY CONTENTS Minister’s foreword v Executive summary vi 1 Cycling in Victoria 1 2 Growing cycling in Victoria 5 Current cycling patterns 5 Potential growth 5 3 Benefits of cycling 8 Healthier Victorians 8 Better places to live 9 Stronger economy 9 Healthier environment 10 4 Strategic framework 11 Direction 1: Build evidence 12 Direction 2: Enhance governance and streamline processes 14 Direction 3: Reduce safety risks 16 Direction 4: Encourage cycling 20 Direction 5: Grow the cycling economy 22 Direction 6: Plan networks and prioritise investment 24 5 Implementation, monitoring and evaluation 29 Appendix 1: Cycling networks, paths and infrastructure 30 PAGE IV CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY Some of our work in metropolitan Melbourne includes: > a new bridge on the Capital City Trail at Abbotsford > bike lanes along Chapel Street > extensions and improvements to the Federation Trail, Gardiner’s Creek Trail and Bay Trail on Beach Road > Jim Stynes Bridge for walking and cycling between Docklands and the CBD along the Yarra River > Heatherton Road off-road bike path from Power Road to the Dandenong Creek Trail > a bridge over the Maroondah Highway at Lilydale > bike connections to Box Hill and Ringwood > Parkiteer bike cages and bike hoops at 16 railway stations > Westgate Punt weekday services > bike paths along the Dingley Bypass, Stud Road, Clyde Road and Narre Warren – Cranbourne Road > bike infrastructure as part of the Regional Rail Link project > a new trail in association with the Peninsula Link. -
Recreational Activity Surveys During COVID-19 and Comparison with Pre-Lockdown Activity Levels
More people out on bicycles: Recreational activity surveys during COVID-19 and comparison with pre-lockdown activity levels May 2020 Measuring recreational activity in unprecedented times Lockdown in Victoria On 30 March 2020, the Minister for Health and Medical Research signed an Order for stage 3 lockdown measures to be put in place across Australian states, following a national outbreak of the novel coronavirus. The Order, which in Victoria falls under section 200 of the Public Health and Wellbeing Act (2008)1, 2, places legally enforceable restrictions on all non-essential gatherings, as a means of minimising the spread of the deadly virus. During the stage 3 restrictions, there are only four reasons for Victorian residents to be outside: • purchasing food and essential supplies; • medical, care or compassionate needs; • exercise; and • work and study if they cannot be undertaken remotely2. How has this affected our recreational activities? An arising question is how these restrictions have affected the recreational needs of residents in Victoria and elsewhere. A recent survey by Bicycle Network3 found that, in response to stage 3 restrictions across Australian states: • 73 per cent [of respondents] are planning to use a bicycle to access essential services (shops, healthcare, work and education) in the coming weeks and months; • 84 per cent of healthcare workers said they would ride bicycles more or the same amount; and • Most respondents (39 per cent) said that they will be riding a bicycle outdoors to get their daily exercise. In addition, emerging data suggests an increase in bicycle purchases during lockdown restrictions4. These findings suggest that, given these increased needs for bicycle-related transport, exercise and recreation; Australian roads and shared paths may be exhibiting major deviations from normal bicycle traffic volumes. -
Walking and Cycling Strategy
1 1 Snapshot Council is committed to a city that is walking and cycling friendly and one where residents of all ages and abilities can easily walk and cycle as their preferred form of exercise and transport. Therefore, the strategy considers opportunities to better cater for the needs of all people who use pathways including people in wheelchairs, parents/carers with prams, young children on scooters, as well as cyclists and walkers. Cycling and especially walking are among Victorian’s most popular activities. Approximately 36% of the population walks and 12% of the population cycles as their preferred form of physical activity. Well-planned, inviting pathways and trails will encourage people to be more active as part of their daily routine and as a result derive some of the social, health and wellbeing, environmental and economic benefits that come with walking and cycling. The strategy recognises that often people walk and cycle for very different reasons and it is important to understand and plan for facilities that support different needs. Therefore the strategy takes into account that people may walk and cycle for health and fitness, recreation, or transport reasons. The strategy provides a framework and principles for the planning, design, improvement and management of Council’s network of pathways and trails. A further objective is to provide a framework for encouraging greater involvement of residents, community organisations, and government in the development of walking, cycling and other pathway related activities and opportunities. The Walking and Cycling Strategy is a strategic document that considers activity and lifestyle trends, industry and government guidelines and standards, partnership opportunities, and the aspirations of residents. -
Whitehorse Open Space Strategy
Whitehorse Open Space Strategy Part Two Precinct recommendations Prepared by THOMPSON BERRILL LANDSCAPE DESIGN PTY LTD in association with ENVIRONMENT & LAND MANAGEMENT PTY LTD ADOPTED BY COUNCIL NOVEMBER 19 2007 Table of contents PART ONE Background and overall strategy recommendations (refer to separate volume, pages 1 to 126) PART TWO Precinct Recommendations Page No. GLOSSARY 11 INTRODUCTION PART TWO 127 12. BLACKBURN 128 12.1 Overview 128 12.1.1 Suburb description 129 12.1.2 Heritage values of open space in Blackburn 129 12.1.3. Demographic summary for Blackburn 129 12.1.4 Open space summary for Blackburn 130 12.1.5 Summary of open space reserves and classification 131 12.2 Existing open space distribution 132 12.3 Community use of open space 133 12.4 Summary of anticipated future change in Blackburn 134 12.5 Open space quality and design 135 12.6 Blackburn precinct recommendations 136 12.7 Individual reserve recommendations for Blackburn 138 13 BLACKBURN NORTH 140 13.1 Overview 140 13.1.1 Suburb description 140 13.1.2 Heritage values of open space in Blackburn North 141 13.1.3. Demographic summary for Blackburn North 141 13.1.4 Open space summary for Blackburn North 142 13.1.5 Summary of open space reserves and classification 142 13.2 Existing open space distribution 143 13.3 Community use of open space 143 13.4 Summary of anticipated future change in Blackburn North 145 13.5 Open space quality and design 146 13.6 Blackburn North precinct recommendations 146 13.7 Individual reserve recommendations for Blackburn North 147 14 BLACKBURN SOUTH 149 14.1 Overview 149 14.1.1 Suburb description 149 WHITEHORSE OPEN SPACE STRATEGY PART TWO NOVEMBER 19 2007 PAGE i PART TWO TABLE OF CONTENTS Page No. -
Newsletter July 2008
Newsletter July 2008 Boroondara BUG meetings are held on the 2nd Wednesday of each month, except January. The Next meeting will be at 7.30pm on Wednesday 9th July, at the Swinburne Hawthorn Campus in room TD244. The TD building is between Park and Wakefield Streets. All welcome. The Boroondara BUG is a voluntary group working to promote the adoption of a safe and practical environment for utility and recreational cyclists in the City of Boroondara. We have close links with the City of Boroondara, Bicycle Victoria, Bicycle Federation of Australia and other local Bicycle Users’ Groups. Boroondara BUG has a website at http://www.boroondarabug.org that contains interesting material related to cycling, links to other cycle groups, recent Boroondara BUG Newsletters and breaking news. We also have two Yahoo Groups: 1. Send a blank email to: [email protected] to receive notification when the latest monthly newsletter and rides supplement have been placed on the web site and very occasional important messages. 2. Send a blank email to: [email protected] to monitor or join in an ongoing discussion of bike related issues both local and general. All articles in this newsletter are the views and opinions of the authors and do not necessarily represent the views of any other members of Boroondara BUG. All rides publicised in this newsletter are embarked upon at your own risk. Trail Notes Gardiners Creek Trail Detour Still no word on this unfortunately. Darebin Creek Path Missing Link to be closed Work is well underway on construction of an underpass, including a section of boardwalk, under Darebin Rd. -
RIDE CALENDAR - August 2021
WHITEHORSE CYCLISTS - RIDE CALENDAR - August 2021 Participation in these rides implies acceptance of the terms of the Club Ride Terms and Conditions, available on request All rides will return to the start point, unless specifically stated otherwise Carry MYKI card, spare tubes, tools, wet wipes, and first aid kit (available for $2) on your bike if possible All rides must comply with the relevant COVID restrictions The Ride Leader can set a limit on the number of riders, divide the ride, and/or change the route Ride leaders or coordinators: after the ride, please send JPG or PDF of the ride sheet to Steve - [email protected] New Riders & Membership enquiries: Jennie F 0416 154 865 Descriptions of Ride Types: www.whitehorsecyclists.org.au "About Rides" Ride Calendar compiler: Steve R 0414 991 231 Remaining rides for 19-31 July 2021 All rides will conform with COVID requirements Date Ride Title Route Description km Leader Mon 19/7 32 SMS Gordon L Beat the Hills Monday As for Monday, 2nd August (see below) 9 am E/M 0409 857 350 Tues 20/7 Easy Tuesday Dandenong Ck, Eastlink, George St, Stud Rd, Ferny Ck Tr, Waterford Valley, E SMS Sally McC 9:30 am Wellington Village Dandelion Drv, Wellington Village (M), Stud Rd, Dandenong Ck 36 0478 230 109 Tues 20/7 Medium Tuesday Eastlink Tr, Dandenong Ck Tr, Stud Rd, Blind Ck Tr, Upper Gully (M), Ferny Ck Tr, 45 Brent C 9 am Cuppa at the UPPA Ferntree Gully Rd, Jells Park, Eastlink Tr M 0407 314 220 (M) = Morning tea (L) = Lunch (B) = Bail-out possible (F) = Finish CP = Car park RS -
Maribyrnong River Valley Design Guidelines
MARIBYRNONG RIVER VALLEY DESIGN GUIDELINES APRIL 2010 CONTENTS Minister’s foreword 01 Executive summary 02 Acknowledgements 09 1 Introduction 11 1.1 Why these guidelines are needed 13 1.2 Policy context 13 1.3 Overview of the river 14 1.4 Study area 18 2 What we want to achieve 21 2.1 Vision 22 2.2 Preferred river character 23 3 Priorities for action 29 3.1 Enlarge the open space corridor 30 3.2 Improve site and precinct planning 38 3.3 Undertake important capital works 41 3.4 Improve overall governance 44 3.5 Refine planning controls 45 3.6 Enhance community engagement 51 4 Design guidelines 53 4.1 Additional open space 54 4.2 Open space management – landscape 59 4.3 Open space management – access 63 4.4 Landform 66 4.5 Urban development interface 68 4.6 Site layout and building visibility 70 4.7 Building design 76 4.8 Infrastructure design 79 5 Definitions and abbreviations 81 5.1 Definitions 81 5.2 Abbreviations 82 6 Bibliography 83 7 Appendices 84 Appendix A Relevant maps of the Maribyrnong River 84 Appendix B Consultation, views and values 91 Appendix C Broad objectives table 96 Appendix D Possible planning permit conditions 102 Appendix E Planning Schemes zoning map 104 Appendix F Maribyrnong River Valley settlement chronology 105 Appendix G Maribyrnong River – responsibilities of government agencies 108 MINISTER’S FOREWORD Consistent and coordinated planning is essential for protecting the natural and built character of our treasured waterways. The Maribyrnong River is one of Melbourne’s most used and loved assets, with thousands of Melburnians relaxing along the river every day.