BIM Awareness Seminar

Total Page:16

File Type:pdf, Size:1020Kb

BIM Awareness Seminar BIM Awareness Seminar August 2018 Agenda of BIM Awareness Seminar 1. What is BIM? 2. What are the benefits of using BIM? 3. Who are using BIM worldwide and locally? 4. What investment is required? 5. What resources are available in the market to assist my company to use BIM? 6. Some limitations of BIM 7. New way of collaboration using BIM 8. How could we learn more about BIM? 9. CIC’s Roles and Support 1. What is BIM ? BIM • Building Information Modelling • Building Information Management • Virtual Design & Construction (VDC) • 建築信息模擬 (Hong Kong) • 建築信息模型 (China) • 建築資訊模擬 (Taiwan) Limitations of 2D Drawings • Difficult to visualize the design with separate drawings • Plans • Elevations • Sections • 3D views • Perspectives • Details • Schedules The elephant metaphor of reality • 2D drawings limit information accuracy & coordination • Drawings cannot be used as ‘input’ for scientific and quantitative analysis, i.e. –performance validation Information and Model 2D ‐ Drawing 1D – Text Information 3D ‐ Model • Area Schedule • Plan • Finishing Schedule • Section • Door/Window Schedule • Elevation • Beam/Column Schedule • Area Diagrams • Equipment Schedule • Schematic Designs • Program • General Building Plans • Cost Estimate • Structural Plans • Quantity Take Off • E/M Drawings • Bills of Quantities • Schematics • Variations • Other Diagrams / Details CAD Vs BIM (3D Model) Object based Parametric geometry + Attributes http://www.cadtobim.com/what‐is‐bim.html Parametric Change Engine in BIM Automatically coordinates changes made anywhere –model views, drawing sheets, schedules, sections ad plans e.g. Change or delete the roof light in any views will automatically coordinate others, hence no discrepancies among drawings, schedules. Building Information Modelling • BIM is the process of developing and using three‐dimensional, digital representation of building data throughout its life cycle. • BIM ‐ the creation and use of coordinated, consistent, computable information, 3D presentation about a building project in design, construction & maintenance Architectural Structural Building Services Applications of BIM BIM Models Coordination Collaboration Logistics Prefabrication Documentation ‐ 2D Drawings Project management Visualization: Rendering Simulation Performance Analysis The information in the model can be updated, shared and used by design & construction teams throughout the entire project development cycle. (A, SE, BSE, CE, GE, QS, LA, FM, contractors, suppliers, Code / Collision Check client, PM, etc.) Material Quantities / Costing Use of BIM throughout Project Development Cycle Project Life Cycle Scheme Detailed Construction of Completion, Feasibility / Tender Design and Design and Foundation / Management & Planning Documentation Project Budget Specification Building Maintenance BIM Enables Sustainable Design Conceptual Design Design Development Design Validation Conduct whole building Use early-stage energy, water & carbon Make detailed design massing models analysis • Optimal location • Benchmark energy use • Adjust rooms and zones • Building form • Recommend potential • Size and shape individual • Orientation of building savings openings design • Study alternatives • Design custom shading devices • Choose optimal materials Structural Engineering –Design Drawing Production BIM Structural Model Framing Plan Collaboration Clash Detection Analytical / Design Model – ETABS / ORION Source: Hong Kong Housing Authority Building Services Installation Air Condition Installation FS Installation Electrical Installation Source: Hong Kong Housing Authority Geotechnical Investigation Integration of Geotechnical data into construction process Source: Hong Kong Housing Authority Building Models for Virtual Design & Construction Performance validation & check buildability https://www.healthandsafetyatwork.com/construction/bim‐spells‐safety‐site Source: http://www.metconus.com/services/bim/ https://www.vrroom.buzz/vr‐news/business/6‐companies‐changing‐construction‐vr Source: https://www.bdcnetwork.com/altered‐reality‐showdown, courtesy Trimble BIM Enabling Safety In Construction Site Process Design for safety •Construction and operation planning • Relationship between working time & space • Validation of construction sequence • Anticipate the interaction between workers & machineries •Evaluation of safety from workers viewpoint •Concern from the public Source: Hong Kong Housing Authority Clash Detection & Maintenance Access Building Services, False ceiling, Structural Elements Clash detected with report generated for rectification Ensure space for Maintenance Access Calculation with BIM The BIM concept supports a wide range of calculation and estimating activities: • Quantity take‐offs • Door/window schedules • Room/Furniture Inventories • Cost estimations • Cash flow analysis Facility Management • As‐built BIM model • Linking Information to BIM model e.g. detailed shop drawings linked to balustrade in 3D view Balustrade selected Basic Information e.g. height, type of glass Detailed Drawings Dimensions of BIM • 3D ‐ 3D Model • 4D ‐ Scheduling & Simulation • 5D ‐ Quantity & Cost Estimation • 6D ‐ Sustainability & Performance • 7D ‐ Facility / Asset Management Source: bimporn.tumblr.com 2. What are the benefits of using BIM? Benefits of using BIM Design • Enhance the effectiveness of design co‐ordination. Changes are automatically coordinated across the project and information generated is therefore of high quality • Improve communication among project team • Facilitate design analysis studies Construction • Enhance building constructability and reduce errors on site due to uncoordinated information in 2D drawings • Reduce rework and hence construction waste • Facilitate site planning including site safety measures Post‐completion • Quick and easy extract of building information for facility / asset management and maintenance BIM Source: http://www.autodesk.com/temp/pdf/McGraw_Hill_Business_Value_of_BIM_ANZ.pdf BIM Adoption – Private Project HIGH RISE BUILDING PROJECT Name of Building: One Island East Client: Swire Properties Main Contractor: Gammon Construction Completion: 2008 Description: 1.5 million sq. ft. 70-storey Hong Kong office building. Source: Andrew Baldwin, David Bordoli (2014). A Handbook for Construction Planning and Scheduling, John Wiley & Sons, Ltd. BIM Adoption HOUSING AUTHORITY PROJECT Source: Housing Authority, HKSAR BIM Adoption HOUSING AUTHORITY PROJECT Source: Housing Authority, HKSAR BIM Adoption – Commercial Office Redevelopment of Hennessy Centre Company: Gammon Construction Limited Project: Redevelopment of Hennessy Centre Location: Causeway Bay, Hong Kong Type: Commercial Scheduled Time of Completion: 2012 Autodesk Far East Ltd. (200), Autodesk BIM Award 2010, Hong Kong, Macau and Taiwan BIM Adoption – Metro Station Hung Hom Station & Approach Tunnels Company: MTR Corporation Limited Project: Hung Hom Station & Approach Tunnels Location: Hung Hom, Hong Kong Type: Civil Infrastructure Scheduled Time of Completion: 2018 BIM Partners: • Aedas Limited • Parsons Brinckerhoff • Atkins • Sweett Limited • InteliBuild • Leighton Contractor (Asia) Limited • Gammon Kaden Joint Venture Autodesk Far East Ltd. (2013), Autodesk BIM Award 2013, Hong Kong, Macau and Taiwan BIM Adoption – Airport Airport Terminal: Midfield Development Design Consultancy Services Company: Mott MacDonald and Arup Project: Midfield Development Design Consultancy Services Location: Hong Kong International Airport Type: Infrastructure Scheduled Time of Completion: Q3, 2015 BIM Partners: • Airport Authority Hong Kong • Aedas Limited • OTC Limited • Atkins China Limited • Bo Steiber Lighting Design Autodesk Far East Ltd. (2009), Autodesk BIM Award 2009, Hong Kong, Macau and Taiwan BIM Adoption – Civic Building Xiqu Centre Company: BTA & RLP Company Limited Project: Xiqu Centre Location: West Kowloon Cultural District, Hong Kong Type: Theatre and Retail Scheduled Time of Completion: 2017 BIM Partners: • West Kowloon Cultural District Authority • Buro Happold International • Rider Levett Bucknall • Atkins China Ltd. • Front Inc. • Hip Hing Construction Co. Ltd. • Kingsfield Engineering Ltd. Autodesk Far East Ltd. (2015), Autodesk BIM Award 2015, Hong Kong, Macau and Taiwan BIM Adoption – Asset Management Study on the Trial Use of Building Information Modelling (BIM) for Asset Management Company: Water Supplies Department, HKSAR Government Project: Study on the Trial Use of Building Information Modelling (BIM) for Asset Management Location: Tai Po and Telegraph Bay Salt Water Pumping Stations Type: Waterworks Scheduled Time of Completion: 2015 BIM Partners: • Summit Technology (HK) Ltd • Sino‐iTech Holdings Co Ltd. Autodesk Far East Ltd. (2015), Autodesk BIM Award 2015, Hong Kong, Macau and Taiwan BIM Adoption ‐ Heritage TERRESTRIAL LASER SCANNING AND BIM 3D ScanningPoint Cloud Data BIM Model Drawing Production and Quantity Take-off Source: Viron, Courtesy of Architectural Services Department 3. The Adoption of BIM in HK & around the world Market Demand : BIM Mandates & Trends Statsbygg, Norway Mainland China 2010: Requires IFC/BIM for new buildings Mandatory Norwegian Defence Estates Agency BIM has been included as part of the National 12th Five Year Plan (2011 – Is running 3 BIM pilots 2015) and is formulating a BIM framework. Korea 2012: Public Procurement Service will fully adopt IFC- based open BIM U.S. GSA U.S. Army Corp of Engineers Senate Properties (property 2008 : Mandatory BIM for government projects services agency), Finland 2007: Requires
Recommended publications
  • Success Story
    c Suc ess Story Professional Construction Gammon Construction’s Quest for Rapid CITIC Telecom CPC’s Top-notch Solutions Offer Total Peace of Mind To connect closely with the Hong Kong headquarter and its Shenzhen back office, Development with 24x7 Enterprise Gammon Construction needs to increase bandwidth on annual basis. Addressing to the Network to Support Multi-Media needs on continuous bandwidth increment, CITIC Telecom CPC has been providing its Communication Application top-level support to Gammon which has been proved to be the best possible solution to cater this trend. “In many cases CITIC Telecom CPC called to inform us of problems Gammon Construction selected CITIC Telecom CPC’s with details the minute we detected them,” Chan recalls. TrueCONNECT™ MPLS VPN solutions and Traffic Monitoring Singapore’s local network failure on a Friday midnight was another example. CITIC Service (TMS) to support increasing network usage and Telecom CPC provided immediate follow-up over the weekend and solved the problem development in Southeast Asia. before office hour was resumed on Monday. Headquartered in Hong Kong, Gammon Construction Limited is one of the leading We used to rely on manual Stay Cost-efficient with TMS Solutions contractors in the construction industry and impel for sustainable development analysis of network equipment “We used to rely on manual analysis of network equipment and traffic data logs, which and traffic data logs, which through innovation. Gammon Construction conducts risk management based on usually took us at least three to four hours. With TMS, we not only saved costs in usually took us at least three to customers’ needs, providing cutting-edge technical solutions that evolve with time.
    [Show full text]
  • CHALLENGING the NORM Sustainability Report 2014 SCOPE of the REPORT
    CHALLENGING THE NORM Sustainability Report 2014 SCOPE OF THE REPORT Gammon Construction Limited is a private company jointly owned by Jardine Matheson, an Asian-based conglomerate, and Balfour Beatty, a leading global publicly listed infrastructure business. The principle activities of Gammon are civil engineering, foundation works, building construction, electrical and mechanical installation, manufacture and supply of fabricated steel, manufacture of concrete and provision of plant and machinery. This report covers the operations of the company and subsidiaries in Hong Kong, Macau, Mainland China and Singapore for the 2014 calendar year. Greenhouse Gas Emissions CONTENTS tonnes C02 equivalent 109,466 01 Chief Executive’s Statement compared PROSPEROUS with 2013 02 Stakeholder Engagement MARKETS increase 24% 03 Our Progress on Roadmap 2020 Long Term Group Turnover Viability and 04 Prosperous Markets by Region Workforce US$ millions Continuity 08 Zero Harm Hong Kong & ENVIRONMENT 12 Environment Macau 2,057 P.04 Efficient Singapore 195 Resource Usage 16 Strong Relationships Mainland China 0.1 and Minimising 19 Driving Improvement compared ZERO HARM the Impact through our Green and with 2013 increase 28% Challenging P.12 Caring Site Commitment the Norm 20 Creating Opportunities through Bold Commitments from Constraints STRONG P.08 RELATIONSHIPS 22 Assurance Statement Nurturing the Industry and 24 Key Performance Indicator Caring for Our People Through Continuous 29 GRI Content Index Group Engagement Accident Incident Rate P.16 per 1,000 workers 5.5 CHALLENGING THE NORM Sustainability Report 2014 compared with 2013 decrease 8.3% Employment by Regions Monthly Paid Staff Daily Paid Workers Hong Kong & Macau 4,386 2,837 Mainland China 517 0 Singapore 494 828 Compared Compared Front Cover with 2013 with 2013 The Shatin to Central Link (SCL) 1111 project team increase 6% increase 19% faced what appeared to be insurmountable challenges.
    [Show full text]
  • The Power of 10
    The Power of 10 Sustainability Report 2012 The Power of 10 Experience has shown us that sustainability challenges are more urgent, complex and deeper than we thought 10 years ago; the opportunities, however, are equally greater. We are firmly committed and on the right track for a more sustainable business, with progress being made in increased business acquisition, capabilities and resilience. Grounded by these foundational years, we’ve connected business and sustainability and developed a Sustainability Action Plan up to the year 2020. 1 Chief Executive’s Statement 2 10 Years of Sustainability Reporting 3 Roadmap 2020 5 Zero Harm 9 Prosperous Markets 13 Environmental Stewardship 17 Strong Relationships 20 Commitment to Green and Caring Sites 21 Assurance Statement Front cover We are pioneering the use of Building Information Modelling and extending its capabilities into 3-D, 4-D (time) and even 5-D (quantity take-off). In Hong Kong, we are calling for an industry-wide approach that fully realises the transformational power of this remarkable technology. The online version of our sustainability report is available on our website, with Key Performance Indicators and an index aligning our report with Global Reporting Initiative (GRI) 3.1 sustainability reporting guidelines. Gammon self declares this report to a GRI Application Level of C+. For more information please visit www.gammonconstruction.com Our Brands Civil, foundations, building, E&M Public-Private Engineering design services and construction services covering Partnership business plant and equipment, concrete technology and steel fabrication Gammon Sustainability Report 2012 1 Chief Executive’s Statement In the 10 years since we began reporting on sustainability, our dialogue with stakeholders has grown from intentions towards a fuller understanding of the key enablers that embed sustainability in our operations.
    [Show full text]
  • Journal of Building Information Modeling (JBIM)
    Journal of Building Information Modeling An official publication of the National BIM Standard (NBIMS) and the National Institute of Building Sciences (NIBS) JBIMFall 2008 TheThe BIMBIM BalancingBalancing Act:Act: TiltTilt thethe ScalesScales inin YourYour FavorFavor Feature Comprehensive International BIM With Full Owner Involvement By Martin Riese and Dennis Shelden, Gehry Technologies INTRODUCTION impose the necessary enabling structure of construction time. Owners have sometimes appeared to information development, distribution and B. Team setup and implementation be “silent partners” in current BIM imple- organizational processes. GT was brought in during Design mentations, a legacy of their tradition- Providing owners with direct added Development, after preliminary 2D draw- ally limited role in the creation and use value from the BIM dataset is an important ings had been completed. GT produced of project documentation. While owners advancement that is required to drive adop- the initial BIM model from the 2D Design have a vested stake in the content of this tion. However, this owner-driven approach drawings, and then transferred the BIM to information—and the underlying processes to BIM implicitly requires new practices the project team. Formal management of of project design and execution—their rela- by owners that drive a need for improved the model was then adopted by the owner, tionships to this information have historical- access to the project information. Benefits with the BIM Consultant providing the ly focussed on managing oversight, approval are now beginning to occur through provid- Model Manager for this role. and, of course, financial responsbility. Until ing owners direct visibility and control of During the design phase, the owner pro- recently, developers of BIM technologies the project BIM, and by integrating BIM vided a co-location office space for the proj- have concnetrated primarily on parties that further into financial aspects of building ect BIM team near the building site.
    [Show full text]
  • Sharing Our Journey
    Sharing Our Journey Sustainability Report 2005 Contents 1 Scope of Report 2 Chief Executive’s Statement 3 About Gammon 4 Corporate Sustainability 6 Economic and Business 10 Social Responsibility 16 Health and Safety 20 Environmental Protection 24 2005 Performance Summary 25 Outlook for 2006 Introduction The construction industry is pivotal to the fostering of long-term sustainable development. Economic growth and development drives all aspects of the construction industry through new infrastructure, urban buildings and regeneration, yet at the same time presents potential environmental, social and economic impacts to project proponents, the service providers and the wider public. Through the promotion and implementation of industry best practice and innovation, Gammon is committed to embracing sustainable business practices. Verification Statement The Business Environment Council (BEC) was commissioned by Gammon Construction Limited (Gammon) to provide a verification statement for its 2005 Sustainability Report “Sharing Our Journey” (the report). BEC conducted sample checks of the data and claims in the report through document and data review, interviews with responsible personnel, and visits to selected sites. Our findings are set out as below. Completeness of the report scope “Sharing Our Journey” provides a comprehensive and balanced account of Gammon’s commitment to sustainability across its core business activities and locations in which it operates. The report also exhibits the increasing reach of the “quadruple bottom line” approach in working with business partners and the wider community to address social, health and safety, environmental and economic considerations. We encourage Gammon to continue its embrace of Global Reporting Initiative (GRI) principles, and in particular to further engage stakeholders to help define the content, performance indicators and presentation of future reports.
    [Show full text]
  • SUSTAINABILITY REPORT MANAGEMENT APPROACHES 2018-2019 Ii SUSTAINABILITY REPORT MANAGEMENT APPROACHES 2018-2019
    SUSTAINABILITY REPORT MANAGEMENT APPROACHES 2018-2019 ii SUSTAINABILITY REPORT MANAGEMENT APPROACHES 2018-2019 CONTENTS Section Page Governance 1 Governance structure 1 Values and norms of behaviour 2 Managing risk 3 Anti-corruption 3 Safety – Zero harm 4 Health and safety and working environment 4 Workforce represented in formal joint management – 5 worker health and safety committees Customer health and safety and compliance of products and services 5 Environment – Zero waste 7 Environmental management 7 Materials 8 Effluent and waste 10 Energy 11 Value Chain – Co-creation 13 Influencing the Industry and committing to change 13 Our supply chain 14 People – Caring 15 Employment 15 Training and education 15 Career development and support 16 SUSTAINABILITY REPORT MANAGEMENT APPROACHES 2018-2019 1 GOVERNANCE MANAGEMENT APPROACHES GOVERNANCE STRUCTURE GRI 102-18 The overall management of the company’s business Committee (RMCC) which meets four times a year is vested in the Board of Executive Directors (also to review the business from a risk and compliance referred to as the Executive Committee or ExCo), which perspective. Other members of the RMCC are select is chaired by the Chief Executive. All Executive Directors members of ExCo, our General Counsel, risk assurance are full- time employees of Gammon, and have specific managers and relevant staff as required. defined responsibilities and authority within the The ExCo is responsible for decision-making on Company’s operations. The organisation chart showing sustainability issues that are
    [Show full text]
  • A Masterpiece of Engineering and Design 建築工程結合藝術 設計的完美傑作
    金門印記 ISSUE 2 2020 M+ A Masterpiece of Engineering and Design 建築工程結合藝術 設計的完美傑作 P7 P23 Kitemark™ Certification awarded for Largest ever solo contract – Terminal 2 innovation management Expansion Works Kitemark™證書確認創新管理成就 最高價值單獨承建合約 — 機場二號客運大樓擴建工程 Chief Executive’s Mes sage 總裁的話 Gammon is proud to have played a key role in many of Hong Kong’s most notable construction projects and none more so than our two current most high-profile contracts: The M+ under construction on the West Kowloon waterfront and the Terminal 2 Expansion Works project by the Airport Authority Hong Kong. As many have noted, M+ is more than simply a museum. 4 Designed by the renowned Swiss architectural firm Herzog & de Meuron, it has been hailed as a work of art in itself. I am gratified to note that it is a project that has successfully called on all of Gammon’s ingenuity since we took over as the Management Contractor in September 2018. Of course, it was a challenge to take over the project well after commencement of construction in early 2015, but we achieved that by winning the trust of contractors already at work onsite. Another challenge was building over the tunnels of the MTR’s Airport Express and the Tung Chung Line, but our experience on the Lyric Theatre project, which presented similar challenges, was great training. I am also thrilled and proud that we have been awarded the Terminal 2 Expansion Works, which is Gammon’s largest solo contract win to date. Our proposal for the project focused on offsite and modular solutions, particularly for electrical and mechanical elements, and also for much of the internal fit-out of the main building, including check- 18 in islands, retail shopfronts and link bridges.
    [Show full text]
  • Safety Management of Ethnic Minority Workers in the Hong Kong Construction Industry
    Safety Management of Ethnic Minority Workers in the Hong Kong Construction Industry Professor Albert P.C. CHAN Department of Building and Real Estate The Hong Kong Polytechnic University 1 Outline of the Presentation • Introduction • Background • Research aim and findings • Conclusions • Q & A 2 Introduction 3 Research Team Members Safety Research Group Prof Albert Chan Prof Francis Wong Dr Carol Hon P-Investigator Co-Investigator Co-Investigator Ms. Sainan Lyu Dr. Arshad Ali Javed Joint PhD student Post-doctoral fellow 4 Research Background 5 Background Age <25, only 6.8% Age of registered construction workers in Hong Number (%) Kong as at 17 August 2014 Below 20 1 893 (0.6%) 20-24 21 401 (6.5%) 25-29 23 569 (7.1%) 30-34 27 182 (8.2%) 35-39 33 519 (10.1%) Age >50, 42.9% 40-44 40 337 (12.1%) 45-49 41 394 (12.5%) 50-54 51 364 (15.5%) 55-59 51 095 (15.4%) 60 or above 39 959 (12.0%) Total 333 995 (100.0%) 6 Source: Construction Workers Registration Authority (2014). Total Number of Valid Registered Construction Workers. Available from: http://www.cwra.org.hk/information/total.asp [Accessed 17 August 2014]. BackgroundValue of major works projects: from HKD45.1 billion (2009/10) to HKD49.6 billion • Ten infrastructure projects(2013/14) Cross-boundary Transportation New Urban Infrastructure Infrastructure Development Areas Projects • West Island Line • Guangzhou- • West Kowloon and South Island Shenzhen- HK Cultural District Line Express Rail Link • Kai Tak • Shatin to Central • HK-Zhuhai-Macao Development Plan Link Bridge • New Development • Tuen Mun Western • HK-Shenzhen Areas Bypass & Tuen Airport Co- Mun-Chek Lap Kok operation Link • HK-Shenzhen Joint Development of Lok Ma Chau Loop 7 Number of industrial accidents and accident rate per 1000 workers in construction industry from 1998 to 2014 (Labour Department) 25000 300 247.9 250 20000 198.4 200 15000 149.8 150 114.6 10000 19588 No.
    [Show full text]
  • Engineered Defences Against Covid-19 工程精英合力對抗新冠疫情
    金門印記 ISSUE 1 2020 Engineered defences against Covid-19 工程精英合力對抗新冠疫情 P18 P23 Double winner – Gammon wins Gold in the 2019 Thermal Tanks – Gammon-designed and -installed Hong Kong Awards for Environmental Excellence chilled-water thermal-energy storage system and a Certificate of Merit for its E&M works breaks records in weight and time installed 兩獎項得主 – 金門在「香港環境卓越大獎」奪建造業金獎、 儲能缸 – 由金門設計及安裝的冷水儲能系統創全港 機電工程奪優異獎 最重量級及最快安裝紀錄 Chief Executive’s Message 總裁的話 Throughout the Covid-19 pandemic, Gammon has emphasised adaptability, implemented flexible work arrangements and other crisis-management measures with the aim of putting the safety of our workforce and business partners first. As a contractor, we have contributed our expertise 4 to help curb the spread of the pandemic within the wider community. In February, Gammon was engaged to provide expert modular integrated construction (MiC) project management and MEP services in the fast- track construction of temporary quarantine facilities in Hong Kong. Consisting of 110 units in a two-storey configuration, it took just 64 days to complete all MiC fabrication, installation, tests and inspections. We also worked with the Institute of Healthcare Engineering and Estate Management (Hong Kong Branch) to construct Hong Kong’s first rapidly built high-standard negative-pressure isolation ward, also using an MiC approach. The demonstration unit showcases that it is possible to build these specialist isolation facilities in a fast- 20 track and cost-effective manner. The past few months have not been easy for any of us. I would like to personally thank our business partners’ support and thank all Gammon staff for their adaptability and resilience in these challenging times and urge Issue 1/2020 everybody to be ready to start afresh for a new chapter of Gammon’s history.
    [Show full text]
  • 2010 Gammon Sustainability Report 2009 2
    Setting the pace Sustainability Report 2010 Gammon Sustainability Report 2009 2 01 Chief Executive’s Statement 02 Performance Highlights 04 The Gammon Way 05 Our Sustainability Framework 06 2010 Highlights – A Year of Sustainability in Action 08 A Case Study in Sustainable Construction 10 Economic and Business 13 Health and Safety 16 Environment 19 Social Responsibility 22 Projects of Distinction 24 Looking Ahead 25 Verification Statement At Gammon we are setting the pace of sustainability in our business, in our brands and joint ventures, and in our daily operations. This report covers the progress we made on our sustainability journey during the 2010 calendar year. This Report and other corporate information are available on our website at www.gammonconstruction.com Our Brands Front Coverphoti For Cathay Pacific’s new cargo terminal project, Gammon devised an innovative construction method Civil, foundations, building, E&M Public-Private Engineering design services (“the Beam Shutter”) for a safer and greener working and construction services covering Partnership business environment. plant and equipment, concrete technology and steel fabrication Gammon Sustainability Report 2010 1 Chief Executive’s Statement Some years ago, we at Gammon made the decision to embrace the sustainability agenda right across our business not only as a way of meeting our project requirements but also as a strong business strategy – our engine for growth. We believe that a robust sustainability strategy puts us in a leadership position within the construction industry and is a key factor in our continuing success as a business. During the past year, we saw considerable growth in Hong Kong’s construction industry, with corresponding falls in unemployment levels.
    [Show full text]
  • The Way We Build
    Integrated Digital Project Delivery The Way We Build Gammon Construction Limited 28th Floor, Devon House, Taikoo Place, 979 King's Road, Hong Kong Tel: 852 2516 8823 Fax: 852 2516 6260 www.gammonconstruction.com Jointly owned by Jardines and Balfour Beatty The Way We Build ... Contents The way we build today is not only about employing new, more 02 The Way We Think sophisticated electronic tools but changing the mindset of people. 04 The Way We Innovate In these pages, we describe how Integrated Digital Project Delivery, 08 The Way We Connect IDPD, is helping us to make a difference in today’s world. 12 The Way We Lead 26 The Way Ahead 28 Footnotes The Way We The Way We Innovate Lead The application of data and Gammon initiatives that creativity to make construction are making construction more efficient and faster, safer and smarter. The Way We cost-effective. The Way We The Way www.yellowcreative.com Think Connect Ahead Collaboration and The impact of our initiatives Our Chief Executive on how digital communication on our on the construction industry tools are revolutionising Gammon BIM journey from 3D to 10D. of tomorrow. and the construction industry. CONCEPT & DESIGN: YELLOW CREATIVE (HK) LIMITED CREATIVE YELLOW & DESIGN: CONCEPT Contents 02 The Way We Think 04 The Way We Innovate 08 The Way We Connect 12 The Way We Lead 26 The Way Ahead 28 Footnotes The Way We Lead Gammon initiatives that are making construction faster, safer and smarter. The Way Ahead The impact of our initiatives on the construction industry of tomorrow.
    [Show full text]
  • Sustainability Report 2013
    Sustainability Report 2013 New Dimensions in Sustainable Construction Group Turnover by Region Accident Incident Rate Greenhouse Gas Emissions Employment by Regions US$ millions per 1,000 workers tonnes CO2 equivalent monthly paid staff and daily paid workers Hong Kong & Macau Hong Kong & Macau Mainland China Mainland China Singapore Singapore 165 101,206 100,277 2005 monthly paid daily paid 166 11.3 128 89,726 Baseline 0 81,429 502 0.4 0 76,862 448 212 507 292 2013 374 423 6.9 Target 465 0.4 6.4 53,241 386 574 6 6 573 1,592 5.4 384 1 1, 481 1, 471 394 388 0 4,060 265 341 3,772 400 0 1, 003 0 0 815 3,072 2,625 0 2,517 1,936 1,939 1,802 2,052 1,406 2009 2010 2011 2012 2013 2009 2010 2011 2012 2013 2009 2010 2011 2012 2013 2009 2010 2011 2012 2013 2009 2010 2011 2012 2013 Group turnover is expected to The Accident Incident Rate (AIR) In 2013, the most significant The retention rate of monthly staff over the past three years remain strong in Hong Kong, and was reduced by 10% (our 2013 action taken to reduce greenhouse has improved and is in the top three of the industry. Over 80% we see growth in Singapore with target). In 2014, we will include gases was to start large-scale use of are permanent contract staff. Direct employment of daily paid several new projects secured. LTI (Lost Time Injures) together locally made Euro V B5 biodiesel workers is expected to continue increasing in Hong Kong as with AIR as our primary measures.
    [Show full text]