High Precast Stadium and Arena Systems Score Big with Architects, Owners, and Fans Alike

Total Page:16

File Type:pdf, Size:1020Kb

High Precast Stadium and Arena Systems Score Big with Architects, Owners, and Fans Alike HI GH PRECAST STADIUM AND ARENA SYSTEMS ® S R E W S N A & S N O I T A V O N N I E T E R C N O C From concept to completion, High helps deliver your project on scope, on spec, on time, and on budget. Precast Stadium and Arena Systems from High Concrete 3 High Performance Stadiums and Arenas 4 Precast Is the Leader for Performance, Quality, and Versatility 5 The All-Precast Stadium 6 High Rises to the Challenge: Stairs and Stadium Risers 7 High Precast Components Go the Distance 8 Cladding Panels: Put Your Best Foot Forward 9 The Surprisingly Green, LEED-Friendly Building Material 10 High Concrete Accessories 11 Across the Spectrum: Colors, Textures, and Finishes 12 Appearance and Cost Guide 14 High Stadium and Arena Systems Detail Gallery 14–17 High Stadium and Arena Systems Project Gallery 18–19 2 High Precast Facade Panels realize any design treatment, from ultra- modern to historically accurate . Precast Stadium and Arena Systems from High Concrete Group LLC Whether for indoor or outdoor facilities, High precast stadium and arena systems score big with architects, owners, and fans alike. For half a century, High precast has provided exceptional aesthetic and structural versatility, speed of enclosure, and durability. No other material provides the combination of range of shapes, colors, and textures, fire- resistance, acoustical insulation, weather-tightness, long-term durability, low mainte nance, and rapid, IAQ-friendly enclosure. Now, the newest innovation in precast, CarbonCast ® using C-GRID ® carbon fiber grid in lieu of steel mesh, enables facade cladding to be lighter, better insulating, and more durable—making precast even more ideal for cladding or enclosing stadiums and arenas. When it comes to stadiums and arenas, High Concrete is the clear first choice. Since 1957 we’ve provided precast products for more than 5,000 buildings. High will give you our undivided attention to the details that make the difference in the successful fulfillment of your design. It’s our attention to detail at every step that has won us, and the customers we serve, numerous national awards from PCI, ACI, and AIA. From concept to completion, High Concrete Group will provide extensive design and specification assistance, connection detailing, construction scheduling and erection planning, samples, mock-ups, assembly testing, field erection, field-finishing and caulking, as well as other services to ensure a streamlined, high quality installation. That’s the High Advantage. 1.800.PRECAS T WWW.HIGHCONCRETE.COM HIG H CONCRETE 3 Put the High design and performance advantage to work for you. HIGH PERFORMANCE STADIUMS AND ARENAS tadiums and arenas for the 21st n Environmental friendliness High Faster and Lower-Cost Fast-Track century are more than just a place thermal efficiency; recyclable materials Construction—In All Weather Sto watch the event. These large and n Economy Low maintenance and life Factory-cast and factory-cured compo - impressive structures offer a total experi - cycle costs nents are manufactured year-round and ence for the fan and family alike. When corrosion-resistant CarbonCast ® installed in almost any weather, which Precast concrete components are integral products are used, performance can be results in fewer schedule delays and faster to most of the major stadiums and enhanced even more. occupancy. arenas in the nation, providing durability, Superior Quality Construction costs may also be reduced by efficiency, comfort, and cost-effectiveness. High precast is manu factured under n Single-source fabrication and erection Precast also offers a vast range of carefully controlled factory conditions structural and architectural shapes for • Means less on-site labor with its that enable concrete mixes with higher unmatched design flexibility. associated congestion, cost, and strengths, corrosion- inhibiting schedule delays, and fewer quality Precast prestressed concrete is the admixtures to protect steel reinforcing, problems due to manpower shortages overwhelming choice for stadiums and and consistently high quality . arenas because of its • Eliminates the usual delays caused by n Consistent results Computerized multiple trades n Unlimited design options batching and enclosed PCI-certified n Just-in-time delivery n High strength and impermeability factory fabrication under controlled • Reduces site disruption by requiring n Superior quality and durability conditions that exceed PCI’s Plant Certification requirements fewer trades on site and reducing on- n Speedy, all-weather construction site storage, and often allows erection • Superior to cast-in-place or tilt-up n within the structure’s footprint Lower cost than cast-in-place concrete construction n n Rapid installation Low maintenance requirements Optimum Durability Outstanding Performance • Allows simultaneous erection of Precast leads the way for durability and structural elements and enclosur e High precast stadium and arena systems ease of maintenance. Because it is so are extremely high performing, delivering impermeable and corrosion resistant, it n Use of MEGA-Tees for deck areas • Means fewer, larger components go n Greater impermeability and strength retains its original appearance for many up faster with fewer joints • Concrete mixes with low years with minimal maintenance. water/cement ratios are enabled by n Abuse resistant Superior resistance to • Requires fewer columns and footings factory-controlled batching and the ravages of man and nature such as n Earlier project delivery and occupancy immediate placement of concrete to impact, chlorides, and dirt • Reduces general conditions, construc - yield higher strength mixes— averaging n Mold and mildew resistant Weather tion financing, and other carrying costs 7,000 psi or more tight enclosures form larger impermeable • Speeds realization of revenue • Precisely controlled air entrainment components that have fewer joints Unrestrained Design Freedom also results in minimal expansion and to caulk contraction and reduced cracking and Designing with precast gives you ultimate surface scaling design freedom and smart ways to solve problems. On a constrained site, for n Safety Inherently superior fire resistance example, you might choose a parking n Security Excellent impact/blast resistance garage to address traffic flow and and great structural strength/ durability contribute to sustainable design. Precast from reinforcing , pre-stressing, or post- systems provide peace of mind you won’t tensioning find with other construction options. 4 HIG H CONCRETE 1.800.PRECAS T WWW.HIGHCONCRETE.COM High precast = peace of mind…with expert design assistance, rapid installation, early project completion, and longer-long-term durability. Guaranteed! PRECAST IS THE LEADER FOR PERFORMANCE , QUALITY AND VERSATILITY Whether you’re building for baseball, n When no fire rating is required, Precast Takes the Heat football, hockey, basketball, soccer, thin-flanged tees and exposed steel Precast stadiums and arenas can be auto racing, horse racing, or any other bearing and connection details can designed to achieve any code-required entertainment, precast offers infinite be used fire rating, depending on concrete appearance options. High Concrete will n Where two-hour ratings are required, thickness and connection details. work with you to develop the structure thick-flanged tees and all-concrete n When no fire rating is required, and the details to bring your vision to bearing and grouted or concrete- thin-flanged tees and exposed steel life, on time and on budget. covered connection details will be used bearing and connection details can Precast Beats Cast-In-Place A new method to improve building stability be used Precast concrete exceeds cast-in-place and prevent collapse from wind or seismic n Where two-hour ratings are required, with more consistent results, greater forces involves casting plastic sleeves into thick-flanged tees and all-concrete impermeability and strength, and faster shear walls. Prestressed strand is then fed bearing and grouted or concrete- and lower-cost fast-track construction. through the sleeves and post-tensioned. covered connection details will be used High-strength precast concrete is virtually Studies have shown this to be an effective impermeable and it resists damaging way to increase structural stability—at a moisture penetration. Prestressing cost lower than conventional methods. enables even more efficient structural Call 1.800.PRECAST for details. design by allowing smaller, higher strength, and stronger members and Small Stadium Construction Phases and Time Line keeping concrete in constant compres - sion to reduce or prevent cracking. Length of construction in weeks 25 Post-Tensioning for 24 CIP Structure and Exceptional Performance 23 Precast Exterior Post-tensioning can allow precast to form 22 21 complex cantilever arm and ring beam Steel Frame and construction to support the roofs of 20 Brick Veneer 6. Erect precast 19 cladding arenas and stadiums. Post-tensioning 18 can also reinforce cantilevered raker 17 8. Enclose columns 5. Strip and dispose beams which carry seating and provide 16 of forms 7. Install stairs unobstructed views of the playing field. 15 14 4. Wait for structure, Precast stadiums and arenas can be 6. Build shafts 13 decks, shafts and designed to achieve any code-required 12 Precast Building 5. Erect scaffold and stairs to cure System fire rating, depending on concrete 11 lay brick veneer thickness and connection details. 3. Pour structure, 10 3. Pour floor leveling 4.
Recommended publications
  • The Main Chapel of the Durres Amphitheater Decoration and Chronology1
    SPIOX - B1: MFA092 - cap. 13 - (1ª bozza) MEFRA – 121/2 – 2009, p. 569-595. The main chapel of the Durres amphitheater Decoration and chronology1 Kim BOWES and John MITCHELL The amphitheater at Durres in central Albania series of limited excavations to clarify the is one of the larger and better preserved building’s post-Roman and Byzantine chronology, amphitheaters of the Roman world, as well as one we completed an in-depth study of the mosaic of the eastern-most examples of the amphitheater chapel, its structure and decoration (fig. 1). form. Nonetheless, it is not for its Roman architecture that the building is best known, but ANCIENT DYRRACHIUM AND ITS AMPHITHEATER its later Christian decoration, specifically, a series of mosaics which adorn the walls of a small chapel Named Epidamnos by its Greek founders and inserted into the amphitheater’s Roman fabric. Dyrrachium by the Romans, Durres was the First published by Vangel Toçi in 1971, these principal city of Epirus Vetus and the land mosaics were introduced to a wider scholarly terminus of the Via Egnatia, the road that audience through their inclusion in Robin throughout late antiquity and the Byzantine Cormack’s groundbreaking 1985 volume Writing period linked Rome to Constantinople.3 Durres in Gold.2 Despite the mosaics general renowned, also sat on a major Adriatic trade route linking the however, they have been studied largely as northern Greek Islands to Dalmatia and northern membra disjecta, cut off from their surrounding Italy. Thus, like Marseilles or Thessaloniki, Durres context, both architectural and decorative. was a place where road met sea and the cultural 6In 2002 and 2003, the authors and a team of currents of east and west mingled.
    [Show full text]
  • A New Model to Modernize U.S. Infrastructure
    Bridging the Gap Together: A New Model to Modernize U.S. Infrastructure May 2016 ACKNOWLEDGMENTS BPC staff produced this report in collaboration with a distinguished group of senior advisors and experts. BPC would like to thank Aaron Klein, Fellow, Economic Studies and Policy Director, Initiative on Business and Public Policy, the Brookings Institution, and the council’s staff for their contributions and continued support. In addition, BPC thanks all the organizations and individuals who participated in the research and contributed to the council’s roundtables and regional forums for their feedback. EXECUTIVE COUNCIL ON INFRASTRUCTURE 7KH([HFXWLYH&RXQFLORQ,QIUDVWUXFWXUHLVDZRUNLQJJURXSRIFRUSRUDWH&(2VDQGH[HFXWLYHVGUDZQIURPWKHÀQDQFLDOLQGXVWULDO logistics, and services industries. The council has developed recommendations to help facilitate increased private sector investment in U.S. infrastructure. DISCLAIMER This report is a product of the BPC Executive Council on Infrastructure, whose membership includes executives of diverse RUJDQL]DWLRQV7KHFRXQFLOUHDFKHGFRQVHQVXVRQWKHVHUHFRPPHQGDWLRQVDVDSDFNDJH7KHÀQGLQJVDQGUHFRPPHQGDWLRQV expressed herein do not necessarily represent the views or opinions of the council member companies, the members of the Political Advisory Group, the Bipartisan Policy Center’s founders or its board of directors. 1 Executive Council on Infrastructure Doug Peterson President and CEO, S&P Global Co-Chair, Executive Council on Infrastructure Susan Story President and CEO, American Water Co-Chair, Executive Council on Infrastructure Eric Cantor Vice Chairman and Managing Director, Moelis & Co. Former House Majority Leader Patrick Decker President and CEO, Xylem Inc. Michael Ducker President and CEO, FedEx Freight Jack Ehnes &KLHI([HFXWLYH2IÀFHU&DOLIRUQLD6WDWH7HDFKHUV· Retirement System (CalSTRS) Jane Garvey Chairman of North America, Meridiam P. Scott Ozanus Deputy Chairman and COO, KPMG Suzanne Shank Chairman and CEO, Siebert Brandford Shank & Co., LLC 2 Political Advisory Group Haley Barbour Former Governor Steve Bartlett Former U.S.
    [Show full text]
  • Transport Infrastructure Development Performance
    Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 178 ( 2017 ) 319 – 329 16th Conference on Reliability and Statistics in Transportation and Communication, RelStat’2016, 19-22 October, 2016, Riga, Latvia Transport Infrastructure Development Performance Oksana Skorobogatova, Irina Kuzmina-Merlino* Transport and Telecommunication Institute, 1 Lomonosova str., Riga, LV-1019, Latvia Abstract Transport infrastructure is an integral part of the transport system of any city or state. In connection with the development of society and intensification of international relations due to the globalization processes, the importance of transport as a factor for economic and social development has enhanced. Various aspects of the activities related to the development of transport infrastructure have increasingly become the objects of scientific researches. Transportation as an economic factor is a measure of economic activity and at the same time transportation is a reflection of economic activity. So, the questions about transport infrastructure performance measurement and relationship between transport infrastructure and economic growth are the subjects for discussions in both academic and non-academic circles. This paper highlights the role of the transportation industry in economic development of Latvia, describes the concept of transport infrastructure as an important part of the state transport system, and estimates the employed international approaches to the measurement of performance of transport infrastructure development. The article focuses on the necessity for the development of the methodology of measuring the transport infrastructure performance, that should be applied systematically and that would be generally helpful to all responsible people making transportation-related decisions. © 20172017 The The Authors. Authors. Published Published by Elsevierby Elsevier Ltd.
    [Show full text]
  • Canal Side Design Guidelines
    Canal Side Design Guidelines Issued by: Erie Canal Harbor Development Corporation A subsidiary of the New York State Urban Development Corporation d/b/a Empire State Development Corporation 95 Perry Street- Suite 500 Buffalo, NY 14203-3030 Prepared by: Ehrenkrantz, Eckstut & Kuhn Architects July, 2009 revised March, 2010 Table of Contents 1. Introduction 3 2. Use 5 3. Massing 8 4. Circulation 12 5. Architectural Features 16 6. Materials 23 7. Signage 25 8. Lighting 26 9. Erie Canal Harbor Parcels 27 10. Sustainability 28 11. Design Review Process 33 Appendix 36 Sections 3.3 & 3.5 of the 2005 Erie Canal Harbor Amendment to the Urban Renewal Plan for the Waterfront Redevelopment Project 1. Introduction Canal Side (the “Project”) is a new mixed-use neighborhood that will reconnect Downtown Buffalo to the Lake Erie waterfront through a network of streets, canals, and public spaces, evoking the City’s history, while creating a timeless neighborhood that will help defi ne its future. With approximately 1.1 million square feet of development, including retail, restaurant, hotel, offi ce, cultural, and residential uses, Canal Side is made up of 23 development parcels within approximately 20 acres on the Buffalo Riverfront (“Project Area”). Anchored by a destination retailer, the Project offers urban amenities and year-round offerings and experiences, including restaurants, entertainment venues, retail outlets, cultural attractions, public spaces, and increased access to the Buffalo River. The proposed Canal Side Site Plan (“Site Plan”, see Exhibit 1) identifi es the conceptual design for the mixed-use project. These Canal Side Design Guidelines (“Guidelines”) apply to all development parcels within Canal Side.
    [Show full text]
  • Why Is Infrastructure Important? 23
    Why Is Infrastructure David Alan Aschauer* As the decade of the 1990s begins, new challenges present them- selves to the citizenry of the United States. Among the most important are concerns about the environment, economic productivity, and inter- national competitiveness, and a rearrangement of standing strategic military relationships. Our future quality of life, economic prosperity, and security depend crucially on how we choose to meet these new challenges. The apparent failure of the communist economic system and the associated relaxation of Cold War tensions offer the potential for a significant reallocation of the nation’s resources from military to other uses. A crucial question then arises whether these resources should be channeled to the private sector, effecting overall government expendi- ture reduction, or kept within the public sector, thereby inducing an alteration in the composition of government spending. The first direction, expenditure reduction, certainly has merit to a broad class of individuals. Many would point to the fact that total federal government outlays, expressed relative to gross national product, rose from 14.8 percent in 1950 to 21.6 percent in 1980 and, in 1989, to 21.8 percent. Others would point to the persistence of federal budget deficits. To both groups, expenditure reduction would be of benefit to economic performance, either by reducing the overall scale of govern- ment activity in the economy or by allowing a reduction in interest rates and an expansion in domestic investment activity. *Formerly Senior Economist, Federal Reserve Bank of Chicago, and now Elmer W. Campbell Professor of Economics, Bates College. 22 David Alan Aschauer But the second direction, expenditure reorientation, may also have merit.
    [Show full text]
  • Pakistan Country Reader
    PAKISTAN COUNTRY READER TABLE OF CONTENTS David D. Newsom 1947-1950 Information Officer, USIS, Karachi Merritt N. Cootes 1947-1949 Acting Principal Officer, Lahore 1949-1951 Public Affairs Officer, Karachi James W.S. Spain 1951-1953 Cultural Affairs Officer, USIS, Karachi 1969 Chargé d’Affaires, Islamabad William J. Crockett 1952-1954 Administrative Officer, Karachi Roy O. Carlson 1953-1954 Vice Consul, Dacca Edward E. Masters 1953-1954 Political Officer, Karachi John O. Bell 1955-1957 Chief of U.S. Operations Mission, ICA, Karachi Jane Abell Coon 1957-1959 Political Officer, Karachi Michael P.E. Hoyt 1957-1959 Administrative / Consular Officer, Karachi Ridgway B. Knight 1957-1959 Minister Counselor, Karachi Charles E. Marthinsen 1957-1959 Economic/Commercial Officer, Dacca Stanley D. Schiff 1957-1959 Economic Officer, Karachi Dennis Kux 1957-1960 Economic Officer, Karachi 1969-1971 Political Officer, Islamabad Royal D. Bisbee 1958-1961 Branch Public Affairs Officer, Lahore Christopher Van Hollen 1958-1961 Political Officer, Karachi, Rawalpindi, and Islamabad William M. Rountree 1959-1962 Ambassador, Pakistan William E. Hutchinson 1959-1963 Deputy Public Affairs Officer, USIS, Karachi L. Bruce Laingen 1960-1964 Political Officer, Karachi 1965-1967 Office Director, Pakistan and Afghanistan Affairs, Washington, DC 1971-1973 Country Director for Pakistan and Afghanistan, Washington, DC Ben Franklin Dixon 1962-1964 Political-Military Assistant, Karachi Archer K. Blood 1962-1964 Political Officer and Deputy Principal Officer, Dacca 1970-1971 Consul General, Dacca R. Grant Smith 1963-1964 Rotation Officer, Karachi 1970-1972 India Desk Officer, Washington, DC Maurice Williams 1963-1967 Director, USAID, Karachi Raymond C. Ewing 1964-1966 Executive Assistant, USIS, Lahore Raymond Malley 1964-1969 Assistant Director, USAID, Karachi Jordan Thomas Rogers 1965-1968 Economic Counselor, Karachi 1968-1969 Deputy Chief of Mission, Rawalpindi C.
    [Show full text]
  • Olympic Infrastructure—Global Problems of Local Communities on the Example of Rio 2016, Pyeongchang 2018, and Krakow 2023
    sustainability Article Olympic Infrastructure—Global Problems of Local Communities on the Example of Rio 2016, PyeongChang 2018, and Krakow 2023 Bartosz Dendura Faculty of Architecture, Cracow University of Technology, 31-155 Kraków, Poland; [email protected]; Tel.: +48-12-374-2443 Received: 31 October 2019; Accepted: 18 December 2019; Published: 23 December 2019 Abstract: Every potential Olympic Games organiser assumers that the games they organise will be special, that they will help to set new, high standards both in the organisation of sports events themselves, as well as in the planning and carrying out of projects accompanying the games. Since the document entitled Agenda 21 was approved by the UN at the Earth Summit in 1992, environmental protection has become the mainstay of the discussion among the Olympic family, and the problem of sustainable planning has become one of the main features of published reports. The conclusion of the conference coincided with the Lillehammer Winter Olympics of 1994, which were praised as the first green games to be held, under the motto “White Green Games”. Four years prior, in Nagano, its organisers advertised the games with the slogan “Coexistence with nature”. London 2012, with its motto “Inspire a Generation”, highlighted the educational aspect of the events and the words “environment” and “sustainability” were on the lips of everyone everywhere in the context of every activity the organisers were undertaking. During Rio 2016, the motto was “Green Games for Blue Planet”. The goal of the article is to investigate whether these mottoes have been actually reflected in the measures taken by authorities and encompassing the period between proclaiming them as Games organisers, during the sports event itself, and during the post-Games period.
    [Show full text]
  • Belmont Park Redevelopment Project Final Scope for Preparation of a Draft Environmental Impact Statement
    Belmont Park Redevelopment Project Final Scope for Preparation of a Draft Environmental Impact Statement A. INTRODUCTION This document is the final scope of work (“Final Scope”) for a Draft Environmental Impact Statement (DEIS) to inform the environmental review process for the proposed redevelopment of two underutilized parcels (the “Project Sites”) located within Belmont Park in the unincorporated hamlet of Elmont, Town of Hempstead, Nassau County, NY. This Final Scope has been prepared to describe the Proposed Project (as defined below), present the proposed framework and methodologies for the DEIS analysis, and discuss the procedures to be followed in the preparation of the DEIS. The DEIS will be prepared pursuant to the State Environmental Quality Review Act (SEQRA) and its implementing regulations at 6 NYCRR Part 617. Empire State Development (ESD) is serving as the lead agency under SEQRA. A Draft Scope for the project was issued on February 27, 2018. Oral and written comments were received during the scoping meetings held by ESD on March 22, 2018 at Elmont Memorial Library at 700 Hempstead Turnpike, Elmont, NY 11003. Written comments were accepted from the issuance of the Draft Scope through the public comment period, which ended April 12, 2018. The majority of the comments relevant to the Draft Scope focused on: (1) potential health and safety concerns related to the proposed siting of a new electrical substation to serve the Proposed Project; (2) traffic generated by the proposed uses and associated pedestrian safety; (3) the adequacy of parking for the proposed uses; (4) infrastructure and community services capacity concerns; (5) buffers between the Project Sites, North Lot, and adjacent communities (6) visual and safety concerns related to the proposed height of the hotel; and (7) concerns about whether the hotel could include a casino.
    [Show full text]
  • Professional Sports Facilities, Franchises and Urban Economic Development
    Professional Sports Facilities, Franchises and Urban Economic Development UMBC Economics Department Working Paper 03-103 Dennis Coates Department of Economics University of Maryland, Baltimore County Brad R. Humphreys Department of Economics University of Maryland, Baltimore County Abstract Local political and community leaders and the owners of professional sports teams frequently claim that professional sports facilities and franchises are important engines of economic development in urban areas. These structures and teams allegedly contribute millions of dollars of net new spending annually and create hundreds of new jobs, and provide justification for hundreds of millions of dollars of public subsidies for the construction of many new professional sports facilities in the United Sates over the past decade. Despite these claims, economists have found no evidence of positive economic impact of professional sports teams and facilities on urban economies. We critically review the debate on the economic effects of professional sports and their role as an engine of urban economic redevelopment, with an emphasis on recent economic research. Economic Development and Sports On the surface, sports facilities and franchises appear to be prime candidates for economic development projects aimed at revitalizing urban neighborhoods. Unlike abstract economic development tools like tax credits and empowerment zones, sports facilities – stadiums, arenas, 2 football pitches, etc. – are highly visible structures. Sporting events are wildly popular throughout the world and widely understood and appreciated by residents of cities. In the United States, new sports facilities are frequently cited as important components of urban redevelopment initiatives and sources of considerable economic growth in terms of job creation and income generation.
    [Show full text]
  • Towards Zero Energy Stadiums: the Case Study of the Dacia Arena in Udine, Italy
    energies Article Towards Zero Energy Stadiums: The Case Study of the Dacia Arena in Udine, Italy Mattia Manni 1 , Valentina Coccia 1,2, Andrea Nicolini 1,2 , Guido Marseglia 3 and Alessandro Petrozzi 1,* 1 CIRIAF—Interuniversity Research Centre on Pollution and Environment “Mauro Felli”, 06125 Perugia, Italy; [email protected] (M.M.); [email protected] (V.C.); [email protected] (A.N.) 2 Department of Engineering, University of Perugia, 06125 Perugia, Italy 3 Research Department, Link Campus University of Rome, 00165 Rome, Italy; [email protected] * Correspondence: [email protected]; Tel.: +39-075-585-3806 Received: 13 July 2018; Accepted: 4 September 2018; Published: 11 September 2018 Abstract: The environmental impacts of sport events have been growing during the last decades, which has led to the organizing associations developing adequate countermeasures to both reduce carbon emissions due to construction and operational stages compensate for the emissions. This work aims at proposing an approach to stadiums energy enhancement that includes strategies largely recognized as effective and applicable to several building typologies (residential, commercial, academic, etc.). The selected case study is the Dacia Arena in northern Italy that has been recently refurbished and renovated. The proposed workflow has as a goal minimizing the increment of the operational emissions, caused by new heated areas in the stadium. Firstly, the energy consumption was estimated in dynamic state for Scenario 0 (current state) and Scenario 1 (refurbished state) to quantify the new plant’s energy demand. Secondly, two hypothetical system layouts were proposed and evaluated. In the first, the power for lighting, cooling and heating is supplied by a system that couples photovoltaic panels with heat pump.
    [Show full text]
  • Cash, Political Institutions, Corruption, and Policy Gestalts
    Policy Studies ISSN: 0144-2872 (Print) 1470-1006 (Online) Journal homepage: http://www.tandfonline.com/loi/cpos20 Explaining infrastructure underperformance in Brazil: cash, political institutions, corruption, and policy Gestalts Leslie Elliott Armijo & Sybil D. Rhodes To cite this article: Leslie Elliott Armijo & Sybil D. Rhodes (2017) Explaining infrastructure underperformance in Brazil: cash, political institutions, corruption, and policy Gestalts, Policy Studies, 38:3, 231-247, DOI: 10.1080/01442872.2017.1290227 To link to this article: https://doi.org/10.1080/01442872.2017.1290227 Published online: 10 Mar 2017. Submit your article to this journal Article views: 437 View Crossmark data Citing articles: 2 View citing articles Full Terms & Conditions of access and use can be found at http://www.tandfonline.com/action/journalInformation?journalCode=cpos20 POLICY STUDIES, 2017 VOL. 38, NO. 3, 231–247 http://dx.doi.org/10.1080/01442872.2017.1290227 Explaining infrastructure underperformance in Brazil: cash, political institutions, corruption, and policy Gestalts Leslie Elliott Armijoa and Sybil D. Rhodesb aSchool for International Studies, Simon Fraser University, Vancouver, BC, Canada; bDepartment of Political Science and International Relations, Universidad del CEMA, Ciudad de Buenos Aires, Argentina ABSTRACT ARTICLE HISTORY Brazil’s infrastructure underperforms compared to that of peer Received 11 August 2016 emerging economies. Why? The political institutions of coalitional Accepted 17 January 2017 presidentialism with strong federalism undermine rational national KEYWORDS planning. Politicians’ incentives to distribute ‘pork’ combine with Infrastructure; Brazil; public sector-specific oligopoly characteristics, offering fertile ground for policy; political institutions; corruption. Yet the greatest challenge is low infrastructure coalitional presidentialism; investment, a consequence of weak private capital markets and clientelism; corruption; regulatory inconsistency.
    [Show full text]
  • Arena District
    Arena District Columbus, Ohio Project Type: Mixed Use/Multiuse Volume 37 Number 03 January–March 2007 Case Number: C037003 PROJECT TYPE Built on the site of a former penitentiary, the Arena District in downtown Columbus, Ohio, is a 75-acre (30.35-hectare) entertainment center with the 685,000-square-foot (63,639-square-meter) Nationwide Arena serving as its anchor. The arena is home to the National Hockey League’s Columbus Blue Jackets and the Arena Football League’s Columbus Destroyers. Developed to help transform the area into a 24/7 neighborhood, supportive retail and restaurants, a movie theater, office space, and residential units constitute the rest of the district in an architectural style that blends historic buildings and facades with new construction. The Arena District is the result of a public/private partnership among Nationwide Realty Investors, the Dispatch Printing Company, and the city of Columbus. LOCATION Central Business District SITE SIZE 75 acres/30.35 hectares LAND USES Mixed-Use District, Entertainment Center, Arena, Retail, Office Building(s), Condominiums, Multifamily Rental Housing KEYWORDS/SPECIAL FEATURES Urban Regeneration Public/Private Partnership Infill Development Adaptive Use DEVELOPER Nationwide Realty Investors Columbus, Ohio 614-857-2330 www.Arena-District.com ARCHITECT 360 Architects Columbus, Ohio 614-221-5407 www.360architects.com PLANNER MSI Design Columbus, Ohio 614-621-2796 www.msidesign.com GENERAL DESCRIPTION The Arena District is a 75-acre (30.35-hectare) master-planned neighborhood in downtown Columbus, Ohio. Originally home to the Ohio State Penitentiary, the site lay barren for more than a decade before it was purchased by Nationwide Mutual Insurance Company during the mid-1990s.
    [Show full text]