Siemens Adds Value to Transportation Not Only with Very High-Speed Trains, but Also with Signaling Solutions. Siemens Equipment

Total Page:16

File Type:pdf, Size:1020Kb

Siemens Adds Value to Transportation Not Only with Very High-Speed Trains, but Also with Signaling Solutions. Siemens Equipment Improving quality of life | B2S Siemens adds value to transportation not start manufacturing by the end of 2017. only with very high-speed trains, but also Such localization of railway vehicles will with signaling solutions. Siemens equipment make many contributions to the economic and solutions are used in the signaling growth of Turkey. In addition to a workforce system of the high-speed line between of approximately 800 people, including Ankara and Konya. local suppliers and factory workers, EUR 250 million worth of exports income is Catenary systems on the first high-speed train expected from the 100 wagons to be manu- line between Ankara and Eskişehir were factured each year. produced and designed by Siemens Turkey. Reducing the commuting time to 1.5 hours, In addition, 22 four-unit subway trains have the trains travel with a maximum speed of been ordered by Bangkok Mass Transit System 250 km/h, and 40% time saving is ensured Public Company (BTSC) from a consortium of compared to traveling by highway. Siemens and Turkish public transportation vehicles manufacturer Bozankaya. Service and Siemens’ signature on Marmaray maintenance of these trains will also be Siemens Turkey, which performs electrifica- undertaken by Siemens for 16 years. tion services of projects such as İstanbul If Siemens wins the tender for 80 sets of very Subway as well as signaling and electrome- high-speed trains, these trains will be deliv- chanics of bridges and tunnels, also worked ered with a minimum localization scale of 53% at the Marmaray Tunnel projects with as stated in the specifications. Siemens Signaling, Telecom and SCADA systems. In addition to this tunnel Tunnel automation and safety constructed under the Bosporus, moderniza- Siemens Turkey, which increases efficiency tion works for the current suburban line and safety in transportation with its Intelligent starting from Halkalı on the European side Traffic Control system, installed automation and ending at Gebze on the Anatolian side systems for 21% of the total highway tunnels were also performed by Siemens Turkey. The in Turkey within the scope of the turnkey first 12 kilometers of the line was opened in projects it has been continuing for 15 years. October 2013. According to the January 2016 data announced by the Ministry of Awarded in logistics Transportation, Maritime and Communica- The volume of Siemens Turkey in the field of tions, 114 million passengers, corresponding logistics reached EUR 21 million in the 2015 to egith times the total population of fiscal year and EUR 19 million of this contrib- İstanbul, have been transported via uted to local companies as gross income. In Marmaray. Also, thanks to this underwater addition to the Ministry of Transport, Maritime rail system that transports approximately Affairs and Ministry of Communications and 200,000 people per day, the vehicle traffic Customs and Commerce, Siemens Turkey also participated as an International Investors on the July 15 Martyrs’ Bridge (Bosporus) and Association (YASED) member to the meetings the Fatih Sultan Mehmet Bridge were held by the European Union Commission reduced by 6% (despite the increasing within the scope of the 10th Development number of vehicles). Plan. Probable solutions for logistics problems were discussed in these meetings. Siemens to manufacture trams in Turkey One of the important breakthroughs of Of note, Siemens Turkey’s suggestions for Siemens Turkey will be the new tram factory improvements in logistics industry were constructed with an investment of rewarded with the “Global Category Logistics EUR 30 million. The factory is planned to Award 2016” by Siemens AG. 68.
Recommended publications
  • Arcadius 8; (Column
    index INDEX 319 Arcadius 8; (column of) 184 Balat 213–14 Archaeological Museum 93ff Baldwin, Count of Flanders 15 Argonauts, myth of 259, 263, 276 Balıklı Kilisesi 197–98 Major references, in cases where many are listed, are given in bold. Numbers in italics Armenian, Armenians 25, 189, 192, Balkapanı Han 132 are picture references. 193, 241–42, 258, 278; (Cemetery) Baltalimanı 258 268; (Patriarchate) 192 Balyan family of architects 34, 161, 193; Arnavutköy 255 (burial place of) 268 A Alexander, emperor 67 Arsenal (see Tersane) Balyan, Karabet 34, 247 Abdülaziz, sultan 23, 72, 215, 251; Alexander the Great 7; (sculptures of) 96 Ashkenazi Synagogue 228 Balyan, Kirkor 34, 234 (burial place of) 117 Alexander Sarcophagus 94, 95 Astronomer, office of 42 Balyan, Nikoğos 34, 246, 247, 249, Abdülhamit I, sultan 23, 118; (burial Alexius I, emperor 13, 282 At Meydanı (see Hippodrome) 252, 255, 274, 275 place of) 43 Alexius II, emperor 14 Atatürk 24, 42, 146, 237, 248; Balyan, Sarkis 34, 83, 247, 258, 272, Abdülhamit II, sultan 23, 251, 252, Alexius III, emperor 14 (Cultural Centre) 242; (Museum) 243; 267 278; (burial place of) 117 Alexius IV, emperor 15 (statue of) 103 Bank, Ottoman 227 Abdülmecit I, sultan 71, 93, 161, 164, Alexius V, emperor 15 Atik Ali Pasha 171; (mosque of) 119 Barbarossa, pirate and admiral 152, 247; (burial place of) 162 Ali Pasha of Çorlu, külliye of 119–20 Atik Mustafa Paşa Camii 216 250, 250; (burial place of) 250; Abdülmecit II, last caliph 24 Ali Sufi, calligrapher 157, 158 Atik Sinan, architect 130, 155, 212; (ensign
    [Show full text]
  • Exports: the Heart of Nep
    How to Export to 2018 Turkey This report includes all the information related to trade basics and detailed data regarding export from Brazil to Turkey. This report is for information purposes only and Tumer Eng. will not be liable to any direct, indirect, incidental, special, consequential or exemplary damages, including but not limited to, damages for loss of profits, goodwill, use, data, or other intangible losses. Ver:1.0 2018 1 Contents 1 Why Turkey.................................................................................................................................... 12 1.1 General Information .............................................................................................................. 12 1.2 Geography ............................................................................................................................. 13 1.2.1 Distances ....................................................................................................................... 18 1.2.2 Climate of Turkey .......................................................................................................... 19 1.2.2.1 Air temperature changes until now .......................................................................... 20 1.2.2.2 Precipitation changes until now ................................................................................ 21 1.2.2.3 Air temperature changes in the 21st century ........................................................... 21 1.2.2.4 Precipitation changes in the 21st century ................................................................
    [Show full text]
  • L-G-0008366837-0017086142.Pdf
    Nuh Bilgin Hanifi Copur Cemal Balci TBM Excavation in Difficult Ground Conditions TBM Excavation in Difficult Ground Conditions Case Studies from Turkey Nuh Bilgin Hanifi Copur Cemal Balci Prof. Dr. Nuh Bilgin Prof. Dr. Hanifi Copur Prof. Dr. Cemal Balci Istanbul Technical University Faculty of Mines, Mining Engineering Department 34469 Maslak/Istanbul Turkey Cover: Methane Explosion in the Pressure Chamber of a Tunnel Boring Machine Photo: Bilgin/Copur Library of Congress Card No.: applied for British Library Cataloguing-in-Publication Data A catalogue record for this book is available from the British Library. Bibliographic information published by the Deutsche Nationalbibliothek The Deutsche Nationalbibliothek lists this publication in the Deutsche Nationalbibliografie; detailed bibliographic data are available on the Internet at <http://dnb.d-nb.de>. © 2016 Wilhelm Ernst & Sohn, Verlag für Architektur und technische Wissenschaften GmbH & Co. KG, Rotherstraße 21, 10245 Berlin, Germany All rights reserved (including those of translation into other languages). No part of this book may be reproduced in any form – by photoprinting, microfilm, or any other means – nor transmitted or translated into a machine language without written permission from the publishers. Registered names, trademarks, etc. used in this book, even when not specifically marked as such, are not to be considered unprotected by law. Coverdesign: Sonja Frank, Berlin Production Management: pp030 – Produktionsbüro Heike Praetor, Berlin Typesetting: Reemers Publishing Services
    [Show full text]
  • Marmaray Tunnel Under the Sea: Public Safety, Cellular and GSMR Coverage in the Marmaray Tunnel
    Cobham Wireless Case Study Marmaray tunnel Under the sea: public safety, cellular and GSMR Coverage in the Marmaray Tunnel Overview The project involved providing public safety, cellular and GSM-R connectivity for the Marmaray underground tunnel, a 13.6km long section of the Marmaray rail project. The tunnel connects Europe to Asia via an undersea tunnel crossing the Bosphorus strait. It is of significant strategic importance to Turkey, so a solution was required which would deliver reliable connectivity to the rail operator, the emergency services and commuters. Challenge Undersea tunnels are a challenging environment to provide coverage. Users of the network should The Challenge also not experience loss of communication while The Marmaray tunnel is a 13.6km long undersea tunnel, with three underground entering or exiting the tunnel, which provides an stations along the route. The tunnel connects Europe to Asia via the Bosphorus strait. additional challenge. A solution was required that would be capable of providing consistent and The project required providing public safety services and critical communications to the reliable public safety, cellular and GSM-R emergency services (police, fire service and ambulance service). connectivity throughout the tunnel. With such a critical project, it was also important Cellular connectivity was also required to connect rail passengers using three Turkish that the deployment was completed in time for operator networks, and GSM-R connectivity needed to be provided for the rail operator. the official opening of the tunnel. Therefore, a system was needed that could accommodate multiple radio technologies such as TETRA, UHF and VHF analogue (later migrated to VHF APCO), GSM, UMTS and The Tech GSM-R.
    [Show full text]
  • Kanal İstanbul: Pipedream Or Politics? Actuelles De L‟Ifri
    Actuelles de l‟Ifri Kanal İstanbul: This paper examines Kanal İstanbul, a plan proposed Pipedream or Politics? by recently re-elected Turkish Prime Minister Christian Keller Recep Tayyip Erdoğan to bypass the Bosphorus Strait by creating a canal west of Istanbul. stanbul has a history of grandeur. From the Byzantines to the Ottomans, Christian Keller, a recipient of the I the city of Istanbul has been designed as, in the words used by Emperor 2011 James A. Baker III Institute for Napoleon, the capital of the world. There was a sense of grandeur, too, when Public Policy / Leadership Rice Summer Mentorship Experience Prime Minister Recep Tayyip Erdoğan announced the construction of a canal Fellowship, is an intern at Ifri in the Energy Program. He studies Political to bypass the Bosphorus Straits, the maritime highway that bisects the City of Science and Policy Studies, with a concentration in urban politics and Istanbul and brings ships from the Mediterranean to the Black Sea and vice public policy, at Rice University. versa. Named Kanal İstanbul, Erdoğan proposed the project during his re- Ifri is a research center and a election campaign less than two months before the general election as a way forum for debate on the major to relieve stress from Turkey‟s prized city and solve some of the nation‟s most international political and economic issues. Headed by pressing issues. Thierry de Montbrial since its founding in 1979, Ifri is a non governemental and non profit organization. As an indepen- dent think tank, Ifri sets its own The Bosphorus agenda, publishing its findings regurlarly for an international audience.
    [Show full text]
  • CONT Mission to Turkey 01 to 04 November 2016
    CONT mission to Turkey within the context of the use of pre-accession funds & visit to Syrian refugee camp 01 to 04 November 2016 © carte du monde Committee on Budgetary Control Programme Fact-finding mission of the Budgetary Control Committee (CONT) to Turkey 01 to 04 November 2016 Directorate-General for Internal Policies of the Union Directorate for Budgetary Affairs Secretariat of the Committee on Budgetary Control - Brussels, 21 October 2016 Fact-finding mission of the Budgetary Control Committee (CONT) to Turkey 01 - 04 November 2016 DRAFT PROGRAMME Tuesday 1 November 2016 16.20 Arrival at Ankara Esenboğa Airport 17:30 – 18:00 Briefing session with Head of EU delegation, Ambassador Berger (Confirmed) Venue: EUD, Uğur Mumcu cad. No.88 Kat.5 GOP, Cankaya 18:00 – 19:30 Debriefing session with UN Agencies (UNHCR, WFP, UNFPA, UNDP, IOM) (Confirmed) Venue: EUD 20:00 Private Dinner Venue: Günaydın Restaurant, Gaziosmanpaşa, Attar Sk. No:6, Çankaya Night in Hilton Hotel Wednesday 2 November 2016 - Ankara 09:00-10:00 Courtesy call to İsmail Kahraman, Speaker of the Turkish Grand National Assembly (TGNA) and tour of TGNA (TBC) Venue: TGNA 10:30-11:30 Meeting with Mr. Ömer Çelik, Minister for EU Affairs & Chief Negotiator (TBC) Venue: Ministry for EU Affairs 12:00-13:00 Meeting with Deputy Prime Minister Mehmet Şimşek (TBC) Venue: Treasury 13:15-14:00 Private Lunch Venue: ? 14:15-15:30 Roundtable with key Turkish actors in indirect management of EU funding (NIPAC, NAO, CFCU and Operating Structures) - (TBC) Venue: Treasury 16:00-17:00 Visit to a school in Altındağ, funded by the Facility Special Measure, where Syrian students are enrolled (Confirmed) Venue: Fatih Sultan Mehmet İlköğretim Okulu, Önder mah.
    [Show full text]
  • Turkey's Unraveling Democracy: Reversing Course from Democratic Consolidation to Democratic Backsliding Julie Soo Jung Ahn Claremont Mckenna College
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Scholarship@Claremont Claremont Colleges Scholarship @ Claremont CMC Senior Theses CMC Student Scholarship 2014 Turkey's Unraveling Democracy: Reversing Course from Democratic Consolidation to Democratic Backsliding Julie Soo Jung Ahn Claremont McKenna College Recommended Citation Ahn, Julie Soo Jung, "Turkey's Unraveling Democracy: Reversing Course from Democratic Consolidation to Democratic Backsliding" (2014). CMC Senior Theses. Paper 852. http://scholarship.claremont.edu/cmc_theses/852 This Open Access Senior Thesis is brought to you by Scholarship@Claremont. It has been accepted for inclusion in this collection by an authorized administrator. For more information, please contact [email protected]. CLAREMONT MCKENNA COLLEGE TURKEY’S UNRAVELING DEMOCRACY: REVERSING COURSE FROM DEMOCRATIC CONSOLIDATION TO DEMOCRATIC BACKSLIDING SUBMITTED TO PROFESSOR KRISTIN FABBE AND DEAN NICHOLAS WARNER BY JULIE SOO JUNG AHN FOR SENIOR THESIS SPRING 2014 APRIL 28, 2014 3 TABLE OF CONTENTS Acknowledgements…………………………………………………………………...…..4 List of Abbreviations.…………………………………………………………………….5 Timeline of Major Events since 2007……………………………………………………6 I. Introduction……………………………………………………………...………7 II. History of Turkey’s Democratic Transition………...…………………………..15 III. Establishing a Media Autocracy…………..…………………..………………..20 IV. Redefining Judicial Independence……………………………………………...28 V. Building up Graft through Construction………………………………………..37 VI. Exploiting a
    [Show full text]
  • Turkey Brief Turkish – Canadian Relations
    TURKEY BRIEF TURKISH – CANADIAN RELATIONS May 2009 TABLE OF CONTENTS CHAIRMAN’S MESSAGE……………………………………………………1 1 COUNTRY PROFILE: 1.1 INTRODUCING TURKEY………………………...……………………...3 1.2 FUTURE PROSPECTS…………………………………………………… 6 2 TURKISH-CANADIAN ECONOMIC RELATIONS. .....................................7 2.1 LEGAL FRAMEWORK .............................................................................. 7 2.2 TURKISH-CANADIAN BUSINESS COUNCIL ........................................8 2.3 HIGHLIGHTS IN 2006 AND 2007 ............................................................10 2.4 BILATERAL TRADE .................................................................................13 2.5 CANADIAN INVESTMENTS IN TURKEY .............................................15 2.6 EDC IN TURKEY.......................................................................................16 3 BUSINESS OPPORTUNITIES ..........................................................................17 CONSTRUCTION AND REAL ESTATE DEVLOPMENT ......................20 DEFENSE ....................................................................................................30 ENERGY ......................................................................................................36 ENTERTAINMENT AND MEDIA ............................................................62 FINANCIAL SERVICES .............................................................................64 FOOD AND AGRICULTURE ....................................................................80 EDUCATION ...............................................................................................85
    [Show full text]
  • Marmaray Tunnel Demonstrates Intergeo Eurasia's Topics in Practice
    NEWS Marmaray Tunnel Demonstrates Intergeo Eurasia's Topics in Practice The Marmaray Tunnel in Istanbul, Turkey, opened on 29 October, six months before the start of two key industry trade shows: Seismic Safety and Intergeo Eurasia. Described locally as the "project of the century", the tunnel connects the European and the Asian parts of the city. The spectacular tunnel is a perfect example of the city's commitment to an earthquake-resistant future and of the relevance of both trade events' topics to this and other projects. Seismic Safety and Intergeo Eurasia showcase solutions that pertain to buildings and urban structures and deal with topics including earthquake resistance, fire protection and urban renewal combined with the necessary measuring and testing systems and geo-data concepts. The 13.6-kilometre-long tunnel, which was officially opened in time for the 90th anniversary of the founding of the Turkish Republic, should considerably relieve traffic congestion in the metropolis of 15 million people. Plans call for expansion of the Marmaray line to 77 kilometres. During the next three years, the line will also be integrated into Istanbul's metro network. The central element of the new tunnel is a 1.4-kilometre-long double tube that connects the European and Asian continents with one another. Made of special-purpose concrete, the tunnel is nestled on the ocean floor at a depth of nearly 60 metres. The tunnel's builders ensure that it can even withstand an earthquake with a magnitude of 9. As a result, the tunnel is protected again earthquakes better than most of Istanbul's high-rise buildings.
    [Show full text]
  • TÜRK CUMHURİYETİ DEVLET DEMİRYOLLARI State Railways Of
    TÜRK CUMHURİYETİ DEVLET DEMİRYOLLARI State Railways of the Republic of Turkey Passenger Timetable Valid from 01 April 2014 Changes from previous edition dated January 2014: Table NumberComments 1A Bosphorus Express reverts to starting from Cerkezkoy, with bus connection ex Sirkeci. 1C Revised distance estimates for YHT lines. 18:55 Konya - Eskisehir added to this table (previously missing in error). 1E New table showing Marmaray servics in Istanbul. 2A + 4A/B/C Dogu Express (Ankara - Kars) Eastbound retimed 90 minutes earlier, Westbound retimed 2 hours earlier. 2B New DMU service introduced Zongludak to Filyos, three round trips per day. 2C + 6A Southbound Kayseri - Adana retimed 40 minutes earlier. Northbound unaltered. 3A Temporary dated bus substitution of Ege Express Soma to Balikesir. 4A New DMU service introduced Sivas to Divrigi, two round trips per day. Revised mileage estimation for Tecer - Kangal new route. 4B Erzurum - Divrigi and v.v. mixed trains withdrawn until 12/06/14. 4D Northbound Sivas - Smasun service retimed 75 minutes earlier. Southbound unchanged. 5A + 6B Eastbound Adana - Elazig retimed yet again. Now departs Adana at 11:00, Westbound unaltered. 5C Diyarbakir - Batman locals added (now confirmed both pairs of trains run). 6A See 2C above. Also Northbound Icanandolu Mavi retimed 65 minutes later. Southbound unaltered. Northbound Toros Express shown in booking system with a schedule through to Eskisehir but no balancing working shown, and not believed to be running through. Computer system error? Revision of Konya - Karaman DMU services, connecting with YHT services at Konya. 6B See 5A above. 6C Incorporates changes made to table 6A. General Addition of arrival times at principal stations, where known, and updated TCDD Map.
    [Show full text]
  • Mechanics Transport Communications
    ISSN 1312-3823 Mechanics Transport volume 11, issue 3, 2013 Communications article № 0813 Academic journal http://www.mtc-aj.com MARMARAY PROJECT Selçuk Duranlar [email protected] Trakya University, Edirne Vocational High School of Social Sciences TURKEY Key words: Marmaray Project,İstanbul, Europa, Asia Abstract: Marmaray Project, which is one of the most important projects in the world, in Istanbul, to sustain a healthy urban life the citizens of a modern city life and urban transportation means of offering high capacity in order to protect the city's natural and historical features, using a non-polluting electric power, reducing the dependence on individual transportation and highway and roads into parking lots is a project aimed at. Project which aims to unite the two sides of the strait in Istanbul in three underground railway station and the underground part of the throat passage of the project is 13.6 km in total. 37 surface stations, a total of 63 km in length are made and 75 000 passengers / hour / one-way planned to be operational in 2015. Channel Tunnel is the longest immersed tube tunnel, water under the section length is 38 km long. No. of tunnels in the world's deepest immersed tunnel Marmaray as tunneling has taken place. In this study, Marmaray Project which solutions can bring to economic and social aspects were investigated by examining the problems of transportation INTRODUCTION The Marmara Project is one of the most Project which connects European and Asia Ssides of İstanbul execute by Turkey. Çok modlu taşımacılık, en az iki ya da daha fazla taşıma türünün (karayolu, demiryolu, denizyolu ya da havayolu) tek bir taşımacılık zincirinde birleştirilmesidir.
    [Show full text]
  • Turkish Airlines •“Best Airline in Europe” in 2011, 2012 & 2013 •Direct Flights to Over 240 Destinations Worldwide •A Star Alliance Member
    General Assembly of the International Federation of Surveyors - FIG 2018 Istanbul Bid Document Table of Contents The Bid : An Overview Letter of Invitations Turkish Chamber of Survey and Cadastre Engineers Motivation for the FIG 2018 Why Istanbul? Proposed Venue Getting Ready for 2018 Conference Programme: Proposed Timeline Proposed Budget Accomodation Access to Istanbul Transportation within the City Unusual Venues Istanbul Convention & Visitors Bureau Discover Turkey Social and Technical Tours Pre-Post Tours Practical Informations about Turkey & Istanbul THE BID: AN OVERVIEW The Turkish Chamber of Survey and Cadastre Engineers (CSCE) proudly welcomes the opportunity to host the International Federation of Surveyors FIG Congress 2018 in Istanbul, Turkey. The proposed dates for the Congress are; 13-21 April, 2018 01-09 June, 2018 22-30 June, 2018 We are certain Istanbul will exceed all expectations for a memorable and successful Congress. This bid has the full support of: President of the Republic of Turkey: H.E. Abdullah Gül Prime Minister of the Republic of Turkey: H.E. Recep Tayyip Erdoğan Governor of Istanbul: H.E. Huseyin Avni Mutlu Mayor of Istanbul: H.E. Kadir Topbas Our selected venue for the FIG 2018 Congress site is the Istanbul Convention Center (ICC). This modern, state-of-the-art facility is located in the heart of Istanbul, in close proximity to shops, cafes, restaurants, and museums. This bid is submitted on the basis that the FIG office will be responsible for the budget and organization of the Congress through the auspices of the FIG Congress Director. The congress will support selected speakers from developing countries by providing 20+ free registration and 50+ free or affordable accommodation.
    [Show full text]