Dredged Material
Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FHWA/TX-01/1733-S 4. Title and Subtitle 5. Report Date TEXAS GULF INTRACOASTAL WATERWAY (GIWW) DREDGED September 2000 MATERIAL: BENEFICIAL USES, ESTIMATING COSTS, DISPOSAL 6. Performing Organization Code ANALYSIS ALTERNATIVES, AND SEPARATION TECHNIQUES 7. Author(s) 8. Performing Organization Report No. Robert Randall, Billy Edge, John Basilotto, David Cobb, Sara Graalum, Qi Report 1733-S He, and Michael Miertschin 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Texas Transportation Institute The Texas A&M University System 11. Contract or Grant No. College Station, Texas 77843-3135 Project No. 0-1733 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Texas Department of Transportation Project Summary Construction Division September 1996- August 1998 Research and Technology Transfer Section 14. Sponsoring Agency Code P.O. Box 5080 Austin, Texas 78763-5080 15. Supplementary Notes Research performed in cooperation with the Texas Department of Transportation and the U.S. Department of Transportation, Federal Highway Administration. Research Project Title: Alternative Dredging and Disposal Methods for the Texas Gulf Intracoastal Waterway (GIWW) 16. Abstract A two-year project, Alternative Dredging and Disposal Methods for the Texas Gulf Intracoastal Waterway, investigates the cost and engineering of long distance pumping, beneficial uses of GIWW-dredged material for the Texas coastal zone, separation techniques for GIWW-dredged material, optimum slurry flow, and alternatives for analyzing dredged material disposal. A cost-estimating program incorporates fuel costs, dredge crew labor costs, routine maintenance and repairs, major repairs, overhead costs, depreciation, profit, mobilization and demobilization, and capital investment cost for a cutter suction dredge.
[Show full text]