TERMS of REFERENCE Post Cyclone Idai Mangrove Ecosystem

Total Page:16

File Type:pdf, Size:1020Kb

TERMS of REFERENCE Post Cyclone Idai Mangrove Ecosystem TERMS OF REFERENCE Post cyclone Idai mangrove ecosystem status assessment in Buzi, Beira and Dondo districts. 1. Objective IUCN is commissioning a consultancy to carry out an assessment of the status of the mangrove ecosystems and potential for restoration of the Buzi, Beira and Dondo districts in response to the damaging effects of the cyclone Idai. 2. Background The IUCN Coastal Resilience to Climate Change (CRCC) initiative is a response of the Government of Mozambique to the increasing challenges coastal communities face as a result of climate change. With support and cooperation by the Swedish Government, the Government of Mozambique, through its Ministry for Sea, Inland Water and Fisheries (MIMAIP) and in partnership with IUCN and Rare, is seeking to increase the resilience of men and women in coastal communities through rights and ecosystem based approaches. CRCC is focused around improving the contribution of ecosystem services to addressing societal challenges arising as a result of climate variability in Mozambique. CRCC will do this by promoting the use of nature as a solution to support integrated approaches to issues such as economic and social development, climate change adaptation, food security, water security, human health and disaster risk reduction. Over the course of four years, CRCC will work with men and women in coastal communities in three target Districts: Inhassoro District, Inhambane Province; Memba District in Nampula Province and Dondo District, Sofala Province. CRCC will strengthen the skills and technical know-how of Provincial and District Governments to support coastal communities to work together to more sustainably govern and manage their natural resource base in an inclusive manner that promotes gender equality and rights. This will involve providing training, practical methodologies and tools as well as technical support to improve practices related to the involvement of coastal communities in managing their natural resources, while ensuring that livelihoods are more sustainable and resilient and strengthening the understanding of the relationships between ecosystems and climate resilience. Mangrove ecosystem is considered among the key habitats that support marine life and coastal livelihoods, yet highly vulnerable to the projected impacts of climate change, particularly sea-level rise (SLR), floods and cyclones. In order to effectively restore and manage the mangrove, it is important to undertake assessments to generate baseline data and maps about the status and projected trends of this ecosystem, including the current impacts of cyclone Idai that affected Sofala province. The data collected will guide the design of interventions necessary for the restoration of these ecosystems through an adaptive management strategy and responses to threats, that will help to improve their sustainable use, 1 as well as their resilience through implementation of community based landscape/seascape approaches. 3. The Cyclone Idai On the 14th of March 2019 the category 3 cyclone Idai made landfall near Beira with 195 km/h winds and gusts up to 280 km/h. The storm originated from a tropical depression that formed off the east coast of Mozambique on the 4th of March that caused heavy downpour in Mozambique already during the days before the worst event. The long-lived storm caused catastrophic damage and severe floods on its path across Mozambique and into Zimbabwe and Malawi leaving more than 1000 people dead and 3 million people affected. The cyclone is one of the worst tropical cyclones on record to affect Africa and has caused a major humanitarian crisis with hundreds of thousands of people in urgent need of assistance across Mozambique and Zimbabwe. Infrastructural damage from Idai across Mozambique, Zimbabwe, Madagascar and Malawi were estimated to be at least USD 1 billion, making Idai the costliest tropical cyclone in the South-West Indian Ocean Basin. 4. Main purpose of the study One of the CRCC project areas, Dondo in Sofala province, was severely affected by the cyclone and in order to further strengthen the initiatives that will improve the resilience of the communities through nature-based solutions, IUCN wishes to perform an assessment to assess the status and degradation of the mangroves in the districts of Buzi, Beira and Dondo and the effects on the same by the cyclone. This in order to assess the status of degraded areas and areas with potential for restoration in order to mitigate disaster risks in connection to similar catastrophic events in the future. The reasoning behind this is that IUCN sees the importance of using natural infrastructure, such as mangroves, to protect people and assets against disasters and therefore wishes to strengthen the protection, restoration and awareness in and around these important ecosystems. This study should show a detailed description of degradation over time (for example last ten years), which areas are degraded now and which areas that could potentially be restored (clearly showing location, size and ecological conditions). 5. Approach The study should investigate the level of degradation and the restoration opportunities in the three target districts/municipalities: Identify the development and trends over time in mangrove cover and map the areas of change (e.g. degradation, colonization and regeneration), including estimated degradation rate in different years (emphasis on the last 15 years); Produce maps showing the current location, density, structure, distribution and conservation status of mangroves, including surrounding land cover and land use settings; Analyse and explain the factors behind mangrove degradation and dynamics in the indicated timeline; 2 Identify major areas of restoration potential within the assessment area and develop restoration plans and criteria (assessing which restoration interventions would be most appropriate for these areas); Categorize these opportunity areas by type of restoration (wide-scale, mosaic, protective etc.) Undertake biological surveys of the mangrove ecosystem (fauna and flora), with emphasis on mangrove species; If satellite imageries are available from after the cyclone event an assessment of damaged ecosystems due to the cyclonic event is requested as well (if not available this point can be neglected) 6. Deliverables The consultancy will deliver: Detailed spatial maps of current location, size and conservation status of mangroves, including restoration potential in the study areas; Brief baseline information on fauna and flora of local mangroves, with emphasis on mangrove species; Proposal for restoration plan and techniques, including appropriate mangrove species to be used for restoration. A final report summarizing the methodology and outcomes of the assessment. 7. Required competencies, skills & experience The proposed consultant(s) must have the following qualifications Graduate degree or equivalent in environmental, geographic or biological sciences, forest, natural resource management, conservation science or related disciplines; Extensive experience in Geographic Information System (GIS) and management of GIS databases, Google earth as well as spatial analysis and development of decision support tools; Experience in ecosystem management, ideally involving coastal and marine ecosystems; Expertise in the application and use of project monitoring, evaluation and learning methods Solid methodological and analytical research skills (quantitative & qualitative analysis) Fluency in English Ability to write clearly and concisely in English, including the ability to communicate technical study findings to a non-technical audience. Time management skills including an ability to work effectively under pressure and to meet deadlines. It is expected that the principal consultant will constitute a team to be able to fulfil the requirements of this ToR, 3 7. Timeline The deadline for applications is the 7th of May and the notification to the winning bid will be at latest on the 9th of May. The consultancy is expected to run from the 15th of May with deadline for report submission on the 30th of June 2019. 8. Reporting All reports and documentation should be written in plain English and submitted as electronic copies. The consultant will report to Manuel Menomussanga, [email protected]. A draft report will be submitted for comment by the CRCC management team prior to finalization. 9. Expressions of interest Those interested in the consultancy must include in their application the following components: Technical A description of the study including preliminary details of the proposed methodology, study design; major stages and milestones for the study and a timetable of activities. Description of proposed staff’s qualifications and their CVs List of similar studies performed Estimate of time needed (days/week) to fulfill the obligations outlined in the ToRs. Financial A preliminary budget in USD, broken down by activity, including daily rates per team member, level of effort, travel and other related costs. Applications and questions can be sent to Manuel Menomussanga, at [email protected] Deadline for applications: 7th of May, 2019 13h00, Mozambique Time. 4 .
Recommended publications
  • World Bank Document
    Report No. 47876-MZ Mozambique Municipal Development in Mozambique Lessons from the First Decade Public Disclosure AuthorizedPublic Disclosure Authorized (In Two Volumes) Volume II : Full Report May 2009 Urban and Water, AFTUW Country Department, AFCS2 Africa Region Public Disclosure AuthorizedPublic Disclosure Authorized Public Disclosure AuthorizedPublic Disclosure Authorized Document of the World Bank Public Disclosure AuthorizedPublic Disclosure Authorized Table of Contents Acronyms ……………………………………………………………………………….7 Executive Summary .........................................................................................................12 Chapter 1 An Introduction to Urbanization and Municipal Development in Mozambique .................................................................................................22 1.1 Objective ........................................................................................................22 1.2 “Urban” and “Municipal” in Mozambique ....................................................22 1.3 A Brief Socio-Economic Profile of Municipalities in Mozambique .............26 1.4 Rationale and Key Questions of the Study ....................................................28 1.5 Structure of the Study ....................................................................................30 1.6 Outline of the Study .......................................................................................32 Annex 1.2 Population by Municipality in Mozambique. 1997 and 2007 estimates ...........39 Chapter
    [Show full text]
  • Environmental and Social Management Framework (Esmf)
    REPUBLIC OF MOZAMBIQUE MINISTRY OF EDUCATION AND HUMAN DEVELOPMENT (MINEDH) IMPROVING LEARNING AND EMPOWERING GIRLS IN MOZAMBIQUE (P172657) ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) February, 2021 TABLE OF CONTENTS LIST OF ABBREVIATIONS ............................................................................................................ 1 LIST OF TABLES AND FIGURES .................................................................................................. 2 EXECUTIVE SUMMARY ................................................................................................................ 4 SUMARIO EXECUTIVO ................................................................................................................. 8 1. INTRODUCTION ................................................................................................................. 133 1.1. Overview ......................................................................................................................... 13 1.2. Scope and Objectives of the ESMF................................................................................... 15 1.3. Methodology Used to Develop ESMF .............................................................................. 15 2 PROJECT DESCRIPTION AND INSTITUTIONAL ARRANGEMENTS .............................. 17 2.1 The Project Area (Geographical Areas Covered) ............................................................ 177 2.2 Project Development Objective (PDO) ............................................................................
    [Show full text]
  • Municipal Development and Urbanization in Mozambique
    Municipal Development IN MOZAMBIQUE: LESSONS FROM THE FIRST DECADE MunicipalMunicipal DevelopmentDevelopment inin MOZAMBIQUE LESSONS FROM THE FIRST DECADE Municipal Development in Mozambique: Lessons from the First Decade 1 Table of Contents Acronyms ……………………………………………………………………………….6 Chapter 1 An Introduction to Urbanization and Municipal Development in Mozambique ...................................................................................................................11 1.1 Objective........................................................................................................11 1.2 “Urban” and “Municipal” in Mozambique....................................................11 1.3 A Brief Socio-Economic Profile of Municipalities in Mozambique .............15 1.4 Rationale and Key Questions of the Study ....................................................17 1.5 Structure of the Study ....................................................................................19 1.6 Outline of the Study.......................................................................................21 Annex 1.2 Population by Municipality in Mozambique. 1997 and 2007 estimates...........28 Chapter 2 The Legal and Institutional Context for Urban and Municipal Development ...................................................................................................................30 2.1 The Legal and Institutional Context for Urban Governance in Mozambique30 2.2 The Legal and Policy Framework for Organization of Urban Services ........37 2.3
    [Show full text]
  • Mozambique Political Process Bulletin Frelimo Wins Another Tainted Election
    Mozambique political process bulletin Issue 56 - 28 November 2014 Editor: Joseph Hanlon ([email protected]), Deputy Editor: Adriano Nuvunga, News editor: Teles Ribeiro, Reporter: Idalêncio Sitoê Material may be freely reprinted. Please cite the Bulletin. _______________________________________________________________________________________________________________ Published by CIP and AWEPA CIP, Centro de Integridade Pública AWEPA, the European Parliamentarians with Africa Rua B (1335) Nr. 79, Bairro da Coop (CP 3266) Maputo Rua Licenciado Coutinho 77 (CP 2648) Maputo www.cip.org.mz [email protected] Tel: +258 21 418 603, 21 418 608, 21 418 626 Tel: +258 21 41 66 16, 82 300 33 29 Fax: +258 21 41 66 25 Fax: +258 21 418 604 e-mail: [email protected] ____________________________________________________________________________________________________________ Frelimo wins another tainted election Frelimo's Presidential candidate Filipe Nyusi won the 15 October 2014 election with 57% of the vote. Frelimo won 144 of the 250 seats in parliament (Assembleia da República, AR). Afonso Dhlakama came second with 37% and Renamo has 89 seats. The Mozambique Democratic Movement (MDM, Movimento Democrático de Déjà vu again Moçambique) won 17 seats and its presidential After the 2009 election we had an article headlined candidate Daviz Simango won 6% of the vote. "Déjà vu - An unnecessarily tainted election". We Results were announced by the National said the Frelimo victory had been "overshadowed Elections Commission on 30 October. There were by unfairness and misconduct. Long term readers 26 other parties and coalitions standing for of this Bulletin will recognise that little has parliament in some provinces; they received 3% of changed in response to harsh criticism of 1999 the vote and won no parliamentary seats.
    [Show full text]
  • Mozambique Humanitarian Situation
    Mozambique Humanitarian Situation Report No. 15 Local: Escola Primária de Thala Valeta, Sofala, Moçambique Copyright:© UNICEF/UN0311486/Tremeau © UNICEF/MOZA2019- 01666/Raoni Liborio Reporting Period: January-December 2019 Highlights Situation in Numbers • Cyclone affected areas recorded heavy rains, deteriorating the humanitarian 1.3 million children in need situation and seven districts in the north of Cabo Delgado province became of humanitarian assistance inaccessible by road; (based on people in need) • UNICEF supported the screening of 640,978 children, and 3,034 cases of Severe Acute Malnutrition (SAM) were identified and referred for treatment; 2.5 million people in need • UNICEF supported 1,688 Integrated Mobile Brigades (IMBs) and supported (OCHA, August 2019) vaccination of 1,103,000 people on cholera outbreak prevention and 35,334 children under five against DTP3 in cyclone affected provinces; • UNICEF established WASH facilities for an estimated 61,700 people in 34 resettlement sites; 94,000 people living in 71 resettlements sites • About 115,556 children had access to education services through the set-up of (IOM, 20 December 2019) 292 temporary learning spaces with UNICEF support; • More than 1,000 children with disabilities benefitted from UNICEF supported interventions, including psychosocial interventions and replacement of assistive devices. UNICEF’s Response and Funding Status UNICEF Appeal 2019 US$ 83 million Funding Status (in US$) Funding gap, $35M Funds received in 2019, $48M * Refer to the footnote on Annex A Results Table. 1 Funding Overview and Partnerships In response to the Cyclones Idai and Kenneth, UNICEF appealed for US$ 83.6M to provide immediate life-saving services for women and children in Mozambique.
    [Show full text]
  • Mozambique Suffers Under Poor WASH Facilities and Is Prone MOZAMBIQUE to Outbreaks of Water- and Vector-Borne Diseases
    ACAPS Briefing Note: Floods Briefing Note – 26 January 2017 Priorities for WASH: Provision of drinking water is needed in affected areas. humanitarian Mozambique suffers under poor WASH facilities and is prone MOZAMBIQUE to outbreaks of water- and vector-borne diseases. intervention Floods in central and southern provinces Shelter: Since October 2016, 8,162 houses have been destroyed and 21,000 damaged by rains and floods. Health: Healthcare needs are linked to the damage to Need for international Not required Low Moderate Significant Major healthcare facilities, which affects access to services. At least assistance X 30 healthcare centres have been affected. Very low Low Moderate Significant Major Food: Farmland has been affected in Sofala province, one of Expected impact X the main cereal-producing areas of a country where 1.8 million people are already facing Crisis (IPC Phase 3) levels of food Crisis overview insecurity. Since the beginning of January 2017, heavy seasonal rains have been affecting central Humanitarian Several roads and bridges have been damaged or flooded in the and southern provinces in Mozambique. 44 people have died and 79,000 have been constraints affected provinces. Some areas are only accessible by boat, and affected. The Mozambican authorities issued an orange alert for the provinces of aid has to be airdropped. Maputo, Gaza, Inhambane and Nampula, yet areas of Tete and Sofala provinces have also been affected. The orange alert means that government institutions are planning for an impending disaster. Continued rainfall has been forecasted for the first quarter of 2017. Key findings Anticipated The impact will be influenced by the capacity of the government to respond.
    [Show full text]
  • Rapid Market Assessment Sofala Province, Mozambique
    RAPID MARKET ASSESSMENT SOFALA PROVINCE, MOZAMBIQUE Ruco Van Der Merwe - USAID Office of Food for Peace (FFP) Antonio Mavie – Famine Early Warning Systems Network (FEWS NET) January 24th-28th, 2017 USAID.GOV USAID RAPID MARKET ASSESSMENT MOZAMBIQUE| 1 ACTIVITY NAME: Rapid Market Assessment in Sofala Province, Mozambique PARTICIPANTS: Antonio Mavie (FEWS NET Mozambique National Technical Manager) and Ruco Van Der Merwe (USAID/FFP Food Security and Markets Advisor) COUNTRIES/REGIONS: Mozambique – Beira City and Dondo District in Sofala Province DATES OF TRAVEL: January 24-28, 2017 TRIP OBJECTIVES: The joint TDY between USAID/FFP and FEWS NET Mozambique to Sofala Province, Mozambique had two distinct objectives: 1) Assess current food security and market conditions including: a) Scale of humanitarian assistance relative to needs b) Understand maize market structure, conduct and performance c) Evaluate seasonal progress in terms of production and rainfall 2) Routine monitoring of FFP partner programs in the area (covered in a separate trip report). SUMMARY OF KEY MEETINGS: Partner / Actor WFP Food for the Hungry / WV DPA (Ministry of Agriculture) DPCI (Ministry of Industry and Commerce) Beira Grains Terminal FEWS NET Mozambique INGC Ministry of Health USAID.GOV USAID RAPID MARKET ASSESSMENT MOZAMBIQUE | 2 Dondo Maize Traders Beira Maize Traders Merec Millers Phytosanitary Control Office Dondo Transporter Export Trading Group (ETG) The following activities were undertaken; key informant interviews with the Government officials including; Agriculture, Commerce, Health, Phytosanitary Control, and INGC key informant interview with NGO and UN partners market assessment of Dondo and Beira markets interview key commercial maize actors including importers and millers BACKGROUND: Sofala Province is located in the central region of Mozambique.
    [Show full text]
  • USAII) SOFAIA RURAL Reiiabii ITAIION PROJECT PROJECT IMPACT SURVEY
    USAII) SOFAIA RURAL REIIABIi ITAIION PROJECT PROJECT IMPACT SURVEY NOVIEMBER 1993 Prepared for Food for the Hungry Internatlonal Av. Zedequlas Nianganhela # 520 - 9th Floor, Fla( F Maputo, Mozambique by 13, W. Delies February 1, 1994 I111 SOIAI A 'RI IRAI RIIIA III IIION I'R)IOJE r IMIACf' mIRVI: Y I. IN lRO Wl ION Since August I')?(), the IISAII)lmded Solaa Rural Reh.ibililtim l'oject (S RRI) has provided visistaince to In.,+ily md smnll scnle commercinl anmers within Sofala Provihce. 'h Irgi lryitig ltle,. includiig periods of' Iinsurgency rid severe drouglit, lhe project ha,; provided fairer-t with crop seeds, igricultural ihplemewls. asricultural extension and Iraning, nd .sitnmce with smnll .wale ngricultural relnted cnterprises. Initially the ,lcg::iri provided asislance to three districts: )ondo, NlIamatanda, and Marroinent. Additional assislance il fei fiornm of emergency seed anl tools dislibutions were liter mach.e in 1th1i I)iStriCt. Ill June of 199. fhe program was expalhded to include exiensill ;utle to 11t1i D)i.sltil. plus exIeisioIn issisltance and cutrergeney seed nd fo<)1 distributiong to (I rCot ngom listict. In July nid Augiist (f 199 1'111 enlisled ihe assislnce of an rmritile cosllrmltot condt a Ica .line social mnid uconomie impact survey Ito galher s;p ilic data lo he used as benlhnarks to mc'asute tie projects impact in the future nd l gahllher inlhrmatiom usetlul for deleimining fulure in1ervetions. Ili Novembei l ot IWQ1I 1 coirtdicthd : lullow 1up sillVty Ito 111.I)9 survey wilh tlhe followinig obJectives: I) ''ll iasttre project implact fy gatlhering and compamrig slpecific ben.hmark data will data gallihend il Iie 199I baseline survey.
    [Show full text]
  • World Bank Document
    The World Bank Report No: ISR16913 Implementation Status & Results Mozambique National Decentralized Planning and Finance Program (P107311) Operation Name: National Decentralized Planning and Finance Program Project Stage: Implementation Seq.No: 9 Status: ARCHIVED Archive Date: 01-Dec-2014 (P107311) Public Disclosure Authorized Country: Mozambique Approval FY: 2010 Product Line:IBRD/IDA Region: AFRICA Lending Instrument: Technical Assistance Loan Implementing Agency(ies): Key Dates Public Disclosure Copy Board Approval Date 30-Mar-2010 Original Closing Date 30-Jun-2015 Planned Mid Term Review Date 30-Jun-2013 Last Archived ISR Date 12-Jul-2014 Effectiveness Date 30-Aug-2010 Revised Closing Date 30-Jun-2015 Actual Mid Term Review Date 18-Sep-2013 Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve the capacity of local government to manage public financial resources for district development in a participatory and transparent manner. Has the Project Development Objective been changed since Board Approval of the Project? Public Disclosure Authorized Yes No Component(s) Component Name Component Cost Improving National Systems 3.20 Strengthening Participatory Planning and Budgeting 10.40 Enhancing Management and Implementation Capacity 9.20 Strengthening Oversight and Accountability 0.30 Knowledge Management 0.40 Effective Project Management and Coordination 3.90 Non-Common-Fund Activities 0.00 Public Disclosure Authorized Overall Ratings Previous Rating
    [Show full text]
  • Overview for Sofala Province
    Back to National Overview OVERVIEW FOR SOFALA PROVINCE Tanzania Zaire Comoros Malawi Cabo Del g ad o Niassa Zambia Nampul a Tet e Sofala Zambezi a Manica Zimbabwe So f al a Madagascar Botswana Gaza Inhambane South Africa Maput o N Swaziland 200 0 200 400 Kilometers Overview for Sofala Province 2 The term “village” as used herein has the same meaning as the term “community” used elsewhere. Schematic of process. SOFALA PROVINCE 661 Total Villages C P EXPERT OPINION o l m OLLECTION a p C n o n n i n e g TARGET SAMPLE n t 114 Villages VISITED INACCESSIBLE 90 Villages 37 Villages F i e l d C o LANDMINE- m NAFFECTED Y AFFECTED O NTERVIEW p U B N I o LANDMINES 52 Villages n 6 Villages e 32 Villages n t 102 Suspected Mined Areas DATA ENTERED INTO D a t IMSMA DATABASE a E C n o t r m y p a MINE IMPACT SCORE (SAC/UNMAS) o n n d e n A t n HIGH IMPACT MODERATE LOW IMPACT a l y 2 Villages IMPACT 37 Villages s i 13 Villages s FIGURE 1. The Mozambique Landmine Impact Survey (MLIS) visited 12 of 13 Districts in Sofala. Cidade de Beira was not visited, as it is considered by Mozambican authorities not to be landmine-affected. Of the 90 villages visited, 52 identified themselves as landmine-affected, reporting 102 Suspected Mined Areas (SMAs). Thirty-seven villages were inaccessible, mostly due to poor road conditions following heavy rains and to the absence of bridges and ferries across rivers.
    [Show full text]
  • MOZAMBIQUE Priority Requirements for the Period 1988-1989
    UNITED NATIONS ' 3ol OFFICE FOR EMERGENCIES IN AFRICA THE EMERGENCY SITUATION IN MOZAMBIQUE Priority requirements for the period 1988-1989 " " JALGERIA ~UbIYAN 03 ARABJAMMANVA EGYPT MAURITANIA CAN CL MALI NIGERT CHAD a,,m. SUDAN• NIGERIA / 1144"16904 IVR ETHIOPIA cow . ec AR GANN OI AA IW r Z AIR I IN ~~ ~ ~ NTDCOLBRAINWIHTE~~AGLAIN THE DUMEC SIT TICK IN MDZAMBIOUE Priority Requirements fr the Period 1988 - 1989 jmm~~mm UNITED REPUBIC OF TNAI ,0<,.N.S o oOEA ,~w o+. =-+ADO:. ; .-.,,-b ,u C.mb mw tNo - , .a m ,. 0 M4656 Nd To 0 0 "rm •~ Isliu iC iNO.b01 PAhr CI'Et B3 ND ....... ... • •• •• •• •..•• 1 - 92 3 I. THE CJRREI EKERGEF2 SI M'ICN IN NZAM IU..o....... 1 - 21 4 II. RwEw c' THE 1987 APPL.. ................ 22 - 40 10 A. pregaration,paclvoud, setting........ 22 - 24 10 B. Requirements and donor response.......... 25 - 26 10 C. Response by sector ..................... 27 - 33 11 D. Gaps, sbortcmxings, lessons learned ..... 34 - 40 12 III. MAIN CIARACEISTICS OF THE 1988-1989 APPEAL.. 41 - 55 15 A. Methodology for preparation of the Appeal............................... 41 - 45 15 B. Strategy of the Government: systematic linking of emergency and rehabilitation activities............ 46 - 47 16 C. mIancement of management capacity at provincial and district levels........ 48 - 50 16 D. Strengthening the country's transport infrastructure .............. ... 51 - 53 17 E. Improved outreach and distribution capacity through the use of national religious institutions and national rxn-governmental organizations (NOe).... 54 - 55 18 IV. EXISTIN MEMPMAISMS FOR EMERM= MW MME AND CO-ORDIWATON.. I....... ...... 56 - 57 19 A. Goverrmnet............................. 56 19 B.
    [Show full text]
  • WFP Mozambique Flood Response Update
    WFP Mozambique Flood Response Update 12 May 2019 Overview In Numbers • WFP Assistant Executive Director (AED) Ms. Valerie Guarnieri travelled to Mozambique (10-13 May) to visit flood affected areas Cyclone Idai and see WFP field work in response to cyclone Idai. On Saturday 1.85 million people affected 11 May, AED travelled to Sofala and Manica, accompanied by WFP Regional Director Ms. Lola Castro and WFP Representative Ms. 4 provinces and 50 districts affected Karin Manente. The visit included a commodity voucher 39,420 people displaced in 38 accommodation distribution site in Beira and a resettlement site in Dondo. AED will centres also attend high level meetings with Government officials and the UN country team during her stay. 1.5 million people received lifesaving food assistance • According to the Government (National Disaster Management Institute - INGC), food insecurity remains a major concern due to the destruction of planted crops (rice, beans, maize, and cassava) Cyclone Kenneth and the loss of pre-Cyclone Kenneth harvests that were either 373,857 people in need of humanitarian assistance washed away or spoiled, becoming inappropriate for human consumption. At least 55,668 hectares of crops have been in Nampula and Cabo Delgado (HRP) affected across the northern provinces (INGC), as Cyclone Kenneth 2 provinces and 21 districts affected made landfall in the middle of the main harvest season. Any maize harvested after Cyclone Kenneth cannot be used for seeds. 20,038 people displaced in accommodation centres • According to the Ministry of Sea, Inland Water and Fisheries, an 123,037 people received lifesaving food assistance estimated 10,000 fishermen have partially or completely lost their fishing boats or fishing gear due to Cyclone Kenneth.
    [Show full text]