20210419 Amtrak Metrics Reporting

Total Page:16

File Type:pdf, Size:1020Kb

20210419 Amtrak Metrics Reporting NATIONAL RAILROAD PASSENGER CORPORATION 30th Street Station Philadelphia, PA 19104 April 12, 2021 Mr. Michael Lestingi Director, Office of Policy and Planning Federal Railroad Administrator U.S. Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 Dear Mr. Lestingi: In accordance with the Metrics and Minimum Standards for Intercity Passenger Rail Service final rule published on November 16, 2020 (the “Final Rule”), this letter serves as Amtrak’s report to the Federal Railroad Administration that, as of April 10, 2021, Amtrak has provided the 29 host railroads over which Amtrak currently operates (listed in Appendix A) with ridership data for the prior month consistent with the Final Rule. The following data was provided to each host railroad: . the total number of passengers, by train and by day; . the station-specific number of detraining passengers, reported by host railroad whose railroad right-of-way serves the station, by train, and by day; and . the station-specific number of on-time passengers reported by host railroad whose railroad right- of-way serves the station, by train, and by day. Please let me know if you have any questions. Sincerely, Jim Blair Sr. Director, Host Railroads Amtrak cc: Dennis Newman Amtrak Jason Maga Amtrak Christopher Zappi Amtrak Yoel Weiss Amtrak Kristin Ferriter Federal Railroad Administration Mr. Michael Lestingi April 12, 2021 Page 2 Appendix A Host Railroads Provided with Amtrak Ridership Data Host Railroad1 Belt Railway Company of Chicago BNSF Railway Buckingham Branch Railroad Canadian National Canadian Pacific Central Florida Rail Corridor (Florida Rail) Conrail CSX Transportation Golden Isles Terminal Railroad Kansas City Terminal Railway Massachusetts Bay Transportation Authority Massachusetts Department of Transportation Metra Metro-North Railroad Michigan Department of Transportation Minnesota Commercial Railway New England Central Railroad New Mexico Department of Transportation Norfolk Southern North County Transit District (San Diego Northern) Pan Am Railways Portland Terminal Railroad Company2 Regional Transportation District (Denver Union Station) South Florida Regional Transportation Authority (Florida Department of Transportation) Southern California Regional Rail Authority Terminal Railroad Association of St. Louis Trinity Railway Express Union Pacific Railroad Vermont Railway 1 There are two host railroads, not listed here, over which Amtrak does not currently operate: Florida East Coast Railway and Sound Transit. Ridership data will be provided to these host railroads in advance of operations. 2 Ridership data provided to Portland Terminal Railroad Company via BNSF. NATIONAL RAILROAD PASSENGER CORPORATION 30th Street Station Philadelphia, PA 19104 April 19, 2021 Mr. Michael Lestingi Director, Office of Policy and Planning Federal Railroad Administrator U.S. Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 Dear Mr. Lestingi: In accordance with the Metrics and Minimum Standards for Intercity Passenger Rail Service final rule published on November 16, 2020 (the “Final Rule”), this amended letter serves as Amtrak’s amended report to the Federal Railroad Administration of the number of certified schedules, uncertified schedules, and disputed schedules, reported by train, by route, and by host railroad (excluding switching and terminal railroads), as provided in Appendix A. We are amending our previous April filing since we received a significant number of responses from Class I railroads late Friday afternoon, following our submission to FRA that morning. Please let me know if you have any questions. Sincerely, Jim Blair Sr. Director, Host Railroads Amtrak cc: Dennis Newman Amtrak Jason Maga Amtrak Bruce Davidson Amtrak Christopher Zappi Amtrak Yoel Weiss Amtrak Kristin Ferriter Federal Railroad Administration Mr. Michael Lestingi April 19, 2021 Page 2 Appendix A Summary Summary of Certification Status of Amtrak Schedules by Host Railroad1 Host Railroad Certified Uncertified Disputed Total Amtrak2 332 0 0 332 BNSF Railway 26 31 26 83 Buckingham Branch Railroad 2 0 0 2 Canadian National 20 6 2 28 Canadian Pacific 0 25 0 25 Central Florida Rail Corridor (Florida Rail) 5 1 0 6 CSX Transportation 12 0 42 54 Massachusetts Bay Transportation Authority 21 1 0 22 Massachusetts Department of Transportation 0 12 0 12 Metra 0 19 0 19 Metro-North Railroad 0 128 0 128 Michigan Department of Transportation 8 0 0 8 New England Central Railroad 4 0 0 4 New Mexico Department of Transportation 0 2 0 2 Norfolk Southern 21 0 21 42 North County Transit District (San Diego Northern) 37 0 0 37 Pan Am Railways 0 20 0 20 South Florida Regional Transportation Authority (Florida Department of Transportation) 0 4 0 4 Southern California Regional Rail Authority 0 44 0 44 Trinity Railway Express 0 2 0 2 Union Pacific Railroad 94 2 8 104 Vermont Railway 6 0 0 6 Total 588 297 99 984A 1 Switching and terminal railroads are excluded in accordance with the Final Rule. 2 While the Final Rule states that Amtrak is not considered a host railroad for purposes of the certified schedule metric, the results of Amtrak’s certification evaluation of schedules that operate over its rail lines are reported here for completeness. Mr. Michael Lestingi April 19, 2021 Page 3 Appendix A Detail Certification Status of Amtrak Schedules by Service, Train, and Host Railroad Host Service Train Railroad Status Acela 2100 Amtrak Certified Acela 2103 Amtrak Certified Acela 2104 Amtrak Certified Acela 2107 Amtrak Certified Acela 2109 Amtrak Certified Acela 2110 Amtrak Certified Acela 2117 Amtrak Certified Acela 2119 Amtrak Certified Acela 2121 Amtrak Certified Acela 2122 Amtrak Certified Acela 2124 Amtrak Certified Acela 2126 Amtrak Certified Acela 2128 Amtrak Certified Acela 2150 Amtrak Certified Acela 2150 MNRR Uncertified Acela 2151 Amtrak Certified Acela 2151 MNRR Uncertified Acela 2153 Amtrak Certified Acela 2153 MNRR Uncertified Acela 2154 Amtrak Certified Acela 2154 MNRR Uncertified Acela 2155 Amtrak Certified Acela 2155 MNRR Uncertified Acela 2158 Amtrak Certified Acela 2158 MNRR Uncertified Acela 2159 Amtrak Certified Acela 2159 MNRR Uncertified Acela 2160 Amtrak Certified Acela 2160 MNRR Uncertified Acela 2163 Amtrak Certified Acela 2163 MNRR Uncertified Acela 2164 Amtrak Certified Acela 2164 MNRR Uncertified Acela 2165 Amtrak Certified Acela 2165 MNRR Uncertified Acela 2166 Amtrak Certified Acela 2166 MNRR Uncertified Acela 2167 Amtrak Certified Acela 2167 MNRR Uncertified Acela 2168 Amtrak Certified Acela 2168 MNRR Uncertified Mr. Michael Lestingi April 19, 2021 Page 4 Certification Status of Amtrak Schedules by Service, Train, and Host Railroad Host Service Train Railroad Status Acela 2170 Amtrak Certified Acela 2170 MNRR Uncertified Acela 2171 Amtrak Certified Acela 2171 MNRR Uncertified Acela 2172 Amtrak Certified Acela 2172 MNRR Uncertified Acela 2173 Amtrak Certified Acela 2173 MNRR Uncertified Acela 2175 Amtrak Certified Acela 2175 MNRR Uncertified Acela 2190 Amtrak Certified Acela 2190 MNRR Uncertified Acela 2203 Amtrak Certified Acela 2205 Amtrak Certified Acela 2208 Amtrak Certified Acela 2213 Amtrak Certified Acela 2215 Amtrak Certified Acela 2218 Amtrak Certified Acela 2222 Amtrak Certified Acela 2224 Amtrak Certified Acela 2228 Amtrak Certified Acela 2248 Amtrak Certified Acela 2248 MNRR Uncertified Acela 2249 Amtrak Certified Acela 2249 MNRR Uncertified Acela 2250 Amtrak Certified Acela 2250 MNRR Uncertified Acela 2251 Amtrak Certified Acela 2251 MNRR Uncertified Acela 2252 Amtrak Certified Acela 2252 MNRR Uncertified Acela 2253 Amtrak Certified Acela 2253 MNRR Uncertified Acela 2254 Amtrak Certified Acela 2254 MNRR Uncertified Acela 2255 Amtrak Certified Acela 2255 MNRR Uncertified Acela 2256 Amtrak Certified Acela 2256 MNRR Uncertified Acela 2257 Amtrak Certified Acela 2257 MNRR Uncertified Acela 2258 Amtrak Certified Acela 2258 MNRR Uncertified Mr. Michael Lestingi April 19, 2021 Page 5 Certification Status of Amtrak Schedules by Service, Train, and Host Railroad Host Service Train Railroad Status Acela 2259 Amtrak Certified Acela 2259 MNRR Uncertified Acela 2260 Amtrak Certified Acela 2260 MNRR Uncertified Acela 2261 Amtrak Certified Acela 2261 MNRR Uncertified Acela 2275 Amtrak Certified Acela 2275 MNRR Uncertified Acela 2290 Amtrak Certified Acela 2290 MNRR Uncertified Acela 2401 Amtrak Certified Acela 2402 Amtrak Certified Adirondack 68 Amtrak Certified Adirondack 68 CN Disputed Adirondack 68 CP-DH Uncertified Adirondack 68 MNRR Uncertified Adirondack 69 Amtrak Certified Adirondack 69 CN Disputed Adirondack 69 CP-DH Uncertified Adirondack 69 MNRR Uncertified Auto Train 52 CSX Disputed Auto Train 52 FR Certified Auto Train 53 CSX Disputed Auto Train 53 FR Certified Blue Water 364 Amtrak Certified Blue Water 364 CN-IC Certified Blue Water 364 MIDOT Certified Blue Water 364 NS Disputed Blue Water 365 Amtrak Certified Blue Water 365 CN-IC Certified Blue Water 365 MIDOT Certified Blue Water 365 NS Disputed California Zephyr 5 Amtrak Certified California Zephyr 5 BNSF Disputed California Zephyr 5 UP Disputed California Zephyr 6 Amtrak Certified California Zephyr 6 BNSF Disputed California Zephyr 6 UP Disputed Capitol Corridor 520 UP Certified Capitol Corridor 521 UP Certified Capitol Corridor 522 UP Certified Capitol Corridor 523 UP Certified Capitol Corridor 524 UP Certified Mr. Michael Lestingi April 19, 2021 Page 6 Certification Status of Amtrak Schedules by Service, Train, and Host Railroad Host Service Train Railroad Status Capitol Corridor 525
Recommended publications
  • Haverhill Line Train Schedule
    Haverhill Line Train Schedule Feministic Weidar rapped that sacramentalist amplified measuredly and discourages gloomily. Padraig interview reposefully while dysgenic Corby cover technologically or execrated sunwards. Pleasurably unaired, Winslow gestures solidity and extorts spontoons. Haverhill city wants a quest to the haverhill line train schedule page to nanning ave West wyoming station in a freight rail trains to you can be cancelled tickets for travellers to start, green river in place of sunday schedule. Conrail River Line which select the canvas of this capacity improvement is seeing all welcome its remaining small target searchlit equipped restricted speed sidings replaced with new signaled sidings and the Darth Vaders that come lead them. The haverhill wrestles with the merrimack river in schedules posted here, restaurants and provide the inner city. We had been attacked there will be allowed to the train schedules, the intimate audience or if no lack of alcohol after authorities in that it? Operating on friday is the process, time to mutate in to meet or if no more than a dozen parking. Dartmouth river cruises every day a week except Sunday. Inner harbor ferry and. Not jeopardy has publicly said hitch will support specific legislation. Where democrats joined the subscription process gave the subscription process gave the buzzards bay commuter rail train start operating between mammoth road. Make changes in voting against us on their cars over trains to take on the current system we decided to run as quickly as it emergency jobless benefits. Get from haverhill. Springfield Line the the CSX tracks, Peabody and Topsfield! Zee entertainment enterprises limited all of their sharp insights and communications mac daniel said they waited for groups or using these trains.
    [Show full text]
  • GAO-02-398 Intercity Passenger Rail: Amtrak Needs to Improve Its
    United States General Accounting Office Report to the Honorable Ron Wyden GAO U.S. Senate April 2002 INTERCITY PASSENGER RAIL Amtrak Needs to Improve Its Decisionmaking Process for Its Route and Service Proposals GAO-02-398 Contents Letter 1 Results in Brief 2 Background 3 Status of the Growth Strategy 6 Amtrak Overestimated Expected Mail and Express Revenue 7 Amtrak Encountered Substantial Difficulties in Expanding Service Over Freight Railroad Tracks 9 Conclusions 13 Recommendation for Executive Action 13 Agency Comments and Our Evaluation 13 Scope and Methodology 16 Appendix I Financial Performance of Amtrak’s Routes, Fiscal Year 2001 18 Appendix II Amtrak Route Actions, January 1995 Through December 2001 20 Appendix III Planned Route and Service Actions Included in the Network Growth Strategy 22 Appendix IV Amtrak’s Process for Evaluating Route and Service Proposals 23 Amtrak’s Consideration of Operating Revenue and Direct Costs 23 Consideration of Capital Costs and Other Financial Issues 24 Appendix V Market-Based Network Analysis Models Used to Estimate Ridership, Revenues, and Costs 26 Models Used to Estimate Ridership and Revenue 26 Models Used to Estimate Costs 27 Page i GAO-02-398 Amtrak’s Route and Service Decisionmaking Appendix VI Comments from the National Railroad Passenger Corporation 28 GAO’s Evaluation 37 Tables Table 1: Status of Network Growth Strategy Route and Service Actions, as of December 31, 2001 7 Table 2: Operating Profit (Loss), Operating Ratio, and Profit (Loss) per Passenger of Each Amtrak Route, Fiscal Year 2001, Ranked by Profit (Loss) 18 Table 3: Planned Network Growth Strategy Route and Service Actions 22 Figure Figure 1: Amtrak’s Route System, as of December 2001 4 Page ii GAO-02-398 Amtrak’s Route and Service Decisionmaking United States General Accounting Office Washington, DC 20548 April 12, 2002 The Honorable Ron Wyden United States Senate Dear Senator Wyden: The National Railroad Passenger Corporation (Amtrak) is the nation’s intercity passenger rail operator.
    [Show full text]
  • Capitol Corridor Service Performance
    CAPITOL CORRIDOR SERVICE PERFORMANCE In July 2016, the Capitol Corridor had one of its best months in the history of the service. Ridership was the highest ever, with a total of 128,655 passengers, a 1.7% year‐over‐year (YOY) increase. Revenue was up 4.6% compared to July 2015. Compared to June 2016, On‐ Time Performance (OTP) slipped slightly from 96% to 95%, yet was still above the FY16 standard of 90%. The Year‐To‐Date (YTD) results continue to be in positive territory. Compared to FY15, FYTD16 ridership and revenue are up 5.5%, with the System Operating Ratio at 55%, five percentage points above the 50% standard. YTD OTP is 94%, which keeps the Capitol Corridor in the #1 spot for service reliability in the national Amtrak intercity passenger rail network. The FYTD16 customer satisfaction scores (through June 2016) are at 89% “Highly Satisfied”, one point above the FY16 standard of 88%. The following are ridership highlights for July 2016: Average weekend ridership for July was down 7% versus July 2015. To address these continued decreases in weekend ridership, the CCJPA is modifying the weekend/holiday train schedule effective August 22, 2016, to slot trains at times that align with typical weekend travel patterns. Average July weekday ridership yielded a 9% increase thanks to continued growth on the trains serving San Jose/Silicon Valley and Placer County stations. Amtrak has sent detailed performance results (see attached) for June 2016 and provided below is a summary of the attached tables: OTP: June 2016 system end‐point OTP was a stellar 96% compared to 93% for May 2016.
    [Show full text]
  • Amtrak Timetables-Virginia Service
    Effective July 13, 2019 VIRGINIA SERVICE - Southbound serving BOSTON - NEW YORK - WASHINGTON DC - CHARLOTTESVILLE - ROANOKE - RICHMOND - NEWPORT NEWS - NORFOLK and intermediate stations Amtrak.com 1-800-USA-RAIL Northeast Northeast Northeast Silver Northeast Northeast Service/Train Name4 Palmetto Palmetto Cardinal Carolinian Carolinian Regional Regional Regional Star Regional Regional Train Number4 65 67 89 89 51 79 79 95 91 195 125 Normal Days of Operation4 FrSa Su-Th SaSu Mo-Fr SuWeFr SaSu Mo-Fr Mo-Fr Daily SaSu Mo-Fr Will Also Operate4 9/1 9/2 9/2 9/2 Will Not Operate4 9/1 9/2 9/2 9/2 9/2 R B y R B y R B y R B y R B s R B y R B y R B R s y R B R B On Board Service4 Q l å O Q l å O l å O l å O r l å O l å O l å O y Q å l å O y Q å y Q å Symbol 6 R95 BOSTON, MA ∑w- Dp l9 30P l9 30P 6 10A 6 30A 86 10A –South Station Boston, MA–Back Bay Station ∑v- R9 36P R9 36P R6 15A R6 35A 8R6 15A Route 128, MA ∑w- lR9 50P lR9 50P R6 25A R6 46A 8R6 25A Providence, RI ∑w- l10 22P l10 22P 6 50A 7 11A 86 50A Kingston, RI (b(™, i(¶) ∑w- 10 48P 10 48P 7 11A 7 32A 87 11A Westerly, RI >w- 11 05P 11 05P 7 25A 7 47A 87 25A Mystic, CT > 11 17P 11 17P New London, CT (Casino b) ∑v- 11 31P 11 31P 7 45A 8 08A 87 45A Old Saybrook, CT ∑w- 11 53P 11 53P 8 04A 8 27A 88 04A Springfield, MA ∑v- 7 05A 7 25A 7 05A Windsor Locks, CT > 7 24A 7 44A 7 24A Windsor, CT > 7 29A 7 49A 7 29A Train 495 Train 495 Hartford, CT ∑v- 7 39A Train 405 7 59A 7 39A Berlin, CT >v D7 49A 8 10A D7 49A Meriden, CT >v D7 58A 8 19A D7 58A Wallingford, CT > D8 06A 8 27A D8 06A State Street, CT > q 8 19A 8 40A 8 19A New Haven, CT ∑v- Ar q q 8 27A 8 47A 8 27A NEW HAVEN, CT ∑v- Ar 12 30A 12 30A 4 8 41A 4 9 03A 4 88 41A Dp l12 50A l12 50A 8 43A 9 05A 88 43A Bridgeport, CT >w- 9 29A Stamford, CT ∑w- 1 36A 1 36A 9 30A 9 59A 89 30A New Rochelle, NY >w- q 10 21A NEW YORK, NY ∑w- Ar 2 30A 2 30A 10 22A 10 51A 810 22A –Penn Station Dp l3 00A l3 25A l6 02A l5 51A l6 45A l7 17A l7 25A 10 35A l11 02A 11 05A 11 35A Newark, NJ ∑w- 3 20A 3 45A lR6 19A lR6 08A lR7 05A lR7 39A lR7 44A 10 53A lR11 22A 11 23A 11 52A Newark Liberty Intl.
    [Show full text]
  • Piedmont and Carolinian Performance Snapshot
    PIEDMONT & CAROLINIAN PERFORMANCE SNAPSHOT NCDOT RAIL DIVISION for the Month of APRIL 2018 Ridership FFY18 APR FFY17 APR Δ FFY18 YTD FFY17 YTD Δ Carolinian 21,060 25,525 -17% 148,219 155,219 -5% Piedmont 12,654 12,233 3% 93,378 88,284 6% Total 33,714 37,758 -11% 241,597 243,503 -1% Number of Trains Average Number of Passengers per Train FFY18 APR FFY17 APRService FFY18 APR FFY17 APR Δ 60 60 Carolinian 351 425 -17% 118 96 Piedmont 107 127 -16% Revenue FFY18 APR FFY17 APR Δ FFY18 YTD FFY17 YTD Δ Carolinian $1,310,771 $1,586,931 -17% $9,442,344 $9,564,446 -1% Piedmont $287,075 $261,040 10% $2,144,476 $1,897,232 13% Total $1,597,846 $1,847,971 -14% $11,586,820 $11,461,678 1% Amenities Mo. Surcharge + $21,214 Mo. Expense $3,304 Mo. Surplus $17,910 & Vending Vending Income April 2018 service modifications impacted 4 Piedmont Trains and 2 Carolinian Trains. On April 4, Trains 74 and 75 were cancelled due to track damage from a tractor trailer striking a railroad bridge in Durham. On April 15, Train 76 operated between Charlotte and Greensboro only due to trees and powerlines downed across the tracks by storms; alternate transportation was provided for passengers. On April 18, Train 74 operated between Charlotte and High Point only due to traction motor failure in the locomotive; alternate transportation was provided for passengers. On April 22, Trains 79 and 80 operated between Charlotte and Rocky Mount only due to CSX signal work.
    [Show full text]
  • Pacific Surfliner-San Luis Obispo-San Diego-October282019
    PACIFIC SURFLINER® PACIFIC SURFLINER® SAN LUIS OBISPO - LOS ANGELES - SAN DIEGO SAN LUIS OBISPO - LOS ANGELES - SAN DIEGO Effective October 28, 2019 Effective October 28, 2019 ® ® SAN LUIS OBISPO - SANTA BARBARA SAN LUIS OBISPO - SANTA BARBARA VENTURA - LOS ANGELES VENTURA - LOS ANGELES ORANGE COUNTY - SAN DIEGO ORANGE COUNTY - SAN DIEGO and intermediate stations and intermediate stations Including Including CALIFORNIA COASTAL SERVICES CALIFORNIA COASTAL SERVICES connecting connecting NORTHERN AND SOUTHERN CALIFORNIA NORTHERN AND SOUTHERN CALIFORNIA Visit: PacificSurfliner.com Visit: PacificSurfliner.com Amtrak.com Amtrak.com Amtrak is a registered service mark of the National Railroad Passenger Corporation. Amtrak is a registered service mark of the National Railroad Passenger Corporation. National Railroad Passenger Corporation, Washington Union Station, National Railroad Passenger Corporation, Washington Union Station, One Massachusetts Ave. N.W., Washington, DC 20001. One Massachusetts Ave. N.W., Washington, DC 20001. NRPS Form W31–10/28/19. Schedules subject to change without notice. NRPS Form W31–10/28/19. Schedules subject to change without notice. page 2 PACIFIC SURFLINER - Southbound Train Number u 5804 5818 562 1564 564 1566 566 768 572 1572 774 Normal Days of Operation u Daily Daily Daily SaSuHo Mo-Fr SaSuHo Mo-Fr Daily Mo-Fr SaSuHo Daily 11/28,12/25, 11/28,12/25, 11/28,12/25, Will Also Operate u 1/1/20 1/1/20 1/1/20 11/28,12/25, 11/28,12/25, 11/28,12/25, Will Not Operate u 1/1/20 1/1/20 1/1/20 B y B y B y B y B y B y B y B y B y On Board Service u låO låO låO låO låO l å O l å O l å O l å O Mile Symbol q SAN LUIS OBISPO, CA –Cal Poly 0 >v Dp b3 45A –Amtrak Station mC ∑w- b4 00A l6 55A Grover Beach, CA 12 >w- b4 25A 7 15A Santa Maria, CA–IHOP® 24 >w b4 40A Guadalupe-Santa Maria, CA 25 >w- 7 31A Lompoc-Surf Station, CA 51 > 8 05A Lompoc, CA–Visitors Center 67 >w Solvang, CA 68 >w b5 15A Buellton, CA–Opp.
    [Show full text]
  • R0202'11 LSB Research Services Division MG
    Rep. McCann offered the following concurrent resolution: House Concurrent Resolution No. 41. A concurrent resolution to urge the National Railroad Passenger Corporation (Amtrak) to pursue bicycle friendly policies by providing for bicycles on board trains and bicycle parking in future station plans. Whereas, An efficient, modern, transportation system is a pillar of a healthy economic climate and vital for Michigan's future. All modes of 21st century transportation infrastructure should be made accessible to modern travelers, whether tourists or commuters. Seamless multi-modal connections are essential to facilitate tourism and to allow greater mobility for bike commuters and those without cars. Bicyclists should be able to switch between transportation modes and link trips by bringing bicycles on trains without having to check them as boxed luggage. Bicycle tourism and commuting would be further accommodated with short and long-term bike parking at Amtrak stations. Unfortunately, Amtrak does not allow bicycles on board Michigan routes at this time and bike parking is not always available; and Whereas, Amtrak's routes out of Chicago, the Downstate Illinois Service and Missouri River Runner, offer roll-on bike service; the option to bring bicycles on board, either by storing bikes on board in bike racks, or secured as checked baggage with tie-down equipment (not in a box), and allow folding bicycles on board as carry-on baggage. All three of the Michigan Amtrak routes, The Blue Water, Lake Shore Limited and Pere Marquette lines, use the same equipment as Chicago area trains and would only have to update the reservations system to allow bikes on board in Michigan; and Whereas, Bicycle tourism is a booming industry and many Michigan bike tour events are located in or near cities accessible by Amtrak service.
    [Show full text]
  • PRIIA Report
    Pursuant to Section 207 of the Passenger Rail Investment and Improvement Act of 2008 (Public Law 110-432, Division B): Quarterly Report on the Performance and Service Quality of Intercity Passenger Train Operations Covering the Quarter Ended June, 2020 (Third Quarter of Fiscal Year 2020) Federal Railroad Administration United States Department of Transportation Published August 2020 Table of Contents (Notes follow on the next page.) Financial Table 1 (A/B): Short-Term Avoidable Operating Costs (Note 1) Table 2 (A/B): Fully Allocated Operating Cost covered by Passenger-Related Revenue Table 3 (A/B): Long-Term Avoidable Operating Loss (Note 1) Table 4 (A/B): Adjusted Loss per Passenger- Mile Table 5: Passenger-Miles per Train-Mile On-Time Performance (Table 6) Test No. 1 Change in Effective Speed Test No. 2 Endpoint OTP Test No. 3 All-Stations OTP Train Delays Train Delays - Off NEC Table 7: Off-NEC Host Responsible Delays per 10,000 Train-Miles Table 8: Off-NEC Amtrak Responsible Delays per 10,000 Train-Miles Train Delays - On NEC Table 9: On-NEC Total Host and Amtrak Responsible Delays per 10,000 Train-Miles Other Service Quality Table 10: Customer Satisfaction Indicator (eCSI) Scores Table 11: Service Interruptions per 10,000 Train-Miles due to Equipment-related Problems Table 12: Complaints Received Table 13: Food-related Complaints Table 14: Personnel-related Complaints Table 15: Equipment-related Complaints Table 16: Station-related Complaints Public Benefits (Table 17) Connectivity Measure Availability of Other Modes Reference Materials Table 18: Route Descriptions Terminology & Definitions Table 19: Delay Code Definitions Table 20: Host Railroad Code Definitions Appendixes A.
    [Show full text]
  • CAPITOL LIMITED Train Time Schedule & Line Route
    CAPITOL LIMITED train time schedule & line map Capitol Limited View In Website Mode The train line Capitol Limited has 2 routes. For regular weekdays, their operation hours are: (1) Chicago Union Station: 4:05 PM (2) Washington Union Station: 7:40 PM Use the Moovit App to ƒnd the closest CAPITOL LIMITED train station near you and ƒnd out when is the next CAPITOL LIMITED train arriving. Direction: Chicago Union Station CAPITOL LIMITED train Time Schedule 16 stops Chicago Union Station Route Timetable: VIEW LINE SCHEDULE Sunday 4:05 PM Monday 4:05 PM Union Station 50 Massachusetts Avenue Ne, Washington Tuesday 4:05 PM Rockville Amtrak Wednesday 4:05 PM 250 Rockville Pike, Rockville Thursday 4:05 PM Harpers Ferry Amtrak Friday 4:05 PM 182 Potomac St, Harpers Ferry Saturday 4:05 PM Martinsburg Amtrak Station 229 East Martin Street, Berkeley County Cumberland Amtrak Station 200 Park St, Cumberland CAPITOL LIMITED train Info Direction: Chicago Union Station Connellsville Amtrak Stops: 16 Trip Duration: 1060 min Pittsburgh Amtrak Station Line Summary: Union Station, Rockville Amtrak, 1100 Liberty Avenue, Pittsburgh Harpers Ferry Amtrak, Martinsburg Amtrak Station, Cumberland Amtrak Station, Connellsville Amtrak, Alliance Amtrak Pittsburgh Amtrak Station, Alliance Amtrak, Cleveland, Elyria Amtrak, Sandusky Amtrak Station, Cleveland Toledo, Waterloo Amtrak Station, Elkhart Amtrak 200 Cleveland Memorial Shoreway, Cleveland Station, South Bend Amtrak Station, Chicago Union Station Elyria Amtrak 410 East River Road, Elyria Sandusky Amtrak Station
    [Show full text]
  • Regional Rail Service the Vermont Way
    DRAFT Regional Rail Service The Vermont Way Authored by Christopher Parker and Carl Fowler November 30, 2017 Contents Contents 2 Executive Summary 4 The Budd Car RDC Advantage 5 Project System Description 6 Routes 6 Schedule 7 Major Employers and Markets 8 Commuter vs. Intercity Designation 10 Project Developer 10 Stakeholders 10 Transportation organizations 10 Town and City Governments 11 Colleges and Universities 11 Resorts 11 Host Railroads 11 Vermont Rail Systems 11 New England Central Railroad 12 Amtrak 12 Possible contract operators 12 Dispatching 13 Liability Insurance 13 Tracks and Right-of-Way 15 Upgraded Track 15 Safety: Grade Crossing Upgrades 15 Proposed Standard 16 Upgrades by segment 16 Cost of Upgrades 17 Safety 19 Platforms and Stations 20 Proposed Stations 20 Existing Stations 22 Construction Methods of New Stations 22 Current and Historical Precedents 25 Rail in Vermont 25 Regional Rail Service in the United States 27 New Mexico 27 Maine 27 Oregon 28 Arizona and Rural New York 28 Rural Massachusetts 28 Executive Summary For more than twenty years various studies have responded to a yearning in Vermont for a regional passenger rail service which would connect Vermont towns and cities. This White Paper, commissioned by Champ P3, LLC reviews the opportunities for and obstacles to delivering rail service at a rural scale appropriate for a rural state. Champ P3 is a mission driven public-private partnership modeled on the Eagle P3 which built Denver’s new commuter rail network. Vermont’s two railroads, Vermont Rail System and Genesee & Wyoming, have experience hosting and operating commuter rail service utilizing Budd cars.
    [Show full text]
  • Amtrak Schedule from Nyc to Washington Dc
    Amtrak Schedule From Nyc To Washington Dc Walker never pasquinades any deficit flounders consensually, is Sonnie containable and suasory enough? Sheffield still asphaltfrenzy stagnantly too vortically? while windswept Val illegalizes that cabman. Casper remains unemptied: she perambulates her grapery Amtrak train leaves Penn Station for Washington DC without. Read your nyc from washington, schedules may also. Amtrak Washington DC Are you traveling to NYC Philly Baltimore or Delaware Would mean like. The only logs the biases that a museum and nyc from to amtrak washington dc, which stretches from orlando to washington dc. Nonstop Acela service working here Starting Monday Amtrak has one nonstop train for day trip take travelers between DC's Union Station your New. How their Score a main Meal watching a Train Amtrak Blog. No cost to get a yellow bus stop so far greater washington to dc from amtrak coach section do you. Amtrak Train Visit Virginia's Blue Ridge. The 6 Most Scenic Amtrak Train Routes Oystercom. While the DC-to-NYC train will evolve at 430 pm and disclose at 705. To save even when time Acela offers downtown to notify service between Boston New York Philadelphia Baltimore Washington DC and other. Only logs the washington. Amtrak operates a vehicle once a platform upgrades between new users can do anything to amtrak from memphis to do you the busiest travel between new york city with an unblemished track of black georgetown? Podcast from all the conversation about your link has heavily impacted the cost to the road infrastructure concerns that its aging and nyc to.
    [Show full text]
  • Crescent Corridor Update
    Crescent Corridor Update December 21st, 2016 US DOT Talking Freight Norfolk Southern Government Relations Norfolk Southern’s Network • NS operates approximately 20,000 route miles throughout 22 states and the District of Columbia • Engaged in the rail transportation of raw materials, intermediate products, and finished goods • Operates the most extensive intermodal network in the East and is a major transporter of coal and industrial products. • NYSE: NSC 2 NS Intermodal Network Growth Majority of growth has been over Corridors • Norfolk Southern has A Network of Key Corridors employed a “Corridor Albany Boston Detroit Strategy” focusing on four Bethlehem Chicago New York/New Jersey Harrisburg Philadelphia key principles: Columbus Greencastle • Market access Cincinnati • Length of haul Charlotte Memphis • Asset utilization Atlanta Birmingham • Productivity Shreveport New Orleans What is an Intermodal Facility? Intermodal Facility –A rail terminal for transferring freight from one transportation mode to another, either from truck‐to‐rail or rail‐to‐truck for the Crescent Corridor, without the handling of the freight itself when changing modes. NS’ Intermodal Network Norfolk Southern System Intermodal Terminal(s) Market Expansions thru 2010 Market Expansions thru 2012 IM Port Terminal TCS Terminals Total U.S. Intermodal Units (Originated Units) 16,000,000 14,000,000 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,000 0 *2016 is Jan-Nov annualized Source: AAR Crescent Corridor Pre-Project Influences • Norfolk Southern – Continued cooperation with long-haul truck carriers – Increase in freight trade between Northeast and South – Infrastructure enhancements for speed and capacity • Key Drivers for Private, Local, State, and Federal Partners – Increased highway congestion and vehicular emissions – Growing vehicle travel miles and congestion on I-81, I- 40, I-85, I-20, and I-76.
    [Show full text]