World Bank Document Timor-Leste: Fundamental School Quality Project TF-050152 Disbursement Categories Category Amount % of Expenditures to be financed Public Disclosure Authorized (1) Civil Works (a) Part (i) of the Project $1,736,190 100% (b) Part (ii) of the Project $9,977,500 100% (2) Goods (including $2,961,592 100% of foreign transportation) expenditures, 100% of local expenditures (ex- factory cost), and 90% of local expenditures for other items procured locally Public Disclosure Authorized (3) Consultants’ Services & #REF! 100% Training (4) Incremental Operating $600,000 100% Costs (5) Unallocated $0 Total #REF! Public Disclosure Authorized Public Disclosure Authorized Timor-Leste: Fundamental School Quality Project TF-050153 Procurement Plan By Disbursement Category - Summary Awarded Planned Total Category Totals Goods ICB $2,098,678 $0 $2,098,678 Goods NS $32,728 $72,436 $105,164 IS DC $757,750 $757,750 Total $2,889,156 $72,436 $2,961,592 $2,961,592 Works - A-1 ICB 1,736,190 1,736,190 Civil Works Total 1,736,190 1,736,190 Works - A-2 NCB $7,374,969 $1,581,658 $8,956,627 PSW $214,178 $806,695 $1,020,873 Total $7,589,147 $2,388,353 $9,977,500 $11,713,690 Consultants Consultants - Firms Awarded Planned Total CQ $150,000 $150,000 QCB $14,460 $14,460 Total $164,460 $164,460 Individual Consultants - CS CS 3,528,893 261,675 $3,790,568 Individual Consultants - SS SS 1,067,278 85,711 $1,152,989 Total $4,596,171 $347,386 $4,943,557 $5,108,017 Audit LCS $50,000 $50,000 $50,000 Incremental Operating Costs PMU $600,000 $600,000 $600,000 Unallocated $166,702 Grand Total $20,600,000 Timor-Leste: Fundamental Schools Quality Project TF-050152 Procurement Plan - Individual Consultants Individual Contracts Awarded and Completed No. Description Contract Selection Prior/Post Contract Receipt of IDA NOL Date Contract Contractual Status Project National/ Name of Consultant Amount Method Review Number Proposals Signed Completion Component Foreign Component A Rebuilding of School Physical Infrastructure 1 Individual National Consultants (35) $111,914 CS Post Various NA April 01.02 Oct 30.02 Complete A.7 National Various 1.1 Extension of National Consultants $111,914 CS Post Various NA Nov 01.02 Apr 30.03 Complete A.7 National Various 1.2 Extension of National Consultants $145,121 CS Post Various NA May 01.03 Nov 30.03 Complete A.7 National Various 1.3 Extension of National Consultants $145,121 CS Post Various NA Dec 01.03 Jan 31.04 Complete A.7 National Various 1.4 Extension of National Consultants $254,756 CS Post Various NA Feb 01.04 March 30.04 Complete A.7 National Various 2 Land Surveyors (3) $39,600 CS Prior ETTA 2558 A,B,C Jan 14.02 Feb 04.02 March 16.02 Complete A.7 International Murray Heir, Michael Milford, Mark Mialszygrosz 3 Engineer Structural $18,100 CS Prior ETTA 2824 25-Mar-2002 March 27.02 June 26.02 Complete A.7 International Jorge Mu 3.1 Extension of Engineer Structural $8,000 CS Post ETTA 2824 AD.1 NA June 26.02 Sept 28.02 Complete A.7 International Jorge Mu 4 Engineer Electrical $6,201 CS Prior ETTA 2825 March 25.02 April 01.02 May 05.02 Complete A.7 International Jacob Lay 4.1 Extension of Engineer Electrical $12,322 CS Post ETTA 2825 AD.1 NA June 26.02 Sept 10.02 Complete A.7 International Jacob Lay 4.2 Engineer Electrical $17,360 CS Post ETTA 2825 AD.2 Complete A.7 International Jacob Lay 5 Architect $14,000 CS Prior ETTA 2822 25-Mar-2002 March 26.02 July 15 02 Complete A.7 International Maria Moita 5.1 Architect Extension $15,000 CS Prior ETTA 2822 AD.1 July 17.02 July 18.02 Oct 15.02 Complete A.7 International Maria Moita 5.2 Architect Extension $16,500 CS Prior ETTA 2822 AD.2 Oct 03.02 Oct 16.02 Jan 14.03 Complete A.7 International Maria Moita 6 Architect $14,000 CS Prior ETTA 2823 March 25.02 March 26.02 July 15 02 Complete A.7 International Luis Fareleira 6.1 Architect Extension $15,000 CS Prior ETTA 2823 AD.1 July 17.02 July 18.02 Oct 15.02 Complete A.7 International Luis Fareleira 6.2 Architect Extension $16,500 CS Prior ETTA 2823 AD.2 Oct 03.02 Oct 16.02 Jan 14.03 Complete A.7 International Luis Fareleira 7 Engineering Draftsman $8,800 CS Prior ETTA 2826 March 25.02 March 26.02 July 15 02 Complete A.7 International Craig Tarbotton 7.1 Engineering Draftsman Extension $15,150 CS Prior ETTA 2826 AD.1 July 17.02 July 16.02 Oct 06.02 Complete A.7 International Craig Tarbotton 7.2 Engineering Draftsman Extension $15,150 CS Prior ETTA 2826 AD.2 Oct 03.02 Oct 09.02 Jan 05.03 Complete A.7 International Craig Tarbotton Timor-Leste: Fundamental Schools Quality Project TF-050152 Procurement Plan - Individual Consultants Individual Contracts Awarded and Completed (Continued) No. Description Contract Selection Prior/Post Contract Receipt of IDA NOL Date Contract Contractual Status Project National/ Name of Consultant Amount Method Review Number Proposals Signed Completion Component Foreign 8 Civil Engineering $16,000 CS Post ETTA 3078 NA May 01.02 July 10.02 Complete A.7 International Glenn Allen 8.1 Civil Engineering Extension $21,066 CS Prior ETTA 3078 AD.1 July 17.02 July 11.02 Oct 10.02 Complete A.7 International Glenn Allen 8.2 Civil Engineering Extension $10,000 CS Prior ETTA 3078 AD.2 Oct 03.02 Oct 11.02 Jan 09.03 Complete A.7 International Glenn Allen 8.3 Civil Engineering Extension $7,000 CS Prior ETTA 3055 Complete A.7 International Glenn Allen 9 Quantity Surveyor $23,250 CS Prior ETTA 3077 March 12.02 June 12.02 Sept 11.02 Complete A.7 International Kwadwo Ahenkorah 9.1 Quantity Surveyor Extension $7,750 CS Prior ETTA 3077 AD.1 Sept 12.02 Sept 12.02 Oct 11.02 Complete A.7 International Kwadwo Ahenkorah 9.2 Quantity Surveyor Extension $18,342 CS Prior ETTA 3077 AD.2 Oct 03.02 Oct 12.02 Dec 23.02 Complete A.7 International Kwadwo Ahenkorah 10 Cad Operator $17,000 CS Prior ETTA 3197 July 17.02 July 15.02 Oct 14.02 Complete A.7 International Vasco Albuquerque 10.1 Cad Operator Extension $15,000 CS Prior ETTA 3197 AD.1 Oct 03.02 Oct 15.02 Jan 14.03 Complete A.7 International Vasco Albuquerque 10.2 Cad Operator $25,145 CS Prior PMU 3067 Complete A.7 International Vasco Albuquerque 11 Junior Architect $15,000 CS Prior ETTA 3196 July 17.02 July 05.02 Oct 04.02 Complete A.7 International Alexandra Sa Torrao 11.1 Junior Architect Extension $15,000 CS Prior ETTA 3196 AD.1 Oct 03.02 Oct 05.02 Jan 04.03 Complete A.7 International Alexandra Sa Torrao 12 Bills of Quantity Consultant $15,586 CS Prior PMU 3022 Nov 25.02 Nov 29.02 Feb 28.03 Complete A.7 International Charles Wright 13 Technical Consultant $1,979 CS Post PMU 3029 NA Dec 30.02 Jan 10.03 Complete A.7 International Jack Williams 14 Structural Services Consultant $1,755 CS Post PMU 3060 NA Dec 19.02 Feb 21.03 Complete A.7 International John Pitt 14.1 Structural Services Consultant $18,360 CS Post PMU 3074 Complete A.7 International Rodghiero Fong 15 Engineering Design Draftsman $75,088 CS Prior PMU 3066 Jan 31.03 Jan 31.03 Nov 30.03 Complete A.7 International Craig Tarbotton 15.1 Engineering Design Draftsman Extension $15,774 CS Prior PMU 3066 AD.1 Dec 20.03 Dec 01.03 Jan 31.04 Complete A.7 International Craig Tarbotton 15.2 Engineering Design Draftsman Extension $13,140 CS Prior PMU 3066 AD.2 Jan 28.04 Feb 01.04 March 31.04 Complete A.7 International Craig Tarbotton 16 Electrical Engineer $17,497 CS Prior PMU 3073 Jan 31.03 Jan 31.03 Apr 30 03 Complete A.7 International Jacob Lay 17 Quantity Surveyor $92,249 CS Prior PMU 3072 Jan 31.03 Jan 31.03 Nov 30.03 Complete A.7 International Kwadwo Ahenkorah 17.1 Quantity Surveyor Extension $22,425 CS Prior PMU 3072 AD.1 Dec 20.03 Dec 01.03 Jan 31.04 Complete A.7 International Kwadwo Ahenkorah 17.2 Quantity Surveyor Extension $16,235 CS Prior PMU 3072 AD.2 Jan 28.04 Feb 01.04 March 31.04 Complete A.7 International Kwadwo Ahenkorah Timor-Leste: Fundamental Schools Quality Project TF-050152 Procurement Plan - Individual Consultants Individual Contracts Awarded and Completed (Continued) Procurement Plan - Individual Consultants (Continued) No. Description Contract Selection Prior/Post Contract Receipt of IDA NOL Date Contract Contractual Status Project National/ Name of Consultant Amount Method Review Number Proposals Signed Completion Component Foreign 18 Junior Architect $29,092 CS Prior PMU 3068 Feb 10.03 Feb 19.03 Apr 30.03 Complete A.7 International Alexandra Sa Torrao 19 Junior Architect $27,250 CS Prior PMU 3069 Feb 10.03 Feb 19.03 Apr 30.03 Complete A.7 International Maria Moita 20 Junior Architect $27,250 CS Prior PMU 3070 Feb 10.03 Feb 19.03 Apr 30.03 Complete A.7 International Luis Fareleira 20.1 Junior Architect Extension $15,800 CS Prior PMU 3070 AD.1 May 27.03 May 28.03 July 20.03 Complete A.7 International Luis Fareleira 21 Civil & Structural Engineer $16,380 CS Post PMU 3099 NA June 13.03 Nov 30.03 Complete A.7 International Zamrube Gaspar 21.1 Civil & Structural Engineer Extension $27,480 CS Prior PMU 3099 AD.1 Dec 20.03 Dec 01.03 Jan 31.04 Complete A.7 International Zamrube Gaspar 21.2 Civil & Structural Engineer Extension $11,781 CS Prior PMU 3099 AD.2 Jan 28.04 Feb 01.04 March 31.04 Complete A.7 International Zamrube Gaspar TOTAL $1,636,183 No.
Recommended publications
  • Timor-Leste's Growing Engagement with the Pacific Islands Region
    110 Regionalism, Security & Cooperation in Oceania Chapter 8 Acting West, Looking East: Timor-Leste’s Growing Engagement with the Pacific Islands Region Jose Kai Lekke Sousa-Santos Executive Summary • Timor-Leste is situated geopolitically and culturally at the crossroads of Southeast Asia and the Pacific Islands region, and has pursued a two-pil- lared neighborhood foreign policy of “comprehensive and collective en- gagement,” which is defined by “Acting West” and “Looking East.” • Timor-Leste is seeking to integrate itself within regional governance and security structures, and institutions of both Southeast Asia and the Pa- cific Islands, thereby increasing its strategic role as a conduit for cooper- ation and collaboration between the two regions. • Timor-Leste is of increasing geostrategic importance to the Asia Pacific in view of the growing focus on the Pacific Ocean in terms of resource security and the growing competition between China and the United States. • Timor-Leste could play an increasingly significant role in regional de- fense diplomacy developments if the Melanesian Spearhead Group re- gional peacekeeping force is realized. Timor-Leste’s Engagement with the Pacific Islands Region - Santos 111 “We may be a small nation, but we are part of our inter- connected region. Our nation shares an island with Indone- sia. We are part of the fabric of Southeast Asia. And we are on the cross road of Asia and the Pacific.” 1 - Xanana Kay Rala Gusmao Introduction Timor-Leste is situated geopolitically and culturally on the crossroads of Southeast Asia and the Pacific Islands region and has, since achieving in- dependence in 2002, pursued a two-pillared neighborhood foreign policy of ‘Acting West’ and ‘Looking East.’ Timor-Leste claims that its geographic position secures the “half-island” state as an integral and categorical part of Southeast Asia while at the same time, acknowledging the clear links it shares with its Pacific Island neighbors to the west, particularly in the areas of development and security.
    [Show full text]
  • 2017 Timor-Leste Parliamentary Elections Report
    TIMOR-LESTE PARLIAMENTARY ELECTIONS JULY 22, 2017 TIMOR-LESTE PARLIAMENTARY ELECTIONS JULY 22, 2017 INTERNATIONAL REPUBLICAN INSTITUTE WWW.IRI.ORG | @IRIGLOBAL © 2017 ALL RIGHTS RESERVED Timor-Leste Parliamentary Elections July 22, 2017 Copyright © 2017 International Republican Institute (IRI). All rights reserved. Permission Statement: No part of this work may be reproduced in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information storage and retrieval system without the written permission of the International Republican Institute. Requests for permission should include the following information: The title of the document for which permission to copy material is desired. A description of the material for which permission to copy is desired. The purpose for which the copied material will be used and the manner in which it will be used. Your name, title, company or organization name, telephone number, fax number, e-mail address and mailing address. Please send all requests for permission to: Attention Communications Department International Republican Institute 1225 Eye Street NW, Suite 800 Washington, DC 20005 Disclaimer: This publication was made possible through the support provided by the United States Agency for International Development. The opinions expressed herein are those of the authors and do not necessarily reflect the views of United States Agency for International Development. TABLE OF CONTENTS EXECUTIVE SUMMARY 2 INTRODUCTION 4 ELECTORAL SYSTEMS AND INSTITUTIONS
    [Show full text]
  • 4. Old Track, Old Path
    4 Old track, old path ‘His sacred house and the place where he lived,’ wrote Armando Pinto Correa, an administrator of Portuguese Timor, when he visited Suai and met its ruler, ‘had the name Behali to indicate the origin of his family who were the royal house of Uai Hali [Wehali] in Dutch Timor’ (Correa 1934: 45). Through writing and display, the ruler of Suai remembered, declared and celebrated Wehali1 as his origin. At the beginning of the twentieth century, the Portuguese increased taxes on the Timorese, which triggered violent conflict with local rulers, including those of Suai. The conflict forced many people from Suai to seek asylum across the border in West Timor. At the end of 1911, it was recorded that more than 2,000 East Timorese, including women and children, were granted asylum by the Dutch authorities and directed to settle around the southern coastal plain of West Timor, in the land of Wehali (La Lau 1912; Ormelling 1957: 184; Francillon 1967: 53). On their arrival in Wehali, displaced people from the village of Suai (and Camenaça) took the action of their ruler further by naming their new settlement in West Timor Suai to remember their place of origin. Suai was once a quiet hamlet in the village of Kletek on the southern coast of West Timor. In 1999, hamlet residents hosted their brothers and sisters from the village of Suai Loro in East Timor, and many have stayed. With a growing population, the hamlet has now become a village with its own chief asserting Suai Loro origin; his descendants were displaced in 1911.
    [Show full text]
  • English, and Distinguishing Speaking, Reading, and Writing, but Not Specifying ‘Reading a Letter’ As in the TLSLS)
    Report No: AUS0000624 . Timor-Leste Public Disclosure Authorized Timor-Leste Poverty Developing Timor-Leste Gender-Disaggregated Poverty Small Area Estimates Public Disclosure Authorized Technical Report . May 2019 Public Disclosure Authorized . POV . Public Disclosure Authorized © 2019 The World Bank 1818 H Street NW, Washington DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org Some rights reserved This work is a product of the staff of The World Bank. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this work is subject to copyright. Because The World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for noncommercial purposes as long as full attribution to this work is given. Attribution—Please cite the work as follows: “World Bank. 2019. DEVELOPING TIMOR-LESTE GENDER- DISAGGREGATED POVERTY SMALL AREA ESTIMATES – TECHNICAL REPORT. © World Bank.” All queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2625; e-mail: [email protected]. ii TABLE OF CONTENTS List of Figures ..........................................................................................................................
    [Show full text]
  • Direcção Geral De Estatística Rua De Caicoli, Po Box 10 Dili Timor-Leste [email protected]
    Direcção Geral de Estatística Rua de Caicoli, Po Box 10 Dili Timor-Leste Www.statistics.gov.tl [email protected] República Democrática de Timor-Leste República Democrática de Timor-Leste Ministerio das Finanças Direcção Geral de Estatística Título Title Timor-Leste Registu Populasaun Segundu Semester 2015 Timor-Leste Second Semester Population Registry, 2015 Editor Elias dos Santos Ferreira Silvino Lopes Ricardo da Cruz Santos Eva Fernandes Delfina Pereira Martins Teresinha de Araujo Baptista Francisca Xavier da Costa Silva Joanico Jose Freitas Januario dos Santos do Rosario Direccao Geral de Estatistica Rua de Caicoli, PO Box 10 Dili, Timor-Leste Director Geral de Estatistica General Directorate of Statistics Antonio Freitas, SE.MM Design e Composição Designed & Composed by Ricardo da Cruz Santos Contents Índice Introdução……………………………………………………………….....1 Introduction……………………………………………………………......2 Mapa Timor-Leste…………………………………………………………3 Estrutura Administrativo…………………………………………………..4 Área por Municipio em Timor-Leste……………………………………...5 Área por Posto Administrativo de Timor-Leste…………………………...6 DADOS REGISTO POPULAÇÃO PRIMEIRO SEMESTRE 2015 Número do População por Grupos de Idade por Municipio 2015………..10 Número da População em Timor-Leste por Municipio no sexo 2015……13 Persentagen População em Timor-Leste por Municipio 2015…………...14 Número Lares com Novo Lares em Timor-Leste por Municipio 2015…..15 Número Comparação Census População 2015 com CRVS PrimeiroPeriodo 2015 em Timor-Leste por Municipio…………………..16 Número Nascimento em Timor-Leste por
    [Show full text]
  • Road Asset Management Plan
    Technical Assistance Consultant’s Report Project Number: 51115-001 February 2021 Democratic Republic of Timor-Leste: Baucau to Viqueque Highway Project Road Asset Management Plan Prepared by SMEC International Pty Ltd Sydney, Australia For Ministry of Planning and Finance, Development Partnership Management Unit; and Directorate of Roads, Bridges and Flood Control This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. Promoting Sustainable Road Network Infrastructure Preface MINISTRY OF PUBLIC WORKS TA-9502 TIM: BAUCAU TO VIQUEQUE HIGHWAY PROJECT 8 ROAD ASSET MANAGEMENT PLAN Reference No. TIM 51115 - 001 Prepared for Asian Development Bank i Road Asset Management Plan Important Notice Important Notice This report is provided pursuant to a Consultancy Agreement between SMEC Australia Pty Limited (“SMEC”) and Asian Development Bank, under which SMEC undertook to perform a specific and limited task for Asian Development Bank. This report is strictly limited to the matters stated in it and subject to the various assumptions, qualifications and limitations in it and does not apply by implication to other matters. SMEC makes no representation that the scope, assumptions, qualifications and exclusions set out in this report will be suitable or sufficient for other purposes nor that the content of the report covers all matters which you may regard as material for your purposes. This report must be read as a whole. Any subsequent report must be read in conjunction with this report.
    [Show full text]
  • Timor-Leste Strategic Development Plan, 2011–2030
    SDP 2011-2013 PART 1: INTRODUCTION SDP 2011-2013 PART 1: INTRODUCTION TIMOR-LESTE STRATEGIC DEVELOPMENT PLAN 2011 - 2030 VERSION SUBMITTED TO THE NATIONAL PARLIAMENT 1 SDP 2011-2013 PART 1: INTRODUCTION 2 SDP 2011-2013 TIMOR-LESTESDP 2011-2013 STRATEGIC DEVELOPMENT PLAN 2011 - 2030 PART 1: INTRODUCTION PART 1: INTRODUCTION CONTENTS PART 1 INTRODUCTION 7 OVERVIEW 8 BACKGROUND 9 STRATEGIC DEVELOPMENT PLAN 11 PART 2 SOCIAL CAPITAL 13 EDUCATION AND TRAINING 14 HEALTH 33 SOCIAL INCLUSION 44 ENVIRONMENT 53 CULTURE AND HERITAGE 61 PART 3 INFRASTRUCTURE DEVELOPMENT 69 ROADS AND BRIDGES 70 WATER AND SANITATION 77 ELECTRICITY 85 SEA PORTS 93 AIRPORTS 97 TELECOMMUNICATIONS 99 PART 4 ECONOMIC DEVELOPMENT 105 RURAL DEVELOPMENT 107 AGRICULTURE 118 PETROLEUM 136 TOURISM 141 PRIVATE SECTOR INVESTMENT 151 PART 5 INSTITUTIONAL FRAMEWORK 157 SECURITY 158 DEFENCE 163 FOREIGN AFFAIRS 170 JUSTICE 176 PUBLIC SECTOR MANAGEMENT AND GOOD GOVERNANCE 181 NATIONAL DEVELOPMENT AGENCY AND ECONOMIC POLICY AND INVESTMENT AGENCY 188 PART 6 ECONOMIC CONTEXT AND MACROECONOMIC DIRECTION 192 PART 7 CONCLUSION AND STAGING OF THE STRATEGIC DEVELOPMENT PLAN 215 3 TIMOR-LESTESDP 2011-2013 STRATEGIC DEVELOPMENT PLAN 2011 - 2030 PART 1: INTRODUCTION DISTRICT MAP OF TIMOR-LESTE 2011 Source: UNDP 4 SDP 2011-2013 TIMOR-LESTESDP 2011-2013 STRATEGIC DEVELOPMENT PLAN 2011 - 2030 PART 1: INTRODUCTION PART 1: INTRODUCTION LIST OF TABLES TABLE 1 – ESTIMATED SCHOOL INFRASTRUCTURE NEEDS 15 TABLE 2 – PROGRESS ACHIEVED IN BASIC EDUCATION, 2000 TO 2010 17 TABLE 3 – SECONDARY EDUCATION IN TIMOR-LESTE, 2010 20 TABLE 4 – GRADUATED STUDENTS (CUMULATIVE DATA UP TO 2011) 22 TABLE 5 – SUMMARY OF EXISTING HEALTH FACILITIES IN TIMOR-LESTE 34 TABLE 6 – BENEFITS PAID UNDER DECREE-LAW NO.
    [Show full text]
  • Divided Loyalties Displacement, Belonging and Citizenship Among East Timorese in West Timor
    DIVIDED LOYALTIES DISPLACEMENT, BELONGING AND CITIZENSHIP AMONG EAST TIMORESE IN WEST TIMOR DIVIDED LOYALTIES DISPLACEMENT, BELONGING AND CITIZENSHIP AMONG EAST TIMORESE IN WEST TIMOR ANDREY DAMALEDO MONOGRAPHS IN ANTHROPOLOGY SERIES For Pamela Published by ANU Press The Australian National University Acton ACT 2601, Australia Email: [email protected] Available to download for free at press.anu.edu.au ISBN (print): 9781760462369 ISBN (online): 9781760462376 WorldCat (print): 1054084539 WorldCat (online): 1054084643 DOI: 10.22459/DL.09.2018 This title is published under a Creative Commons Attribution-NonCommercial- NoDerivatives 4.0 International (CC BY-NC-ND 4.0). The full licence terms are available at creativecommons.org/licenses/by-nc-nd/4.0/legalcode Cover design and layout by ANU Press Cover photograph: East Timorese procession at Raknamo resettlement site in Kupang district 2012, by Father Jefri Bonlay. This edition © 2018 ANU Press Contents Abbreviations . ix List of illustrations . xiii List of tables . xv Acknowledgements . xvii Preface . xxi James J . Fox 1 . Lest we forget . 1 2 . Spirit of the crocodile . 23 3 . ‘Refugees’, ‘ex-refugees’ and ‘new citizens’ . 53 4 . Old track, old path . 71 5 . New track, new path . 97 6 . To separate is to sustain . 119 7 . The struggle continues . 141 8 . Divided loyalties . 161 Bibliography . 173 Index . 191 Abbreviations ADITLA Associação Democrática para a Integração de Timor Leste na Austrália (Democratic Association for the Integration of East Timor into Australia) AITI Association
    [Show full text]
  • República Democrática De Timor-Leste
    REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE RELATÓRIO DE EXECUÇÃO DO ORÇAMENTO DO FUNDO COVID-19 PERÍODO DE 17 DE ABRIL A 30 DE NOVEMBRO DE 2020 CONSELHO DE GESTÃO DO FUNDO COVID-19 REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE RELATÓRIO DE EXECUÇÃO DO ORÇAMENTO DO FUNDO COVID-19 PERÍODO DE 17 DE ABRIL A 30 DE NOVEMBRO DE 2020 CONSELHO DE GESTÃO DO FUNDO COVID-19 Índice Siglas/Abreviaturas .......................................................................................................................................... 3 Introdução .......................................................................................................................................................... 4 Conselho de Gestão de Fundo COVID-19 ...................................................................................................... 5 Secretariado Técnico do Fundo COVID-19 ...................................................................................................... 5 Orçamento de Fundo COVID-19 ...................................................................................................................... 6 Execução do Fundo COVID-19 ......................................................................................................................... 9 Saldo de Dinheiro ........................................................................................................................................... 12 DEMONSTRAÇÃO DE RECEITAS E PAGAMENTOS DE DINHEIRO.................................................................... 13 Notas
    [Show full text]
  • Least Developed Sucos: Timor-Leste
    Pacifi c Studies Series Least Developed Sucos TIMOR-LESTE Pacif ic Studies Series Least Developed Sucos TIMOR-LESTE © 2013 Asian Development Bank All rights reserved. Published in 2013. Printed in the Philippines. ISBN 978-92-9254-222-1 (Print), 978-92-9254-223-8 (PDF) Publication Stock No RPS135851-2 Cataloging-In-Publication Data. Asian Development Bank. Least developed sucos: Timor-Leste. Mandaluyong City, Philippines: Asian Development Bank, 2013. 1. villages. 2. Timor-Leste. I. Asian Development Bank. The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area. ADB encourages printing or copying information exclusively for personal and noncommercial use with proper acknowledgment of ADB. Users are restricted from reselling, redistributing, or creating derivative works for commercial purposes without the express, written consent of ADB. Cover photo: ADB photo library. Note: In this report, “$” refers to US dollars unless otherwise stated. Asian Development Bank 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines Tel +63 2 632 4444 This paper has been prepared by Craig Sugden. Fax +63 2 636 2444 The author thanks Helder Lopes, consultant to ADB, www.adb.org and Rommel Rabanal of the ADB Pacific Department, For orders, please contact: for research support.
    [Show full text]
  • Rv I SURVEY OF
    rv I SURVEYOF I IHL AI.,-,LYSIS AND I r' REL~CTION - r- -- v- '-7 w -.- Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A PARTNERSHIPOF THE EASTTIMOR TRANSITIONAL ADMINISTRATION, THE ASIANDEVELOPMENT BANK, THE WORLDBANK AND THE UNITEDNATIONS DEVELOPMENT PROGRAMME Public Disclosure Authorized 1 INTRODUCTION THE POVERTYASSESSMENT THESURVEY OF SUCOSIN TIMORLOROSA'E (SSTL) MORE INFORMATION 8 POWERAND WATER 12 THEIMPACT OF THE VIOLENCE OF 1999 13 HUMANITARIAN,RECONSTRUCTION AND DEVELOPMENTPROGRAMS 14 A Suco DEVELOPMENTINDEX 16 ~MPL~CAT~ONSFOR POLICY OF THE SURVEYOF SUCOS IN TIMORLOROSA'E ANNEX A MEMBERSOF THE PROJECTTEAM ANNEX B THESURVEY QUESTIONNAIRE ANNEX C DATAQUALITY ANNEX D DATACD CHARTS Chart 1 General Economic Characteristics Chart 2 Education Chart 3 Health Chart 4 The Availability of Food Figure 2.1 Total Population Figure 2.2 Average Household Size Figure 2.3 Female:Male Sex Ratio Figure 2.4 Mothers' Access to Care at Delivery Figure 2.5 Potential ema ale-~eaded Households Figure 2.6 Children Aged 6-1 0 Years Attending School Figure 2.7 Number of Houses Reported as Destroyed in 0911999 Figure 2.8 Presence and Seasonality of Irrigation Figure 2.9 Food Shortages - Western Regions Figure 2.1 0 Food Shortages - Eastern Regions Figure 2.1 1 Food Shortages - Atauro, D~liTown and Oecussi Figure 2.1 2 Percent of Livestock (Animal Units) in 2001 cf. Pre-9/99 Figure 2.1 3 Rice Cultivation Figure 2.14 Maize Cultivation Figure 2.1 5 Tuber Cultivation Figure 2.1 6 Coffee Cultivation Figure 2.1 7 Vegetable
    [Show full text]
  • Democratic Republic of Timor-Leste</I>
    DEMOCRATIC REPUBLIC OF ittle is known of Timor before AD 1500, although Chinese and Javanese traders vis- “Lited the island from at least the 13th centu- ry, and possibly as early as the 7th century. These traders searched the coastal settlements for aromatic sandalwood, which was valued for its use in making furniture and in- cense, and beeswax, used for making candles. Portuguese traders arrived between 1509 and 1511, but it wasn’t until 1556 that a handful of Dominican friars established the first Portuguese settlement at Lifau – in the present-day Oecussi enclave – and set about converting the Timorese to Cathol- icism. In 1642, Francisco Fernandes led a Portuguese military ex- pedition to weaken the power of the Timor kings. Comprised primarily of Topasses, the ‘black Portuguese’ mestizosDelivered (people by Ingenta of mixed parentage) from neighboringIP: 192.168.39.151Flores, his small On: army Sat, 02 Oct 2021 09:05:08 of musketeers settled inCopyright: Timor, extending American Portuguese Society for influ Photogrammetry- and Remote Sensing ence into the interior. To counter the Portuguese, the Dutch established a base at Kupang in western Timor in 1653. The Portuguese appointed an administrator to Lifau in 1656, but the Topasses went on to become a law unto themselves, eas where the Australians were operating. By the end of the driving out the Portuguese governor in 1705. By 1749 the To- war, between 40,000 and 60,000 Timorese had died. passes controlled central Timor and marched on Kupang, but “After WWII the colony reverted to Portuguese rule until, the Dutch won the ensuing battle, expanding their control of following the coup in Portugal on 25 April 1974, Lisbon set western Timor in the process.