Clearing The

Total Page:16

File Type:pdf, Size:1020Kb

Clearing The AN INDEPENDENT VOICE FOR RAIL USERS No 139 £2 April 2014 Clearing the way Picture: NETWORK RAIL See page 2 Page one picture Rail is taking off LOCAL ACTION Heathrow is likely to gain a new start in 2016 if planning permis- To York Yorkshire link so that passengers from the sion is granted, with tunnelling and Selby By Chris Hyomes [email protected] West can travel by rail direct to in 2018. The project would be ML EC the airport. complete in 2021. ver e o n n dg Electrification To Knottingley bri It will reduce the need to travel d to erte into London and back out again, A double for Corby div The Halifax Courier, the Hebden Road level crossing or transfer by bus on congested to be closed Bridge Times and the Todmorden roads. The line from Kettering to Corby News are backing calls for the is to be doubled this year, under- Do Calder Valley railway line to be Network Rail announced in Feb- nca lining the success of Corby ste electrified. Nina Smith of Railfuture ruary that it was planning to pro- r No Joan Croft rth vide a service from Reading, via station since it was reopened five Cho Junction said there is a massive groundswell rd of support right along the Leeds- Slough, to Heathrow. years ago. Railfuture’s David Fursdon, who Manchester route via Halifax for it Network Rail has met MPs and to be electrified. Calder Valley MP other stakeholders to discuss has promoted the new services Craig Whittaker has also spoken in to Corby, said he was optimistic e the detailed plans, known as the lin favour of electrification. The Halifax n that a second platform would ai & District Rail Action Group said: Western Rail Access Programme. m soon be installed at the town. st “It’s a no-brainer.” The group says A new junction would be cre- oa To Scunthorpe C it is astonishing that the line was David is delighted that the Corby ast and Immingham ated between Langley and Iver E not included in a list of lines to be stations, linking with a three- Evening Telegraph, as well as TV and radio stations are keen to considered for electrification. HADRAG insists: “If our line is mile tunnel for trains to go to not electrified this will mean keeping diesel trains to operate Heathrow Terminal 5. A steering report the good news and to interview rail campaigners. He Calder Valley line services that will run under the wires to group, including Network Rail, destinations beyond Leeds, Manchester and Preston. This the Department for Transport, said: “I am proud of what we are reduces efficiency and hence increases costs. The alternative achieving.” To Shaftholme Junction Thames Valley Berkshire local Doncaster Existing of an isolated diesel Calder Valley – connectivity lost – using enterprise partnership, Slough The number of people using and London freight line outdated units well into the 2020s is simply not acceptable. borough council and the Airport, Corby nearly doubled from to Scunthorpe We should be planning for electrification now.” has been set up to make progress 115,400 in 2009-10 to 215,400 in and Immingham n n on the proposals. Work could 2011-12. More improvements needed at Halifax station DIAGRAM OF PAGE ONE PICTURE: The new chord allows There have been big improvements at Halifax station over the ISSN 0267-5943 www.railwatch.org.uk freight to travel across the East Coast main line without East Coast interloper past six years but Halifax & District Rail Action Group says railwatch impeding main line traffic while the newly diverted road allows more needs to be done, including plumbing improvements in is edited by Robert Stevens, John Stanford and Ray King, 4 Christchurch the level crossing near Joan Croft Junction to be closed It is possible that new Pendolinos from Alstom could be the toilets, attention to the inefficient power-operated doors Square, London E9 7HU Tel 020 8985 8548 [email protected] taking advantage of the extra capacity being created on to the platform and better signs. HADRAG also wants to see [email protected] [email protected] Our page one picture shows power stations because British the East Coast main line. Alliance Rail Holdings wants to an additional running line serving a restored platform 3. Printed by Print-Out, High Street, Histon, Cambridge CB4 4JD Tel: 01223 the new twin-track flyover energy policy is in flux at the run nine-coach tilting trains under the Great North Eastern n n £45 million reopening campaign for Ripon 232709. Railfuture members receive Railwatch free aimed at freeing up a notorious moment. The power stations are Railway brand between London, Newcastle and Edinburgh bottleneck over the East Coast involved in switching from coal from 2016. MPs have been urged to support £45 million plans to reopen Non-members can subscribe online at www.railfuture.org.uk/books/sub- main line. to biomass in an effort to reduce The Pendolinos could be targeting the Edinburgh and scription.php or by sending £8 (cheque payable to the Harrogate-Ripon-Northallerton railway. The Leeds The bridge and two miles of pollution, but the Government Newcastle segments of the market, two years before Railfuture) to: Alan Cocker, 11 Franklin Road, Ipswich, Suffolk IP3 9DX. Northern Railway Reinstatement Group sent a 19-point new line will take freight clear of is being accused of failing to Hitachi’s new Intercity Express trains are introduced on proposal, highlighting the economic benefits, especially if Copy deadlines: For the next issue, published in June, copy must be Shaftholme Junction, just north provide subsidies to allow the ECML. Alliance believes it can persuade people who further routes to Leeds and Wetherby are reopened. The MP emailed to [email protected] by 7 May. Paper copy can be sent to 4 of Doncaster. all of them to continue in full currently fly to switch to rail. It applied to the Office of Rail for Skipton and Ripon, Julian Smith, told the Yorkshire Post: Christchurch Square, London E9 7HU but must be earlier. operation. Regulation in February for permission to operate under “I’m very supportive of any ideas for returning the railways to The £45 million chord will open access rules. Ripon – but thus far there needs to be more detail and much Advertising: Full page: £190. Half page: £95. Quarter page: £45. allow for freight trains serving “We see coal shrinking very rapidly from now on, probably more focus on the cost-benefit analysis of any proposals.” Small ads are free to members. Otherwise: 30p per word. Immingham docks and the But Railfuture member Graham Lund said: “It is bizarre that contributing nothing to power Regional Transport Partnerships, will run for eight or nine years, Please report any problems with the delivery or condition of your copy of three power stations of Drax, Ripon with a population of over 16,000 inhabitants, is not a generation by 2030,” Energy after a series of meetings at Railwatch to [email protected] or to the E9 7HU address above. Ferrybridge and Eggborough to well beyond 2018 or 2019 when front runner for funds to reopen its long abandoned rail link keep clear of the main line. Minister Michael Fallon told Peterborough, Doncaster, new Intercity Express trains built to Harrogate and Leeds. The Times in December. “Coal Newcastle and Edinburgh. Railfuture They currently have to travel by Hitachi for Agility Trains at is going to disappear off the The Government has ignored a new train factory in Newton n n £17 million project to improve Leeds station is independent and voluntary. It is the campaigning name of the Railway along the East Coast main line system.” for a short section, sometimes a Trades Union Congress Aycliffe will become available Development Society Ltd, a not-for-profit company limited by guarantee. In 2012, coal generated 40% supported campaign to keep the for the East Coast line. Transport Secretary Patrick McLoughlin described Leeds as Registered in England and Wales No 5011634. delaying passenger trains. a “gateway to the north” in February when he praised the of British electricity. Freight East Coast franchise in the hands The East Coast line has had Registered Office: 24 Chedworth Place, Tattingstone, Suffolk IP9 2ND. The project will also clear the trains are however expected £17 million project to improve the station by opening up a of Directly Operated Railways an ill-starred history since southern entrance. way for the closure of Joan Croft to transport much of the which has run EC services since Media enquiries level crossing (middle right in privatisation. Twice it has had to biomass which will become one 2009. In January, it named three be taken back into public hands n n Rail North team prepares for new franchises Bruce Williamson, 29 Granby Hill, Clifton, Bristol BS8 4LT. the picture) because the road is alternative fuel. Providing more bidders on a shortlist to take Tel: 0117 9272954 Mobile: 07759 557389 being diverted and a new road because of the financial failure capacity on the East Coast main over the franchise of the of its operators (first GNER and A partnership between local councils and the Department Email: [email protected] bridge, top right, is part of the line could help Alliance Rail 393-mile long line. for Transport was set up in January to oversee the renewal scheme. then National Express). Holdings (owned by Arriva, The three are East Coast Trains in 2016 of the TransPennine Express and Northern rail Membership £18 per year.
Recommended publications
  • Tourism Leaflet 2021
    Visit Cannock Chase Your guide on getting more from your visit to Our Visitor Centres Birches Valley Visitor Centre Marquis Drive Visitor Centre Museum of Cannock Chase Cannock Chase National Trust Shugborough Estate The Cannock Chase District is nestled in the heart of the West Midlands, Chasewater Country Park in the county of Staffordshire. We are a historical, proud District spanning The Wolseley Centre - Staffordshire Wildlife Trust HQ across three town centres, Cannock, Hednesford and Rugeley. Some of our visitor centres sit just outside the district. For full details, take a look at page 13 Visit us to enjoy incredible shopping at McArthuGlen’s Designer Outlet West Midlands, only a 20 minute walk from Cannock town centre and only 10 minutes walk from Cannock Train Station. And why not explore, walk and mountain bike in the Cannock Chase Area Well Worth a Visit of Outstanding Natural Beauty. Less than 20 minutes drive from our three town centres. McArthurGlen Designer Outlet West Midlands Cannock Chase AONB Go Ape Hednesford Hills Raceway Cannock Chase German Military Cemetery Planet Ice Skating Rink Cannock Cinema Prince of Wales Theatre The Rugeley Rose Theatre Cannock Chase Leisure Centre and Golf Course Rugeley Leisure Centre Within the County Drayton Manor Theme Park SnowDome Alton Towers Resort Trentham Estate - Shopping, Monkey Forest and Gardens National Memorial Arboretum Photographs courtesy of Michelle Williams, 2 Margaret Beardsmore and Carole & David Perry 3 A well connected place... Heritage Trail Map By road By bus and coach A great walking and cycling route linking Rugeley, Hednesford & Cannock Cannock Chase The A5 and A34 AONB Bus links to all local and surrounding areas trunk roads, M6 and as well as wider areas including Central M6 toll provide Birmingham and Walsall.
    [Show full text]
  • Infrastructure Delivery Plan Contents 1 Introduction 3
    APPENDIX O Infrastructure Delivery Plan 1 March 2018 Infrastructure Delivery Plan Contents 1 Introduction 3 2 Policy Context 5 3 Funding & Delivery 8 4 Strategic Infrastructure 11 5 Local Infrastructure Needs 58 Appendices A Lichfield District Integrated Transport Strategy 93 B River Mease SAC Water Catchment Area 94 C Cannock Chase SAC Zone of Influence 96 March 2018 Infrastructure Delivery Plan 3 1 Introduction 1.1 Infrastructure Planning is an essential element in ensuring that the Local Plan Strategy and Local Plan Allocation Document is robust and deliverable. 1.2 The term infrastructure is broadly used for planning purposes to define all of the requirements that are needed to make places function efficiently and effectively and in a way that creates sustainable communities. Infrastructure is commonly split into three main categories, defined as: Introduction Physical: the broad collection of systems and facilities that house and transport people and goods, and provide services e.g. transportation networks, housing, energy supplies, 1 water, drainage and waste provision, ICT networks, public realm and historic legacy. Green: the physical environment within and between our cities, towns and villages. A network of multi-functional open spaces, including formal parks, gardens, woodland, green corridors, waterways, street trees and open countryside. Social & Community: the range of activities, organisations and facilities supporting the formation, development and maintenance of social relationships in a community. It can include the provision
    [Show full text]
  • WMRU June 2014 Cover
    West Midlands Rail User Issue 8 JUNE 2014 £2 www.campaignforrail.org.uk ON OTHER PAGES: 10. Rail continues to grow ON OTHER PASGES: 2. Comment 11. Metro developments 3.BirminghamCurzon 12.Whypaymore? 4. Cross City South grows 13. Bushbury Junction 6. CfR’s Annual Meeting 14. Snippets 7. TripleTriumphforStourbridgeGroup 15. Thenextstationis…..Stone 8. TheFutureisWestMidlandsRail 16. TrackliftedtoCauldonLowe The voice of Campaign for Rail in the West Midlands COMMENT Imagine buying a vacuum cleaner and taking it back next day because it didn’t work. ‘Were you trying to use late afternoon? It’s not valid at that time. We didn’t tell you when we sold you it.’ Instead of vacuum cleaner, read ‘off peak rail ticket’. Twice recently I have bought rail tickets from booking clerks who have only asked if I am travelling after 09.30. In both cases, I later discovered they were not valid for my afternoon return journey. The problem is with Cross Country. It has decided some afternoon trains are ‘peak’ but it doesn’t identify them in its timetables and Cross Country unhelpfully only tells us, ‘off peak times vary by route’. As the i newspaper said about rail tickets re- cently, ‘Peak time is now more difficult to define in a sentence than the Higgs boson.’ Equally useless from Cross Country is, ‘Break of journey is generally permitted unless prohibited for the journey you are making.’ Each ticket says, ‘Route: Any permitted’ and ‘Validity: See restrictions.’ But where? A CfR member tried to buy a ticket to Kidderminster which involved going south via Bromsgrove to Droitwich Spa and then doubling back.
    [Show full text]
  • Signal and Track Improvements for Trent Valley Line Passengers
    Signal and track improvements for Trent Valley Line passengers July 19, 2021 Rail passengers travelling between Stafford and Rugby are being urged to ‘look before they book’ ahead of a month of weekend railway upgrades. The major improvements to the Trent Valley Line will see new railway track laid and signalling – the traffic lights of the railway – improved. Once complete, it will mean smoother, more reliable journeys for passengers who use this busy stretch of the West Coast main line. Passengers are being urged to check www.nationalrail.co.uk to plan their journeys while the essential work is carried out on 24-25 July, 31 July-1 August, 7-8 August and 14-15 August. To keep London Northwestern Railway and West Midlands Railway passengers on the move, buses will replace trains between: Rugby – Stafford Hednesford – Rugeley Trent Valley Bermuda Park/Coventry Arena – Nuneaton A revised timetable will be in place to minimise disruption for passengers. Avanti West Coast passengers will also see fewer trains and slightly longer journey times with services diverted via Birmingham New Street. James Dean, Network Rail’s West Coast South route director, said: “We’re really pleased to be investing in the Trent Valley Line so that passengers get the journeys they deserve as they continue to return to the railway. The investment is a key part of our work to support the post-pandemic recovery, helping the country build back better. “Services will only be affected during the weekends with some journeys replaced by buses to ensure passengers can still get to where they need to be.
    [Show full text]
  • National Rail Route Diagram
    Thurso Georgemas Junction Wick Great Britain Far North Helmsdale Line Lairg Tain Invergordon Garve Dingwall Nairn Forres Elgin ISLE OF SKYE Achnasheen Inverness Keith Strathcarron national rail Huntly Plockton Stromeferry Kyle of Lochalsh Aviemore Inverurie route diagram Dyce Kingussie HIGHLAND December 2020 Spean Aberdeen Glenfinnan Bridge Mallaig Blair Atholl Fort William Stonehaven High speed route HS2 under construction / planned Rannoch Montrose West Pitlochry Principal routes Highland Regional routes Lines Arbroath Local routes Tyndrum Oban Limited service Dalmally Crianlarich Dundee Elizabeth Line and East West Rail under construction Perth Gleneagles Cupar Arrochar & Tarbet Dunblane Major cities with multiple stations Fife Markinch Stirling Circle Alloa Kirkcaldy All lines shown except in London area Garelochhead Dunfermline Inverkeithing Larbert Falkirk within grey line Balloch Grahamston Edinburgh Edinburgh Helensburgh Upper Gateway Waverley Helensburgh Central North Berwick Milngavie Lenzie Airport interchange Falkirk Linlithgow Haymarket Dunbar Dumbarton Central Maryhill High Railair coach link with Heathrow Airport Cumbernauld Westerton Springburn Bathgate Berwick-upon-Tweed Ferry interchange Queen Street Drumgelloch Partick Airdrie Coatbridge Port Paisley Galashiels Not all stations shown Glasgow Gilmour St Central Kirknewton Gourock Inverclyde Whifflet Shotts Tweedbank Chathill Wemyss Bay Line Paisley Newton Holytown Ayr Canal Cathcart EAST COAST Largs Line Stewarton Motherwell Carluke Ardrossan Kilwinning Neilston Alnmouth
    [Show full text]
  • West Midlands and Chilterns Route Utilisation Strategy Draft for Consultation Contents 3 Foreword 4 Executive Summary 9 1
    November 2010 West Midlands and Chilterns Route Utilisation Strategy Draft for Consultation Contents 3 Foreword 4 Executive summary 9 1. Background 11 2. Dimensions 20 3. Current capacity, demand, and delivery 59 4. Planned changes to infrastructure and services 72 5. Planning context and future demand 90 6. Gaps and options 149 7. Emerging strategy and longer-term vision 156 8. Stakeholder consultation 157 Appendix A 172 Appendix B 178 Glossary Foreword Regional economies rely on investment in transport infrastructure to sustain economic growth. With the nation’s finances severely constrained, between Birmingham and London Marylebone, as any future investment in transport infrastructure well as new journey opportunities between Oxford will have to demonstrate that it can deliver real and London. benefits for the economy, people’s quality of life, This RUS predicts that overall passenger demand in and the environment. the region will increase by 32 per cent over the next 10 This draft Route Utilisation Strategy (RUS) sets years. While Network Rail’s Delivery Plan for Control out the priorities for rail investment in the West Period 4 will accommodate much of this demand up Midlands area and the Chiltern route between to 2019, this RUS does identify gaps and recommends Birmingham and London Marylebone for the next measures to address these. 30 years. We believe that the options recommended Where the RUS has identified requirements for can meet the increased demand forecast by this interventions to be made, it seeks to do so by making RUS for both passenger and freight markets and the most efficient use of capacity.
    [Show full text]
  • Q1 What Are the Main Arguments for Or Against HSR?
    Written evidence from The Chiltern Society (HSR81) Q1 What are the main arguments for or against HSR? 1.1 To answer this question meaningfully it is essential to distinguish between the concept of High Speed Rail (HSR), the proposed HS2 project and the issue of whether the latter is an effective response to the Government’s case for the former. 1.2 HSR covers a wide spectrum of different rail track and train design speeds1. If there is a demonstrable case for HSR, one key question is ‘what design speed concept(s) will provide the best strategic fit and value for money for England, Wales and Scotland?’ 1.3 The Chiltern Society is not opposed to the concept of HSR. It is though strongly opposed to the currently proposed HS2 project, which has been evolved through a highly flawed, and arguably unlawful, process. Moreover, the HS2 project has been proposed in the absence of a soundly developed national strategic context against which to test its soundness in terms of fitness for purpose. The Society is drawn into this debate because, as a direct result of these process failures, an HSR route through the Chilterns Area of Outstanding Natural Beauty (AONB) is proposed. This has been done without conclusive demonstration, as required by planning guidance2 and best practice, that no alternative that avoids the AONB is possible to meet the (currently undefined) ‘national interest’ need for an HSR network. 1.4 The Society is prepared to accept that there are prima facie arguments for reducing rail travel times between major cities and, importantly, improving connectivity to and between major centres in the English Midlands and the North.
    [Show full text]
  • Coventry – Nuneaton Rail Line Upgrade MSBC Appraisal Summary
    Coventry – Nuneaton Rail Line Upgrade MSBC Appraisal Summary September 2011 CONTENTS 1 INTRODUCTION 1 1.1 Background 1 1.2 Scheme Objectives 1 2 CURRENT SERVICE AND PASSENGER DEMAND 3 2.1 Existing Rail Service 3 2.2 Base Rail Demand 3 2.3 Recent Growth in Base Rail Demand 4 3 MODELLING APPROACH 6 3.1 Introduction 6 3.2 Scheme Elements 6 3.3 Modelling Approach 7 3.4 Summary of Approach 12 4 MODEL RESULTS 15 4.1 Base Demand on the Coventry – Nuneaton Line 15 5 ECONOMIC APPRAISAL 21 5.1 Introduction 21 5.2 Capital Costs 21 5.3 Operating Costs 21 5.4 Revenues and Subsidy 22 5.5 User and Non – User Benefits 22 5.6 Economic Appraisal 23 5.7 Cost Benefit Analysis Results 28 Table 1 Existing Timetable 3 Table 2 Preferred Scheme Timetable (Half-hourly) 8 Table 3 Coventry Arena Events Traffic Forecast 12 Table 4 Summary of Approach to Modelling Key Scheme Impacts 13 Table 5 Coventry – Nuneaton Passengers: Model vs November 2009 15 Table 6 2016 Do Minimum Weekday Passenger Forecast (2-hour periods) 16 Table 7 2016 Do Minimum Annual Passenger Forecast 17 Table 8 Historical West Midlands Rail Patronage Growth 17 Table 9 2016 Do Something Weekday Passenger Forecast (2-hour periods) 17 Table 10 2016 Do-Something Visum Model Annual Passenger Forecast 18 Table 11 2016 Long Distance and Arena Event Trips 19 Table 12 2016 Combined Annual Passenger Forecast 19 Table 13 2016 Additional Annual Passenger Forecast (DS – DM) 19 Table 14 Mode Share Analysis - Screenlines 20 Table 15 Capital Costs (1st Quarter 2011) 21 st Table 16 Annual Additional Operating Costs (1 Quarter 2011) 21 Table 17 Revenues and Subsidy, 2002 prices and Outturn Prices 22 Table 18 Breakdown of Quantified Benefits 24 Table 19 Monetised Time Benefits by Size of Time Saving (£k) 24 Coventry – Nuneaton Rail Line Upgrade, Appraisal Summary, September 2011 Table 20 Quantified Wider Economic Benefits (£k PV).
    [Show full text]
  • RUGBY PARKWAY: a Feasibility Study Into a New Station to Serve the Rugby Radio Station Sustainable Urban Extension
    RUGBY PARKWAY: A feasibility study into a new station to serve the Rugby Radio Station Sustainable Urban Extension 30 April 2015 Report Preparation Approval for issue version Prepared by Date Approved by Date 1.0 MH 30/04/2015 MH 30/04/2015 2.0 3.0 Final MH 12/06/2015 MH 12/06/2015 www.slcrail.com Page 1 of 35 Contents 1. Executive summary ........................................................................................................................ 4 1.1 Introduction ........................................................................................................................ 4 1.2 Station Site Options ............................................................................................................ 5 1.3 Capital Cost Estimate .......................................................................................................... 7 1.4 Timetabling Feasibility ........................................................................................................ 7 1.5 Demand Analysis ................................................................................................................. 8 2. Scope and purpose of report.......................................................................................................... 8 2.1 Objectives ............................................................................................................................ 8 2.2 Report structure .................................................................................................................
    [Show full text]
  • Letter Title
    Campaigning for better services over a bigger rail network please reply to: ICWC Consultation 42 Quickrells Avenue Department for Transport Cliffe 4/18 Great Minster House Rochester 33 Horseferry Road Kent London SW1P 4DR ME3 7RB [email protected] [email protected] 1st August 2016 Dear Sir, Consultation: InterCity West Coast Rail Franchise Railfuture is a national independent voluntary organisation campaigning for a bigger, better railway in Britain, so we welcome the opportunity to provide an informed response to the questions of this consultation. The response has been coordinated by Trevor Bishop ([email protected]) the Ra0lifuture TOC liaison for this franchise. Railfuture recognises the importance of the provision of improved rail services offering more journey opportunities to a wider range of travellers by contributing to wider economic, employment and skills, social inclusion and environmental issues. Our response is attached. If you require any more detail, or clarification, please do not hesitate to get in touch. Yours sincerely Chris Fribbins Railfuture Head of Passenger Group www.railfuture.org.uk www.railfuturescotland.org.uk www.railfuturewales.org.uk www.railwatch.org.uk The Railway Development Society Limited is a (not for profit) Company Limited by Guarantee. Registered in England and Wales No. 5011634. Registered Office:- 24 Chedworth Place, Tattingstone, Suffolk IP9 2ND InterCity West Coast rail franchise consultation Table of contents Respond in English - 2 Respond in Welsh - 17 Ymgynghoriad ar Ryddfraint Rheilffordd InterCity Arfordir y Gorllewin Tabl cynnwys Ymateb yn Saesneg - 2 Ymateb yn Gymraeg - 17 InterCity West Coast rail franchise consultation The Department for Transport is seeking the views of the public and stakeholders on the future of rail services, stations and other supporting services provided in the InterCity West Coast rail franchise.
    [Show full text]
  • Railway Reminiscences
    rafc ^' NQTJSS ''SUPEB/. CORNELL UNIVERSITY LIBRARY FROM Cornell University Library HE3018.2.N37 A3 Railway reminiscences. 3 1924 030 116 960 olin RAILWAY REMINISCENCES. All books are subject to recall after two weeks Olin/Kroch Library DATE DUE ' RAILWAY REMINISCENCES BY GEORGE P. NEELE, LATE SUTERINTENDENT OF THE LINE OF THE LONDON AND NORTH WESTERN RAILWAY. NOTES AND REMINISCENCES OF HALF A century's PROGRESS IN RAILWAY WORKING, AND OF A RAILWAY SUPERINTENDENT'S LIFE, PRINCIPALLY ON THE LONDON AND NORTH WESTERN RAILWAY, WITH SOME SUPPLEMENTARY MEMORANDA AS TO THE RAILWAY JOURNEYS TO AND FROM SCOTLAND MADE BY HER LATE MAJESTY QUEEN VICTORIA. XonDon: M'^CORQUODALE & CO., LIMITED, PRINTERS, CARDINGTON STREET. 1904. ^7 A77373S" PREFACE. Owing to suggestions made from time to time by old comrades in railway life, I have been induced to put together some record of the part I have taken in connection with the inner working of Railways; going back to very early experiences, and through gradual developments extending over a long series of years, to the time when it became advisable for me to retire from the daily pressure of the work. A railway service commencing in 1847, carries one back a long way towards association with those who were the actual pioneers of our railway system ; from whom we learnt our first lessons, by whose successes we have profited, by whose failures we have acquired knowledge ; and on whose foundation we have endeavoured to raise a superstructure of so sub- stantial a character, that those who follow in our steps will have no reason to be ashamed of their predecessors.
    [Show full text]
  • Agenda Item 4 Strategic Rail Priorities 110920.Pdf
    Strategic Transport Forum 11th September 2020 Agenda Item 4: Strategic Rail Priorities for the West Coast Main Line and Midland Main Line Recommendation: It is recommended that the Forum: a) Considers the region’s priorities for the West Coast Main Line and Midland Main Line b) Note, in that context, presentations provided from Avanti West Coast Partnership and East Midlands Railway setting out their current franchise priorities c) Reinforce, subject to amendments agreed by the Group, the Heartland’s long- term rail needs must be along both of these corridors to deliver on the ambitions set out in the Draft Transport Strategy 1. Strategic Context 1.1. The Draft Transport Strategy identifies the West Coast Main Line and Midland Main Line as two of the busiest and most important strategic rail corridors in the Heartland. Today, both play a vital role in providing commuting, inter-urban and inter-city services to some of the country’s highest performing labour markets and regionally significant hubs. Both operate as key rail freight arteries; with the West Coast Main Line carrying the region’s largest volumes of intermodal freight from deep-sea ports in the south east and the Midland Main Line moving significant flows of construction materials originating from Leicester and the Peak District. 1.2. Both networks require greater levels of infrastructure investment if they are to deliver on the ambitions of the Transport Strategy: delivering growth in a way that is both sustainable and achieves environmental net gain. The Strategy’s policy framework recognises that investment in these strategic rail corridors will act as a catalyst for sustainable change in our region and must be used to shape our partners’ future economic and housing growth proposals brought through the local plan process.
    [Show full text]