World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 58890-EG PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN Public Disclosure Authorized IN THE AMOUNT OF US$200 MILLION TO THE ARAB REPUBLIC OF EGYPT FOR THE SECOND INTEGRATED SANITATION AND SEWERAGE INFRASTRUCTURE PROJECT Public Disclosure Authorized June 6, 2011 Sustainable Development Department Middle East and North Africa Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized CURRENCY EQUIVALENTS (Exchange Rate Effective April 13, 2011) Currency Unit = Egyptian Pound LE1 = US$0.173 US$1 = LE 5.96 FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS ARP Abbreviated Resettlement Plan ASBR Advanced Sequential Batch Reactors BD Bidding Document BOD Biological Oxygen Demand DA Designated Account DO Dissolved Oxygen EC European Commission EEAA Egyptian Environmental Affairs Agency ERR Economic Rate of Return ESAF Environmental and Social Assessment Framework ESMMF Environmental & Social Management & Monitoring Framework ESW Economic Sector Work EU European Union EWRA Egyptian Water Regulatory Agency FC Fecal Coli form FM Financial Management FMS Financial Management Specialist FY Fiscal Year GDP Gross Domestic Product GOE Government of Egypt GIZ German Society for International Cooperation HCWW Holding Company for Water and Wastewater IBRD International Bank for Reconstruction and Development ICB International Competitive Bidding IDA International Development Association IFR Interim Financial Report ISSIP Integrated Sanitation and Sewerage Infrastructure Project IWSP Improved Water and Sanitation Program JSDF Japan Social Development Fund LAU Local Administrative Unit LE Egyptian Pound M&E Monitoring and Evaluation MOHP Ministry of Health and Population MOHUUD Ministry of Housing, Utilities and Urban Development MOPIC Ministry of Planning and International Cooperation MWRI Ministry of Water Resources and Irrigation NCB National Competitive Bidding NOPWASD National Organization for Potable Water and Sanitary Drainage O&M Operation and Maintenance OP Operational Policy PAD Project Appraisal Document PAP Project Affected Persons PFS Project Financial Statement PIC Public Information Center PID Project Information Document PIM Project Implementation Manual PIU Project Implementation Unit PMCF Program Management Consulting Firm PMU Project Management Unit PS Pumping Station QA Quality Assurance RBC Rotating Biological Contractor RAP Resettlement Action Plan RPF Resettlement Policy Framework RSU Rural Sanitation Unit SA Social Assessment / Special Account SBD Standard Bidding Documents SIL Specific Investment Loan TA Technical Assistance TOR Terms of Reference TSS Total Suspended Solids TTL Task Team Leader UASB Up flow Anaerobic Sludge Blanket UNICEF The United Nations Children‟s Fund WQ Water Quality WSC Water and Sanitation Company WUA Water Users‟ Association WWTP Wastewater treatment plant Vice President: Shamshad Akhtar Country Director: A. David Craig Sector Director Laszlo Lovei Sector Manager: Francis Ato Brown Task Team Leader: Parameswaran Iyer Table of Contents I. Strategic Context .................................................................................................................... 1 II. Project Development Objectives............................................................................................ 4 III. Project Description................................................................................................................. 4 IV. Implementation ...................................................................................................................... 6 V. Key Risks ............................................................................................................................... 8 Annex I: Results Framework and Monitoring .............................................................................. 15 Annex II: Detailed Project Description......................................................................................... 18 Annex III: Implementation Arrangements .................................................................................... 22 Annex IV: Operational Risk Assessment Framework (ORAF) .................................................... 30 Annex V: Implementation Support Plan ...................................................................................... 34 Annex VI: Team Composition ...................................................................................................... 36 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. PAD DATA SHEET ARAB REPUBLIC OF EGYPT THE SECOND INTEGRATED SANITATION AND SEWERAGE INFRASTRUCTURE PROJECT PROJECT APPRAISAL DOCUMENT MIDDLE EAST AND NORTH AFRICA Sustainable Development Department Date: June 6, 2011 Sectors: Sanitation (20%); Sewerage (80%) Country Director: A. David Craig Themes: Rural Services and Infrastructure (P) Sector Director: Laszlo Lovei Environmental Assessment Sector Manager: Ato Brown Screening Category: B Team Leader: Parameswaran Iyer Project ID: P120161 Lending Instrument: SIL Project Financing Data: Proposed terms: [X] Loan [ ] Credit [ ] Grant [ ] Guarantee [ ] Other: Source Total Amount (US$M) Total Project Cost: 310 Cofinancing: 110 Total Bank Financing: IBRD 200 IDA New Recommitted Others Borrower: Arab Republic of Egypt Implementing Agency: Ministry of Housing, Utilities and Urban Development, 12 Ismail Abaza Street, Cairo, Arab Republic of Egypt Responsible Sub-Agencies: 1. National Organization for Potable Water and Sanitary Drainage (NOPWASD) Arab Republic of Egypt. Contact Person: Eng. Samia M. Saleh Badr El Din Telephone No.: +202-33042922 2. Holding Company for Water and Waste Water (HCWW) Arab Republic of Egypt. Contact Person: Eng. Mamdouh Raslan Telephone No.: +202-24583591 Estimated Disbursements (Bank FY/US$ m) FY 2012 2013 2014 2015 2016 2017 Annual 0 25 40 60 60 15 Cumulative 0 25 65 125 185 200 Project Implementation Period: Start: January 2012 End: December 2016 Expected effectiveness date: January 1, 2012 Expected closing date: December 31, 2016 Does the project depart from the CAS in content or other significant ○ Yes No respects? If yes, please explain: Does the project require any exceptions from Bank policies? ○ Yes No Have these been approved by Bank management? ○ Yes ○ No Is approval for any policy exception sought from the Board? ○ Yes No If yes, please explain: Does the project meet the Regional criteria for readiness for Yes ○ No implementation? Project Development Objective: The Project Development Objective is to provide targeted populations in the Governorates of Menoufia, Sharkeya, Assiut and Sohag with increased access to improved sanitation and sewerage services. Project description The Project consists of the following parts: Component 1: Construction of wastewater infrastructure systems in selected village clusters in the Governorates of Menoufia and Sharkeya, including wastewater treatment plants, collection networks, customer connections, and decentralized treatment systems. Component 2: Construction of wastewater infrastructure systems in selected village clusters in the Governorates of Assiut and Sohag, including wastewater treatment plants, collection networks, customer connections, and decentralized treatment systems. Component 3: Support HCWW and NOPWASD in project implementation, monitoring and evaluation and management, including construction supervision and environmental management services. Safeguard policies triggered? Environmental Assessment (OP/BP 4.01) Yes ○ No Natural Habitats (OP/BP 4.04) ○ Yes No Forests (OP/BP 4.36) ○ Yes No Pest Management (OP 4.09) ○ Yes No ii Physical Cultural Resources (OP/BP 4.11) ○ Yes No Indigenous Peoples (OP/BP 4.10) ○ Yes No Involuntary Resettlement (OP/BP 4.12) Yes ○ No Safety of Dams (OP/BP 4.37) ○ Yes No Projects on International Waters (OP/BP 7.50) ○ Yes No Projects in Disputed Areas (OP/BP 7.60) ○ Yes No Conditions and Legal Covenants: Loan Agreement Description of Covenant When Due Reference 1. Schedule 2 Section An interagency agreement has been executed between the 45 days after I A. 4 National Organization for Potable Water and Sanitary effectiveness Drainage (NOPWASD) and the Holding Company for Water and Wastewater (HCWW) in form and substance acceptable to the Bank. 2. Schedule 2 Section The Borrower has adopted the updated Project 45 days after I A. 4 Implementation Manual (PIM), in form and substance effectiveness acceptable to the Bank. 3. Section IV. B 1 No withdrawal shall be made (a) for payments prior to the Disbursement date of the Loan Agreement; or (b) for works under the condition project until the Borrower has acquired and installed accounting software for the Project, acceptable to the Bank. 4. Schedule 2, Section The Borrower shall: Implementation I B 1 (a) prepare and disclose, prior to the commencement of any construction works requiring land acquisition under the Project, a Resettlement Action Plan, acceptable to the Bank, in accordance with the RPF; (b) Implement the Resettlement Action Plan, including, unless otherwise agreed with the Bank, payment in full of compensation to all affected people prior to commencing
Recommended publications
  • SYNAXARION, COPTO-ARABIC, List of Saints Used in the Coptic Church
    (CE:2171b-2190a) SYNAXARION, COPTO-ARABIC, list of saints used in the Coptic church. [This entry consists of two articles, Editions of the Synaxarion and The List of Saints.] Editions of the Synaxarion This book, which has become a liturgical book, is very important for the history of the Coptic church. It appears in two forms: the recension from Lower Egypt, which is the quasi-official book of the Coptic church from Alexandria to Aswan, and the recension from Upper Egypt. Egypt has long preserved this separation into two Egypts, Upper and Lower, and this division was translated into daily life through different usages, and in particular through different religious books. This book is the result of various endeavors, of which the Synaxarion itself speaks, for it mentions different usages here or there. It poses several questions that we cannot answer with any certainty: Who compiled the Synaxarion, and who was the first to take the initiative? Who made the final revision, and where was it done? It seems evident that the intention was to compile this book for the Coptic church in imitation of the Greek list of saints, and that the author or authors drew their inspiration from that work, for several notices are obviously taken from the Synaxarion called that of Constantinople. The reader may have recourse to several editions or translations, each of which has its advantages and its disadvantages. Let us take them in chronological order. The oldest translation (German) is that of the great German Arabist F. Wüstenfeld, who produced the edition with a German translation of part of al-Maqrizi's Khitat, concerning the Coptic church, under the title Macrizi's Geschichte der Copten (Göttingen, 1845).
    [Show full text]
  • National Feasibility Study & Roadmap for Riverbank
    SUPPORTING INNOVATION IN WATER & WASTEWATER IN EGYPT NATIONAL FEASIBILITY STUDY & ROADMAP FOR RIVERBANK FILTRATION IN EGYPT CAIRO 2018 (REVISED) 2020 RBF Unit, Sohag, Egypt - ©2021 COPYRIGHT AND DISCLAIMER Copyright © United Nations Human Settlements Programme (UN-Habitat) 2020 All rights reserved United Nations Human Settlements Programme (UN-Habitat) P.O. Box 30030 00100 Nairobi GPO KENYA Tel: 254-020-7623120 (Central Office) www.ar.unhabitat.org DISCLAIMER The designations employed and the presentation of material in this publication do not imply the expression of any opinion whatsoever on the part of the secretariat of the United Nations concerning the legal status of any county, territory, city or area or its authorities, or concerning the delimitation of its frontiers or boundaries regarding its economic system or degree of development. Excerpts may be reproduced without authorization, on condition that the source is indicated. Views expressed in this publication do not necessarily reflect those of the United Nations Human Settlements Programme, the United Nations and its member states. i National Feasibility Study and roadmap for River Bank Filtration in Egypt NATIONAL FEASIBILITY STUDY AND ROADMAP FOR RIVER BANK FILTRATION IN EGYPT FEASIBILITY STUDY REPORT PARTNERS COORDINATORS The initial version of this report was produced under Hyat Inclusive and Sustainable Local Economic Development Project in partnership with the Egyptian Ministry for Local Development, the Egyptian Ministry for Housing, Utilities and Urban Communities, the Egyptian Holding Company for Water and Wastewater and the United Nations Human Settlement’s Programme (UN Habitat). Funded by the United Nations Trust Fund for Human Security and UN Habitat. CONTACT DETAILS Holding Company for Water and Wastewater (HCWW) Prof.
    [Show full text]
  • LOT NUMBER RESERVE £ Postal History 1 Early Missionary Letter
    1 LOT NUMBER RESERVE £ Postal history 1 Early Missionary letter dated 7 Dec 1830, Alexandria to Beyroot 59.00 2 French Consular Mail – Entire Alex to Marseilles with 40 centimes cancelled 5080 (diamond) via Paquebots de la Mediterrane (in red) and PD (in red). Reduced rate from 1866 44.00 Second Issue, 1867-69 (Nile Post numbers) 3 5-para (D8), Types 104 unused, with photograph 24.00 4 10-para (D91), used with watermark on face. ESC certificate 45.00 5 3 x 10-para (D9a, 9b, 9c), used in excellent condition with photograph 85.00 6 10-para (D9, Types 1-4), unused, includes Stone A Type 2 (D9A) 83.00 7 10-para (D9f, Types 1-4), unused, includes Stone B Type 2 unbroken O, with photograph 63.00 8 10-para (D9 Types 1-4), unused and used including Stone A 3rd State Type 2 with photograph 111.00 9 20-para (D10 Types 1-4), unused Stone A (2 dots) with photograph 72.00 10 20-para (D10i Types 1-4), unused Stone B (3 dots) with photograph 65.00 11 1-piastre (D11), 37 copies unused and used, all types. Worthy of research by a student of this issue 49.00 12 5-piastre (D 13 Types 1-4), unused, fine condition 390.00 13 5-piastre (D13 Types 1-4), used, fine condition 240.00 14 5-para (D8k) used, misplaced perforation 43.00 15 5-para (D8), yellow green, mint, very fine 19.00 16 10-para (D9j), unused, “white hole in wig” variety 29.00 17 1-piastre (D11v), unused, “inverted watermark” 19.00 18 1-piastre (D11m), unused, imperforate 22.00 Postage Due issue 1922 (Nile Post numbers) 19 PD30a, mint block of 12, overprint à cheval 186.00 20 PD30a, three mint singles,
    [Show full text]
  • (CE:1968A-1975B) PILGRIMAGES. There Are More Than Sixty
    (CE:1968a-1975b) PILGRIMAGES. There are more than sixty centers of Coptic pilgrimage in Egypt, of which the main ones are those of the Virgin Mary at Musturud, Saint Menas at Maryut, Saint George (Mar Jirjis) of Mit Damsis, Sitt Dimyanah near Bilqas, and Anba Shinudah at Dayr al-Abyad, near Suhaj. For the Copts, pilgrimage is a religious act of public worship of high spiritual and social value, consisting of an act of veneration offered directly to God and his saints, or to God through his saints. In contrast to abstinence, fasting, and almsgiving, which are simple acts of corporal asceticism or charity, pilgrimage is a complex event. It implies, in effect, bodily fatigue, asceticism, and often a vow, with an offering being made and the poor receiving their share of alms. In short, pilgrimage is a religious act, perfect and complete, and if made with pure and righteous intent, it is a means of sanctification and glorification of God and his saints. While the private and public usefulness and the sanctity of pilgrimage are evident, yet at all times and in all countries, it has been abused. Such abuses have been denounced by responsible spiritual people, like the monk SHENUTE, who, in the fifth century, accused the pilgrimages of being commercial fairs and sites of fun and leisure. The Length and Dates of the Pilgrimages Most pilgrimages last seven days, unless they coincide with a liturgical season, such as the feast of Ascension or the Fast of the Virgin. The last day of the pilgrimage, that of the saint's feastday, is particularly celebrated.
    [Show full text]
  • Hostage-Taking and Intimidation by Security
    January 1995 Vol. 7. No. 1 EGYPT HOSTAGEHOSTAGE----TAKINGTAKING AND INTIMIDATION BY SECURITY FORCES CONTENTS SUMMARY.................................................................................................................................................................................. 2 RECOMMENDATIONS............................................................................................................................................................ 5 1. HOSTAGE-TAKING ON A WIDE SCALE: 1992 .......................................................................................................... 8 2. THE PRACTICE CONTINUES: 1993-1994 .............................................................................................................. 14 3. INTIMIDATION OF FAMILIES: 1994 ......................................................................................................................... 21 Complaints of Lawyers Ignored, Families Pressured............................................................... 22 SSI Officer Intimidates Family of Victim of Security Forces Raid..................................... 25 Civilians Killed by Security Forces, Eyewitness and Family of One Victim Intimidated by Police 26 Pressure on the Family of Abdel Harith Madani........................................................................... 27 4. INTERNATIONAL STANDARDS................................................................................................................................... 31 5. THE EGYPTIAN GOVERNMENT'S
    [Show full text]
  • Kurzübersicht Über Vorfälle Aus Dem Armed Conflict Location & Event
    EGYPT, FIRST QUARTER 2017: Update on incidents according to the Armed Conflict Location & Event Data Project (ACLED) compiled by ACCORD, 22 June 2017 National borders: GADM, November 2015b; administrative divisions: GADM, November 2015a; Hala’ib triangle and Bir Tawil: UN Cartographic Section, March 2012; Occupied Palestinian Territory border status: UN Cartographic Sec- tion, January 2004; incident data: ACLED, 3 June 2017; coastlines and inland waters: Smith and Wessel, 1 May 2015 Development of conflict incidents from March 2015 Conflict incidents by category to March 2017 category number of incidents sum of fatalities riots/protests 58 1 battle 44 158 remote violence 29 79 violence against civilians 18 26 strategic developments 6 0 total 155 264 This table is based on data from the Armed Conflict Location & Event Data Project This graph is based on data from the Armed Conflict Location & Event (datasets used: ACLED, 3 June 2017). Data Project (datasets used: ACLED, January 2017, and ACLED, 3 June 2017). EGYPT, FIRST QUARTER 2017: UPDATE ON INCIDENTS ACCORDING TO THE ARMED CONFLICT LOCATION & EVENT DATA PROJECT (ACLED) COMPILED BY ACCORD, 22 JUNE 2017 LOCALIZATION OF CONFLICT INCIDENTS Note: The following list is an overview of the incident data included in the ACLED dataset. More details are available in the actual dataset (date, location data, event type, involved actors, information sources, etc.). In the following list, the names of event locations are taken from ACLED, while the administrative region names are taken from GADM data which serves as the basis for the map above. In Ad Daqahliyah, 3 incidents killing 0 people were reported.
    [Show full text]
  • Environmental and Social Impact Assesment for Rural Clusters Under Phase 2 of ISSIP II
    Submitted to: Environmental and Social Impact Holding Company for Water and Wastewater Cornish El Nil, El-Sahel, Assesment for Rural Clusters under Rod E Rowd Farag Water Treatment Plant Cairo, Egypt Phase 2 Tel: 20/ 24583591 – 24583596 of ISSIP II Fax: 20/ 24583884 Email: [email protected] Assuit Governorate From: Final Report 12 El-Saleh Ayoub St., Zamalek, Cairo, Egypt 11211 Tel: + 20 2 27359078 – 2736 4818 October 2016 Fax: + 20 2 2736 5397 E-mail: [email protected] URL: http://www.ecoconserv.com Holding Company for Water and Wastewater (HCWW) ESIA for Phase 2 of ISSIP II– Assuit 1 3ndDraft Environmental and Social Impact Assesment for Rural Clusters under Phase 2 of ISSIP II October 2016 Holding Company for Water and Wastewater (HCWW) ESIA for Phase 2 of ISSIP II i List of Abbreviations AST Above ground storage tank BOD Biological Oxygen Demand CAA Competent administrative authority CDA Community development association COD Chemical oxygen demand EEAA Egyptian Environmental Affairs Agency EHS Environment, Health and Safety EIA Environmental Impact Assessment EM Environmental Management EMP Environmental Management Plan EMU Environmental Management Unit ESIA Environmental and Social Impact Assessment ESIAF Environmental And Social Impact Assessment Framework Study ESMP Environmental and Social Management Plan FGD Focus Group Discussion FM Force Main FS Feasibility Study HC House Connections HCWW Holding Company for Water and Wastewater IC Inspection Chamber IFC International Finance Corporation ISO International Standards Organization
    [Show full text]
  • GEOLEV2 Label Updated October 2020
    Updated October 2020 GEOLEV2 Label 32002001 City of Buenos Aires [Department: Argentina] 32006001 La Plata [Department: Argentina] 32006002 General Pueyrredón [Department: Argentina] 32006003 Pilar [Department: Argentina] 32006004 Bahía Blanca [Department: Argentina] 32006005 Escobar [Department: Argentina] 32006006 San Nicolás [Department: Argentina] 32006007 Tandil [Department: Argentina] 32006008 Zárate [Department: Argentina] 32006009 Olavarría [Department: Argentina] 32006010 Pergamino [Department: Argentina] 32006011 Luján [Department: Argentina] 32006012 Campana [Department: Argentina] 32006013 Necochea [Department: Argentina] 32006014 Junín [Department: Argentina] 32006015 Berisso [Department: Argentina] 32006016 General Rodríguez [Department: Argentina] 32006017 Presidente Perón, San Vicente [Department: Argentina] 32006018 General Lavalle, La Costa [Department: Argentina] 32006019 Azul [Department: Argentina] 32006020 Chivilcoy [Department: Argentina] 32006021 Mercedes [Department: Argentina] 32006022 Balcarce, Lobería [Department: Argentina] 32006023 Coronel de Marine L. Rosales [Department: Argentina] 32006024 General Viamonte, Lincoln [Department: Argentina] 32006025 Chascomus, Magdalena, Punta Indio [Department: Argentina] 32006026 Alberti, Roque Pérez, 25 de Mayo [Department: Argentina] 32006027 San Pedro [Department: Argentina] 32006028 Tres Arroyos [Department: Argentina] 32006029 Ensenada [Department: Argentina] 32006030 Bolívar, General Alvear, Tapalqué [Department: Argentina] 32006031 Cañuelas [Department: Argentina]
    [Show full text]
  • World Bank Document
    PROCUREMENT PLAN (Textual Part) Project information: Egypt Transforming Egypt's Healthcare System Project P167000 Project Implementation agency: Ministry of Health and Population Public Disclosure Authorized Date of the Procurement Plan: October 23, 2018 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan Public Disclosure Authorized for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. Public Disclosure Authorized Leased Assets: “Not Applicable” Procurement of Second Hand Goods: “Not Applicable” Domestic
    [Show full text]
  • Riverbank Filtration for Sustainable Water Supply: Application to a Large
    Clean Techn Environ Policy (2008) 10:351–358 DOI 10.1007/s10098-007-0143-2 ORIGINAL PAPER Riverbank filtration for sustainable water supply: application to a large-scale facility on the Nile River Mohamed Shamrukh Æ Ahmed Abdel-Wahab Received: 20 October 2007 / Accepted: 12 December 2007 / Published online: 11 January 2008 Ó Springer-Verlag 2008 Abstract Riverbank filtration (RBF) is an efficient and better than the allowable standards for drinking purposes. low-cost natural alternative technology for water supply The results prove the implementation of RBF treatment application in which surface water contaminants are method for water supply in Nile valley. removed or degraded as the infiltrating water moves from the river/lake to the pumping wells. The removal or Keywords Water supply Á Riverbank filtration Á degradation of contaminants is a combination of physi- River Nile Á Egypt Á Groundwater cochemical and biological processes. For more than 100 years, RBF has been used in Europe for public and industrial water supply along Rhine, Elbe, and Danube Introduction rivers. This paper presents an investigation of a full-scale RBF plant located in Upper Egypt as section of Nile valley As the World’s growing population puts greater demands to produce drinking water. The studied plant is constructed on the available supply of high quality drinking water, in 2004 to supply potable water for Sidfa city (30,000 several advanced treatment technologies have been devel- residents), Assiut Governorate. It consists of 6 vertical oped and applied by water utilities to treat waters of wells, each about 60 m deep, with distance about 30 m degraded quality.
    [Show full text]
  • International Agreement on the Statistics of Causes of Death With
    ¡i+OO SAORSÏAÏ EIREANN. TREATY SERIES, 1934 No. 8 INTERNATIONAL AGREEMENT ON THE Statistics of Causes of Death, with Protocol of Signature. London, June 19, 1934 Presented to both Houses of the Oireaohtas by the Minister for External Affairs, 2 2. DUBLIN : ASW PUBLISHED BY THE STATIONERY OFFICE. To be purchased directly from the GOVERNMENT PUBLICATIONS SALE OFFICE, 5 NASSAU ST., DUBLIN, C.2, or through and Bookseller. Price Threepence. (P. No. 1400). SAORSTAT E1REANN. TREATY SERIES, 1934 No. 8 INTERNATIONAL AGREEMENT ON THE Statistics of Causes of Death, with Protocol of Signature. London, June 19, 1934 Presented to both Houses of the Oireachtas by the Minister for External Affairs. DUBLIN : PUBLISHED BY THE STATIONERY OFFICE. To be purchased directly from the GOVERNMENT PUBLICATIONS SALE OFFICE, 5 NASSAU ST., DUBLIN, C.2, or through and Bookseller. Priée Threepence. (P. No. 1400). 2 INTERNATIONAL AGREEMENT ON THE STATISTICS OF CAUSES OE DEATH. T*he Governments of the Union of South Africa, the German Reich, the Commonwealth of Australia, the Federal State of Austria, Canada, the Republic of Chile, His Majesty the King of Egypt, the Spanish Republic, the Irish Free State, the United States of America, the United Kingdom of Great Britain and Northern Ireland, the Hellenic Republic, the Kingdom of Hungary, His Majesty the King of Italy, the Republic of Latvia, the United States of Mexico, Her Majesty the Queen of the Netherlands, New Zealand, the Republic of Panama, the Republic of Paraguay, His Majesty the Shah of Persia, the Republic of Poland, the Czechoslovak Republic and the United States of Venezuela, recognising the importance of ensuring as far as possible the uniformity and comparability of statistics of causes of death, the undersigned Plenipotentiaries, being duly authorised thereto, have agreed upon the following provisions :— Article 1.
    [Show full text]
  • Determination of Natural Radionuclides for Water Resources on the West Bank of the Nile River, Assiut Governorate, Egypt
    water Article Determination of Natural Radionuclides for Water Resources on the West Bank of the Nile River, Assiut Governorate, Egypt Hany El-Gamal 1,* , Ahmed Sefelnasr 2 and Ghada Salaheldin 1 1 Physics Department, Faculty of Science, Assiut University, Assiut 71516, Egypt; [email protected] 2 Geology Department, Faculty of Science, Assiut University, Assiut 71516, Egypt; [email protected] * Correspondence: [email protected] Received: 20 January 2019; Accepted: 5 February 2019; Published: 12 February 2019 Abstract: Estimations of natural radioactivity levels were carried out for water (surface and groundwater) samples collected from the west bank of the Nile River in Assiut Governorate, Egypt. The activity concentrations in the water samples ranged from 19.20 ± 2.40 to 492.26 ± 71.52 mBq/L, from 15.58 ± 2.62 to 351.39 ± 66.13 mBq/L, and from 50.31 ± 5.58 to 2255.03 ± 249.42 mBq/L for 226Ra, 232Th, and 40K, respectively. In this work, the recorded activity concentrations have been organized statistically using a dendrogram cluster and a principal coordinate analysis. In view of the groupings of radionuclide activity, the average annual effective doses through ingestion for adults, children, and infants, despite the responsibility of each explicit radionuclide to the total dose, were assessed and debated. Children had the most important measurement calculations, making them the most regarded mass gathering. All estimations for each different water type, as well as for each individual population group, scored well under the recommended reference value of 0.1 mSv resulting from a one year’s intake of drinking water in accordance with the recommendations of the European Commission (EC) in 1998.
    [Show full text]