World Bank Document PROCUREMENT PLAN (Textual Part) Project information: Egypt Transforming Egypt's Healthcare System Project P167000 Project Implementation agency: Ministry of Health and Population Public Disclosure Authorized Date of the Procurement Plan: October 23, 2018 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan Public Disclosure Authorized for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. Public Disclosure Authorized Leased Assets: “Not Applicable” Procurement of Second Hand Goods: “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Other Relevant Procurement Information. NA Public Disclosure Authorized PROCUREMENT Egypt, Arab Republic of : Transforming Egypt's Healthcare System Project PLAN General Information Country: Egypt, Arab Republic of Bank’s Approval Date of the Original Procurement Plan: 2018-10-23 Revised Plan Date(s): (comma delineated, leave blank if none)2018-11-15 Project ID: P167000 GPN Date: Project Name: Transforming Egypt's Healthcare System Project Loan / Credit No: IBRD / 88950 Executing Agency(ies):Ministry of Health and Population WORKS Bid Evaluation Activity Reference No. Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EG-MOHP-83290-GO-RFQ / purchasing virus c drugs for abnub district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83293-GO-RFQ / purchasing virus c drugs for Abou Tiag district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83300-GO-RFQ / purchasing virus c drugs for El-fath district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83301-GO-RFQ / purchasing virus c drugs for alqawsiuh district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83303-GO-RFQ / purchasing virus c drugs for dayrout district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83287-GO-RFQ / purchasing virus c drugs for El dabaa district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400 mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83296-GO-RFQ / purchasing virus c drugs for Elbadari district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83277-GO-RFQ / purchasing virus c drugs for El hamam district. the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83299-GO-RFQ / purchasing virus c drugs for El-ghanaym district . the currently used drugs Pending through the Egyptian Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-10-28 2018-11-06 2019-01-05 national treatment Quotations One Envelope tion program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83742-GO-RFQ / Purchasing hepatitis C medicines for Alriyad district. Pending the currently used Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 medicines through the Quotations One Envelope tion Egyptian national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83743-GO-RFQ / Purchasing hepatitis C medicines for Baltim district. Pending Request for Single Stage - the currently used IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Quotations One Envelope medicines through the tion Egyptian national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . Page 1 EG-MOHP-83618-GO-RFQ / purchasing hepatitis C medicines for Alkhalifuh district. the currently used Pending medicines through the Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Egyptian national Quotations One Envelope tion treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83621-GO-RFQ / Purchasing hepatitis C medicines for Alzaytun district. the currently used Pending medicines through the Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Egyptian national Quotations One Envelope tion treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83620-GO-RFQ / Purchasing hepatitis C medicines for Alssahil district. the currently used Pending medicines through the Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Egyptian national Quotations One Envelope tion treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83622-GO-RFQ / Purchasing hepatitis C medicines for Alsalam Atnin district. the Pending currently used medicines Request for Single Stage - IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 through the Egyptian Quotations One Envelope tion national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83623-GO-RFQ / Purchasing hepatitis C medicines for Alsayidat Walqalea district. the currently used Pending Request for Single Stage - medicines through the IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Quotations One Envelope Egyptian national tion treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83625-GO-RFQ / Purchasing hepatitis C medicines for Alsharabia district. the currently used Pending Request for Single Stage - medicines through the IBRD / 88950 Post Limited 0.00 Implementa 2018-11-14 2018-11-25 2019-01-24 Quotations One Envelope Egyptian national tion treatment program are combination of Sofosbuvir
Recommended publications
  • Dopady Různosti Obřadů V Manželských Kauzách Na Církevním Soudu
    UNIVERZITA KARLOVA V PRAZE KATOLICKÁ TEOLOGICKÁ FAKULTA Miloš Szabo Dopady různosti obřadů v manželských kauzách na církevním soudu Disertační práce Vedoucí práce: prof. JUDr. Antonín Hrdina, DrSc. 2014 Prohlášení 1. Prohlašuji, že jsem předkládanou práci zpracoval samostatně a použil jen uvedené prameny a literaturu. 2. Prohlašuji, že práce nebyla využita k získání jiného titulu. 3. Souhlasím s tím, aby práce byla zpřístupněna pro studijní a výzkumné účely. V Praze dne 25. 11. 2014 2 Bibliografická citace Dopady různosti obřadů v manželských kauzách na církevním soudu [rukopis]: disertační práce / Miloš Szabo; vedoucí práce: Antonín Hrdina. – Praha, 2014. – 187 s. (+ 74 s. příloha) Anotace Křesťanství se z Jeruzaléma šířilo několika směry. Jedno z jeho nejvlivnějších center vzniklo v Římě, jenž se stal také sídlem papežů a zůstal jím i po přesídlení císaře do tehdy řecké Konstantinopole. Kromě Říma, spjatého s apoštolem Petrem však existovaly i další velké křesťanské obce, založené ostatními apoštoly, ležící na východ od římské říše, které se stejně jako ta římská nazývaly církví. A tak i dnes kromě největší latinské (římské) církve existují desítky východních, právem se chlubících vlastní apoštolskou tradicí. V průběhu dějin došlo několikrát k narušení jejich komunikace s Římem, ale i mezi sebou navzájem. V dnešní době, kdy z různých důvodů dochází k velkým migračním vlnám, se některá církevní společenství, doposud považována striktně za východní, dostávají do diaspory s latinskou církví, čímž vzniká nejen velká pravděpodobnost růstu počtu smíšených intereklesiálních manželství, ale zároveň také zvýšené množství manželských kauz, které bude muset následně řešit církevní soud. Aby jeho rozhodnutí bylo spravedlivé, je potřebné znát jak historii těchto východních církví, mezi nimiž je i dvacet dva sjednocených s Římem (tedy východní katolické církve), tak i především jejich teologická specifika, spiritualitu a partikulární právo.
    [Show full text]
  • BIFAO 118 (2018), P
    MINISTÈRE DE L'ÉDUCATION NATIONALE, DE L'ENSEIGNEMENT SUPÉRIEUR ET DE LA RECHERCHE BULLETIN DE L’INSTITUT FRANÇAIS D’ARCHÉOLOGIE ORIENTALE en ligne en ligne en ligne en ligne en ligne en ligne en ligne en ligne en ligne en ligne BIFAO 118 (2018), p. 143-187 Frédéric Guyot, Valentina Azzarà, François Briois, Julie Marchand, Béatrix Midant-Reynes An Early Old Kingdom Rural Community in the Eastern Nile Delta: First Season of Excavations at Tell el-Neshed Conditions d’utilisation L’utilisation du contenu de ce site est limitée à un usage personnel et non commercial. Toute autre utilisation du site et de son contenu est soumise à une autorisation préalable de l’éditeur (contact AT ifao.egnet.net). Le copyright est conservé par l’éditeur (Ifao). Conditions of Use You may use content in this website only for your personal, noncommercial use. Any further use of this website and its content is forbidden, unless you have obtained prior permission from the publisher (contact AT ifao.egnet.net). The copyright is retained by the publisher (Ifao). Dernières publications 9782724708288 BIFAO 121 9782724708424 Bulletin archéologique des Écoles françaises à l'étranger (BAEFE) 9782724707878 Questionner le sphinx Philippe Collombert (éd.), Laurent Coulon (éd.), Ivan Guermeur (éd.), Christophe Thiers (éd.) 9782724708295 Bulletin de liaison de la céramique égyptienne 30 Sylvie Marchand (éd.) 9782724708356 Dendara. La Porte d'Horus Sylvie Cauville 9782724707953 Dendara. La Porte d’Horus Sylvie Cauville 9782724708394 Dendara. La Porte d'Hathor Sylvie Cauville 9782724708011 MIDEO 36 Emmanuel Pisani (éd.), Dennis Halft (éd.) © Institut français d’archéologie orientale - Le Caire Powered by TCPDF (www.tcpdf.org) 1 / 1 An Early Old Kingdom Rural Community in the Eastern Nile Delta First Season of Excavations at Tell el-Neshed frédéric guyot, valentina azzarà, françois briois, julie marchand, béatrix midant-reynes* résumé Le site de Tell el-Neshed est situé non loin de la limite orientale du Delta dans le gouver- norat de la Sharqiyah.
    [Show full text]
  • Econbc Feasibility Study I 220
    VTT TECHNOLOGY NOL CH OG E Y T • • R E E C S N E E A EcoNBC feasibility study I 220 R C 220 C Transforming New Borg El Arab into an EcoCity S H • S H N I G O I H S L New Borg El Arab was inaugurated in 1988 and is seen as the I I V G • H S natural extension of Alexandria, as well as one of the most T important industrial areas in Egypt. Transforming New Borg El Arab EcoNBC feasibility study City into an EcoCity was one of the main drivers for EcoNBC project (EcoCity Capacity Building in New Borg El Arab City). Carrying out a Feasibility Study to explore more in detail the viability of the idea was one of the first steps to be taken towards that transformation. In this case, it is the result of the joint effort of a team of Finnish and Egyptian experts through a series of structured workshops that took place both in Finland and Egypt, and a number of focused discussions that involved also key stakeholders. An insight into the different economic sectors has been taken and a vision of how the main issues of concern selected, namely Energy, Water and Water, should be approached from each of those sectors has been defined, of course with a special emphasis on the sustainability of the Ecosystem. This has allowed the expert team responsible for this Feasibility Study to propose practical solutions in the form of scenarios. In the case of some sectors where reliable data was available for the calculations, these scenarios have been developed down to their associated impacts.
    [Show full text]
  • New Records of the Family Chalcididae (Hymenoptera: Chalcidoidea) from Egypt
    Zootaxa 4410 (1): 136–146 ISSN 1175-5326 (print edition) http://www.mapress.com/j/zt/ Article ZOOTAXA Copyright © 2018 Magnolia Press ISSN 1175-5334 (online edition) https://doi.org/10.11646/zootaxa.4410.1.7 http://zoobank.org/urn:lsid:zoobank.org:pub:6431DC44-3F90-413E-976F-4B00CFA6CD2B New records of the family Chalcididae (Hymenoptera: Chalcidoidea) from Egypt MEDHAT I. ABUL-SOOD1 & NEVEEN S. GADALLAH2,3 1Zoology Department, Faculty of Science (Boys), Al-Azhar University, P.O. Box 11884, Nasr City, Cairo, Egypt. E-mail: [email protected] 2Entomology Department, Faculty of Science, Cairo University, Giza, Egypt 3Corresponding author. E-mail: [email protected] Abstract In the present study, a checklist of new records of the family Chalcididae of Egypt is presented based on a total of 180 specimens collected from 24 different Egyptian localities between June 2011 and October 2016, mostly by sweeping and Malaise traps. Nineteen species as well as the subfamily Epitraninae and the genera Bucekia Steffan, Epitranus Walker, Proconura Dodd, and Tanycoryphus Cameron, are newly recorded from Egypt. A single species previously placed in the genus Hockeria is transferred to Euchalcis Dufour as E. rufula (Nikol’skaya, 1960) comb. nov. Key words: Parasitic wasps, Chalcidinae, Dirhininae, Epitraninae, Haltichellinae, new records, new combination Introduction The Chalcididae (Hymenoptera: Chalcidoidea) is a medium-sized family represented by more than 1500 described species in 93 genera (Aguiar et al. 2013; Noyes 2017; Abul-Sood et al. 2018). A large number of described species are classified in the genus Brachymeria Westwood (about 21%), followed by Conura Spinola (20.3%) (Noyes 2017).
    [Show full text]
  • Hydrostratigraphic Characterization of Groundwater Systems in Khatatba Area Using Vertical Electric Sounding and Well Log Data, Sw Nile Delta, Egypt
    ISSN 2321 – 9149 IJAEES (2014) Vol.2, No.1, 39-50 Research Article International Journal of Advancement in Earth and Environmental Sciences HYDROSTRATIGRAPHIC CHARACTERIZATION OF GROUNDWATER SYSTEMS IN KHATATBA AREA USING VERTICAL ELECTRIC SOUNDING AND WELL LOG DATA, SW NILE DELTA, EGYPT Abdulaziz M. Abdulaziz Mining, Petroleum, and Metallurgical Engineering Department, Faculty of Engineering, Cairo University, Giza, Egypt ( [email protected]) --------------------------------------------------------------------------------------------------------------------------------------- ABSTRACT: The study area represents the western extension of the Nile Delta flood plain at the contact of the desert, where the importance of ground water is rising. This requires a thorough understanding to the developed groundwater systems, particularly the shallow aquifers. In this study, well log data was integrated to a Vertical Electric Sounding (VES) survey acquired using Schlumberger configuration at the Khatatba area to characterize the aquifer systems. The results were interpreted using the published stratigraphic data of the study area, and consequently the extension of the identified aquifers can be laterally correlated. Two aquifer systems separated by an aquitard or basaltic layer were mapped and characterized in details. The upper aquifer corresponds to El Khashab formation that produces fresh to brackish water and generally shows unconfined condition that could locally change to partially semi confined. The second aquifer is commonly confined
    [Show full text]
  • Country Advice Egypt Egypt – EGY37024 – Treatment of Anglican Christians in Al Minya 2 August 2010
    Country Advice Egypt Egypt – EGY37024 – Treatment of Anglican Christians in Al Minya 2 August 2010 1. Please provide detailed information on Al Minya, including its location, its history and its religious background. Please focus on the Christian population of Al Minya and provide information on what Christian denominations are in Al Minya, including the Anglican Church and the United Coptic Church; the main places of Christian worship in Al Minya; and any conflict in Al Minya between Christians and the authorities. 1 Al Minya (also known as El Minya or El Menya) is known as the „Bride of Upper Egypt‟ due to its location on at the border of Upper and Lower Egypt. It is the capital city of the Minya governorate in the Nile River valley of Upper Egypt and is located about 225km south of Cairo to which it is linked by rail. The city has a television station and a university and is a centre for the manufacture of soap, perfume and sugar processing. There is also an ancient town named Menat Khufu in the area which was the ancestral home of the pharaohs of the 4th dynasty. 2 1 „Cities in Egypt‟ (undated), travelguide2egypt.com website http://www.travelguide2egypt.com/c1_cities.php – Accessed 28 July 2010 – Attachment 1. 2 „Travel & Geography: Al-Minya‟ 2010, Encyclopædia Britannica, Encyclopædia Britannica Online, 2 August http://www.britannica.com/EBchecked/topic/384682/al-Minya – Accessed 28 July 2010 – Attachment 2; „El Minya‟ (undated), touregypt.net website http://www.touregypt.net/elminyatop.htm – Accessed 26 July 2010 – Page 1 of 18 According to several websites, the Minya governorate is one of the most highly populated governorates of Upper Egypt.
    [Show full text]
  • Identification of Terrestrial Gastropods Species in Sohag Governorate, Egypt
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Archives of Agriculture and Environmental Science Archives of Agriculture and Environmental Science 3(1): 45-48 (2018) https://doi.org/10.26832/24566632.2018.030105 This content is available online at AESA Archives of Agriculture and Environmental Science Journal homepage: www.aesacademy.org e-ISSN: 2456-6632 ORIGINAL RESEARCH ARTICLE Identification of terrestrial gastropods species in Sohag Governorate, Egypt Abd El-Aleem Saad Soliman Desoky Department of Plant protection (Agriculture Zoology), Faculty of Agriculture, Sohag University, EGYPT E-mail: [email protected] ARTICLE HISTORY ABSTRACT Received: 15 January 2018 The study aims to identify of terrestrial gastropods species in Sohag Governorate during the Revised received: 10 February 2018 year 2016 and 2017. The present study was carried out for survey and identification for ran- Accepted: 21 February 2018 dom land snail in 11 districts, i.e. (Tema, Tahta, Gehyena, El-Maragha, Saqultah, Sohag, Akhmim, El-Monshah, Gerga, El-Balyana, and Dar El-Salam) at Sohag Governorate, Egypt. Samples were collected from 5 different locations in each district during 2016-2017 seasons. The monthly Keywords samples were taken from winter and summer crops (areas were cultivated with the field crops Egypt such as wheat, Egyptian clover, and vegetables crops. The results showed that found two spe- Eobania vermiculata cies of land snails, Monacha obstracta (Montagu) and Eobania vermiculata (Muller). It was
    [Show full text]
  • Shereif Hassan Mahmoud
    Hydroclimate Changes to Arid regions subjected to Impact of climate change, human activities, and Large-scale climate patterns by Shereif Hassan Mahmoud A thesis submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy in Water Resources Engineering Department of Civil and Environmental Engineering University of Alberta © Shereif Hassan Mahmoud, 2020 Abstract In recent years, many regions worldwide have suffered from natural hazards related to the impact of human activities and climate change, such as floods and droughts, sea level rise, extreme weather events and an accelerated hydrological cycle. In Africa, the driest continent on Earth, climate change has led to more frequent occurrences of droughts of greater severity. Beside climate change, human activities have also incurred negative environmental impact which in turn has likely affected the climate at a wide range of temporal-spatial scales worldwide. For example, in the Middle East, floods of greater magnitude have been occurring more frequently in recent decades, which could be attributed partly to rapid urbanization or the effect of climate change, or both. In the Nile River basin (NRB), recurring droughts and increasing population have led to rising tension between competing users for water. Therefore, to develop more effective mitigation strategies against the potential impact of climate change, there is an urgent need to better understand changes to the hydrologic cycle of arid regions and linkage to regional climate change. The objectives of this dissertation are: 1) To investigate the potential implications of urbanization and climate change to the flood risk of Egypt and Saudi Arabia of arid climate in the Middle East.
    [Show full text]
  • The Central Mediterranean Route: Deadlier Than Ever
    GLOBAL MIGRATION DATA ANALYSIS CENTRE DATA BRIEFING SERIES ISSN 2415-1653 │ Issue No. 3, June 2016 The Central Mediterranean route: Deadlier than ever 1 in 23 die in the Mediterranean in the first five arrivals; (b) analyse the changing routes towards the months of 2016 departure points for this dangerous sea journey into Europe; and (c) investigate how patterns and trends During the first five months of 2016, 1 in every 23 have changed during the period between January 2014 migrants has died attempting the journey across the and the end of May 2016. Central Mediterranean to Europe. This represents a drastic worsening of the death toll. Since the beginning HOW MANY MIGRANTS HAVE DIED? of 2014, the overall ratio of deaths to the number of migrant crossings has been 1 in 50. For 2015, it was Monthly totals of deaths in the Central 1 in 53. This ratio of deaths to attempted crossings Mediterranean, January 2014–May 2016 worsened further in April and May 2016 when 1 migrant died for every 17 attempted crossings. This was 5 per Figure 1 indicates the deaths and disappearances by cent of the total number of people who attempted month on each Mediterranean route. Compared to the journey across the Central Mediterranean during other routes, death while attempting to cross the these two months. These estimated figures, using the Central Mediterranean occurs at disproportionately same methodology and sources since the beginning high levels to the number of people attempting the of 2014, indicate an increasingly deadly route, despite crossing. Since 2014, 17 of every 20 migrant deaths the widespread media attention and public and policy in the Mediterranean have occurred on the Central awareness of this continuing humanitarian disaster.
    [Show full text]
  • World Bank Document
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 58890-EG PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN Public Disclosure Authorized IN THE AMOUNT OF US$200 MILLION TO THE ARAB REPUBLIC OF EGYPT FOR THE SECOND INTEGRATED SANITATION AND SEWERAGE INFRASTRUCTURE PROJECT Public Disclosure Authorized June 6, 2011 Sustainable Development Department Middle East and North Africa Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized CURRENCY EQUIVALENTS (Exchange Rate Effective April 13, 2011) Currency Unit = Egyptian Pound LE1 = US$0.173 US$1 = LE 5.96 FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS ARP Abbreviated Resettlement Plan ASBR Advanced Sequential Batch Reactors BD Bidding Document BOD Biological Oxygen Demand DA Designated Account DO Dissolved Oxygen EC European Commission EEAA Egyptian Environmental Affairs Agency ERR Economic Rate of Return ESAF Environmental and Social Assessment Framework ESMMF Environmental & Social Management & Monitoring Framework ESW Economic Sector Work EU European Union EWRA Egyptian Water Regulatory Agency FC Fecal Coli form FM Financial Management FMS Financial Management Specialist FY Fiscal Year GDP Gross Domestic Product GOE Government of Egypt GIZ German Society for International Cooperation HCWW Holding Company for Water and Wastewater IBRD International Bank for
    [Show full text]
  • Mints – MISR NATIONAL TRANSPORT STUDY
    No. TRANSPORT PLANNING AUTHORITY MINISTRY OF TRANSPORT THE ARAB REPUBLIC OF EGYPT MiNTS – MISR NATIONAL TRANSPORT STUDY THE COMPREHENSIVE STUDY ON THE MASTER PLAN FOR NATIONWIDE TRANSPORT SYSTEM IN THE ARAB REPUBLIC OF EGYPT FINAL REPORT TECHNICAL REPORT 11 TRANSPORT SURVEY FINDINGS March 2012 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS CO., LTD. ALMEC CORPORATION EID KATAHIRA & ENGINEERS INTERNATIONAL JR - 12 039 No. TRANSPORT PLANNING AUTHORITY MINISTRY OF TRANSPORT THE ARAB REPUBLIC OF EGYPT MiNTS – MISR NATIONAL TRANSPORT STUDY THE COMPREHENSIVE STUDY ON THE MASTER PLAN FOR NATIONWIDE TRANSPORT SYSTEM IN THE ARAB REPUBLIC OF EGYPT FINAL REPORT TECHNICAL REPORT 11 TRANSPORT SURVEY FINDINGS March 2012 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS CO., LTD. ALMEC CORPORATION EID KATAHIRA & ENGINEERS INTERNATIONAL JR - 12 039 USD1.00 = EGP5.96 USD1.00 = JPY77.91 (Exchange rate of January 2012) MiNTS: Misr National Transport Study Technical Report 11 TABLE OF CONTENTS Item Page CHAPTER 1: INTRODUCTION..........................................................................................................................1-1 1.1 BACKGROUND...................................................................................................................................1-1 1.2 THE MINTS FRAMEWORK ................................................................................................................1-1 1.2.1 Study Scope and Objectives .........................................................................................................1-1
    [Show full text]
  • Inventory of Municipal Wastewater Treatment Plants of Coastal Mediterranean Cities with More Than 2,000 Inhabitants (2010)
    UNEP(DEPI)/MED WG.357/Inf.7 29 March 2011 ENGLISH MEDITERRANEAN ACTION PLAN Meeting of MED POL Focal Points Rhodes (Greece), 25-27 May 2011 INVENTORY OF MUNICIPAL WASTEWATER TREATMENT PLANTS OF COASTAL MEDITERRANEAN CITIES WITH MORE THAN 2,000 INHABITANTS (2010) In cooperation with WHO UNEP/MAP Athens, 2011 TABLE OF CONTENTS PREFACE .........................................................................................................................1 PART I .........................................................................................................................3 1. ABOUT THE STUDY ..............................................................................................3 1.1 Historical Background of the Study..................................................................3 1.2 Report on the Municipal Wastewater Treatment Plants in the Mediterranean Coastal Cities: Methodology and Procedures .........................4 2. MUNICIPAL WASTEWATER IN THE MEDITERRANEAN ....................................6 2.1 Characteristics of Municipal Wastewater in the Mediterranean.......................6 2.2 Impact of Wastewater Discharges to the Marine Environment........................6 2.3 Municipal Wasteater Treatment.......................................................................9 3. RESULTS ACHIEVED ............................................................................................12 3.1 Brief Summary of Data Collection – Constraints and Assumptions.................12 3.2 General Considerations on the Contents
    [Show full text]