October 2013
Total Page:16
File Type:pdf, Size:1020Kb
OPPM Monthly Project Reports October 27, 1976 The Arts and Industries Building receives an Historic Preservation Award from the Washington Metropolitan Chapter of the American Institute of Architects. The ceremony was held in the National Gallery of Art Cafe. A plaque, which was affixed to the building exterior, and four certificates of achievement of excellence in historic preservation, are awarded. October 2013 Office of Facilities Engineering and Operations October 2013 Arts and Industries Building Revitalization Phase 1 - Shell Mission/Scope: On May 5, 2008, the Board of Regents decided not to pursue a public private partnership and to seek other resources in order to fund the revitalization of the Arts & Industries Building. The project will comprise three phases: the Shell, the Interior, and the Program. While the program is being developed, work on the Shell has moved forward –the replacement of the roof exceeding 10,000 M2 and more than 800 windows and structural improvements to address snow, wind, seismic and blast loads is under construction. The cost of the Shell improvements is approximately $50M. The 2009 American Recovery & Reinvestment Act funded $5.1M of additional masonry repairs and interior demolition and hazmat removal. The balance of the work is funded with Facilities Capital; earmarked federal Legacy funds; and Trust funds in support of the design, construction, and program. New Windows Range SW Court and East Hall Setting the Cupola Finial AIB Roof, Windows Replacement, Structural Upgrades ‐ Shell Cost Summary Project Status BUDGET (in $ millions) *Approved Budget PM Estimate Status Cons tructi on Time Elapsed as of 9/30/2013: 94% 06/09/2011 10/01/2013 Cons tructi on Compl ete as of 9/30/2013: 98% Engineering and Design 4.05 3.70 * Cons tructi on Amount Expensed: $38,428,007: 89% Design Services 4.05 3.70 * Current Cons truction Contract Value: $443,098,022 Commissioning 0.37 0.00 * 1 Roof replacement and structural work for seismic, snow, wind, and blast approximately 98% complete Commissioning 0.37 0.00 2 Windows incorporating original colored glass panes installed at Halls end walls. Construction 48.25 48.39 * 3 Interior scaffolding removal nearly complete Constr. Primary Constructor 34.42 34.42 * 4 87% of construction waste recovered to date Planned additional demolition scope 1.14 * 5 Window installation at Towers and Pavilions proceeding very slowly due to continued fabrication errors.. Contingency Used 0.00 7.11 * 6 Due to previous failures of windows testing ‐ project completion date extended to November 30, 2013 at no Construction Management 1.98 2.21 * additional cost to Smithsonian. Additional extension of schedule is likely to be required. Constr. Secondary Constructor 0.47 0.47 * Constr Contingency Remaining 8.92 0.55 * ISSUES * Projected completion date has been extended by contract to 11/30/2013 due to errors and delays in window Engineering During Constr 2.46 2.49 * fabrication but completion within extended schedule is unlikely. Construction Management is working to Other Capital 0.17 0.17 * resolve problems with Contra ctor. Hazardous Materials 0.17 0.17 Total Project Cost 52.84 52.26 Funding Plan Prior FY 2009 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Total FYs Program Type Remarks Fed Trust Fed Trust Fed Trust Fed Trust Fed Trust Fed Trust Fed Trust Engineering and Design ‐ ‐ 2.29 ‐ 1.71 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 4.00 ‐ Construction 0.51 ‐ ‐ ‐ 41.24 ‐ (0.20) ‐ ‐ 3.50 2.50 0.71 44.05 4.21 Subtotals 0.51 ‐ 2.29 ‐ 42.95 ‐ (0.20) ‐ ‐ 3.50 2.50 0.71 48.05 4.21 Total (FED+TRUST) per FY 0.51 2.29 42.95 ‐0.20 3.50 3.21 52.26 Funds in Hand: **** * *** Funds Requested: **** **** Schedule Milestone Progress Activity Start End FY2009 FY2010 FY2011 FY2012 FY2013 Activity Planned Actual Status Planned Oct-08 Aug-09 Planning 08/28/09 08/28/09 Planning * Actual Oct-08 Aug-09 Studies 06/26/09 06/26/09 Planned Jan-09 Jun-09 Design Phase Studies 10/23/09 10/23/09 * Studies * Actual Jan-09 Jun-09 Design Services 06/25/10 06/25/10 Planned Apr-09 Oct-09 Procurement (Sched Milestone) 09/30/10 09/30/10 * Design Phase Studies * Actual Apr-09 Oct-09 Construction 11/30/13 Planned Oct-09 Jun-10 * Design Services Actual Oct-09 Jun-10 Project Manager: LETHBRIDGE,CHRISTOPHER Procurement (Sched Planned Jul-10 Sep-10 Design Manager: KFOURY,MARY Milestone) A c t u a l J u l - 10 S e p - 10 Construction Manager: PONTON,PATRICK Planned Nov-10 13-Sep Construction Primary Constructor: GRUNLEY CONSTRUCTION COMPANY, INC. Actual Nov-10 Architect: Ennead/Smithgroup 10/1/2013 OFEO Project Number 730815102 Office of Facilities Engineering and Operations October 2013 Arts and Industries Building Interim Public Use Mission/Scope: The Arts and Industries Building has always been about celebrating innovation and progress. In order to create a program for the building that celebrates American ingenuity, the Smithsonian has entered into a seven‐ year collaboration with the U.S. Patent and Trademark Office to develop an Innovation Pavilion of approximately 1650 square meters. The Pavilion will be a center for active learning, engaging visitors using digital technology and informing them about new developments in American innovation and technology. In addition to the Innovation Pavilion, plans are being developed for other parts of AIB, including additional exhibitions, public programs, a store and a café. The interior will not be completely finished in 2014 because the permanent use of the building is uncertain. All improvements to ensure the public’s life safety will have been made and infrastructure to support the programs will be provided. Plans for AIB Roofing Removal, July 27, 2011 –Photograph by Ed Wahl between 2014 and 2021 are considered temporary until a final disposition Concept View of the North Hall of the proposed National Museum of the American Latino is made. Venice Biennale at the Arsenal AIB INTERIM PUBLIC USE Cost Summary Project Status BUDGET (in $ millions) *Approved Budget PM Estimate Status A steering committee has been established with representatives from all those units who will 01/31/2013 10/21/2013 have programs or facilities in the building and from OFEO and OCIO who will be providing Engineering and Design$ 0.10 $ 0.10 Design Services 0.10 0.10 * support. It is meeting monthly. Project Director Pherabe Kolb continues to oversee working Construction$ 5.79 $ 5.79 * groups focused on exhibitions, special events and public programs, retail and food service. Construction Contractor 4.91 4.91 Shell AE contract has been modified to include design services for major infrastructure elements. Cons tr Contingency 0.88 0.88 Competitive bidding of work will require more complete documentation for new work, requiring Other Initial Costs$ 0.81 $ 0.81 Furniture and Equipment 0.10 0.10 * more extensive design services than anticipated. Ceratin limited activities, primarily selective Events Infrastructure 0.61 0.61 demolition, abatement, and encapsulation, are proceeding while Shell project is being Visitor Services 0.10 0.10 completed. e work to begin while the Shell project is still under construction. Recurring Costs FY13 ‐ FY21 $ 15.08 $ 15.08 Estimate of project cost is being revised to reflect changes to scope, discovery of unknown Maintenance and Operations 5.11 5.11 * Security 2.88 2.88 conditions, additional design requirements, and developing requirements of OSHEM, OCIO, and Utilities 3.22 3.22 OPS. Exhibits Infrastructure 3.03 3.03 Project Lead Mary Kfoury has prepared 4 scope options at costs ranging from $3.2M to $12.2M and Visitor Services 0.59 0.59 representing more or less substantially reduced program area within building. Discussions with SI Gardens 0.26 0.26 OCIO WiFi tbd tbd senior staff will determine future of project. Total Project Costs FY13 ‐ FY21 $ 21.78 $ 21.78 Funding Plan FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 ‐ 2021 Total FYs Program Type Remarks Fed Trust Fed Trust Fed TrustFed Trust Fed Trust Fed Trust Fed Trust SE Net Gain 0.00 ‐1.12 0.57 0.57 0.57 2.03 2.61 Events ‐0.04 ‐0.19 0.18 0.29 0.31 1.17 1.72 Funding plan projects a delta of ‐8.205M Federal Utilities 0.35 0.35 0.35 0.35 1.33 2.74 Projected Partner Facility Use Charge may eliminate the deficit PTO 1.00 1.00 1.00 1.00 2.50 6.50 and may result in full cost recovery TOTAL ‐0.04 0.04 2.10 2.21 2.23 7.03 13.58 Schedule Milestone Progress Activity Start End FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 ‐ 2021 Activity Planned Actual Status Project planning and Planned 1/15/2012 6/1/2012 Planning 1/15/12 1/15/12 * design studies Actual 1/15/2012 6/1/2012 Concept Development 6/1/12 6/1/12 * Concept development Planned 6/1/2012 12/1/2012 Procurement Planning 12/1/12 12/1/12 * and Regents review Actual 6/1/2012 12/1/2012 Design 7/30/13 * Procurement and Planned 12/1/2012 3/1/2013 Construction 9/2/13 * execution planning Actual 12/1/2012 Exhibits, Equipment, and Furniture 7/1/14 Performance and Planned 3/1/2013 6/1/2013 * design documents Actual Project Manager: LETHBRIDGE,CHRISTOPHER Planned 7/1/2013 2/1/2014 Project Lead/Design Manager: KFOURY,MARY Construction Actual Construction Manager: PONTON,PATRICK Exhibition, retail, and Planned 2/1/2014 5/1/2014 Primary Constructor: TBD food services install Actual Architect: Ennead/SmithGroup 10/21/2013 OFEO Project Number 731215101 Office of Facilities Engineering and Operations October 2013 Smithsonian Campus Master Plan – Phase 1 South of the Mall from 12th Street to 7th Street Mission/Scope: The Smithsonian intends to align its physical plan for its campus with its vision and strategic plan.