Price List of NIGER 25 03 2020

Total Page:16

File Type:pdf, Size:1020Kb

Price List of NIGER 25 03 2020 NIGER 25 03 2020 - Code: NIG200101c-NIG200113d Newsletter No. 1271 / Issues date: 25.03.2020 Printed: 27.09.2021 / 09:40 Code Country / Name Type EUR/1 Qty TOTAL Stamperija: NIG200101b NIGER 2020 Perforated €4.95 - - Elvis Presley (85th anniversary of Elvis Presley (Elvis Imperforated €15.00 - - Presley 1935–1977; Graceland) Background info: Elvis FDC €7.45 - - Presley 1955 Cadillac Fleetwood Series 60) FDC imperf. €17.50 - - Stamperija: NIG200101c NIGER 2020 Perforated €4.95 - - Elvis Presley (85th anniversary of Elvis Presley (Elvis Imperforated €15.00 - - Presley 1935–1977; Marilyn Monroe 1926–1962)) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200101d NIGER 2020 Perforated €29.70 - - Elvis Presley (85th anniversary of Elvis Presley (Elvis Imperforated €90.00 - - Presley 1935–1977; Marilyn Monroe 1926–1962)) FDC €39.70 - - FDC imperf. €100.00 - - Stamperija: NIG200102b NIGER 2020 Perforated €4.95 - - Fire engines (Fire engines (Ferrara Freightliner Imperforated €15.00 - - Pumper) Background info: Renault Midlum 240.14 CCF; FDC €7.45 - - Oshkosh A/S32P-19A) FDC imperf. €17.50 - - Stamperija: NIG200102c NIGER 2020 Perforated €4.95 - - Fire engines (Fire engines (Spartan Crimson Pumper; Imperforated €15.00 - - Oshkosh A/S32P-19A; OSHKOSH T-1500; Renault FDC €7.45 - - Midlum 240.14 CCF)) FDC imperf. €17.50 - - Stamperija: NIG200102d NIGER 2020 Perforated €29.70 - - Fire engines (Fire engines (Spartan Crimson Pumper; Imperforated €90.00 - - Oshkosh A/S32P-19A; OSHKOSH T-1500; Renault FDC €39.70 - - Midlum 240.14 CCF)) FDC imperf. €100.00 - - Stamperija: NIG200103b NIGER 2020 Perforated €4.95 - - Tall ships (Tall ships (Christian Radich) Background Imperforated €15.00 - - info: Larus marinus; Sørlandet) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200103c NIGER 2020 Perforated €4.95 - - Tall ships (Tall ships (Anna-Kristina; Stabben Imperforated €15.00 - - Lighthouse; Statsraad Lehmkuhl; Sørlandet; Svanhild; FDC €7.45 - - Feistein Lighthouse)) FDC imperf. €17.50 - - Stamperija: NIG200103d NIGER 2020 Perforated €29.70 - - Tall ships (Tall ships (Anna-Kristina; Stabben Imperforated €90.00 - - Lighthouse; Statsraad Lehmkuhl; Sørlandet; Svanhild; FDC €39.70 - - Feistein Lighthouse)) FDC imperf. €100.00 - - Stamperija: NIG200104b NIGER 2020 Perforated €4.95 - - Steam trains (Steam trains (9P-13231) Background Imperforated €15.00 - - info: MÁV 394,057) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200104c NIGER 2020 Perforated €4.95 - - Steam trains (Steam trains (TKh 4207; Ty2-81; L- Imperforated €15.00 - - 1160; MÁV 370)) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200104d NIGER 2020 Perforated €29.70 - - Steam trains (Steam trains (TKh 4207; Ty2-81; L- Imperforated €90.00 - - 1160; MÁV 370)) FDC €39.70 - - FDC imperf. €100.00 - - Stamperija: NIG200105b NIGER 2020 Perforated €4.95 - - Speed trains (Speed trains (700 Series Shinkansen) Imperforated €15.00 - - Background info: TGV 001; Frecciarossa 1000) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200105c NIGER 2020 Perforated €4.95 - - Speed trains (Speed trains (TGV 001; Amtrak Acela Imperforated €15.00 - - Express; Eurostar e320; Frecciarossa 1000)) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200105d NIGER 2020 Perforated €29.70 - - Speed trains (Speed trains (TGV 001; Amtrak Acela Imperforated €90.00 - - Express; Eurostar e320; Frecciarossa 1000)) FDC €39.70 - - FDC imperf. €100.00 - - Stamperija: NIG200106b NIGER 2020 Perforated €4.95 - - Butterflies (Butterflies (Aglais io) Background info: Imperforated €15.00 - - Papilio glaucus; Anthocharis cardamines caterpillar) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200106c NIGER 2020 Perforated €4.95 - - Butterflies (Butterflies (Anthocharis cardamines; Imperforated €15.00 - - Carterocephalus palaemon; Battus philenor; Cupido FDC €7.45 - - minimus)) FDC imperf. €17.50 - - Stamperija: NIG200106d NIGER 2020 Perforated €29.70 - - Butterflies (Butterflies (Anthocharis cardamines; Imperforated €90.00 - - Carterocephalus palaemon; Battus philenor; Cupido FDC €39.70 - - minimus)) FDC imperf. €100.00 - - Stamperija: NIG200107b NIGER 2020 Perforated €4.95 - - Kingfishers (Kingfishers (Alcedo azurea) Background Imperforated €15.00 - - info: Halcyon leucocephala) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200107c NIGER 2020 Perforated €4.95 - - Kingfishers (Kingfishers (Alcedo atthis; Pelargopsis Imperforated €15.00 - - melanorhyncha; Dacelo novaeguineae; Megaceryle FDC €7.45 - - alcyon)) FDC imperf. €17.50 - - Stamperija: NIG200107d NIGER 2020 Perforated €29.70 - - Kingfishers (Kingfishers (Alcedo atthis; Pelargopsis Imperforated €90.00 - - melanorhyncha; Dacelo novaeguineae; Megaceryle FDC €39.70 - - alcyon)) FDC imperf. €100.00 - - Stamperija: NIG200108b NIGER 2020 Perforated €4.95 - - Flying dinosaurs (Flying dinosaurs (Eudimorphodon Imperforated €15.00 - - ranzii) Background info: Pterodactylus antiquus) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200108c NIGER 2020 Perforated €4.95 - - Flying dinosaurs (Flying dinosaurs (Pterodactylus Imperforated €15.00 - - antiquus; Anhanguera blittersdorffi; Dsungaripterus FDC €7.45 - - weii)) FDC imperf. €17.50 - - Stamperija: NIG200108d NIGER 2020 Perforated €29.70 - - Flying dinosaurs (Flying dinosaurs (Pterodactylus Imperforated €90.00 - - antiquus; Anhanguera blittersdorffi; Dsungaripterus FDC €39.70 - - weii)) FDC imperf. €100.00 - - Stamperija: NIG200109b NIGER 2020 Perforated €4.95 - - Orchids (Orchids (Cattleya intermedia) Background Imperforated €15.00 - - info: Dendrobium nobile “Paula”) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200109c NIGER 2020 Perforated €4.95 - - Orchids (Orchids (Dendrobium nobile; Cypripedium Imperforated €15.00 - - passerinum; Oeceoclades spathulifera; Cymbidium FDC €7.45 - - “Enzan Knuckle”)) FDC imperf. €17.50 - - Stamperija: NIG200109d NIGER 2020 Perforated €29.70 - - Orchids (Orchids (Dendrobium nobile; Cypripedium Imperforated €90.00 - - passerinum; Oeceoclades spathulifera; Cymbidium FDC €39.70 - - “Enzan Knuckle”)) FDC imperf. €100.00 - - Stamperija: NIG200110b NIGER 2020 Perforated €4.95 - - Shells (Shells (Naticarius alapapilionis) Background Imperforated €15.00 - - info: Tonna galea) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200110c NIGER 2020 Perforated €4.95 - - Shells (Shells (Turbo sarmaticus; Tonna dolium; Cassis Imperforated €15.00 - - cornuta; Strombus latissimus)) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200110d NIGER 2020 Perforated €29.70 - - Shells (Shells (Turbo sarmaticus; Tonna dolium; Cassis Imperforated €90.00 - - cornuta; Strombus latissimus)) FDC €39.70 - - FDC imperf. €100.00 - - Stamperija: NIG200111b NIGER 2020 Perforated €4.95 - - Bee-eaters (Bee-eaters (Merops philippinus) Imperforated €15.00 - - Background info: Merops bulocki) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200111c NIGER 2020 Perforated €4.95 - - Bee-eaters (Bee-eaters (Merops orientalis; Merops Imperforated €15.00 - - pusillus; Merops ornatus; Merops persicus)) FDC €7.45 - - FDC imperf. €17.50 - - Stamperija: NIG200111d NIGER 2020 Perforated €29.70 - - Bee-eaters (Bee-eaters (Merops orientalis; Merops Imperforated €90.00 - - pusillus; Merops ornatus; Merops persicus)) FDC €39.70 - - FDC imperf. €100.00 - - Stamperija: NIG200112b NIGER 2020 Perforated €4.95 - - Herons (Herons (Nyctanassa violacea) Background Imperforated €15.00 - - info: Nycticorax nycticorax; Nycticorax caledonicus; FDC €7.45 - - Cochlearius cochlearius) FDC imperf. €17.50 - - Stamperija: NIG200112c NIGER 2020 Perforated €4.95 - - Herons (Herons (Nycticorax nycticorax; Egretta Imperforated €15.00 - - garzetta; Cochlearius cochlearius; Botaurus FDC €7.45 - - lentiginosus)) FDC imperf. €17.50 - - Stamperija: NIG200112d NIGER 2020 Perforated €29.70 - - Herons (Herons (Nycticorax nycticorax; Egretta Imperforated €90.00 - - garzetta; Cochlearius cochlearius; Botaurus FDC €39.70 - - lentiginosus)) FDC imperf. €100.00 - - Stamperija: NIG200113b NIGER 2020 Perforated €4.95 - - Tropical fishes (Tropical fishes (Cantherhines Imperforated €15.00 - - macrocerus) Background info: Chaetodon xanthurus; FDC €7.45 - - Pterois volitans; Chaetodon citrinellus) FDC imperf. €17.50 - - Stamperija: NIG200113c NIGER 2020 Perforated €4.95 - - Tropical fishes (Tropical fishes (Chromobotia Imperforated €15.00 - - macracanthus; Epinephelus striatus; Arothron hispidus; FDC €7.45 - - Chelmon rostratus)) FDC imperf. €17.50 - - Stamperija: NIG200113d NIGER 2020 Perforated €29.70 - - Tropical fishes (Tropical fishes (Chromobotia Imperforated €90.00 - - macracanthus; Epinephelus striatus; Arothron hispidus; FDC €39.70 - - Chelmon rostratus)) FDC imperf. €100.00 - - Total 39 diff. Perforated x 1: €514.80 STAMPERIJA Ltd. POBOX 5 RIESES POST, Vilnius distr. LT-14028 Lithuania E-mail [email protected] www.stampera.eu.
Recommended publications
  • Mezinárodní Komparace Vysokorychlostních Tratí
    Masarykova univerzita Ekonomicko-správní fakulta Studijní obor: Hospodářská politika MEZINÁRODNÍ KOMPARACE VYSOKORYCHLOSTNÍCH TRATÍ International comparison of high-speed rails Diplomová práce Vedoucí diplomové práce: Autor: doc. Ing. Martin Kvizda, Ph.D. Bc. Barbora KUKLOVÁ Brno, 2018 MASARYKOVA UNIVERZITA Ekonomicko-správní fakulta ZADÁNÍ DIPLOMOVÉ PRÁCE Akademický rok: 2017/2018 Studentka: Bc. Barbora Kuklová Obor: Hospodářská politika Název práce: Mezinárodní komparace vysokorychlostích tratí Název práce anglicky: International comparison of high-speed rails Cíl práce, postup a použité metody: Cíl práce: Cílem práce je komparace systémů vysokorychlostní železniční dopravy ve vybra- ných zemích, následné určení, který z modelů se nejvíce blíží zamýšlené vysoko- rychlostní dopravě v České republice, a ze srovnání plynoucí soupis doporučení pro ČR. Pracovní postup: Předmětem práce bude vymezení, kategorizace a rozčlenění vysokorychlostních tratí dle jednotlivých zemí, ze kterých budou dle zadaných kritérií vybrány ty státy, kde model vysokorychlostních tratí alespoň částečně odpovídá zamýšlenému sys- tému v ČR. Následovat bude vlastní komparace vysokorychlostních tratí v těchto vybraných státech a aplikace na český dopravní systém. Struktura práce: 1. Úvod 2. Kategorizace a členění vysokorychlostních tratí a stanovení hodnotících kritérií 3. Výběr relevantních zemí 4. Komparace systémů ve vybraných zemích 5. Vyhodnocení výsledků a aplikace na Českou republiku 6. Závěr Rozsah grafických prací: Podle pokynů vedoucího práce Rozsah práce bez příloh: 60 – 80 stran Literatura: A handbook of transport economics / edited by André de Palma ... [et al.]. Edited by André De Palma. Cheltenham, UK: Edward Elgar, 2011. xviii, 904. ISBN 9781847202031. Analytical studies in transport economics. Edited by Andrew F. Daughety. 1st ed. Cambridge: Cambridge University Press, 1985. ix, 253. ISBN 9780521268103.
    [Show full text]
  • Annexe 6.8 Tonnages Des Materiels Roulants Voyageurs Pris En Compte
    ANNEXE 6.8 TONNAGES DES MATERIELS ROULANTS VOYAGEURS PRIS EN COMPTE POUR L'ELABORATION DE LA TARIFICATION DES PRESTATIONS MINIMALES Document de référence du réseau annexe 6.8 Horaire de service 2020 (version 3-1 du 13 décembre 2019) 1/11 Matériel roulant utilisé pour les trafics voyageurs conventionnés Cette table a été utilisée par SNCF Réseau afin de recomposer le tonnage par type de matériel. Dans un souci de cohérence entre la méthode de calcul des tarifs 2019 et la méthode de facturation, il est demandé aux entreprises ferroviaires de déclarer : - la masse totale à charge de leurs circulations commerciales à l'aide de la masse à charge par type de matériel (colonne C) - la masse à vide de leurs circulations non commerciales à l'aide de la masse à vide par type de matériel (colonne B) SNCF Réseau se réserve le droit de modifier et compléter cette liste le cas échéant. Série Masse à vide (t) Masse à charge (t) BB 7200 PV 84 84 BB 7200 GV 84 84 BB 7600 84 84 BB 8100 92 92 BB 80000 92 92 BB 8500 80 80 BB 88500 79 79 BB 9200 82 82 BB 9300 84 84 BB 9600 67 67 BB 15000 90 90 BB 16000 88 88 BB 16100 90 90 BB 16500 75 75 BB 17000 78 78 BB 22200 90 90 BB 25100 87 87 BB 25200 PV 84 84 BB 25200 GV 87 87 BB 25500 80 80 BB 26000 90 90 BB 27000 90 90 BB 27300 90 90 BB 36000 89 89 BB 36300 89 89 BB 37000 90 90 CC 92000 126 126 BB 185000 DB BR 185 85 85 BB 4000 CFL 85 85 BB 3000 CFL 90 90 BB 1300 SNCB série 13 90 90 BB 37500 Veolia 90 90 BB 60000 76 76 BB 61000 87 87 BB 63000 68 68 BB 63500 68 68 Document de référence du réseau annexe 6.8 Horaire
    [Show full text]
  • Télécharger La Grande Vitesse Dans Le Monde
    la grande vitesse dans le monde « l'Union Internationale des Chemins aller vite de Fer représente plus de 90 pays » une question de principes mondiale représentant le secteur ferroviaire. Elle compte 200 membres, dans plus de 90 pays répartis sur les 1er principe 2e principe 3e principe cinq continents. Sa mission est de promouvoir la croissance du transport La grande vitesse ferroviaire Un système différent Un système qui signifie ferroviaire à l’échelle mondiale ainsi que se conçoit comme un système d'un pays à l'autre accroissement de la capacité d’encourager et d’organiser la coopéra- tion internationale entre ses membres. Les systèmes ferroviaires à grande Le système à grande vitesse se Conformément à la principale Jean-Pierre Loubinoux L’UIC développe des liens de coopéra- vitesse sont complexes car ils font définit par la manière dont l'ensemble caractéristique du mode ferroviaire, Directeur Général UIC tion étroits avec plus de 50 organisations appel aux techniques les plus de ses composantes sont conçues et le rail à grande vitesse est synonyme internationales et professionnelles, et a avancées dans différents domaines. interagissent entre elles. Le résultat de capacité et de mobilité durable. le statut de consultant auprès des D'abord au niveau de l'infrastructure obtenu en termes de coûts et de Il trouvera encore plus de pertinence « La ligne à grande vitesse Paris-Rennes l’une des pionnières dans le monde dès Nations unies. y compris les ouvrages d’art, la voie, performances peut varier lorsqu’il suscite un accroissement permettra de relier les deux villes en 1H25.
    [Show full text]
  • High Speed Railway Project Development and Regional Accessibility Improvement: the First Experience in India
    FACULTY OF CIVIL AND INDUSTRIAL ENGINEERING Master Degree in Transport System Engineering Thesis High Speed Railway Project Development and Regional Accessibility Improvement: The First Experience in India Supervisor: Candidate: Prof. Eng. Antonio Musso Amal Kuzhiparambil Purushothaman Co-Supervisor: N° 1722321 Dr. Eng. Cristiana Piccioni Academic Year 2018/2019 2 Table of contents Summary 1. Introduction 1.1 Study purpose 1.2 Research background 1.3 Research methodology 1.4 Key issues 2. The Reference framework 2.1 Definition of high-speed rail 2.2 HSR benefits 2.3 HS Rail around the world 2.3.1 Japan 2.3.2 Italy 2.3.3 France 2.3.4 Germany 2.3.5 Spain 2.3.6 China 3. The accessibility concept 3.1 Definition of accessibility 3.2 Accessibility indicators 3.3 A basic benchmarking exercise 4. Accessibility and HSR projects: an insight into international experiences 4.1 The Madrid-Barcelona HSR case study, Spain 4.2 The China HSR case study 4.3 The Seoul HSR case study, Korea 4.4 Brisbane - Melbourne proposed HSR, Australia 5. Building an accessibility indicators framework 5.1 Identification of Accessibility indicators 5.2 A selection of accessibility indicators 5.2.1 Weighted average travel times (Location indicator) 5.2.2 Economic potential 3 5.2.3 Daily accessibility indicator 5.2.4 Economic accessibility 6. Pilot study: the Mumbai – Ahmedabad HSR project 6.1 HSR project background 6.1.1 Necessity of HSR System in India 6.2 Major cities affected by the project 6.2.1 Mumbai 6.2.2 Surat 6.2.3 Vadodara 6.2.4 Ahmedabad 6.3 HSR Project overview 6.3.1 Basic characteristics 6.3.2 Stations 6.3.3 Train operation plans 6.4 Accessibility assessment 6.4.1 Calculation and evaluation of indicators 6.4.2 Weighted average travel times (location indicator) 6.4.3 Economic potential 6.4.4 Daily accessibility indicator 6.4.5 Economic indicator 7.
    [Show full text]
  • Bilancio 2002 Del Gruppo Fs
    Financial Financial statements statements 2013 2013 Piazza della Croce Rossa,1 00161 Roma www.trenitalia.com TRENITALIA S.p.A. FINANCIAL STATEMENTS AT 31 DECEMBER 2013 Disclaimer This Annual Report 2013 has been translated into English solely for the convenience of the international reader. In the event of conflict or inconsistency between the terms used in the Italian version of the report and the English version, the Italian version shall prevail, as the Italian version constitutes the sole official document. TRENITALIA S.p.A. Trenitalia SpA Company with a sole shareholder subject to the direction and coordination activities of Ferrovie dello Stato Italiane S.p.A. Share capital: Euro 1,654,464,000.00 fully paid-up Registered office: Piazza della Croce Rossa no. 1, 00161 Rome Fiscal code and Register of companies: 05403151003 R.E.A. (Repertorio Economico Amministrativo, Administrative Economic Register): no.: 0883047 VAT: 05403151003 2013 Financial Statements 2 TRENITALIA S.p.A. OUR MISSION Trenitalia operates in the sector of services for the mobility of passengers and goods within a national and international context. For Trenitalia, the basic conditions underlying its mission are the safety of the service, quality, workers’ health, protection of the environment and it considers the importance of the relationship with the customer as the means to achieve a steady competitive advantage and create value for shareholders. The whole organisation of Trenitalia, which is committed to meeting the needs of customers and the requirements of the market, always guarantees the highest standards of safety and it implements development and modernisation plans in compliance with social and environmental sustainability.
    [Show full text]
  • Eisenbahn Ingenieur (Vol.63 No.9)
    Eisenbahn Ingenieur (Vol.63 No.9) 2012/9 ページ 1 見解:鉄道システムはさらに強化されなければならない Das System Bahn muss weiter gestärkt werden 3 2 イノトランス 2012:ベルリン見本市会場の概要 InnoTrans: Nutzung des gesamten Berliner Messegeländes 6 3 イノトランス 2012 - 予告案内:ユーレイルプレスのイノトランス 2012 の予告案内 Die Eurailpress-Messevorschau zur InnoTrans 2012 10 Frank Lademann "Mitgliederwerbung und eine bessere Außendarstellung - das 4 へのインタビュー:購読メンバー並びにより良い外面描写 - 我々が今 56 日一緒に取りかからなければならないこと müssen wir jetzt gemeinsam angehen" SNCF Euroduplex der interoperable Doppelstock- 5 高速列車: が運行するアルストム社製でインターオペラビリティの運転ができる - 60 二階建高速列車 Euroduplex TGV Hochgeschwindigkeitszug Pilotierung eines Assistenzsystems zur kraftstoffsparenden 6 66 運転:地方鉄道輸送において燃費効率の良い運転を支援する試験プロジェクト Fahrweise im SPNV Hochgenaue und integre Ortung für den Schienenverkehr der 7 72 鉄道測量:将来の鉄道輸送用に高度高精度統合位置情報システム Zukunft Erhöhte Betriebssicherheit von Radsatzwellen durch Fest- und 8 76 頑健な運転:冷間圧延及び表面圧延による車輪軸の軸部の耐久性の向上 Glattwalzen 9 EI スペシャル 防音 II:全ての関係者のための挑戦 - 防音は会社経営のテーマ Herausforderung für alle Beteiligten 79 Evaluierung innovativer Lärmschutzmaßnahmen des 10 EI II 80 スペシャル 防音 :活況的プログラムでの革新的な防音法の評価 Konjunkturprogramms Integrierte Lärmscchutzpolitik am Beispiel des 11 EI II 84 スペシャル 防音 :統合的防音策の例として鉄道輸送騒音 Schienenverkehrslärms 12 EI スペシャル 防音 II:将来の仕事として革新的な防音 Innovativer Lärmschutz als Zukunftsaufga be 88 Niedrige Schallschutzwände im Rahmen des Konjunktur 13 EI II 92 スペシャル 防音 :活況的プログラムでの低い高さの防音壁 programms II EI II 14 スペシャル 防音 :レールの腹部と底部を覆って騒音を低減 - 現場測定で騒音低 Lärmreduktion mit Schienenabschirmung - Feldmessungen 99 減効果を確認 15 EI スペシャル 防音 II:鋼鉄道橋の騒音低減
    [Show full text]
  • Trenitalia Orders Frecciarossa 1000 Hsts Virtual Reality For
    lay R 319 tisk.qxp_Railvolution 23.07.19 22:42 Stránka 6 Trenitalia Orders effort of 370 kN. Seating capacity will Frecciarossa 1000 HSTs be 457 (300 in standard, 76 in premium, On 4 June 2019 Trenitalia awarded 69 in business and 10 in executive class). a contract worth around 575 million EUR Two wheelchair spaces will be provided. to a 60/40 % joint venture formed by The trains will comply with all cur- Hitachi Rail and Bombardier Transporta- rent TSIs, and will be designed for use tion for 14 Frecciarossa 1000 (ETR 400) in France, Germany, Spain, Austria, Type V300 ZEFIRO high speed trains. Switzerland, Netherlands and Belgium, The contract includes ten years of main- being equipped with all pertinent ATP tenance and servicing by the manufac- systems, including ETCS. However, their turers. For Bombardier the deal is worth exact areas of operation will be deter- 233 million EUR and for Hitachi 342 mil- mined by Trenitalia. When the first batch lion EUR. of 50 ETR 400s was ordered, a similar Trenitalia currently has a fleet of wide international operating range was On 4 June 2019 the Italian rail regu- to target the international market or 50 Frecciarossa 1000s, built between envisaged. Deliveries are to start within lator ARAFER announced that Trenitalia practise cabotage on the domestic 2013 and 2017. Like these, the follow- 18 months of the date on which the subsidy Thello had informed it of its in- French one. Thello states that its aim is ing 14 will be built in Italy, at Hitachi’s contract was signed.
    [Show full text]
  • High Speed Rail Competition in Italy a Major Railway Reform with a “Win-Win Game”?
    High Speed Rail Competition in Italy A Major Railway Reform with a “Win-Win Game”? Discussion11 Paper 2016 • 11 Christian Desmaris Laboratoire Aménagement Économie Transports, University of Lyon, France High Speed Rail Competition in Italy A Major Railway Reform with a “Win-Win Game”? Discussion Paper No. 2016-11 Prepared for the Working Group on Public Transport Market Organisation and Innovation Christian Desmaris Laboratoire Aménagement Économie Transports, University of Lyon, France September 2016 The International Transport Forum The International Transport Forum is an intergovernmental organisation with 57 member countries. It acts as a think tank for transport policy and organises the Annual Summit of transport ministers. ITF is the only global body that covers all transport modes. The ITF is politically autonomous and administratively integrated with the OECD. The ITF works for transport policies that improve peoples’ lives. Our mission is to foster a deeper understanding of the role of transport in economic growth, environmental sustainability and social inclusion and to raise the public profile of transport policy. The ITF organises global dialogue for better transport. We act as a platform for discussion and pre-negotiation of policy issues across all transport modes. We analyse trends, share knowledge and promote exchange among transport decision-makers and civil society. The ITF’s Annual Summit is the world’s largest gathering of transport ministers and the leading global platform for dialogue on transport policy. The Members
    [Show full text]
  • 2017 Annual Report(.Pdf — 6403
    (Translation from the Italian original which remains the definitive version) 2017 ANNUAL REPORT CONTENTS 2017 ANNUAL REPORT 1 Chairwoman’s letter 1 Group highlights 8 DIRECTORS’ REPORT 15 Non-financial information – Methodology for reporting non-financial information 16 The group’s financial position and performance 18 Business model 27 Segment reporting 29 FS Italiane S.p.A.’s financial position and performance 40 Investments 44 Research, development and innovation 53 Context and focus on FS Italiane group 55 Report on corporate governance and the ownership structure 82 Sustainability in the group 102 Stakeholders 117 Main events of the year 136 Risk factors 145 Travel safety 151 Other information 152 The parent’s treasury shares 159 Related party transactions 160 Outlook 161 Consolidated financial statements of Ferrovie dello Stato Italiane group as at and for the year ended 31 December 2017 162 Consolidated financial statements 163 Notes to the consolidated financial statements 169 Annexes 263 Separate financial statements of Ferrovie dello Stato Italiane S.p.A. as at and for the year ended 31 December 2017 276 Financial statements 277 Notes to the separate financial statements 283 Proposed allocation of the profit for the year of Ferrovie dello Stato Italiane S.p.A. 345 Ferrovie dello Stato Italiane group 2 Chairwoman’s letter Dear Shareholder, Ferrovie dello Stato Italiane group posted excellent results for 2017, in line with the challenging 2017-2026 business plan approved by the board of directors in September 2016. In their collective pursuit of the objectives set forth in this business plan, the group companies are highly focused on protecting their businesses and satisfying their stakeholders, with a strong sense of belonging and shared accountability for the achievement of their common strategic goals.
    [Show full text]
  • Trenitalia S.P.A
    (Translation from the Italian original which remains the definitive version) Trenitalia S.p.A. Financial statements as at and for the year ended 31 December 2017 (with report of the auditors thereon) KPMG S.p.A. 19 March 2018 ANNUAL REPORT (Translation from the Italian original which remains the definitive version) TRENITALIA S.p.A. Trenitalia S.p.A. Company with sole shareholder, managed and coordinated by Ferrovie dello Stato Italiane S.p.A. Registered office: Piazza della Croce Rossa 1, 00161 Rome Fully paid-up share capital: €1,417,782,000.00 Rome R.E.A. no. 0883047 Tax code and VAT no. 05403151003 Telephone: 06 44101 Website: www.trenitalia.com 2017 annual report 1 TRENITALIA S.p.A. COMPANY MISSION Trenitalia provides passenger transport services domestically and internationally. Trenitalia’s mission revolves around certain essential conditions, which consist in the safety of its services, the quality and the health of its workers and protecting the environment. Trenitalia believes that putting its relationship with customers first is the way to gain a long-term competitive advantage and create value for shareholders. Trenitalia’s entire organisation is committed to meeting customers’ needs and market demands. It always guarantees high safety standards and implements development and modernisation plans in accordance with economic, social and environmental sustainability standards. To achieve its mission, the company has created an organisational structure divided into divisions, and it has assigned each of these the monitoring of the relevant business according to the particular characteristics of the market in which the division operates. 2017 annual report 2 TRENITALIA S.p.A.
    [Show full text]
  • La Dans Le Monde Grande Vitesse
    la grande vitesse dans le monde Brochure conçue dans le cadre de la coproduction de l’exposition Grande vitesse ferroviaire « l'Union Internationale aller vite des Chemins de fer une question de principes représente plus de 90 pays » 1er principe1er principe 2e principe2e principe 3e principe3e principe La grandeLa grande vitesse vitesse ferroviaire ferroviaire Un systèmeUn système différent différent Un systèmeUn système qui quisignifie signifie se conçoitse conçoit comme comme un systèmeun système d'und'un pays pays à l'autre à l'autre accroissementaccroissement de la de capacité la capacité dans plus de 90 pays répartis sur les cinq continents. Sa mission est de Les Lessystèmes systèmes ferroviaires ferroviaires à grande à grande Le systèmeLe système à grande à grande vitesse vitesse se ConformémentConformément à la àprincipale la principale promouvoir la croissance du trans- vitessevitesse sont sont complexes complexes car ilscar font ils font définitse définitpar la manièrepar la manière dont l'ensemble dont caractéristiquecaractéristique du mode du mode ferroviaire, ferroviaire, port ferroviaire à l’échelle mondiale et appelappel aux auxtechniques techniques les plusles plus de sesl'ensemble composantes de ses sont composantes conçues et le raille àrail grande à grande vitesse vitesse est synonymeest synonyme d’encourager la coopération interna- avancéesavancées dans dans différents différents domaines. domaines. interagissentsont conçues entre et elles. interagissent Le résultat entre de capacitéde capacité et de et mobilité de
    [Show full text]
  • PERFORMANCES and COMPARISION BETWEEN ETR1000, ETR500, ICE3 and TGV
    DYNAMIC BEHAVIOUR OF HIGH SPEED TRAIN: PERFORMANCES AND COMPARISION BETWEEN ETR1000, ETR500, ICE3 and TGV Faculty of Civil and Industrial Engineering Academic Year Master’s Degree in Transport Systems Engineering 2018-2019 Student : Yatish Manju Matricola : 1772366 Supervisor Co-Supervisor Professor and Student Guide Director of ETR1000 High Speed Train Gabriele Malavasi Diego Canetta Page 1 Abstract: The goal of this Thesis is to identify “DYNAMIC BEHAVIOR OF HIGH SPEED RAIL and Performance in the FIRENZE SANTA MARIA NOVELLA to BOLOGNA CENTRALE HIGH SPEED LINE” practices starting from the Operational Performances, Energy Consumption, 10% of Weight Reduction of all trains and only we done a Future line mark ETR1000 High Speed Train with maximum speed is 330km/h and 360 km/h. Practices of high speed rail are ETR1000 and comparing with three different type high speed Trains ETR500, ICE3 and TGV-THALYS. Speed is 300 km/h and Electric system is 25 kV 50 Hz is used for SANTA MARIA NOVELLA to BOLOGNA CENTRALE LINE high-speed rail systems currently in operation line. New generation high speed trains are designed to have better performances, retain the safety of the rolling stock at higher speed and guarantee the passengers comfort. Design features are verified during the homologation and the commissioning of the train. The opportunity to perform some measurements on the train allows to define the characteristics of the rolling stock and to assess the reliability of design procedures and numerical codes used to predict the train performances. Weight reduction has done by following technical characteristics of all trains are ETR1000, ETR500, ICE3 and TGV-THALYS.
    [Show full text]