Anglia Route Study Long Term Planning Process Summary Document March 2016 2 Anglia Route Study: Summary Document March 2016 the Railway in Anglia

Total Page:16

File Type:pdf, Size:1020Kb

Anglia Route Study Long Term Planning Process Summary Document March 2016 2 Anglia Route Study: Summary Document March 2016 the Railway in Anglia EB/046 Anglia Route Study Long Term Planning Process Summary Document March 2016 2 Anglia Route Study: Summary Document March 2016 The Railway in Anglia The railway in Anglia plays a vital role in the region’s economy, providing links between communities and employment, industry and markets, and conveying nationally important freight flows from ports where container traffic arrives in the UK. The rail industry has delivered more trains, reduced delays and improved safety, at the same time as improved efficiency and value over the last 20 years. Over the next 30 years more and more people are expected to travel by train, and more freight traffic is forecast to come off the road and onto the railway. This presents significant challenges which are explored and options to address them presented in the Anglia Route Study. Anglia Route Study: Summary Document 3 March 2016 Planning for Growth The Anglia Route Study identifies key corridors and highlights expected increases in passenger and freight flows, proposing options to meet this demand he Anglia Route Study examines The Route Study forms part of a suite of Toptions to improve the railway in Studies for the UK rail network, which East Anglia, setting out a long term represent a crucial component of the strategy to meet growing passenger and railway’s Long Term Planning Process freight demand on the railway from 2019 (LTPP). Looking ahead to 2043 ensures and beyond. that those requirements prioritised for the next ten years are consistent with The Route Study sets out a vision for the longer-term developments. next 10 to 30 years of a much busier A COLLABORATIVE PROCESS railway, with investment enabling faster, The choices set out in the Route Study more frequent and more reliable have been developed together with industry partners to deliver a railway that journeys. It presents choices for funders offers value to taxpayers, users and to meet this future demand. funders. Outside London, the Anglia region has The Anglia Route Study Draft for the fastest growing employment in Consultation was published in November England and needs a rail service to 2014 and the consultation ran until support this economic growth. The February 2015. Over 190 responses were benefits of these potential investments received and have been used to review, will flow far beyond the railway, leading update and complete further analysis to to: support the final strategy for Anglia. • economic growth • reduced environmental impact • regeneration of communities 4 Anglia Route Study: Summary Document March 2016 Anglia Route The Anglia Route comprises 1,426 track miles covering the whole of East Anglia and routes into and around London The Great Eastern Main Line runs The Orbital Routes include the North between London Liverpool Street and London Line (NLL) and Gospel Oak to Norwich and carries key commuter flows Barking line (GOB), providing a major link into London, a fast-growing long distance between key arterial routes to and from flow connecting world leading centres for the capital. It carries a busy commuter biosciences, engineering and renewable service and provides connections for energy, as well as a significant amount of freight to other routes across London. freight. The Essex Thameside route runs from The Cross country corridor via Ely London Fenchurch Street to supports freight between the Port of Shoeburyness and carries a mixture of Felixstowe and other regions such as the commuter and leisure traffic along with Midlands, Yorkshire and Scotland container traffic to and from the ports at alongside busy inter-regional passenger Tilbury and London Gateway. services. Sheringham The West Anglia Main Line runs between Cromer London Liverpool Street and Kings Lynn and carries busy commuter and leisure Kings Lynn traffic from Stansted Airport and Great Cambridge into London Liverpool Street. Norwich Yarmouth It has the potential for significant housing and employment growth. Lowestoft Ely Thetford Bury St Edmunds Cambridge Sudbury Ipswich Felixstowe Manningtree Harwich Town Stansted Braintree Colchester Marks Walton-on-the-Naze Airport Tey Hertford East Witham Clacton-on-Sea Chelmsford Southminster Chingford Sheneld Southend Victoria Richmond Shoeburyness London Liverpool Street London Fenchurch Street Anglia Route Study: Summary Document 5 March 2016 Priority flows and growth The forecast growth in passenger and freight demand is significant across all main service groups in the Anglia region n terms of peak-level demand, the Freight growth across Anglia to 2043 I pattern for the Anglia route is largely 8000 driven by commuting habits to and from 7000 London. As a result, additional growth will be driven by employment growth 6000 rather than people transferring to rail 5000 from other modes of transport. 4000 The forecast growth in freight over the 3000 next 30 years is significant across the km Tonne Net Million region, particularly in container traffic 2000 Other which is conveyed on the main routes 1000 Container both via London and via Ely to other 0 parts of the country. 2012 2024 2034 2044 Passenger crowding in 2043 without investment Norwich to improve the rail service (average across high-peak hour, not representing individual trains) Kings Lynn Peterborough Ely Seats busy - up to 85% taken Bury St. Cambridge Edmunds Seats full - 85% to 100% taken Ipswich Felixstowe 0 to 40% standing space utilised Stansted Airport 40% to 80% standing space utilised Hertford East Colchester Over 80% standing space utilised Marks Tey Eneld Town Chelmsford Chingford Sheneld Southend Gospel Victoria Oak Barking Shoeburyness Stratford Richmond London Liverpool Street Grays London Fenchurch Street 6 Anglia Route Study: Summary Document March 2016 Choices for funders Investment is required in Anglia to meet forecast growth in both passenger and freight numbers here is the clear potential in Anglia Tfor further growth and expansion which would be significantly supported and enhanced by improvements to the railway. We have therefore set out a number of investment opportunities for our funders. Sheringham Level Crossings (corridor wide) 11 Kings Lynn 4 Doubling Signalling Trowse Bridge Norwich improvements 9 GEML Level Crossings Ely area capacity 5 improvements 7 Ely Thetford Haughley Junction Ely - Soham partial 10 Doubling doubling 8 Bury Cambridge St Edmunds Felixstowe Branch 6 Capacity Enhancement Ipswich West Anglia Train Loop north of Lengthening 12 Felixstowe 3 Witham Stansted Colchester Airport Signalling Witham 2 improvements Journey Time Improvements 13 Chelmsford Preparatory works for a 1 Liverpool Street major intervention such as 14 Station Capacity Crossrail 2 on West Anglia Shoeburyness Signalling London improvements 15 Essex Thameside 17 Train lengthening Freight regulating points 16 Anglia Route Study: Summary Document 7 March 2016 Great Eastern Main Line West Anglia Main Line To deliver more and faster trains To enable housing growth and economic development through 1. Improvements at London Liverpool more and faster trains Street station including more passenger space and additional 12. Longer trains on peak services platform(s) 13. Line speed improvements 2. Improvements to signalling to allow to support faster journeys more trains to run between 14. Preparatory works for a major Chelmsford and Stratford (through intervention such as Crossrail 2 Digital Railway) on West Anglia 3. Passing loop north of Witham 4. Doubling of Trowse Swing Bridge Orbital Routes Sheringham 5. Level crossing closures or improved (NLL & GOB) Level Crossings safety mitigations To deliver more freight and 11 passenger trains (corridor wide) Kings Lynn Doubling 4 15. Improvements to signalling Signalling Trowse Bridge Norwich Cross country corridor via Ely to allow more trains to run improvements 9 To deliver more freight trains and 16. Regulating points enabling freight better connectivity to wait for a path without GEML Level Crossings detaining passenger services Ely area capacity 5 6. Felixstowe Branch capacity enhancements improvements 7 Ely Thetford Haughley Junction 7. Ely area improvements, including Essex Thameside signalling improvements to allow Ely - Soham partial 10 Doubling more trains to run, Ely North Junction To deliver more seats in peak hours doubling 8 Bury and level crossings Cambridge St Edmunds Felixstowe Branch 6 Capacity Enhancement 8. Partial doubling of the Ely to Soham 17. Longer trains on peak services single line Ipswich Train lengthening comprises both the West Anglia Train Loop north of 9. Improvements to signalling to allow medium and long term strategy on this corridor. Should the realised rate of Lengthening 12 Felixstowe 3 more trains to run at Ely and Bury St Witham Edmunds growth out-perform the forecasts in the Stansted Colchester Signalling medium term, it is still likely to fall within Airport 10. Haughley Junction doubling the longer term demand forecasts. The Witham 2 improvements Journey Time Improvements 11. Level crossing closures or improved strategy will therefore still cater to this 13 Chelmsford safety mitigations speedier passenger increase, but may Preparatory works for a 1 Liverpool Street require earlier implementation. major intervention such as 14 Station Capacity Crossrail 2 on West Anglia Shoeburyness Signalling London improvements 15 Essex Thameside 17 Train lengthening Longer Term Freight regulating 16 An intervention such as Crossrail 2 is On the Great Eastern Main Line further points required to meet demand and improve enhancements to support peak growth
Recommended publications
  • Our Counties Connected a Rail Prospectus for East Anglia Our Counties Connected a Rail Prospectus for East Anglia
    Our Counties Connected A rail prospectus for East Anglia Our Counties Connected A rail prospectus for East Anglia Contents Foreword 3 Looking Ahead 5 Priorities in Detail • Great Eastern Main Line 6 • West Anglia Main Line 6 • Great Northern Route 7 • Essex Thameside 8 • Branch Lines 8 • Freight 9 A five county alliance • Norfolk 10 • Suffolk 11 • Essex 11 • Cambridgeshire 12 • Hertfordshire 13 • Connecting East Anglia 14 Our counties connected 15 Foreword Our vision is to release the industry, entrepreneurship and talent investment in rail connectivity and the introduction of the Essex of our region through a modern, customer-focused and efficient Thameside service has transformed ‘the misery line’ into the most railway system. reliable in the country, where passenger numbers have increased by 26% between 2005 and 2011. With focussed infrastructure We have the skills and enterprise to be an Eastern Economic and rolling stock investment to develop a high-quality service, Powerhouse. Our growing economy is built on the successes of East Anglia can deliver so much more. innovative and dynamic businesses, education institutions that are world-leading and internationally connected airports and We want to create a rail network that sets the standard for container ports. what others can achieve elsewhere. We want to attract new businesses, draw in millions of visitors and make the case for The railways are integral to our region’s economy - carrying more investment. To do this we need a modern, customer- almost 160 million passengers during 2012-2013, an increase focused and efficient railway system. This prospectus sets out of 4% on the previous year.
    [Show full text]
  • Issue 185 Feb 2020 SPECIAL FEATURE on HOW the LATEST
    Issue 185 ● Feb 2020 www.railfuture.org.uk/East+Anglia twitter.com/RailfutureEA Railfuture campaigns for better services over a bigger railway (passengers + freight) Join us for £20 per year www.railfuture.org.uk/join SPECIAL FEATURE ON HOW THE LATEST TRAIN TECHNOLOGY CAN BENEFIT PASSENGERS Image reproduced courtesy of Petards Rail Technology— www.petards.com Inside this edition of RAIL EAST... • East West Rail - Progress at last! • Station footfall for 2018/19 • Look back over last 10 years • Easy Stations — the winners • What we expect in the next 10 • A giant leap for train technology • Cambridge South consultation • Whittlesford audit improvements RAIL EAST 185 — FEBRUARY 2020 Railfuture East Anglia www.railfuture.org.uk TOPICS COVERED IN THIS ISSUE OF RAIL EAST In this issue’s 24 pages we have fewer (but longer) articles than last time and only five authors. Contributions are welcome from readers. Contact info on page 23. Chair’s thoughts – p.3 Easy Stations winners announced – plus how do our stations compare with Germany’s? And a snapshot of progress with platform development work at Stevenage East West Rail big announcement (1) – p.5 Preferred route for the central section is finally published – now the serious work begins East West Rail big announcement (2) – p.7 Progress on the western section, as Transport & Works Order is published and work on the ground is set to start Another critical consultation – Cambridge South – p.8 Momentum builds on this key item of passenger infrastructure – Railfuture’s wish- list for the new station
    [Show full text]
  • The Elizabeth Line
    COMPLETING ELIZABETH LINE THE ELIZABETH LINE Trial Running Update TRIAL RUNNING Plumstead Sidings PROJECT UPDATE WHAT IS TRIAL RUNNING? Delivery of the Elizabeth line is now in its Throughout the Trial Running programme Crossrail will Trial Running marks the point at which the Railways and complex final stages. Crossrail and Transport steadily increase the numbers of trains running in the tunnels. Other Guided Transport Systems (Safety) Regulations 2006 This will then be further increased and will allow the railway (ROGS) apply for the first time in the Central Operating for London (TfL) are working to ensure the and the supporting systems to be operated as close as Section. Crossrail transitions from following the construction earliest possible opening for the Elizabeth line. possible to an operational timetable. regulations to following Rail regulations. The project is nearing the next important milestone and There is important work to be done but we will take the time Following a readiness review, we will sign over control of the expects to commence extensive commissioning of the railway needed to get it right. Our top priority is a safe railway which central operating section to TfL as infrastructure manager as in spring 2021. This is a crucial moment in the project with the London and the UK can rely on. we transition to ROGS and operate under the Railway Rule railway on track to open in the first half of 2022. Book. From that moment forward, TfL’s service and The progress we have seen over recent months highlights the infrastructure managers will be accountable for the safety, The next phase, Trial Running, involves integrated trials of clear path we have towards completing the Elizabeth line and operation and maintenance of the railway, and the Trial the railway to demonstrate that the Elizabeth line is safe and commencing passenger services in the first half of 2022.
    [Show full text]
  • Services Between Enfield Lock and Tottenham Hale
    Crossrail 2 factsheet: Services between Enfield Lock and Tottenham Hale New Crossrail 2 services are proposed to serve Tottenham Hale, Northumberland Park, Angel Road, Ponders End, Brimsdown and Enfield Lock, with between 10 and 12 trains per hour in each direction operating directly to, and across, central London. What is Crossrail 2? Why do we need Crossrail 2? Crossrail 2 is a proposed new railway serving London and On the West Anglia Main Line, local stopping services and the wider South East that could be open by 2030. It would faster services from Cambridge and Stansted Airport all connect the existing National Rail networks in Surrey and compete for space on the line. This limits the number of Hertfordshire with trains running through a new tunnel trains that can call at local stations, and extends journey from Wimbledon to Tottenham Hale and New Southgate. times to and from the area. Crossrail 2 will connect directly with National Rail, Liverpool Street and Stratford stations also currently face London Underground, London Overground, Crossrail 1, severe capacity constraints. It is forecast that by 2043 High Speed 1 international and domestic and High Speed 2 demand for rail travel on this line will have increased by 39%. services, meaning passengers will be one change away There is currently no spare capacity for additional services. from over 800 destinations nationwide. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce journey times for longer distance Crossrail 2 in this area services, and would enable us to run more local services to central London.
    [Show full text]
  • Network Rail Response with Appendices
    Defendant’s Response to Sole Reference Ref: TTP1546 1 of 9 1 DETAILS OF PARTIES 1.1 The names and addresses of the parties to the reference are as follows:- (a) Freightliner Limited whose Registered Office is at 3rd Floor, 90 Whitfield Street, London W1T 4EZ (“Freightliner”) ("the Claimant"); and (b) Network Rail Infrastructure Limited whose Registered Office is at 1 Eversholt Street, London NW1 2DN ("Network Rail") ("the Defendant"). 1.2 Other Train and Freight Operating Companies that could be affected by the outcome of this dispute: (a) Greater Anglia (Abellio East Anglia Ltd), MTR Corporation (Crossrail) Ltd, Arriva Rail London Ltd, GB Railfreight Ltd, DB Cargo (UK) Ltd, c2c (Trenitalia c2c Ltd) 2 CONTENTS OF THIS DOCUMENT This Response to the Claimant’s Sole Reference includes:- (a) Confirmation, or qualification, that the subject matter of the dispute is as set out by the Claimant in its Sole Reference, in the form of a summary schedule cross-referenced to the issues raised by the Claimant in the Sole Reference, identifying which the Defendant agrees with and which it disagrees with. (b) A detailed explanation of the Defendant’s arguments in support of its position on those issues where it disagrees with the Claimant’s Sole Reference, including references to documents or contractual provisions not dealt with in the Claimant’s Sole Reference. (c) Any further related issues not raised by the Claimant but which the Defendant considers fall to be determined as part of the dispute; (d) The decisions of principle sought from the Panel in respect of (i) legal entitlement, and (ii) remedies; (e) Appendices and other supporting material.
    [Show full text]
  • London to Norwich Direct Train
    London To Norwich Direct Train Kristos gurgles her incautiousness frontally, dree and patchier. Nightmarish Adnan usually calibrate some lurkers or sleet jawbreakingly. Weighted Stillman bade ministerially or bales harmonically when Wyatan is rhotic. East anglia is direct, there are implemented and can travel entry to change or parks on this car, no direct train to london norwich. How to Travel From London to Norwich by Train Bus TripSavvy. National Express runs a regular bus service between London Victoria Coach now and the Norwich Bus Station which leaves London at. Bus from London to Norwich Find schedules Compare prices Book Megabus National Express and National Express tickets. The cheapest train connections from London to Norwich. When creating an average northern advanced fare. Norwich is also elm hill and table service is definitely worth trying when it from your train to yorkshire and make significant damage to alcohol, london to norwich direct train! Click on a gift card pin. What is Norwich like about visit? Get cheap train tickets to Norwich with our split up search. The direct from london st pancras international partners sites selected are as nationalrail and direct train tickets between london liverpool street every kind of. Our London Sidcup Hotel is Located between London and Kent and just 100m from the Train them Free Wi-Fi Throughout Your content Book Direct. How it is regarded as a colourful excursion to norwich here when we cannot wait to ironically for all! Connect to new azuma trains from time limit fuel facility supplies renewable compressed natural habitats, so just under a button down.
    [Show full text]
  • Submissions to the Call for Evidence from Organisations
    Submissions to the call for evidence from organisations Ref Organisation RD - 1 Abbey Flyer Users Group (ABFLY) RD - 2 ASLEF RD - 3 C2c RD - 4 Chiltern Railways RD - 5 Clapham Transport Users Group RD - 6 London Borough of Ealing RD - 7 East Surrey Transport Committee RD – 8a East Sussex RD – 8b East Sussex Appendix RD - 9 London Borough of Enfield RD - 10 England’s Economic Heartland RD – 11a Enterprise M3 LEP RD – 11b Enterprise M3 LEP RD - 12 First Great Western RD – 13a Govia Thameslink Railway RD – 13b Govia Thameslink Railway (second submission) RD - 14 Hertfordshire County Council RD - 15 Institute for Public Policy Research RD - 16 Kent County Council RD - 17 London Councils RD - 18 London Travelwatch RD – 19a Mayor and TfL RD – 19b Mayor and TfL RD - 20 Mill Hill Neighbourhood Forum RD - 21 Network Rail RD – 22a Passenger Transport Executive Group (PTEG) RD – 22b Passenger Transport Executive Group (PTEG) – Annex RD - 23 London Borough of Redbridge RD - 24 Reigate, Redhill and District Rail Users Association RD - 25 RMT RD - 26 Sevenoaks Rail Travellers Association RD - 27 South London Partnership RD - 28 Southeastern RD - 29 Surrey County Council RD - 30 The Railway Consultancy RD - 31 Tonbridge Line Commuters RD - 32 Transport Focus RD - 33 West Midlands ITA RD – 34a West Sussex County Council RD – 34b West Sussex County Council Appendix RD - 1 Dear Mr Berry In responding to your consultation exercise at https://www.london.gov.uk/mayor-assembly/london- assembly/investigations/how-would-you-run-your-own-railway, I must firstly apologise for slightly missing the 1st July deadline, but nonetheless I hope that these views can still be taken into consideration by the Transport Committee.
    [Show full text]
  • London to Ipswich
    GREAT EASTERN MAIN LINE LONDON TO IPSWICH © Copyright RailSimulator.com 2012, all rights reserved Release Version 1.0 Train Simulator – GEML London Ipswich 1 ROUTE INFORMATIONINFORMATION................................................................................................................................................................................................................... ........................... 444 1.1 History ....................................................................................................................4 1.1.1 Liverpool Street Station ................................................................................................. 5 1.1.2 Electrification................................................................................................................ 5 1.1.3 Line Features ................................................................................................................ 5 1.2 Rolling Stock .............................................................................................................6 1.3 Franchise History .......................................................................................................6 2 CLASS 360 ‘DESIRO’ ELECTRIC MULTIPLE UNUNITITITIT................................................................................... ..................... 777 2.1 Class 360 .................................................................................................................7 2.2 Design & Specification ................................................................................................7
    [Show full text]
  • Chapter Four – a Good Public Transport Experience
    A GOOD PUBLIC TRANSPORT EXPERIENCE 129 Chapter four – A good public transport experience London has one of the most extensive public transport networks in the world, with more than 9 million trips made every day by bus, tram, Tube, train and river boat. Use of the public transport system has increased by 65 per cent since 2000, largely because of enhanced services and an improved customer experience. An easy to use and accessible public transport system is an essential part of the Healthy Streets Approach as it gives people alternatives to car use for journeys that are not possible on foot or by cycle. By providing the most efficient and affordable option for journeys that are either impractical or too long to walk or cycle, public transport has helped to reduce Londoners’ dependency on cars during the past 15 years and this trend must continue. VERSION FOR PUBLICATION A GOOD PUBLIC TRANSPORT EXPERIENCE 131 401 As it grows, the city requires the public This chapter sets out the importance of The whole journey ‘By 2041, the transport capacity to reduce crowding a whole journey approach, where public A good public transport experience and support increasing numbers of transport improvements are an integral means catering for the whole journey, public transport people travelling more actively, efficiently part of delivering the Healthy Streets with all its stages, from its planning to and sustainably. Figure 18 shows that Approach. The chapter then explains the return home. All public transport system will need by 2041 the public transport system will in four sections how London’s public journeys start or finish on foot or by need to cater for up to around 15 million transport services can be improved for cycle, and half of all walking in London is trips every day.
    [Show full text]
  • HS2AA Capacity Report
    HS2AA RAIL CAPACITY BRIEFING Why HS2 is not needed to solve capacity issues on UK’s railways 9TH September 2013 For more information please contact: Richard Houghton T: 07803 178 037 E: [email protected] HS2AA Rail Capacity Briefing Contents Page 1. Summary 3 2. Introduction 4 3. Capacity arguments for HS2 fundamentally flawed 4 4. Future Demand 5 5. Scope to Upgrade WCML 6 6. Euston commuter capacity 7 7. Commuter capacity in Birmingham, Manchester and Leeds 8 8. Freight Capacity 8 9. Disruption 8 10. Capacity on other routes 9 Page 2 of 9 HS2AA Rail Capacity Briefing 1. Summary • WCML will not be full by the mid 2020. Network Rail figures shows that, expect for HS1, it is the least crowded main line into and out of London • Future demand on WCML will only come from growth in total transport market as switch from road and air has already happened post upgrade • Nationally number of rail journeys fell in the first quarter of 2013 • Commuter capacity issues into Euston can be solved immediately at no cost by allowing commuters to use Virgin trains • Commuter capacity in Birmingham, Manchester and Leeds will only gain two more trains, on just one route, into each city • HS2 will not provide additional capacity for freight • Disruption caused by 51 alternative would not be comparable with upgrade of WCML • HS2 delivers no benefits to ECML and MML until 2033 at the earliest Page 3 of 9 HS2AA Rail Capacity Briefing 2. Introduction The West Coast Main Line is the least crowded main line to London, and, unlike many other routes, its capacity can be significantly increased by lengthening and reconfiguring the trains, at a fraction of the cost of HS2.
    [Show full text]
  • Signal Box Register Series
    Signal Box Registers Publication schedule and current state of play as at 10th July 2019 Item Publication dateStatus 1. Great Western PB: 22 December 2007 Out of Print HB: 28 December 2007 Out of Print 1. Great Western PB: 10 May 2011 Published (Revised Edition) HB: 24 May 2011 Published 2. Midland Railway latest draft is version E22 dated Substantially complete. 18th September 2017 Publication expected 2020-2021 3. LNER (Southern Area) PB: 29 May 2012 Published. HB: 6 Nov 2012 Published. 4. Southern Railway PB & HB: 23 April 2009 Published 5. LNWR (includes NSR, Sources include NSR (1998), No work started yet. MCR, FR and L&Y) LNWR (240-599), L&Y (1999). 6. Scotland PB: 31 Oct 2012 Published. HB: 7 Nov 2012 Published. 7. North Eastern Region Work in hand (includes H&B) 8. London Transport PB: 12 Jul 2019 Published. HB: 26 Jul 2019 Published. 9. Ireland PB & HB: 3 August 2015 Published CD-ROM CD: 1 January 2008 Includes Volume 1 CDROM updates #1: 2 February 2008 Corr. Sht 1 & updated vol. 1 GW. #2: 16 September 2008 Corr. Sht 2 & updated vol. 1 GW. #3: 23 April 2009 Plus Volume 4 Southern Railway #4: 24 May 2011 Plus corr. sheet 3 & the GW register (revised edition) #5: 21 June 2012 As above plus correction sheet 4 and volume 3 LNER (Southern) #6: 15 Nov 2012 (DVD-ROM) As above plus correction sheet 5 and volume 6 Scotland #7: 25 Jul 2013 (DVD-ROM) As above plus correction sheet 6 #8: 31 May 2014 (DVD-ROM) As above plus correction sheet 7 #9: 3 Aug 2015 (DVD-ROM) As above plus correction sheet 8 #9: 3 Aug 2015 (CD-ROM) Volume 9 Ireland & Isle of Man #10: 21 Nov 2015 (DVD-ROM) As above plus correction sheet 9 #11: 10 Jul 2019 (DVD-ROM) As above plus correction sheet 10 Volume 8 London Transport Correction sheets 1: 16 January 2008 Amended vol.
    [Show full text]
  • Britain's Rail Delivery Group, Comprising the Chief Executives of the Rail Owning Groups, Freight Operators and Network Rail T
    Written evidence from the Rail Delivery Group (ROR 01) 1. This is the response of the Rail Delivery Group (RDG) to the Transport Select Committee’s call for evidence on the reform of the railways. 2. The RDG welcomes the Government’s support for the RDG contained in the Command Paper ‘Reforming our Railways: Putting the Customer First’, which was published today. The Paper calls on the Rail Delivery Group to provide leadership to the industry and to respond to the Government’s strategic challenges. The Command Paper lays out the Government’s vision for an expanding and efficient railway that meets the needs of passengers, freight users and taxpayers. The Government sees the Rail Delivery Group leading the industry in driving up efficiency and demand for the railway. This is a challenge that the Group accepts. 3. The Command Paper calls on the Rail Delivery Group to lead the rail industry in working together to deliver a more efficient, more affordable railway. The Rail Delivery Group is pleased that the Government has recognised that the Group is taking and shaping the industry’s agenda for a sustained programme of improved management and running of the rail network. 4. The Command Paper lists the six priority areas being addressed by the Group • Asset, programme and supply chain management; • Contractual and regulatory reform; • Technology, innovation and working practices; • Train utilisation; • A whole-system approach; and • Industry planning 5. The Rail Delivery Group was created to unlock efficiencies that will improve Britain’s railways. In its first nine months the Group has identified opportunities for a range of savings, for example in asset management through earlier involvement of the operators in planning work on the network.
    [Show full text]