Stratford Additional Platforms Summary of Route Study And
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Our Counties Connected a Rail Prospectus for East Anglia Our Counties Connected a Rail Prospectus for East Anglia
Our Counties Connected A rail prospectus for East Anglia Our Counties Connected A rail prospectus for East Anglia Contents Foreword 3 Looking Ahead 5 Priorities in Detail • Great Eastern Main Line 6 • West Anglia Main Line 6 • Great Northern Route 7 • Essex Thameside 8 • Branch Lines 8 • Freight 9 A five county alliance • Norfolk 10 • Suffolk 11 • Essex 11 • Cambridgeshire 12 • Hertfordshire 13 • Connecting East Anglia 14 Our counties connected 15 Foreword Our vision is to release the industry, entrepreneurship and talent investment in rail connectivity and the introduction of the Essex of our region through a modern, customer-focused and efficient Thameside service has transformed ‘the misery line’ into the most railway system. reliable in the country, where passenger numbers have increased by 26% between 2005 and 2011. With focussed infrastructure We have the skills and enterprise to be an Eastern Economic and rolling stock investment to develop a high-quality service, Powerhouse. Our growing economy is built on the successes of East Anglia can deliver so much more. innovative and dynamic businesses, education institutions that are world-leading and internationally connected airports and We want to create a rail network that sets the standard for container ports. what others can achieve elsewhere. We want to attract new businesses, draw in millions of visitors and make the case for The railways are integral to our region’s economy - carrying more investment. To do this we need a modern, customer- almost 160 million passengers during 2012-2013, an increase focused and efficient railway system. This prospectus sets out of 4% on the previous year. -
London Guide Welcome to London
Visitor information Welcome to London Your guide to getting around central London on public transport and making the most of your visit. tfl.gov.uk/visitinglondon Tube and central London bus maps inside #LondonIsOpen Welcome to London Paying for your travel Public transport is the best way to get There are different ways to pay for your around London and discover all that the travel. For most people, pay as you go - city has to offer. This guide will help you paying for the trips you make - with a plan how to get around the Capital on contactless payment card, an Oyster card or public transport. a Visitor Oyster card, is the best option as it If you have just arrived at an airport and are offers value, flexibility and convenience. looking for ways to get to central London, go to page 11 in this guide. Getting around London London’s transport system is iconic. With its world famous Underground (Tube) and iconic red buses, travelling around the Capital is an experience in itself. But London is much more than just the Tube or the bus; our vast network of transport services includes: Contactless payment cards If your credit, debit, charge card or wearable device has the contactless symbol above you can use it for pay as you go travel on London’s public transport. Android Pay and Apple Pay are also accepted. Benefits of contactless • It’s quick and easy – there’s no need to queue to buy a ticket • It offers great value – pay as you go with contactless is better value than buying a single ticket and you can benefit from both Night Tube daily and weekly capping (see page 5) • 14 million people have used contactless Night Tube services run on the to travel in London – including customers Jubilee, Victoria and most of from over 90 countries the Central and Northern lines all night on Fridays and Saturdays. -
Services Between Enfield Lock and Tottenham Hale
Crossrail 2 factsheet: Services between Enfield Lock and Tottenham Hale New Crossrail 2 services are proposed to serve Tottenham Hale, Northumberland Park, Angel Road, Ponders End, Brimsdown and Enfield Lock, with between 10 and 12 trains per hour in each direction operating directly to, and across, central London. What is Crossrail 2? Why do we need Crossrail 2? Crossrail 2 is a proposed new railway serving London and On the West Anglia Main Line, local stopping services and the wider South East that could be open by 2030. It would faster services from Cambridge and Stansted Airport all connect the existing National Rail networks in Surrey and compete for space on the line. This limits the number of Hertfordshire with trains running through a new tunnel trains that can call at local stations, and extends journey from Wimbledon to Tottenham Hale and New Southgate. times to and from the area. Crossrail 2 will connect directly with National Rail, Liverpool Street and Stratford stations also currently face London Underground, London Overground, Crossrail 1, severe capacity constraints. It is forecast that by 2043 High Speed 1 international and domestic and High Speed 2 demand for rail travel on this line will have increased by 39%. services, meaning passengers will be one change away There is currently no spare capacity for additional services. from over 800 destinations nationwide. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce journey times for longer distance Crossrail 2 in this area services, and would enable us to run more local services to central London. -
Network Rail Response with Appendices
Defendant’s Response to Sole Reference Ref: TTP1546 1 of 9 1 DETAILS OF PARTIES 1.1 The names and addresses of the parties to the reference are as follows:- (a) Freightliner Limited whose Registered Office is at 3rd Floor, 90 Whitfield Street, London W1T 4EZ (“Freightliner”) ("the Claimant"); and (b) Network Rail Infrastructure Limited whose Registered Office is at 1 Eversholt Street, London NW1 2DN ("Network Rail") ("the Defendant"). 1.2 Other Train and Freight Operating Companies that could be affected by the outcome of this dispute: (a) Greater Anglia (Abellio East Anglia Ltd), MTR Corporation (Crossrail) Ltd, Arriva Rail London Ltd, GB Railfreight Ltd, DB Cargo (UK) Ltd, c2c (Trenitalia c2c Ltd) 2 CONTENTS OF THIS DOCUMENT This Response to the Claimant’s Sole Reference includes:- (a) Confirmation, or qualification, that the subject matter of the dispute is as set out by the Claimant in its Sole Reference, in the form of a summary schedule cross-referenced to the issues raised by the Claimant in the Sole Reference, identifying which the Defendant agrees with and which it disagrees with. (b) A detailed explanation of the Defendant’s arguments in support of its position on those issues where it disagrees with the Claimant’s Sole Reference, including references to documents or contractual provisions not dealt with in the Claimant’s Sole Reference. (c) Any further related issues not raised by the Claimant but which the Defendant considers fall to be determined as part of the dispute; (d) The decisions of principle sought from the Panel in respect of (i) legal entitlement, and (ii) remedies; (e) Appendices and other supporting material. -
Submissions to the Call for Evidence from Organisations
Submissions to the call for evidence from organisations Ref Organisation RD - 1 Abbey Flyer Users Group (ABFLY) RD - 2 ASLEF RD - 3 C2c RD - 4 Chiltern Railways RD - 5 Clapham Transport Users Group RD - 6 London Borough of Ealing RD - 7 East Surrey Transport Committee RD – 8a East Sussex RD – 8b East Sussex Appendix RD - 9 London Borough of Enfield RD - 10 England’s Economic Heartland RD – 11a Enterprise M3 LEP RD – 11b Enterprise M3 LEP RD - 12 First Great Western RD – 13a Govia Thameslink Railway RD – 13b Govia Thameslink Railway (second submission) RD - 14 Hertfordshire County Council RD - 15 Institute for Public Policy Research RD - 16 Kent County Council RD - 17 London Councils RD - 18 London Travelwatch RD – 19a Mayor and TfL RD – 19b Mayor and TfL RD - 20 Mill Hill Neighbourhood Forum RD - 21 Network Rail RD – 22a Passenger Transport Executive Group (PTEG) RD – 22b Passenger Transport Executive Group (PTEG) – Annex RD - 23 London Borough of Redbridge RD - 24 Reigate, Redhill and District Rail Users Association RD - 25 RMT RD - 26 Sevenoaks Rail Travellers Association RD - 27 South London Partnership RD - 28 Southeastern RD - 29 Surrey County Council RD - 30 The Railway Consultancy RD - 31 Tonbridge Line Commuters RD - 32 Transport Focus RD - 33 West Midlands ITA RD – 34a West Sussex County Council RD – 34b West Sussex County Council Appendix RD - 1 Dear Mr Berry In responding to your consultation exercise at https://www.london.gov.uk/mayor-assembly/london- assembly/investigations/how-would-you-run-your-own-railway, I must firstly apologise for slightly missing the 1st July deadline, but nonetheless I hope that these views can still be taken into consideration by the Transport Committee. -
Chapter Four – a Good Public Transport Experience
A GOOD PUBLIC TRANSPORT EXPERIENCE 129 Chapter four – A good public transport experience London has one of the most extensive public transport networks in the world, with more than 9 million trips made every day by bus, tram, Tube, train and river boat. Use of the public transport system has increased by 65 per cent since 2000, largely because of enhanced services and an improved customer experience. An easy to use and accessible public transport system is an essential part of the Healthy Streets Approach as it gives people alternatives to car use for journeys that are not possible on foot or by cycle. By providing the most efficient and affordable option for journeys that are either impractical or too long to walk or cycle, public transport has helped to reduce Londoners’ dependency on cars during the past 15 years and this trend must continue. VERSION FOR PUBLICATION A GOOD PUBLIC TRANSPORT EXPERIENCE 131 401 As it grows, the city requires the public This chapter sets out the importance of The whole journey ‘By 2041, the transport capacity to reduce crowding a whole journey approach, where public A good public transport experience and support increasing numbers of transport improvements are an integral means catering for the whole journey, public transport people travelling more actively, efficiently part of delivering the Healthy Streets with all its stages, from its planning to and sustainably. Figure 18 shows that Approach. The chapter then explains the return home. All public transport system will need by 2041 the public transport system will in four sections how London’s public journeys start or finish on foot or by need to cater for up to around 15 million transport services can be improved for cycle, and half of all walking in London is trips every day. -
Route Plan 5 – West Anglia
This Route Plan is part of a set. 2009 Plans Route Route Plans 2009 To view or download the others Route 5 visit www.networkrail.co.uk West Anglia Note Other documents in the Delivery Plan This Route Plan forms part of the Control Period 4 5 Route (CP4) Delivery Plan and supersedes the version can be found on the Network Rail website published in April 2008. www.networkrail.co.uk West Key to route diagrams Anglia 03 KEY Junction Station name Station Station 01 STATION Station name name name name 02 Junction KEY STATION Junction name A A name 1 B 04 KEY STATION KEY STATION Capacity and operational constraints Track descriptions A Location: capacity or operational constraint The colour of the line denotes the route classification Issues on the route 1 Primary Location: issue on the route London and South East commuter Secondary Key planned projects A Rural Location: planned project on the route Freight only Strategic route sections 01 The line shading indicates strategic route sections Listed in the appendix of the route plan which are numbered on the map The width of the line denotes the number of tracks Other symbols Multiple track Key station location Double track KEY STATION Key station on this route Single track KEY STATION Key station on another route Connecting local Other station location Other lines are shown as follows: Station name Other station on this route Line on other route Junction name Junction / other landmark Non Network Rail infrastructure Non operational line communities GRIP stages 1 Output definition 2 Pre-feasibility 3 Option selection 4 Single option selection 5 Detailed design 6 Construction, test and commission 7 Scheme hand back 8 Project close out Cover printed on box board which is both FSC and TCF. -
UK Jubilee Line Extension (JLE)
UK Jubilee Line Extension (JLE) - 1 - This report was compiled by the OMEGA Centre, University College London. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. - 2 - CONTENTS A INTRODUCTION Type of Project Location Major Associated Developments Current Status B BACKGROUND TO PROJECT Principal Project Objectives Key Enabling Mechanisms and Timeline of Key Decisions Principal Organisations Involved • Central Government Bodies/Departments • Local Government • London Underground Limited • Olympia & York • The coordinating group • Contractors Planning and Environmental Regime • The JLE Planning Regime • The Environmental Statement • Project Environmental Policy & the Environmental Management System (EMS) • Archaeological Impact Assessment • Public Consultation • Ecological Mitigation • Regeneration Land Acquisition C PRINCIPAL PROJECT CHARACTERISTICS Route Description Main Termini and Intermediate Stations • Westminster -
Lea Valley Rail Report
LEA VALLEY RAIL BETTER ACCESS TO JOBS AND HOMES All you want to know about the upgrades of the line! LEA VALLEY RAIL — BETTER ACCESS TO JOBS AND HOMES This report shows how much more the existing railways can achieve and contribute to the Lea Valley’s future economic, social and environmental goals. The Lea Valley requires better connectivity, to help the creation of new jobs and homes and to enable the area’s economic structure to strengthen and grow, with catchments accessible by public transport. This requires smart thinking, better use of existing infrastructure and a few new elements. The Chingford Line Users Association (CLUA) and Railfuture have looked particularly at the Waltham Forest catchments. Waltham Forest is the ‘borough across the Valley’ and needs better integration into the main Lea Valley transport corridors. JRC was commissioned in March 2012 by CLUA and Railfuture (who funded the report) to write an appraisal of three significant rail projects in the Lea Valley, and to set out their merits. This report responds to that commission. It describes each scheme sequentially, the rationales and merits of the proposals, present status, service plans, foreseeable demand and costs, funding matters and next steps. The report’s structure is: Part 1: The Lea Valley’s economic, planning and transport context Part 2: Reopening Lea Bridge station Part 3: Better Lea Valley rail services Part 4: Chingford Line access to Stratford. Practitioners and campaigners will appreciate that securing even small changes in railway services and infrastructure can be a lengthy challenge that needs the best arguments and clarity about the project purpose, and to set out these points to stakeholders, funders and decision-makers. -
South East Strategic Leaders and South East England Councils
South East Strategic Leaders and South East England Councils (Examination in Public IDs 2448 and 3133) London Plan Examination in Public – Matter M76 Transport schemes and development M76 - (a) Are all of the transport schemes set out in Table 10.1 necessary and adequate to deliver the development proposed in the Plan? (b) In the context of the identified funding gap of £3.1 billion per year, is there a reasonable prospect that the transport schemes set out in Table 10.1, and any other essential strategic transport schemes, will be delivered in a timely fashion in relation to the timing of development proposed in the Plan? SESL/SEEC comments 1. We focus our response on M76 part (a), given the importance of infrastructure to underpin sustainable development in both London and the wider South East, the need to tackle existing infrastructure deficits, and the vital interdependencies as explained in our papers on other matters such as M16 re the wider South East and beyond. 2. SESL/SEEC welcome the inclusion, in Table 10.1 and Figure 2.15, of schemes that are in, and should offer better transport for, parts of the wider South East as well as bringing benefits to communities in London. The principle of schemes outside London offering benefits for the wider South East’s local economies is important, to avoid simply opening up corridors that encourage further commuting into the capital. In Table 10.1 these include: Brighton Mainline Upgrade (higher frequencies) Crossrail 2 (including West Anglia Main Line 4-tracking) Heathrow Airport Southern Access Heathrow Airport Western Access National Rail freight upgrades, especially to enable freight to bypass London Thameslink Programme. -
The Transport Committee's Review of the North London Railway March
Transport Committee London’s Forgotten Railway The Transport Committee’s review of the North London Railway March 2006 Transport Committee London’s Forgotten Railway The Transport Committee’s review of the North London Railway March 2006 copyright Greater London Authority March 2006 Published by Greater London Authority City Hall The Queen’s Walk More London London SE1 2AA www.london.gov.uk enquiries 020 7983 4100 minicom 020 7983 4458 ISBN 1 85261 852 3 This publication is printed on recycled paper The Transport Committee Roger Evans - Chairman (Conservative) Geoff Pope - Deputy Chair (Liberal Democrat) John Biggs - Labour Angie Bray - Conservative Elizabeth Howlett - Conservative Peter Hulme Cross - One London Darren Johnson - Green Murad Qureshi - Labour Graham Tope - Liberal Democrat The Transport Committee’s general terms of reference are to examine and report on transport matters of importance to Greater London and the transport strategies, policies and actions of the Mayor, Transport for London, and the other Functional Bodies where appropriate. In particular, the Transport Committee is also required to examine and report to the Assembly from time to time on the Mayor’s Transport Strategy, in particular its implementation and revision. The terms of reference as agreed by the Transport Committee on 20th October 2005 for this scrutiny were: • To survey the current state of the North London Line and the Gospel Oak- Barking line in terms of service frequency, reliability, rolling stock, safety and amenity on stations and station approaches. • To gather and consider the views of Boroughs, business communities, rail passengers, campaign groups and other stakeholders on how they would wish these rail lines to be upgraded and improved. -
Studio Wayne Mcgregor General Information
Studio Wayne McGregor General Information Studio Wayne McGregor is located at Broadcast Centre, Here East, Queen Elizabeth Olympic Park, London E15 2GW. The Broadcast Centre is the large black and orange glass building. Enter via Atrium B (with a large B outside). Studio Wayne McGregor is on Level 2. Phone: 020 7278 6015 [email protected] waynemcgregor.com Information about the space Directions and transport Map of Here East Accommodation, amenities and catering About Studio Wayne McGregor About Here East Studio Wayne McGregor vision and FreeSpace programme Studio Wayne McGregor is the first arts organisation to have its home at Here East on Queen Elizabeth Olympic Park. Studio Wayne McGregor is home to McGregor, his company and collaborators, and an array of diverse artists who will take residence in the space through the FreeSpace programme. Our FreeSpace programme provides artists access to our world-class studios regardless of funding or stage of development. Information about the space Studio Wayne McGregor is a smoke-free environment. Ground floor - Studio 3, 16m x 16m x 5.6m / 3.6m to perimeter. - Guest dressing room and accessible toilets and shower (accessed through lobby) First floor - Dressing rooms for Company Wayne McGregor, treatment room, accessible showers and toilets - Archive Second floor - Studio 1, 18m x 16m x 5.6m / 3.6m to beams. (Same size as Sadler’s Wells stage) - Studio 2, (above dressing rooms), 7m x 13m x 4m - Office - Accessible toilet Gantry - External gantry terrace Accessibility - Accessible toilets and showers located on ground floor (through lobby) and first floor via elevator. Additional accessible toilet located on second floor next to Studio 2.