Annual Report of the Division of Metropolitan Planning
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Hyde Park Bulletin
The Hyde Park Bulletin Volume 17, Issue 41 October 11, 2018 HPNA digs deeper into Neponset Greenway talks development issues bike paths in Hyde Park Members of the Hyde Park Neighborhood Association met and discussed the Railyard 5 Project, shown above, among other projects. COURTESY PHOTO Mary Ellen Gambon about 20-something units,” Staff Reporter HPNA president John Raymond said. “They tried to About 25 members of the confuse us by lowering the Hyde Park Neighborhood As- square footage by about 7,500 The Neponset River Greenway Council met last Wednesday and discussed its progress in Hyde Park. sociation attended the meeting square feet. But there wasn’t a PHOTO BY JEFF SULLIVAN on Thursday, October 4 to dis- big reduction in units.” cuss new development issues – The developer, Jordan D. one in the near future and the Jeff Sullivan bike lane on the streets and a na- project, which connected the Warshaw, of the Noannet ture bike path through protected Martini Shell to Mattapan be- other on the radar. Staff Reporter Group, eliminated 29 units areas of the Massachusetts De- tween the Truman Parkway and The first focus was a recap from the final plan. There will The Neponset River partment of Recreation and Con- the Neponset River. It opened in of the meeting on October 1 on be 364 for-rent apartments and Greenway Council (NRGC) met servation (DCR). Currently, there 2012 and was completed in the Sprague Street development 128 for-sale condos, according last week and discussed several are ways to bike the path, but some 2015, spanning to the Neponset project at 36-70 Sprague Street to the proposal. -
Changes to Transit Service in the MBTA District 1964-Present
Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964. -
270 Baker Street
Project Notification Form Submitted Pursuant to Article 80 of the Boston Zoning Code 270 BAKER STREET WEST ROXBURY, MASSACHUSETTS AUGUST 26, 2016 Submitted to: BOSTON REDEVELOPMENT AUTHORITY One City Hall Square Boston, MA 02201 Submitted by: 270 BAKER, LLC Prepared by: NORTHEAST STRATEGY AND COMMUNICATIONS GROUP Thomas Maistros, Jr., RA In Association with: NESHAMKIN FRENCH ARCHITECTS, INC. MCCLURG TRAFFIC . TABLE OF CONTENTS PAGE 1.0 PROJECT SUMMARY 1-1 1.1 Project Team 1-1 1.2 Project Description 1-2 1.3 Consistency with Zoning 1-6 1.4 Legal Information 1-7 1.5 Public Agencies 1-7 1.6 Schedule 1-8 1.7 Existing Photograph 1-9 2.0 ASSESSMENT OF DEVELOPMENT REVIEW COMPONENTS 2-1 2.1 Project Design 2-1 2.2 Urban Design 2-2 2.3 Design Exhibits 2-4 2.4 Historic Resources 2-14 2.5 Sustainable Design 2-19 2.6 Transportation 2-26 2.7 Environmental Protection 2-54 2.7.1 Wind 2-54 2.7.2 Shadow 2-54 2.7.3 Daylight 2-59 2.7.4 Solar Glare 2-62 2.7.5 Air Quality 2-62 2.7.6 Water Quality/Stormwater 2-63 2.7.7 Storm Water Management Standards 2-63 2.7.8 Flood Hazard Zones/Wetlands 2-63 2.7.9 Geotechnical/Groundwater 2-63 2.7.10 Solid and Hazardous Wastes 2-64 2.7.11 Noise/Vibration 2-65 2.7.12 Construction Impacts 2-66 2.7.13 Rodent Control 2-66 2.7.14 Wildlife Habitat 2.67 2.8 Infrastructure System 2-67 2.8.1 Sewage System 2-87 2.8.2 Water Supply System 3-68 2.8.3 Stormwater System 2-69 2.8.4 Energy Needs 2-72 3.0 COORDINATION WITH OTHER GOVERNMENTAL AGENCIES 3-1 4.0 PROJECT'S CERTIFICATION 4-1 APPENDICES Appendix A - Climate Change Checklist Appendix B - Accessibility Checklist Appendix C - Discclosure Statement 2016/270 Baker/Expanded PNF Page ii Table of Contents 1.0 PROJECT SUMMARY 1.1 Project Team Project Name: 270 Baker Street Location: The Project site is located at 270 Baker Street in the West Roxbury Neighborhood of the City of Boston. -
Following Boston's Mysterious Stony Brook
Following Boston's Mysterious Stony Brook Saturday, April 15, 2017 at 9:30 am at Adams Park in Roslindale Square 10:00 am at gate on Bellevue Hill Rd. in West Roxbury Starting from the city's highest point, Bellevue Hill, the stream known as Stony Brook goes through Stony Brook Reservation, Hyde Park, Roslindale, Jamaica Plain (including its Stonybrook neighborhood), Mission Hill, Roxbury, and the Fenway on its way to the Charles River. But it's almost all underground! Join Jessica Mink, whose house abuts the creek's conduit, on this bike ride to see how close we can come to its route. The group will return following the Muddy River and Bussey Brook. Look for pictures at http://www.masspaths.net/rides/StonyBrook2017.html Miles Action Miles Action 0.0 Start at Adams Park in Roslindale 7.7 Left on Bourne St. 0.0 Left on South St. 7.7 Left on Catherine St. 0.1 Straight under railroad tracks 7.8 Right on Wachusett St. 0.2 Left on Conway St. 8.0 Left on Southbourne St. 0.2 Straight across Robert St. 8.1 Right on Hyde Park Ave. 0.3 Straight on park path 8.7 Left on Ukraine Way 0.4 Left through tunnel under tracks 8.7 Right on Washington St. 0.5 Straight on Metcalf Ave. across Belgrade Ave. 9.0 Right on sidewalk after crossing the Arborway 0.5 Left on Haslet St. 9.0 Left on Southwest Corridor bike path 0.6 Right on Roslindale Ave. 10.6 Cross Centre St. -
Annual Report of the Metropolitan District Commission
Public Document No. 48 W$t Commontoealtfj of iWa&sacfmsfetta ANNUAL REPORT OF THE Metropolitan District Commission For the Year 1935 Publication or this Document Approved by the Commission on Administration and Finance lm-5-36. No. 7789 CONTENTS PAGE I. Organization and Administration . Commission, Officers and Employees . II. General Financial Statement .... III. Parks Division—Construction Wellington Bridge Nonantum Road Chickatawbut Road Havey Beach and Bathhouse Garage Nahant Beach Playground .... Reconstruction of Parkways and Boulevards Bridge Repairs Ice Breaking in Charles River Lower Basin Traffic Control Signals IV. Maintenance of Parks and Reservations Revere Beach Division .... Middlesex Fells Division Charles River Lower Basin Division . Bunker Hill Monument .... Charles River Upper Division Riverside Recreation Grounds . Blue Hills Division Nantasket Beach Reservation Miscellaneous Bath Houses Band Concerts Civilian Conservation Corps Federal Emergency Relief Activities . Public Works Administration Cooperation with the Municipalities . Snow Removal V. Special Investigations VI. Police Department VII. Metropolitan Water District and Works Construction Northern High Service Pipe Lines . Reinforcement of Low Service Pipe Lines Improvements for Belmont, Watertown and Arlington Maintenance Precipitation and Yield of Watersheds Storage Reservoirs .... Wachusett Reservoir . Sudbury Reservoir Framingham Reservoir, No. 3 Ashland, Hopkinton and Whitehall Reservoirs and South Sud- bury Pipe Lines and Pumping Station Framingham Reservoirs Nos. 1 and 2 and Farm Pond Lake Cochituate . Aqueducts Protection of the Water Supply Clinton Sewage Disposal Works Forestry Hydroelectric Service Wachusett Station . Sudbury Station Distribution Pumping Station Distribution Reservoirs . Distribution Pipe Lines . T) 11 P.D. 48 PAGE Consumption of Water . 30 Water from Metropolitan Water Works Sources used Outside of the Metropolitan Water District VIII. -
Hammond Pond Parkway Reconstruction 25% Public Meeting Meeting Logistics
Hammond Pond Parkway Reconstruction 25% Public Meeting Meeting Logistics • Two ways to ask questions during the meeting • Raise your hand • Use Q&A feature • You will have the opportunity to submit comments over the course of the next four weeks at: • DCR Public Comments https://www.mass.gov/forms/dcr-public-comments • Please note that this meeting will be recorded; the recording will be a public record Commonwealth of Massachusetts Governor Charles D. Baker Lieutenant Governor Karyn E. Polito Energy and Environmental Secretary Kathleen A. Theoharides Department of Conservation and Recreation Commissioner Jim Montgomery Project Team Department of Conservation and Recreation Project Proponent – Responsible for design process & construction funding City of Newton Project Stakeholder – Responsible for coordination with public outreach BSC Group Design Consultant – Roadway design, landscape architecture and permitting Project Location PROJECT LOCATION Existing Parkway • Existing roadway was built in 1934 • The roadway consists of two lanes in each direction. • Overall length is approximately one mile • Roadway crosses over D Branch of the MBTA’s Green Line on a single span bridge • Three signalized intersections within project limits • Coordination with MassDOT required for modifications to bridge and minor improvements at Route 9 • Limited sidewalks and bicycle accommodation Project Goals • Redesign Hammond Pond Parkway as a “complete street” gem in the DCR parkway system • Provide safe bicycle and pedestrian accommodation along parkway -
Report of the Board of Metropolitan Park Commissioners (1898)
A Digitized by the Internet Archive in 2013 http://archive.org/details/reportofboardofm00mass_4 PUBLIC DOCUMENT No. 48. REPORT ~ Board of Metropolitan Park Commissioners. J^ANUARY, 1899. BOSTON : W RIGHT & POTTER PRINTING CO., STATE PRINTERS, 18 Post Office Square. 1899. A CONTENTS. PAGE Report of the Commissioners, 5 Report of the Secretary, 18 Report of the Landscape Architects, 47 Report of the Engineer, 64 Financial Statement, . 86 Analysis of Payments, 99 Claims (chapter 366 of the Acts of 1898), 118 KEPOKT. The Metropolitan Park Commission presents herewith its sixth annual report. At the presentation of its last report the Board was preparing to continue the acquirement of the banks of Charles River, and was engaged in the investigation of avail- able shore frontages and of certain proposed boulevards. Towards the close of its last session the Legislature made an appropriation of $1,000,000 as an addition to the Metropolitan Parks Loan, but further takings were de- layed until the uncertainties of war were clearly passed. Acquirements of land and restrictions have been made or provided for however along Charles River as far as Hemlock Gorge, so that the banks for 19 miles, except where occu- pied by great manufacturing concerns, are in the control either of this Board or of some other public or quasi public body. A noble gift of about 700 acres of woods and beau- tiful intervales south of Blue Hills and almost surroundingr Ponkapog Pond has been accepted under the will of the late ' Henry L. Pierce. A field in Cambridge at the rear of « Elm- wood," bought as a memorial to James Russell Lowell, has been transferred to the care of this Board, one-third of the purchase price having been paid by the Commonwealth and the remaining two-thirds by popular subscription, and will be available if desired as part of a parkway from Charles River to Fresh Pond. -
Weight and Height Restrictions That Impact Truck Travel
ON REG ST IO O N B BOSTON REGION METROPOLITAN PLANNING ORGANIZATION M Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair E N T R O I Karl H. Quackenbush, Executive Director, MPO Staff O T P A O IZ LMPOI N TA A N G P OR LANNING TECHNICAL MEMORANDUM DATE: December 21, 2017 TO: Boston Region Metropolitan Planning Organization FROM: William S. Kuttner RE: Weight and Height Restrictions that Impact Truck Travel 1 INTRODUCTION This memorandum presents information about bridges in the Boston Region Metropolitan Planning Organization (MPO) area that have signs restricting the weight or height of vehicles permitted to pass over or under them. MassDOT personnel monitor these weight and height restrictions, along with a bridge’s physical condition, or rating, and summarize them as inspection reports in MassDOT’s internal database. However, the physical condition or rating of bridges is not the direct concern of this study. The concern of this study is that truck restrictions cause trucks that are otherwise fully compliant with Massachusetts and Federal Highway Administration (FHWA) size guidelines to use more circuitous routes than necessary to reach their various commercial destinations. Forced circuitous truck travel increases expenses for freight carriers and customers, increases the total environmental impact for a given level of freight traffic, and increases the negative impacts on local residents and communities. This study characterizes the severity of height and weight restrictions on trucks in the MPO region. The information developed will be used to evaluate projects considered for inclusion in two MPO planning documents: the Long-Range Transportation Plan (LRTP) and the Transportation Improvement Program (TIP). -
Find It and Fix It Stormwater Program in the Charles and Mystic River Watersheds
FIND IT AND FIX IT STORMWATER PROGRAM IN THE CHARLES AND MYSTIC RIVER WATERSHEDS FINAL REPORT JUNE 2005 - AUGUST 2008 October 29, 2008 SUBMITTED TO: MASSACHUSETTS ENVIRONMENTAL TRUST EXECUTIVE OFFICE OF ENERGY AND ENVIRONMENTAL AFFAIRS OFFICE OF GRANTS AND TECHNICAL ASSISTANCE 100 CAMBRIDGE STREET, 9TH FLOOR BOSTON, MA 02114 SUBMITTED BY: CHARLES RIVER WATERSHED ASSOCIATION MYSTIC RIVER WATERSHED ASSOCIATION 190 PARK ROAD 20 ACADEMY STREET, SUITE 203 WESTON, MA 02493 ARLINGTON, MA 02476 Table of Contents List of Figures................................................................................................................................. 3 List of Tables .................................................................................................................................. 5 Introduction..................................................................................................................................... 6 Organization of Report ................................................................................................................... 8 1.0 PROGRAM BACKGROUND............................................................................................ 9 1.1 Charles River.................................................................................................................. 9 1.1.1 Program Study Area................................................................................................ 9 1.1.2 Water Quality Issues............................................................................................ -
Ffys 2020-24 TIP Massdot Project Comparison
FFYs 2020‐24 DRAFT TIP Programming (MassDOT Projects Only): Boston Region MPO Changes from FFYs 2019‐23 TIP 3/28/2019 2020 2021 2022 2023 2024 Current Proposed Current Proposed Current Proposed Current Proposed Proposed Earmark or Discretionary Grant 606501 ‐ Holbrook ‐ No Change Reconstruction of Union Street (Route 139), from Linfield Street to Centre Street/Water Street Bridge Program / Off‐System 608637 ‐ Maynard ‐ Bridge No Change 608255 ‐ [NEW] ‐ Stow ‐ Bridge TBD ‐ [NEW] ‐ Canton ‐ Bridge Replacement, M‐10‐006, Carrying Replacement, S‐29‐011, Box Mill Replacement, C‐02‐042, Revere Florida Road Over the Assabet Road Over Elizabeth Brook Court Over East Branch Neponset River River 608079 ‐ [MOVED FROM 2019] ‐ TBD ‐ [NEW] ‐ Hamilton ‐ Bridge Sharon ‐ Bridge Replacement, S‐ Replacement, Winthrop Street 09‐003 (40N), Moskwonikut Street Over Ipswich River Over AMTRAK/MBTA Bridge Program / On‐System (NHS) 605342 ‐ Stow ‐ Bridge No Change 604173 ‐ Boston ‐ Bridge Change in Cost Schedule 604173 ‐ Boston ‐ Bridge Change in Cost Schedule 606902 ‐ Boston ‐ Bridge No Change 608703 ‐ [NEW] ‐ Wilmington ‐ Replacement, S‐29‐001, (ST Replacement, B‐16‐016, North Replacement, B‐16‐016, North Reconstructure/Rehab, B‐16‐181, Bridge Replacement, W‐38‐029 62), Gleasondale Road Over the Washington Street Over the Washington Street Over the West Roxbury Parkway Over MBTA (2KV), ST 129 Lowell Street Over I‐ Assabet River Boston Inner Harbor Boston Inner Harbor 93 604173 ‐ Boston ‐ Bridge Cost Increase 605287 ‐ Chelsea ‐ Route 1 No Change 608614 ‐ Boston -
CHANGE of DATE Improvements to Hammond Pond Parkway in Newton Thursday, January 21, 2021 7:00Pm – 8:30Pm
Department of Conservation and Recreation Commonwealth of Massachusetts NOTICE: CHANGE OF DATE Improvements to Hammond Pond Parkway in Newton Thursday, January 21, 2021 7:00pm – 8:30pm Register here: https://zoom.us/webinar/register/WN_dWYruP09RVC1x3luBVMtyw At this public meeting, the DCR team for this project and its engineering design consultant, BSC Group, will present project objectives and gather public input on preliminary design to inform a pedestrian- and bike-friendly redesign of Hammond Pond Parkway in Newton, from Boylston Street (Route 9) to Beacon Street. To register, click on the appropriate link above or enter it into your browser, and you will be prompted to submit your name and email. After registering, you will receive a confirmation email containing information about joining the webinar. This information cannot be shared, the participation link is unique to you. If you need assistance when registering, please contact Jennifer Norwood at [email protected]. After the presentation, the public will be invited to ask questions and provide feedback on the proposed design, using Q&A functionality that will be available through the virtual participation platform. After the meeting, the presentation will be available for viewing at https://www.mass.gov/dcr/past-public-meetings. DCR encourages the public to share additional feedback, with a deadline for receipt of comments by DCR of Thursday, February 4, 2021. Comments may be submitted online at www.mass.gov/dcr/public-comment. Please note that the content of comments you submit to DCR, along with your name, town, and zip code, will be posted on DCR's website. -
Boston Water and Sewer Commission
Permit No. MAS010001 Page 1 of 20 AUTHORIZATION TO DISCHARGE UNER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of the federal Clean Water Act, as amended, 33 U. C. 1251 et seq ., and the Massachusetts Clean Waters Act, as amended, Mass. Gen. Laws. ch. 21, 26 the Boston Water and Sewer Commission is authorized to discharge from all of its new or existing separate storm sewers: 195 identified Separate Stor. Sewer Outfalls and associated receiving waters are Listed in Attachment A to receiving waters named: Belle Island Inlet, Boston Harbor, Boston Inner Harbor, Brook Far. Brook, Bussey Brook, Canterbury Brook, Chandler' s Pond, Charles River, Chelsea River, Cow Island Pond, Dorchester Bay, Fort Point Channel, Goldsmith Brook, Jamaica Pond, Little Mystic Channel, Mill Pond, Millers River, Mother Brook, Muddy River, Mystic River, Neponset River, Old Harbor, Patten' s Cove, Reserved Channel, Sprague Pond, Stony Brook, Turtle Pond and unnamed wetlands, brooks and streams. in accordance with effluent limitations, monitoring requirements and other conditions set forth herein. This permit shall become effective 30 days from date of signature. This permit and the authorization to discharge expire at midnight, five years from the effective date. This permit consists of 20 pages and Attachment A in Part I including monitoring requirements, etc., and 35 pages in Part II including General Conditions and Definitions. 4;1;ctor , D ' isi n '- f Office of Ecosystem Protection Watershed Management Enyironmental Protection Agency Department of Environmental Region I Protection Boston Commonwealth of Massachusetts , MA Boston, MA ). ). Page 2 of 20 Permit No. MASOIOOOl PART MUICIPAL SEPARTE STORM SEWER SYSTEM DISCHARGES THROUGH THE MUNICIPAL SEPARATE STORM SEWER SYSTEM AUTHORIZED UNER THIS PERMIT permit Area.