Ffys 2020-24 TIP Massdot Project Comparison

Total Page:16

File Type:pdf, Size:1020Kb

Ffys 2020-24 TIP Massdot Project Comparison FFYs 2020‐24 DRAFT TIP Programming (MassDOT Projects Only): Boston Region MPO Changes from FFYs 2019‐23 TIP 3/28/2019 2020 2021 2022 2023 2024 Current Proposed Current Proposed Current Proposed Current Proposed Proposed Earmark or Discretionary Grant 606501 ‐ Holbrook ‐ No Change Reconstruction of Union Street (Route 139), from Linfield Street to Centre Street/Water Street Bridge Program / Off‐System 608637 ‐ Maynard ‐ Bridge No Change 608255 ‐ [NEW] ‐ Stow ‐ Bridge TBD ‐ [NEW] ‐ Canton ‐ Bridge Replacement, M‐10‐006, Carrying Replacement, S‐29‐011, Box Mill Replacement, C‐02‐042, Revere Florida Road Over the Assabet Road Over Elizabeth Brook Court Over East Branch Neponset River River 608079 ‐ [MOVED FROM 2019] ‐ TBD ‐ [NEW] ‐ Hamilton ‐ Bridge Sharon ‐ Bridge Replacement, S‐ Replacement, Winthrop Street 09‐003 (40N), Moskwonikut Street Over Ipswich River Over AMTRAK/MBTA Bridge Program / On‐System (NHS) 605342 ‐ Stow ‐ Bridge No Change 604173 ‐ Boston ‐ Bridge Change in Cost Schedule 604173 ‐ Boston ‐ Bridge Change in Cost Schedule 606902 ‐ Boston ‐ Bridge No Change 608703 ‐ [NEW] ‐ Wilmington ‐ Replacement, S‐29‐001, (ST Replacement, B‐16‐016, North Replacement, B‐16‐016, North Reconstructure/Rehab, B‐16‐181, Bridge Replacement, W‐38‐029 62), Gleasondale Road Over the Washington Street Over the Washington Street Over the West Roxbury Parkway Over MBTA (2KV), ST 129 Lowell Street Over I‐ Assabet River Boston Inner Harbor Boston Inner Harbor 93 604173 ‐ Boston ‐ Bridge Cost Increase 605287 ‐ Chelsea ‐ Route 1 No Change 608614 ‐ Boston ‐ Bridge Cost Decrease 606728 ‐ Boston ‐ Bridge No Change Replacement, B‐16‐016, North Viaduct Rehabilitation (SB/NB) on Substructure Repairs, B‐16‐179, Replacement, B‐16‐365, Bowker Washington Street Over the C‐09‐007 & C‐09‐011 Austin Street Over I‐93 Ramps, Overpass Over Storrow Drive (EB) Boston Inner Harbor MBTA Commuter Rail and Orange Line 605287 ‐ Chelsea ‐ Route 1 No Change 604952 ‐ Lynn ‐ Saugus Bridge Cost Increase (FFYs 2019‐23 TIP 604952 ‐ Lynn ‐ Saugus Bridge Cost Increase (FFYs 2019‐23 TIP 604952 ‐ Lynn ‐ Saugus Bridge Cost Increase (FFYs 2019‐23 TIP Viaduct Rehabilitation (SB/NB) on Replacement , L‐18‐ Amendment 2) Replacement , L‐18‐ Amendment 2) Replacement , L‐18‐ Amendment 2) C‐09‐007 & C‐09‐011 016=S‐05‐008, Route 107 Over the 016=S‐05‐008, Route 107 Over the 016=S‐05‐008, Route 107 Over the Saugus River (AKA‐ Belden G. Bly Saugus River (AKA‐ Belden G. Bly Saugus River (AKA‐ Belden G. Bly Bridge) Bridge) Bridge) 604952 ‐ Lynn ‐ Saugus Bridge Cost Increase (FFYs 2019‐23 TIP 607327 ‐ Wilmington ‐ Bridge No Change Replacement , L‐18‐ Amendment 2) Replacement, W‐38‐002, Route 38 016=S‐05‐008, Route 107 Over the (Main Street) Over the B&M Saugus River (AKA‐ Belden G. Bly Railroad Bridge) Bridge Program / On‐System (non‐NHS) 608596 ‐ Essex ‐ Superstructure No Change 608929 ‐ Wilmington ‐ Bridge No Change 608197 ‐ Boston ‐ Superstructure No Change 608522 ‐ [NEW] ‐ Middleton ‐ Replacement, E‐11‐001 (2TV), Replacement, W‐38‐003, Butters Replacement, B‐16‐107, Canterbury Bridge Replacement, M‐20‐003, Route 133/Main Street Over Essex Row Over MBTA Street Over AMTRAK/MBTA Route 62 (Maple Street) Over River Ipswich River Bridge Program / Systematic Maintenance 608610 ‐ Newton ‐ Steel No Change 608866 ‐ Newton ‐ Weston ‐ Steel No Change 608609 ‐ Newton ‐ Westwood ‐ Steel No Change Superstructure Cleaning (Full Superstructure Cleaning (Full Superstructure Cleaning (Full Removal) and Painting of N‐12‐ Removal) and Painting of 3 Removal) and Painting of 2 Bridges: N‐ 055 Bridges: N‐12‐051, W‐29‐011 & W‐ 12‐056, W‐31‐006 29‐028 2020 2021 2022 2023 2024 Current Proposed Current Proposed Current Proposed Current Proposed Proposed Interstate Pavement 608208 ‐ Quincy, Milton, Boston ‐ Moved to 2021 608378 ‐ Danvers, Topsfield, Moved to Statewide Project List 608210 ‐ Foxborough, Plainville, Removed from TIP Interstate Maintenance and Boxford, Rowley ‐ Interstate Wrentham, Franklin ‐ Interstate Related Work on I‐93 Maintenance and Related Work Maintenance and Related Work on I‐95 on I‐495 608208 [MOVED FROM 2020] ‐ Quincy, Milton, Boston ‐ Interstate Maintenance and Related Work on I‐93 (cost increase) Non‐Interstate Pavement 608480 ‐ Foxborough, Walpole ‐ Moved to 2022 607477 ‐ Lynnfield, Peabody ‐ No Change 608817 ‐ Salem, Lynn ‐ No Change 608495 ‐ Concord, Lexington, Lincoln ‐ Moved to 2024 608495 [MOVED FROM 2024] ‐ Resurfacing and Related Work on Resurfacing and Related Work on Resurfacing and Related Work on Resurfacing and Related Work on Concord, Lexington, Lincoln ‐ Route 1 Route 1 Route 107 Route 2A Resurfacing and Related Work on Route 2A 608482 ‐ Cambridge, Somerville ‐ No Change 608467 [NEW]‐ Marlborough ‐ 608818 ‐ Danvers ‐ Resurfacing No Change 609102 ‐ Wenham ‐ Gloucester ‐ Moved to 2020 609402 [NEW] ‐ Concord ‐ Lincoln ‐ Resurfacing and Related Work on Resurfacing and Related Work on and Related Work on Route 114 Pavement Preservation and Related Lexington ‐ Resurfacing and Route 28 Route 20 Work on Route 128 Related Work on Route 2A 608484 ‐ Canton, Milton ‐ Moved to 2023 608498 ‐ Hingham, Weymouth, Moved to 2023 608484 [MOVED FROM 2020] ‐ 609399 [NEW] ‐ Randolph ‐ Resurfacing and Related Route on Braintree ‐ Resurfacing and Canton, Milton ‐ Resurfacing and Resurfacing and Related Work on Route 138 Related Work on Route 53 Related Route on Route 138 Route 28 609101 ‐ Peabody ‐ Pavement No Change 608480 [MOVED FROM 2020] ‐ 608498 [MOVED FROM 2022] ‐ 609396 [NEW] ‐ Randolph ‐ Milton Preservation and Related Work on Foxborough, Walpole ‐ Hingham, Weymouth, Braintree ‐ ‐ Resurfacing and Related Work Route 128 Resurfacing and Related Work on Resurfacing and Related Work on on Route 28 Route 1 Route 53 609102 [MOVED FROM 2023] ‐ Wenham ‐ Gloucester ‐ Pavement Preservation and Related Work on Route 128 Roadway Improvements 609222 [NEW] ‐ Arlington ‐ Spy 608599 ‐ Canton, Sharon, No Change Pond Sediment Removal Foxborough, Norwood, Walpole ‐ Stormwater Improvements along Route 1, Route 1A, and I‐95 Safety Improvements 608608 ‐ Braintree ‐ Highway No Change 609090 ‐ Boston, Milton, Quincy ‐ Moved to 2022 609090 [MOVED FROM 2021] ‐ 609053 ‐ Canton, Dedham, Norwood ‐ Cost Increase 609058 ‐ [MOVED FROM 2023] ‐ Lighting Improvements at I‐ Highway Lighting System Boston, Milton, Quincy ‐ Highway Highway and Lighting Improvements Peabody to Gloucester ‐ Guide 93/Route 3 Interchange Replacement on I‐93, from Lighting System Replacement on I‐ at I‐93 and I‐95/128 and Traffic Sign Replacement on Neponset Ave. to the Braintree 93, from Neponset Ave. to the Route 128 Split Braintree Split (cost increase) 608611 ‐ Canton, Milton, No Change 609060 [MOVED FROM 2023]‐ 609058 ‐ Peabody to Gloucester ‐ Moved to 2024 Randolph ‐ Replacement and Lynnfield, Peabody, Danvers ‐ Guide and Traffic Sign Replacement Rehabilitation of the Highway Guide and Traffic Sign on Route 128 Lighting System at the Route Replacement on I‐95/128 24/Route 1/I‐93 Interchange 608205 [NEW] ‐ Reading to 609060 ‐ Lynnfield, Peabody, Danvers Moved to 2022 Lynnfield ‐ Guide and Traffic Sign ‐ Guide and Traffic Sign Replacement Replacement on a Section of I‐95 on I‐95/128 (SR 128) 2020 2021 2022 2023 2024 Current Proposed Current Proposed Current Proposed Current Proposed Proposed Intersection Improvements 608562 ‐ Somerville ‐ Signal and Moved to 2021 607761 ‐ Swampscott ‐ No Change 608567 ‐ Peabody ‐ Improvements No Change 608052 ‐ Norwood ‐ Intersection and No Change 609254 [NEW] ‐ Lynn ‐ Intersection Improvement on I‐93 Intersection and Signal at Route 114 at Sylvan St., Cross Signal Improvements on US 1 and Intersection Improvements at at Mystic Ave. and McGrath Improvements at SR 1A at St., Northshore Mall, Loris Road, Morse Street Two Locations on Broadway Highway Swampscott Mall Route 128 Interchange and Esquire Dr. 607342 ‐ Milton ‐ Intersection and Moved to 2021 607748 ‐ Acton ‐ Intersection and No Change 608569 ‐ Quincy ‐ Intersection No Change 608564 ‐ Watertown ‐ Intersection No Change 607759 [NEW] ‐ Boston ‐ Signal improvements @ Route 28 Signal Improvements on SR 2 and Improvements at Route 3A Improvements at Route 16 and Galen Intersection and Signal and Chickatawbut Road SR 111 at Piper Road and Taylor (Southern Artery) and Broad St. Street Improvements at the VFW Road Parkway and Spring Street 607759 ‐ Boston ‐ Intersection and Moved to 2024 608562 [MOVED FROM 2020] ‐ 608566 ‐ Marlborough ‐ No Change 607759 ‐ [MOVED FROM 2020] ‐ Signal Improvements at the VFW Somerville ‐ Signal and Improvements at Route 20 (East Boston ‐ Intersection and Signal Parkway and Spring Street Intersection Improvement on I‐93 Main St.) at Curtis Ave. Improvements at the VFW at Mystic Ave. and McGrath Parkway and Spring Street Highway 607342 [MOVED FROM 2020] ‐ Milton ‐ Intersection and Signal improvements @ Route 28 and Chickatawbut Road Roadway Reconstruction 608835 ‐ Medford ‐ No Change 607901 ‐ Dedham ‐ Pedestrian No Change 607977 ‐ Hopkinton, No Change 607977 ‐ Hopkinton, Westborough ‐ No Change 607977 ‐ Hopkinton, Improvements at Brooks Improvements along Elm St. and Westborough ‐ Reconstruction of I‐ Reconstruction of I‐90/I‐495 Westborough ‐ Reconstruction of I‐ Elementary School Rustcraft Road Corridors 90/I‐495 Interchange Interchange 90/I‐495 Interchange 608743 ‐ Salem ‐ Improvements at No Change 608911 ‐ Belmont ‐ Improvements No Change Bates Elementary at Wellington Elementary School 608791 ‐ Winchester ‐ No Change Improvements at Vinson‐Owen Elementary Bicycles and Pedestrians 607888 ‐ Boston, Brookline ‐ Multi‐Moved to
Recommended publications
  • Hyde Park Bulletin
    The Hyde Park Bulletin Volume 17, Issue 41 October 11, 2018 HPNA digs deeper into Neponset Greenway talks development issues bike paths in Hyde Park Members of the Hyde Park Neighborhood Association met and discussed the Railyard 5 Project, shown above, among other projects. COURTESY PHOTO Mary Ellen Gambon about 20-something units,” Staff Reporter HPNA president John Raymond said. “They tried to About 25 members of the confuse us by lowering the Hyde Park Neighborhood As- square footage by about 7,500 The Neponset River Greenway Council met last Wednesday and discussed its progress in Hyde Park. sociation attended the meeting square feet. But there wasn’t a PHOTO BY JEFF SULLIVAN on Thursday, October 4 to dis- big reduction in units.” cuss new development issues – The developer, Jordan D. one in the near future and the Jeff Sullivan bike lane on the streets and a na- project, which connected the Warshaw, of the Noannet ture bike path through protected Martini Shell to Mattapan be- other on the radar. Staff Reporter Group, eliminated 29 units areas of the Massachusetts De- tween the Truman Parkway and The first focus was a recap from the final plan. There will The Neponset River partment of Recreation and Con- the Neponset River. It opened in of the meeting on October 1 on be 364 for-rent apartments and Greenway Council (NRGC) met servation (DCR). Currently, there 2012 and was completed in the Sprague Street development 128 for-sale condos, according last week and discussed several are ways to bike the path, but some 2015, spanning to the Neponset project at 36-70 Sprague Street to the proposal.
    [Show full text]
  • 270 Baker Street
    Project Notification Form Submitted Pursuant to Article 80 of the Boston Zoning Code 270 BAKER STREET WEST ROXBURY, MASSACHUSETTS AUGUST 26, 2016 Submitted to: BOSTON REDEVELOPMENT AUTHORITY One City Hall Square Boston, MA 02201 Submitted by: 270 BAKER, LLC Prepared by: NORTHEAST STRATEGY AND COMMUNICATIONS GROUP Thomas Maistros, Jr., RA In Association with: NESHAMKIN FRENCH ARCHITECTS, INC. MCCLURG TRAFFIC . TABLE OF CONTENTS PAGE 1.0 PROJECT SUMMARY 1-1 1.1 Project Team 1-1 1.2 Project Description 1-2 1.3 Consistency with Zoning 1-6 1.4 Legal Information 1-7 1.5 Public Agencies 1-7 1.6 Schedule 1-8 1.7 Existing Photograph 1-9 2.0 ASSESSMENT OF DEVELOPMENT REVIEW COMPONENTS 2-1 2.1 Project Design 2-1 2.2 Urban Design 2-2 2.3 Design Exhibits 2-4 2.4 Historic Resources 2-14 2.5 Sustainable Design 2-19 2.6 Transportation 2-26 2.7 Environmental Protection 2-54 2.7.1 Wind 2-54 2.7.2 Shadow 2-54 2.7.3 Daylight 2-59 2.7.4 Solar Glare 2-62 2.7.5 Air Quality 2-62 2.7.6 Water Quality/Stormwater 2-63 2.7.7 Storm Water Management Standards 2-63 2.7.8 Flood Hazard Zones/Wetlands 2-63 2.7.9 Geotechnical/Groundwater 2-63 2.7.10 Solid and Hazardous Wastes 2-64 2.7.11 Noise/Vibration 2-65 2.7.12 Construction Impacts 2-66 2.7.13 Rodent Control 2-66 2.7.14 Wildlife Habitat 2.67 2.8 Infrastructure System 2-67 2.8.1 Sewage System 2-87 2.8.2 Water Supply System 3-68 2.8.3 Stormwater System 2-69 2.8.4 Energy Needs 2-72 3.0 COORDINATION WITH OTHER GOVERNMENTAL AGENCIES 3-1 4.0 PROJECT'S CERTIFICATION 4-1 APPENDICES Appendix A - Climate Change Checklist Appendix B - Accessibility Checklist Appendix C - Discclosure Statement 2016/270 Baker/Expanded PNF Page ii Table of Contents 1.0 PROJECT SUMMARY 1.1 Project Team Project Name: 270 Baker Street Location: The Project site is located at 270 Baker Street in the West Roxbury Neighborhood of the City of Boston.
    [Show full text]
  • Following Boston's Mysterious Stony Brook
    Following Boston's Mysterious Stony Brook Saturday, April 15, 2017 at 9:30 am at Adams Park in Roslindale Square 10:00 am at gate on Bellevue Hill Rd. in West Roxbury Starting from the city's highest point, Bellevue Hill, the stream known as Stony Brook goes through Stony Brook Reservation, Hyde Park, Roslindale, Jamaica Plain (including its Stonybrook neighborhood), Mission Hill, Roxbury, and the Fenway on its way to the Charles River. But it's almost all underground! Join Jessica Mink, whose house abuts the creek's conduit, on this bike ride to see how close we can come to its route. The group will return following the Muddy River and Bussey Brook. Look for pictures at http://www.masspaths.net/rides/StonyBrook2017.html Miles Action Miles Action 0.0 Start at Adams Park in Roslindale 7.7 Left on Bourne St. 0.0 Left on South St. 7.7 Left on Catherine St. 0.1 Straight under railroad tracks 7.8 Right on Wachusett St. 0.2 Left on Conway St. 8.0 Left on Southbourne St. 0.2 Straight across Robert St. 8.1 Right on Hyde Park Ave. 0.3 Straight on park path 8.7 Left on Ukraine Way 0.4 Left through tunnel under tracks 8.7 Right on Washington St. 0.5 Straight on Metcalf Ave. across Belgrade Ave. 9.0 Right on sidewalk after crossing the Arborway 0.5 Left on Haslet St. 9.0 Left on Southwest Corridor bike path 0.6 Right on Roslindale Ave. 10.6 Cross Centre St.
    [Show full text]
  • Annual Report of the Metropolitan District Commission
    Public Document No. 48 W$t Commontoealtfj of iWa&sacfmsfetta ANNUAL REPORT OF THE Metropolitan District Commission For the Year 1935 Publication or this Document Approved by the Commission on Administration and Finance lm-5-36. No. 7789 CONTENTS PAGE I. Organization and Administration . Commission, Officers and Employees . II. General Financial Statement .... III. Parks Division—Construction Wellington Bridge Nonantum Road Chickatawbut Road Havey Beach and Bathhouse Garage Nahant Beach Playground .... Reconstruction of Parkways and Boulevards Bridge Repairs Ice Breaking in Charles River Lower Basin Traffic Control Signals IV. Maintenance of Parks and Reservations Revere Beach Division .... Middlesex Fells Division Charles River Lower Basin Division . Bunker Hill Monument .... Charles River Upper Division Riverside Recreation Grounds . Blue Hills Division Nantasket Beach Reservation Miscellaneous Bath Houses Band Concerts Civilian Conservation Corps Federal Emergency Relief Activities . Public Works Administration Cooperation with the Municipalities . Snow Removal V. Special Investigations VI. Police Department VII. Metropolitan Water District and Works Construction Northern High Service Pipe Lines . Reinforcement of Low Service Pipe Lines Improvements for Belmont, Watertown and Arlington Maintenance Precipitation and Yield of Watersheds Storage Reservoirs .... Wachusett Reservoir . Sudbury Reservoir Framingham Reservoir, No. 3 Ashland, Hopkinton and Whitehall Reservoirs and South Sud- bury Pipe Lines and Pumping Station Framingham Reservoirs Nos. 1 and 2 and Farm Pond Lake Cochituate . Aqueducts Protection of the Water Supply Clinton Sewage Disposal Works Forestry Hydroelectric Service Wachusett Station . Sudbury Station Distribution Pumping Station Distribution Reservoirs . Distribution Pipe Lines . T) 11 P.D. 48 PAGE Consumption of Water . 30 Water from Metropolitan Water Works Sources used Outside of the Metropolitan Water District VIII.
    [Show full text]
  • Report of the Board of Metropolitan Park Commissioners (1898)
    A Digitized by the Internet Archive in 2013 http://archive.org/details/reportofboardofm00mass_4 PUBLIC DOCUMENT No. 48. REPORT ~ Board of Metropolitan Park Commissioners. J^ANUARY, 1899. BOSTON : W RIGHT & POTTER PRINTING CO., STATE PRINTERS, 18 Post Office Square. 1899. A CONTENTS. PAGE Report of the Commissioners, 5 Report of the Secretary, 18 Report of the Landscape Architects, 47 Report of the Engineer, 64 Financial Statement, . 86 Analysis of Payments, 99 Claims (chapter 366 of the Acts of 1898), 118 KEPOKT. The Metropolitan Park Commission presents herewith its sixth annual report. At the presentation of its last report the Board was preparing to continue the acquirement of the banks of Charles River, and was engaged in the investigation of avail- able shore frontages and of certain proposed boulevards. Towards the close of its last session the Legislature made an appropriation of $1,000,000 as an addition to the Metropolitan Parks Loan, but further takings were de- layed until the uncertainties of war were clearly passed. Acquirements of land and restrictions have been made or provided for however along Charles River as far as Hemlock Gorge, so that the banks for 19 miles, except where occu- pied by great manufacturing concerns, are in the control either of this Board or of some other public or quasi public body. A noble gift of about 700 acres of woods and beau- tiful intervales south of Blue Hills and almost surroundingr Ponkapog Pond has been accepted under the will of the late ' Henry L. Pierce. A field in Cambridge at the rear of « Elm- wood," bought as a memorial to James Russell Lowell, has been transferred to the care of this Board, one-third of the purchase price having been paid by the Commonwealth and the remaining two-thirds by popular subscription, and will be available if desired as part of a parkway from Charles River to Fresh Pond.
    [Show full text]
  • Boston Water and Sewer Commission
    Permit No. MAS010001 Page 1 of 20 AUTHORIZATION TO DISCHARGE UNER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of the federal Clean Water Act, as amended, 33 U. C. 1251 et seq ., and the Massachusetts Clean Waters Act, as amended, Mass. Gen. Laws. ch. 21, 26­ the Boston Water and Sewer Commission is authorized to discharge from all of its new or existing separate storm sewers: 195 identified Separate Stor. Sewer Outfalls and associated receiving waters are Listed in Attachment A to receiving waters named: Belle Island Inlet, Boston Harbor, Boston Inner Harbor, Brook Far. Brook, Bussey Brook, Canterbury Brook, Chandler' s Pond, Charles River, Chelsea River, Cow Island Pond, Dorchester Bay, Fort Point Channel, Goldsmith Brook, Jamaica Pond, Little Mystic Channel, Mill Pond, Millers River, Mother Brook, Muddy River, Mystic River, Neponset River, Old Harbor, Patten' s Cove, Reserved Channel, Sprague Pond, Stony Brook, Turtle Pond and unnamed wetlands, brooks and streams. in accordance with effluent limitations, monitoring requirements and other conditions set forth herein. This permit shall become effective 30 days from date of signature. This permit and the authorization to discharge expire at midnight, five years from the effective date. This permit consists of 20 pages and Attachment A in Part I including monitoring requirements, etc., and 35 pages in Part II including General Conditions and Definitions. 4;1;ctor , D ' isi n '- f Office of Ecosystem Protection Watershed Management Enyironmental Protection Agency Department of Environmental Region I Protection Boston Commonwealth of Massachusetts , MA Boston, MA ). ). Page 2 of 20 Permit No. MASOIOOOl PART MUICIPAL SEPARTE STORM SEWER SYSTEM DISCHARGES THROUGH THE MUNICIPAL SEPARATE STORM SEWER SYSTEM AUTHORIZED UNER THIS PERMIT permit Area.
    [Show full text]
  • Department of Conservation & Recreation, Boston, MA | 2014
    Department of Conservation and Recreation dC r NPDES Storm Water Management Program Permit Year 11 Annual Report Municipality/Organization: Department of Conservation and Recreation EPA NPDES Permit Number: MARO43001 MaDEP Transmittal Number: Annual Report Number & Reporting Period: No. 11: April 2013— March 2014 Department of Conservation and Recreation NPDES P11 Small MS4 General Permit Annual Report ) Part I. General Information Contact Person: Robert Lowell Title: Environmental Section Chief Telephone #: (617) 626-1340 Email: [email protected] Certification: I certify under penalty of law that this document and all attachments were prepared under my direction olsupervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on myinquiry of the person or persons who manage the system, or those persons directly responsible for gathing the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant pealties for submitting false information, includin the possibility of fine and imprisonment r knowing violations. Signature: Printed Name: John P. Murray Title: Commissioner Date: 30 2o ‘— 5/1/2014 Pa2e2 Department of Conservation and Recreation (DCR) NPDES Storm Water Management Program Permit Year 11 Annual Report For Coverage Under National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Small Municipal Separate Storm Sewer Systems (MS4s) Department of Conservation and Recreation 251 Causeway Street Suite 600 Boston, MA 02114-2104 Submittal: May 1, 2014 5/1/2014 Department of Conservation and Recreation NPDES Storm Water Management Program Permit Year 11 Annual Report Municipality/Organization: Department of Conservation and Recreation EPA NPDES Permit Number: MAR043001 MaDEP Transmittal Number: Annual Report Number & Reporting Period: No.
    [Show full text]
  • West Roxbury), MA
    RECONASSANCE ARCHAEOLOGICAL SURVEY Allandale Woods Park Boston (West Roxbury), MA Prepared for Boston Parks and Recreation Department City of Boston Prepared by Joseph Bagley City Archaeologist Boston Landmarks Commission Environment Department City of Boston Introduction Allandale Woods is an 86-acre Urban Wild Park located in the Boston neighborhoods of Jamaica Plain and West Roxbury (figure 1). In the summer of 2014, a walkover survey was conducted covering the entirety of the park with the goal of producing sensitivity maps that will aid the Boston Parks and Recreation in avoiding or mitigating impacts to known or potential archaeological sites within the park in future improvement projects. Brief Park History (The following section is a summary of the work of Richard Heath and Richard Primack, no date, attached to this report as appendix A) No Native American cultural materials have been found within the Allandale Woods. Just east of the property, within the Arnold Arboretum, there are over a dozen Native archaeological sites ranging in age from 7,500-400 years in age in topography that resembles that of the Allandale Woods. The Park began as a small portion of the massive estate of Thomas and Joseph Weld, who arrived in Roxbury in 1632. At this time, the property was used as farmland. After passing through several generations, a portion of the Weld estate was sold to Thomas Williams in 1806 who built a farm with several outbuildings in the southern portion of the park near the present-day Annunciation Church (Figure 2). In 1864, 20 acres in the eastern portion of the current park was sold to Henry Wellington near where Centre and Allandale Streets intersect.
    [Show full text]
  • Report of the Board of Metropolitan Park Commissioners (1897)
    MMISSION 711 M3 M59r J / : PUBLIC DOCUMENT No. 48 REPORT Board of Metropolitan Park Commissioners. J ANUARY, 1898. BOSTON WRIGHT & POTTER PRINTING CO., STATE PRINTERS, 18 Post Office Square. 1898. STATE LffiEAB! Cf KA.i3ACHUSETTS, STATE HOUSE. BOSTON. FEB 9A 1898 A CONTENTS. PAGE Report of the Commissioners, 5 Report of the Secretary, 17 Report of the Landscape Architects, 55 Part I. Acquired Reservations, 56 Part II. Desirable Acquisitions, 64 Part III. Metropolitan Parkways, 66 Report of the Engineer, . 71 Financial Statement, 91 Analysis of Payments, 101 Appendix : — Report of Charles Eliot, Landscape Architect, to the Metropolitan Park Com- mission of 1893 119 EEPORT. The Metropolitan Park Commission presents herewith its fifth annual report. The principal new work of the past year has been the development of Revere Beach, the preparation of plans for the acquirement of the shores of Charles River from Water- town to Newton Upper Falls and the completion of Mystic Valley Parkway. Construction of the Blue Hills and Mid- dlesex Fells Parkways has been continued, and much study and investigation has been made preliminary to the expendi- ture of the appropriations for parkways made by the Legis- lature of 1897. This work divides itself naturally, and will be considered as usual, according as it has been done under the Park Acts or under the Boulevard Acts. A preliminary commission reported to the Legislature of 1893 a scheme for park and parkway or boulevard work, based chiefly on the accompanying report of its landscape architect, Mr. Charles Eliot. In this report Mr. Eliot described the country about Boston as possessed of unusual wealth of scenery, but ill adapted for indiscriminate crowd- ing by large population, and argued that there was a special necessity for regulating its settlement by excluding popula- tion from certain portions and by reserving other portions for the sake of the scenery or as recreation grounds.
    [Show full text]
  • Annual Report of the Division of Metropolitan Planning
    Public Document No. 142 Clje CommontoealtJ) of Jttag£acJ)u£ettg ANNUAL REPORT OF THE DIVISION OF METROPOLITAN PLANNING FOR THE YEAR ENDING NOVEMBER 30 1933 T r r. B L I C Publication of this Document Approved by the Commission on Administration and Finance 500. 7-'34. Order 1891. C&e Commontoealt!) of Jftaaaaciwaette Division of Metropolitan Planning 20 Somerset Street, Boston, November 30, 1933 To the Honorable Senate and House of Representatives in General Court Assembled: This Division herewith respectfully submits its annual report for the year ending November 30, 1933. Many projects that have been underway have been completed and others of great merit are now under way, their construction having been expedited by the direct grant of six and one-half million dollars received from the Federal Govern- ment, authorized and made available by the National Industrial Recovery Act which was passed in June of this year. The projects that have been completed and those that are underway include the following: 1. Worcester Turnpike continuation to Sumner St., Brookline, including an overpass over the Hammond Pond Parkway. 2. Hammond Pond Parkway from Boylston Street to Beacon Street, Newton. 3. Veterans of Foreign Wars Parkway, Boston from Centre Street to connect with the Brook Farm Parkway at its intersection with the West Roxbury Parkway. A large and attractive traffic circle has also been completed at the intersection of the three parkways. 4. Mystic Valley Parkway Extension from Mystic Avenue easterly to the Fellsway at its intersection with the Revere Beach Parkway, Medford. This is under construction and work on the drawbridge will begin shortly.
    [Show full text]
  • 2020 Public Records Request
    MWRA Public Information Requests 2020 Nature of request The date on The date on Petitions submitted under The date on The number of The number of Fees charged to Requests The time The final which the which a clause (iv) of subsection (d) which a public hours required hours required to the person appealed required to adjudication of request was response is of section 10 (Yes/No) record is to fulfill the fulfill the request making the under section comply with any court received provided to provided to the request (hours) (minutes) request, if any 10A (Yes/No) supervisor of proceedings the requestor requestor records under subsection orders under (d) of said said section section 10A 10A 1 Record Plan: Section 111 1/2/2020 1/3/2010 1/3/2010 1 0 $0.00 No Oakdale Avenue and Fairview Street, Dedham 1 Record Plan: Section 77 1/2/2020 1/3/2020 1/3/2020 1 0 $0.00 No Lagrange Street, West Roxbury Sewer plans for Maple Street, 1/6/2020 1/6/2020 1/6/2020 1 30 $0.00 No Chilton Road and Avalon Road in Boston 5 Detail Records: Section 4 and 1/6/2020 01/06/20 01/06/20 1 0 $0.00 No Mystic 30" Main, Pearl Street, Somerville Sewer plans for an existing 1/7/2020 1/7/2020 1/7/2020 1 30 $0.00 No culvert beneath railroad tracks in Everett Remote Headworks Final 1/6/2020 1/6/2020 1/8/2020 0 45 $0.00 No Concept Design Report for Remote Headworks (August 19, 2009); Remote Headworks Final Concept Design Report on Solids Handling Systems (August 11, 2009); and Remote Headworks Upgrade PDR (September 2011) Engineering plans for Revere 1/7/2020 1/8/2020 1/8/2020 3
    [Show full text]
  • Department of Conservation and Recreation Stewardship Council Meeting Roxbury Heritage State Park | Boston February 7, 2020 | 10:30 A.M
    Department of Conservation and Recreation Stewardship Council Meeting Roxbury Heritage State Park | Boston February 7, 2020 | 10:30 a.m. to 1 p.m. February Meeting Minutes Council Members Present: Jack Buckley, Melissa Harper, Vivian Ortiz, Alvin L. Reynolds, Esq., Dennis Smith, Nate Walton, Jennifer N.S. Wilson, Esq. Council Members Not Present: Ann B. Canedy, Esq., David Murphy DCR/EEA Attendees: Lisa Barstow, Ryan Hutton, Leonard Lee, Jennifer Norwood, Joe Rotondo Public Attendees (from sign-in sheet): Sarah Freeman, Arborway Coalition; Jessica Mink, Neponset River Greenway Council; Galen Mook, MassBike; Jennifer Jones, Southwest Corridor Park Conservancy; Celeste Walker, Friends of Allandale; Eliza Parad, Boston Cyclists Union; Ben Wetherill, West Roxbury Bikes; Julia O’Brien (former MDC staff); Chuck Anastas, Mass. Conservation Voters ______________________________________________________________________________ Call to Meeting – Chairman Nate Walton Chairman Walton expressed congratulations to newly appointed Commissioner Jim Montgomery. He shared background on how council meeting structure has changed over the past year with the hope of improving the efficiency and transparency of the council. Monthly meetings would include breakout sessions for each of the three committees and once per quarter, the Council would forgo committee breakouts to focus on extended time of interaction with DCR Senior Staff. The flow of the meetings has been such that it’s possible to include a 40-minute committee breakout at every meeting and a presentation at every meeting. Thus, two meetings with external stakeholders would be followed by one meeting with DCR Senior Staff. Chairman Walton introduced Jennifer Norwood to deliver the Commissioner’s Report in Commissioner Montgomery’s absence. _____________________________ Commissioner’s Report – Director of External Affairs and Partnerships, Jennifer Norwood The report is attached hereto and made a part hereof.
    [Show full text]