High Speed Bogie - Mutual Development JR EAST - DBAG

Total Page:16

File Type:pdf, Size:1020Kb

High Speed Bogie - Mutual Development JR EAST - DBAG High speed bogie - Mutual development JR EAST - DBAG Koichi SASAKI, Koji ASANO, Hitoshi SHIRAISHI EAST Japan railway company 2-2-2 Yoyogi, Shibuya-ku, Tokyo 151-8578, Japan Tel: +81-3-5334-1146_Fax: +81-3-5334-1108 e-mail: [email protected] Hans-Peter Lang, Stephan Schubert, Eckhard Scheunemann, Dieter Fastnacht, Deutche Bahn AG Weserglacis 2, D-32423, Minden, Germany Tel: +49-571-393-5435_Fax: +49-571-393-5645 e-mail: [email protected] 1 Introduction For the purpose of the improvement in railway technology, JR EAST and DB AG concluded general agreement for the technical research and development of the railway in 1993. On the basis of this agreement, we exchanged railway technology through the exchange of information and the running tests of the bogies manufactured by MAN Technology in Germany by STAR21 etc. In this technical exchange, we have agreed with developing jointly the high-speed bogies which aimed at application to high-speed rolling stocks of the next generation in 1995. On the basis of this agreement, we made jointly the specifications of the high-speed bogies, and are developing the bogies according to the specification, respectively. JR EAST and DB AG are developing two kinds of bogies, for E2 and for ICE2, respectively, and carry out the running test for the performance check by own company. Subsequently, we are going to carry the bogies into the partner country and to carry out the running test for the performance comparison. In this paper, we introduce the outline of the performance tests about mutual development. 2 Schedule of the tests The schedule of the performance tests is shown in Table 1. As shown in this table, JR EAST and DB AG manufactured 4 kinds of bogies in total. We carried out the roller rig tests and the running tests of these development bogies. 3 Outline of the Development bogie 3.1 Development Bogie for E2 by JR EAST The bogie for E2 Shinkansen which JR EAST developed is shown in Figure 1. The main features of this bogie are as follows. 1) Adoption of the brake disk, caliper and axle box made of aluminum alloy. (Lightweight design) 2) Equipment of the active suspension system using pneumatic actuators. (Improvement of riding comfort) 3) Equipment of the noise damped wheel which installed the sound-proofing ring. (Decrease of noise) 4) Equipment of the sprit type for up and down axle box which only the wheelset is removed easily from the bogie. (Low maintenance) 3.2 Development Bogie for E2 by DB AG The bogie for E2 Shinkansen which DB AG developed is shown in Figure 2. The main features of this bogie are as follows. 1) By use of inside bearing of the wheelsets and consistent lightweight design important weight reductions can be achieved with the wheelsets and the bogie frame. 2) The primary anti-rolling device which controls the rolling between the bogie frame and the wheelset and the secondary anti-rolling device which controls the rolling between the car body and the bogie frame. 3) The type of axle suspension is the link type. 3.3 Development Bogie for ICE2 by JR EAST The bogie for ICE2 Shinkansen which JR EAST developed is shown in Figure 3. Basically, this bogie has the same specifications as the development bogie for E2 Shinkansen by JR EAST. However, this bogie is modified about the following points for the adaptation to ICE2. 1) Equipment of the anti rolling device between car body and bogie frame. 2) Equipment of the electromagnetic rail brake. 3) Equipment of four yaw dampers per 1 bogie. For the next generation vehicle, this bogie is considered that the eddy current brake will be able to be installed on the bogie. 3.4 Development Bogie for ICE2 by DB AG The bogie for ICE2 which DB AG developed is shown in Figure 4. Basically, this bogie has the same specifications as the development bogie for E2 Shinkansen by DB AG. However, this bogie is equipped with the semi-active dampers between the car body and the bogie frame in the vertical direction. 4 Roller rig tests For the confirmation of the basic performance, we carried out the roller rig tests of the development bogies at the Railway Technical Research Institute in Japan and DB AG Research and Test Centre in Germany. In the roller rig tests, we confirmed the running stability , riding comfort etc. of the development bogies. The roller rig tests of the E2 bogies were carried out by the half car body model, and the roller rig tests of the ICE2 bogies were carried out by the full car body model. The scenery of the roller rig tests with the development bogies for E2 at RTRI are shown in Figure 5. The scenery of the roller rig tests with the development bogies for ICE2 are shown in Figure 6. 5 Running tests 5.1 Running tests of the Development Bogie for E2 After the confirmation of the basic performance by the roller rig tests, we carried out the running tests of the development bogies by E2 Sinkansen. The outlines of the running tests are as follows. 1) Period of the running test : JR Bogie : May 24 - Jul. 9, 1998 DB Bogie : Oct. 12 - Nov. 17, 1999 2) Test section : (Fig. 7) Tohoku Shinkansen : Sendai – Kitakami 3) Test car : E2 Shinkansen train _8 cars formation_ Development bogies are mounted on No.8 car of E2 Shinkansen train. 4) Maximum speed : 320km/h 5) Test items : Running safety, Riding comfort, Active, Braking test etc. 5.2 Running tests of the Development Bogie for ICE2 The outlines of the running tests of the development bogies for ICE2 are as follows. 1) Period of the running test : JR Bogie : Feb. 21 - Mar. 10, 2000 DB Bogie : Mar. 5 - July 13, 2001 2) Test section : (Fig. 8) _ Hannover - Göttingen _ Wolfsburg - Rathenow _ Trier - Merzig _ Geislingen 3) Test car : ICE-S testing train _4 cars formation_ 2 Development bogies are mounted on ICE2 coach. 4) Maximum speed : JR Bogie 385km/h DB Bogie 393km/h 5) Test items : Running safety, Riding comfort, Braking, Curving performance test etc. 6 Conclusion We developed the high-speed bogies for E2 and ICE2, and confirmed the performance of these bogies by the roller rig tests and the running tests. We will arrange these test results and the result of mutual development, and on the basis of these results, we will examine the design method and the evaluation method of the development bogie. BIBLIOGRAPHY NAKAGAWA et al.: “High speed bogie ~ Mutual development JR EAST – DBAG ~”, World Congress on Railway Research 1999, October 1999..
Recommended publications
  • Railway Stations Adapting to Future Society Railway Stations Adapting to Future Society
    Railway Stations ADAPTING TO FUTURE SOCIETY Railway Stations ADAPTING TO FUTURE SOCIETY CONTENTS 3 FOREWORD BY UIC DIRECTOR-GENERAL 5 UIC STATION MANAGERS GLOBAL GROUP 7 HISTORY OF STATIONS: EVOLUTION OF THE CONCEPT 03 MODEL OF STATION CONCEPT 11 OPERATION faCELIFT: MAJOR PROJECTS STATION RENOvaTION POLICIES, TRENDS AND CHALLENGES 60 A QUICK LOOK AT SOME STATIONS AROUND THE WORLD... 70 BIBLIOGRAPHY Railway Stations ADAPTING TO FUTURE SOCIETY FOREWORD BY UIC DIRECTOR-GENERAL JEAN-PIERRE LOUBINOUX tations emerged alongside railways, as the Stations have gradually become organised, transfor- In the visual representations you will see the chan- staging-posts of this new industrial era. med and developed to host all those passing through ging relationships between station stakeholders. They increased in number as railways deve- – whether travellers or not – and to offer board, lod- As well as a depiction of how the concept of a “sta- loped into networks that, in turn, could only ging, or other everyday services. And since we must tion” has changed over time and the interaction Sdevelop alongside stations. From the outset, stations always go via somewhere in order to go anywhere, between stations and their urban environment, two 3 have been essential to the departure, the passage stations have become an interface between all the slides explain complex phenomena which vary ac- and the arrival of trains, and to the ebb and flow of various modes of mobility – trains, metro, buses, cars cording to the context and reality of each country all the travellers they carry. A railway network can and bicycles. They have thus become mediators and and even each station, all focusing on a complex web be seen as lines irrigating a geographical area in the organisers of daily mobility.
    [Show full text]
  • Opening of Tohoku Shinkansen Extension to Shin Aomori and Development of New Faster Carriages—Overview of Series E5/E6 Shinichiro Tajima
    Expansion of High-Speed Rail Services Opening of Tohoku Shinkansen Extension to Shin Aomori and Development of New Faster Carriages—Overview of Series E5/E6 Shinichiro Tajima Introduction FASTECH 360 Z were started in June 2010. These carriages will be coupled with Series E5 carriages in commercial In preparation for the December 2010 opening of the Tohoku operation to run at 320 km/h. Shinkansen extension to Shin Aomori, JR East worked steadily from 2002 on technologies to increase speed, Path to Speed Increase finally settling on a commercial operating speed of 320 km/h after various considerations, including running tests using The Tohoku Shinkansen started operation in 1982 at a the FASTECH 360 test train. Furthermore, Series E5 pre- maximum speed of 210 km/h. Today, the commercial production models were built to determine the specifications operation speed is 275 km/h but 20 years have passed since of carriages used for commercial operations; running tests the first 275 km/h operation with Series 200 carriages on the confirmed the final specifications ahead of introduction of the Joetsu Shinkansen in 1990. Full-scale operation at 275 km/h Series E5 in spring 2011. Moreover, Series E6 pre-production started with the introduction of the E3 and E2 at the opening models reflecting development successes using the of the Akita Shinkansen and Nagano Shinkansen in 1997. Figure 1 Path to Speed Increase km/h 450 JNR JR 425 km/h (STAR21, 1993) Max. test speed 400 345.8 km/h (400 series, 1991) 350 319 km/h 320 km/h (961 series, 1979) 300 km/h (2013) (2011) 300 275 km/h (1990) Max.
    [Show full text]
  • How the Punctuality of the Shinkansen Has Been Achieved
    Computers in Railways XII 111 How the punctuality of the Shinkansen has been achieved N. Tomii Chiba Institute of Technology, Japan Abstract The high speed railway line in Japan began operation in 1964. The high speed railway is called the Shinkansen and is known for its safety and reliability. In addition, the Shinkansen is well known for punctuality. As a matter of fact, the average delay of trains is less than one minutes every year. The Shinkansen runs along dedicated lines, which seem to be advantageous in keeping punctuality. However, there are lots of disadvantages as well. For example, although traffic is very dense, resources are not abundant. In some Shinkansen lines, trains go directly through conventional railway lines and the Shinkansen is easily influenced by the disruption of those lines. Punctuality of the Shinkansen is supported by hardware, software and humanware. In this paper, we first introduce a brief history of the Shinkansen and then focus on humanware, which makes the punctuality possible. Keywords: high speed trains, punctuality, rescheduling, Shinkansen. 1 Introduction In 1964, a high speed railway line opened in Japan. The new line connects Tokyo, the capitol, and Osaka, the second largest city located 600 km away. The maximum speed of trains was 210km/h, which was almost twice that of other trains in those days and the travelling time between these two cities was halved to only three hours and ten minutes. The new high-speed line was called the Shinkansen and it had a great impact not only on railways in Japan, but also on railways worldwide.
    [Show full text]
  • Shinkansen - Wikipedia 7/3/20, 1048 AM
    Shinkansen - Wikipedia 7/3/20, 10)48 AM Shinkansen The Shinkansen (Japanese: 新幹線, pronounced [ɕiŋkaꜜɰ̃ seɴ], lit. ''new trunk line''), colloquially known in English as the bullet train, is a network of high-speed railway lines in Japan. Initially, it was built to connect distant Japanese regions with Tokyo, the capital, in order to aid economic growth and development. Beyond long-distance travel, some sections around the largest metropolitan areas are used as a commuter rail network.[1][2] It is operated by five Japan Railways Group companies. A lineup of JR East Shinkansen trains in October Over the Shinkansen's 50-plus year history, carrying 2012 over 10 billion passengers, there has been not a single passenger fatality or injury due to train accidents.[3] Starting with the Tōkaidō Shinkansen (515.4 km, 320.3 mi) in 1964,[4] the network has expanded to currently consist of 2,764.6 km (1,717.8 mi) of lines with maximum speeds of 240–320 km/h (150– 200 mph), 283.5 km (176.2 mi) of Mini-Shinkansen lines with a maximum speed of 130 km/h (80 mph), and 10.3 km (6.4 mi) of spur lines with Shinkansen services.[5] The network presently links most major A lineup of JR West Shinkansen trains in October cities on the islands of Honshu and Kyushu, and 2008 Hakodate on northern island of Hokkaido, with an extension to Sapporo under construction and scheduled to commence in March 2031.[6] The maximum operating speed is 320 km/h (200 mph) (on a 387.5 km section of the Tōhoku Shinkansen).[7] Test runs have reached 443 km/h (275 mph) for conventional rail in 1996, and up to a world record 603 km/h (375 mph) for SCMaglev trains in April 2015.[8] The original Tōkaidō Shinkansen, connecting Tokyo, Nagoya and Osaka, three of Japan's largest cities, is one of the world's busiest high-speed rail lines.
    [Show full text]
  • JR East High-Speed Rolling Stock Development Koji Asano Director of the Advanced Railway System Development Center, Research and Development Center of JR East Group
    Special feature article JR East High-speed Rolling Stock Development Koji Asano Director of the Advanced Railway System Development Center, Research and Development Center of JR East Group 1 Introduction The history of Shinkansen rolling stock for JR East started with the series 200 Shinkansen, which debuted at the opening of the Tohoku/Joetsu Shinkansen in 1982 in the Japanese National Railway era. It was initially a 12-car all motor car train with a maximum operating speed for 210 km/h. The Shinkansen network spreading out in five directions later came to have a variety of forms of operation (Fig. 1); and even after the series 200, Shinkansen rolling stock conforming to those forms of operation and with increased speeds was developed. In addition to the standard type of Shinkansen dedicated rolling stock, others appeared such as rolling stock for through service between Shinkansen and conventional lines to Akita and Shinjo and double deck rolling stock for large-volume short-distance transport. A variety of services came to be provided as well, such as GranClass providing a higher level of service and fun-to-ride Looking at high-speed railway trends around the world, we “Toreiyu” and “Genbi Shinkansen” (Fig. 2). see that many countries have achieved commercial operation The Shinkansen, handling long-distance transport, has been in excess of 300 km/h, and Italy has announced further speed forced to compete with airlines and others with the expansion of increases with a goal of 360 km/h commercial operation. And the Shinkansen network. In order to have customers choose the for JR East to transfer high-speed railway technologies abroad, Shinkansen, we need to think up how to make it more attractive we need to accumulate technologies for high-speed running in and amenity-rich.
    [Show full text]
  • Shinkansen Before and After JNR Reform: Modification of Its
    Shinkansen Investment before and after JNR Reform Institute of Transportation Economics in Japan Fumio KUROSAKI, Ph.D. Outline of Presentation 1) Shinkansen Projects in JNR Era 2) Shinkansen Projects after JNR Reform 3) Through-Train Operation in Japan 4) Investment & Performance of Shinkansen Lines Roundtable on the Economics of Investment in High Speed Rail New Delhi, India 18-19 December 2013 Shinkansen Projects by JNR Niigata Joetsu Shinkansen Morioka Tohoku Shinkansen Okayama Omiya Ueno Tokyo Shin-Osaka Tokaido Shinkansen Hakata Sanyo Shinkansen Roundtable on the Economics of Investment in High Speed Rail New Delhi, India 18-19 December 2013 JNR Reform in April 1987 JR-Hokkaido Shinkansen operation was divided into JR East, JR Central and JR West JR-East JR-West JR-Central JR-Kyushu JR-Shikoku Roundtable on the Economics of Investment in High Speed Rail New Delhi, India 18-19 December 2013 Projects after JNR Reform (1) <Shinkansen Lines> Completed by JNR reform (1987) Completed since JNR reform Under construction Sapporo Planning stage Shin-Aomori Hokuriku Shinkansen Tohoku Shinkansen Nagano Morioka Tsuruga Takasaki Takeo-Onsen Ueno Tokyo (Shin-)Osaka Hakata Kyushu Shinkansen Nagasaki Kagoshima-Chuo Roundtable on the Economics of Investment in High Speed Rail New Delhi, India 18-19 December 2013 Projects after JNR Reform (2) <Conventional Line> Mini-Shinkansen (completed) Akita Shinjo Fukushima (Dedicated) High-speed train Mini-Shinkansen train Roundtable on the Economics of Investment in High Speed Rail New Delhi, India 18-19 December
    [Show full text]
  • Part 2: Speeding-Up Conventional Lines and Shinkansen Asahi Mochizuki
    Breakthrough in Japanese Railways 9 JRTR Speed-up Story 2 Part 2: Speeding-up Conventional Lines and Shinkansen Asahi Mochizuki Reducing Journey Times on is limited by factors such as curves, grades, and turnouts, so Conventional Lines scheduled speed can only be increased by focusing effort on increasing speed at these locations. Distribution of factors limiting speed Many of the intercity railways in Japan are lines in The maximum speed of any line is determined by emergency mountainous areas. So, objectives for increasing speeds braking distance. However, train speeds are also restricted by cannot be achieved by simply raising the maximum speed. various other factors, such as curves, grades, and turnouts. Acceleration and deceleration performance also impact Speed-up on curves journey time. The impact of each element depends on the The basic measures for increasing speeds on curves are terrain of the line. The following graphs show the distributions lowering the centre of gravity of rolling stock and canting the of these elements for the Joban Line, crossing relatively flat track. However, these measures have already been applied land, and for the eastern section of the Chuo Line, running fully; cant cannot be increased on lines serving slow freight through mountains. trains with a high centre of gravity. Conversely, increasing The graph for the Joban Line crossing the flat Kanto passenger train speed through curves to just below the limit Plain shows that it runs at the maximum speed of 120 km/h where the trains could overturn causes reduced ride comfort (M part) for about half the journey time.
    [Show full text]
  • Shinkansen - Bullet Train
    Shinkansen - Bullet Train Hokkaido Shinkansen Shin-Hakodatehokuto Sea of Japan Shin-Aomori Hachinohe Akita Shinkansen Akita Shinjyo Morioka Tohoku Shinkansen Yamagata Shinkansen Joetsu Shinkansen Yamagata Niigata Sendai North Pacific Ocean Hokuriku Shinkansen Fukushima Kanazawa Nagano Omiya Takasaki Sanyo Shinkansen Tokyo Kyoto Nagoya Shin-Yokohama Okayama Hiroshima Tokaido Shinkansen Shin-osaka Hakata Kokura Railhead Terminus Operating km Hokkaido Shinkansen Shin-Aomori Shin-Hakodatehokuto 148.8 Kumamoto Tohoku Shinkansen Tokyo Shin-Aomori 713.7 Akita Shinkansen Morioka Akita 127.3 Yamagata Shinkansen Fukushima Shinnjo 148.6 Kyushu Shinkansen Kagoshima-chuo Joetsu Shinkansen Tokyo Niigata 333.9 Hokuriku Shinkansen Tokyo Kanazawa 450.5 Tokaido Shinkansen Tokyo Shin-Osaka 552.6 Sanyo Shinkansen Shin-Osaka Hakata 644.0 Kyushu Shinkansen Hakata Kaghoshima-chuo 288.9 As of February 2017 The high-speed Shinkansen trail over about 3,450 km connects the major cities throughout Japan. The safe and punctual public transportation system including trains and buses is convenient to move around in Japan. < Move between major cities > (approximate travel time) Tokyo to: Shin-Hakodatehokuto (4 hours and 2 minutes) Shin-Aomori (3 hours and 10 minutes) Akita (3 hours and 50 minutes) Niigata (2 hours and 23 minutes) Kanazawa (2 hours and 28 minutes) Shin-Osaka (2 hours and 38 minutes) Hakata (5 hours and 28 minutes) Shin-Osaka to: Nagoya (53 minutes) Hiroshima (1 hours and 34 minutes) Hakata (2 hours and 48 minutes) Hakata to: Kaghoshima-chuo (1 hours and 42 minutes) This document is owned or licensed by JETRO and providers of the information content. This document shall not be reproduced or reprinted on any medium or registered on any search system in whole or part by any means, without prior permission of JETRO.
    [Show full text]
  • JRTR No.64 Feature 50 Years of High-Speed Railways
    50 Years of High-Speed Railways Measures Taken by JR East to Expand Shinkansen Network and Increase Train Speeds Masanobu Karuzawa Introduction (JNR) era. Upon the 1987 creation of the JR group of railway operators, ownership of the shinkansen lines The Tohoku Shinkansen extension from Hachinohe to was transferred to the Shinkansen Holding Corporation Shin-Aomori commenced service on 4 December 2012, (hereafter SHC, dissolved in 1991), which leased the tracks completing construction of the full Tohoku Shinkansen, to JR East and the other JR operators. (The Tokyo–Ueno which had started just over 40 years earlier in 1971. section of the Tohoku Shinkansen, which was built by the Moreover, there is much anticipation of the further expansion SHC after the creation of JR East, was handled in the of the shinkansen network prior to the opening of the same manner.) Hokuriku Shinkansen through to Kanazawa in late FY2014. However, after the October 1991 abolition of the (JR East’s section of this new line is between Nagano and shinkansen track lease system, JR East purchased Joetsumyoko.) This article describes the expansion of the Tohoku Shinkansen (Tokyo–Morioka) and Joetsu the shinkansen network, its current status, and JR East’s Shinkansen (Omiya–Niigata) tracks, which remain company measures to increase train speeds. assets today. The Yamagata and Akita shinkansen lines were not Current Status of Shinkansen Network in shinkansen as defined by the Nationwide Shinkansen JR East Area Railway Development Act, but were existing narrow-gauge lines that were widened with dual-gauge tracks to allow JR East’s current shinkansen network consists of five through-services for both shinkansen and conventional trains lines—the Tohoku Shinkansen (Tokyo–Shin-Aomori), (mini-shinkansen).
    [Show full text]
  • Interior Design for Gran Class of E5 Tohoku Shinkansen "Hayabusa
    Hitachi Review Vol. 62 (2013), No. 6 302 Interior Design for Gran Class of E5 Tohoku Shinkansen “Hayabusa”: An Unprecedented Journey Experience Shingo Hirose OVERVIEW: The Gran Class is the first new grade of passenger car to Yukie Motomiya be introduced since the Shinkansen began operating. Its design needed to Hideo Kitabayashi provide not only a luxurious interior, but also an extraordinary experience that would justify the additional cost of a premium seat. Hitachi had Atsushi Matsuoka collaborated with the East Japan Railway Company to develop the design of Yukinobu Abe, Dr. Eng. the new Gran Class passenger car for the E5 “Hayabusa” used on the Tohoku Shinkansen. The aim was to provide an unprecedented travel experience. The initial design work involved visualizing how passengers would use the car. This was followed by the formulation of scenarios covering different travel experiences that were then used to determine passengers’ latent requirements and subjective values. The final step was to develop the style of service and interior that would satisfy the requirements identified from the scenarios. In producing this design for an unprecedented premium passenger car, Hitachi found that it needed to trial a variety of different methodologies and to utilize manufacturing techniques with a high degree of craftsmanship. INTRODUCTION The first of the new Gran Class Shinkansen HITACHI and the East Japan Railway Company (JR passenger cars commenced operation as part of the E5 East) have for some time been jointly engaged in the Shinkansen (production model) that entered service development and production of Shinkansen passenger in March 2011 (see Fig.
    [Show full text]
  • JR-East Shinkansen Technology
    JR-East Shinkansen Technology Naomichi Yagishita, Executive Director East Japan Railway Company 2013/ 4/8 Presentation for41th Modern Rolling Stock at Technical University Graz. Contents Outline of JR-East Shinkansen network Features of Shinkansen rolling stock Control center for monitoring of Shinkansen operations Turn-back at Tokyo station Through service Countermeasures against natural disasters Environmental technology Riding comfort technology 3.11 Earthquake, restoration and recovery Future Plans Copyright© 2013 East Japan Railway Company ALL Rights Reserved. Network of JR East Shin-Aomori Akita Yamagata Nagano Niigata Sendai Tokyo *After 2013 spring Network Gauge Power supply Max Velocity Category 1 Dedicated guideway 1140km AC 25kv 50Hz 320km/h Standard High speed Through service 277km (1435mm) AC 20kv 50Hz network into conventional line 130km/h on electrified 100km/h on Non- Category 2 Tokyo urban network 2550km Narrow DC 1.5kv AC 20kv 50Hz electrified Category 3 Local network 3586km (1064mm) Non-electrified Copyright© 2013 East Japan Railway Company ALL Rights Reserved. Features of JR-East Shinkansen network Shin-Aomori 1.Runs in 5 directions from Hachinohe Tokyo Akita Morioka 2. Uses 3 types of rolling stock 3. Through-operation on Shinjo converted conventional lines by hybrid type Yamagata Sendai Niigata Fukushima 4.Quick turn-back at terminal stations (12 minutes at Tokyo Kanazawa Station) Nagano Takasaki 5. Maximum speed 320km/h Omiya Copyright© 2013 East Japan Railway Company ALL Rights Reserved. Features of rolling stock Three types of JR East Shinkansen trains For longer trips 275km/h 320km/h Hybrid type For through service with coupling/uncoupling functions 275km/h 300km/h For commuting 240km/h240km/h Copyright© 2013 East Japan Railway Company ALL Rights Reserved.
    [Show full text]
  • Tohuku Shinkansen : Tokyo - Aomori
    TRAIN : Shinkansen JOURNEY : Tohuku Shinkansen : Tokyo - Aomori Journey Duration : Scenic Day Trip Six train categories operate on the Tohoku Shinkansen: The Hayabusa is the fastest train category along the Tohoku Shinkansen, serving only Tokyo, Omiya,Sendai, Morioka and Shin-Aomori Stations. Introduced in March 2011, the Hayabusa currently operates only two round trips per day along the entire line, but the number of services will be increased in the future. Trains run at speeds of up to 300 km/h, to be increased to 320 km/h in spring 2013. The Hayabusa is one of the few shinkansen trains where advance seat reservation is mandatory. When all seats are booked out, standing tickets can be purchased. Only between Morioka and Shin-Aomori, passengers may use vacant seats without seat reservations. Besides ordinary seats (3x2 seats per row) and a Green Car (2x2 seats per row), the Hayabusa carries one Gran Class car, the first class service by JR East with 2x1 seats per row. The Hayate is the second fastest train category along the Tohoku Shinkansen, running along its entire length between Tokyo and Shin-Aomori, but stopping at a few more stations than the Hayabusa trains. Most of the Hayate trains are coupled with a Komachi train between Tokyo and Morioka. The Hayate also has mandatory advance seat reservations. When all seats are booked out, standing tickets can be purchased. Only between Morioka and Shin-Aomori, passengers may use vacant seats without seat reservations. The same exception also applies between Sendai and Morioka on Hayate trains that stop on stations between Sendai and Morioka.
    [Show full text]