LENGTH CONTENTS Page
Total Page:16
File Type:pdf, Size:1020Kb
EXPLANATORY REMARKS 1. The Financial year is the period from 1st July of the previous year to 30th June of the current year. 2. Tonnage figures are all in Metric tons. I Metric ton = 2204. 62 lbs. 3. Exchange rates : 1 Bangladesh Taka = 100 paisa 1 US$ = Tk. 78.40 Pound Sterling = 123.62 1 Taka = 0.01276 U.S. Dollar 1 Taka = 0.008089 Pound Sterling 4. Lak. = 100,000 5. The abbreviations `BG' and `MG' indicate Broad Gauge (5'-6'' or 1676 mm) and Meter Gauge (3'-3-3/8'' or 1000 mm) respectively. 6. The abbreviation `DG' indicates Dual Gauge (Broad Gauge and Meter Gauge combined) 7. No Broad Gauge System exists in the East Zone. 8. The Zone-wise Statistics have been introduced from the financial year 1982-83. 9. All Statistics have been expressed in Metric Units. CONVERSION COEFFICIENTS LENGTH One mile = 1.609344 kilometers One kilometer = 0.621371 mile One meter = 39.369996 inches = 3.280833 feet = 1.093611 yards One inch = 0.0254 meter One feet = 0.3048 meter One yard = 0.9144 meter One long ton-mile = 1.635169 tone- kilometers. WEIGHT One long ton = 1.016047 metric tons (Tones) = 1016.05 kilograms One metric ton (Tone) = 0.984206 long ton = 26.7923 maunds = 1000 kilograms One maund = 37.3242 kilograms One seer = 0.93310 kilogram One kilogram = 1.071691 seers = 2.204622 pounds One gallon = 4.54596 liters One liter = 0.21997 gallon CONTENTS Page Brief History 1-4 Railway Recovery and Reform Programme 5-8 Schematic Organ gram 9 Private Sector Association 10 Development Plan Outlays 11-13 Track, Bridges, Stations & Signaling 14-16 Tele communication 17 Rolling Stock, Railway Ferry Services and Electrical 18-19 Stores, Passenger and Freight Traffic 20-21 Operational Problems 22 Officers and Staff Welfare 23-24 Social Cost 25 Security 26-27 Financial Summary 27-28 Statistical Highlights 29-31 Statistical Tables Railway Stations 32 Block & Non-block Stations 33 Route Kilometers 34 District-wise Route Kilometers 35 Track Kilometers Operated 36 Locomotives 37 Coaching Vehicles 38 Type- wise Passenger Coaching Vehicles 39 Type-wise Other Coaching Vehicles 40 Abandonment of Coaching Vehicles 41 Addition of Coaching Vehicles 42 Freight Wagons 43 Type-wise Freight Wagons 44 Abandonment of Freight Wagons 45 Addition of Freight Wagons 46 Summary of Rolling Stock 47 Availability of Rolling Stock 48 Passenger Traffic 49 Gauge-wise Passenger Traffic 50 Passenger Traffic Air-conditioned and First Class 51 Passenger Traffic Second Class 52 Class-wise Percentage of Passenger Traffic 53 Class-wise Percentage of Passenger-kilometers 54 Intercity Passenger Traffic 55 Service-wise Passenger Traffic 56 Occupancy of Intercity Trains 57 Freight Wagons Loaded 58 Freight Tones Carried 59 Gauge-wise Freight Tones Carried 60 Principal Commodities Carried 61 Earnings from Principal Commodities 62 Freight Traffic in Descending Order of Tones Carried 63 Passenger Trains and Train-kilometers (BG) 64 Passenger Trains and Train-kilometers(MG- East & West Zone Combined) 65 Passenger Trains and Train-kilometers(MG-Zone-wise) 66 Running of Passenger Trains (MG-Zone-wise) 67 Passenger Train-kilometers (MG-Zone-wise) 68 Punctuality of Passenger Trains (BG & MG) 69 Punctuality of Passenger Trains(MG-Zone-wise) 70 Coaching Vehicles per Train and Coaching Vehicle-kilometers (BG) 71 Coaching Vehicles per Train and Coaching Vehicle-kilometers (MG) 72 Coaching Vehicles per Train and Coaching 73 Vehicle-kilometers (MG-Zone wise) Freight Trains (BG) 74 Freight Trains (MG) 75 Freight Trains (MG-Zone-wise) 76 Freight Trains Gross Tone-kilometers 77 Container Services 78 Speed and Net Load of Freight Trains (BG) 79 Speed and Net Load of Freight Trains (MG) 80 Speed and Net Load of Freight Trains (MG-Zone-wise) 81 Coaching Vehicle Performance (BG) 82 Coaching Vehicle Performance (MG-East & West Zone Combined) 83 Freight Wagon Performance (BG) 84 Freight Wagon Performance (MG-East & West Zone Combined) 85 Locomotive Performance (BG) 86 Locomotive Performance (MG-East & West Zone Combined) 87 Engine Kilometers-Passenger, Goods and others (BG) 88 Engine Kilometers-Passenger, Goods and Others 89 (MG-East & West Zone Combined) Fuel Consumption 90 Fuel Consumption (Zone-wise) 91 Traffic Density (West Zone) 92-94 Traffic Density (East Zone) 95-96 Train Accidents 97 Analysis of Train Accidents 98 Casualties 99 Passenger and Freight Revenue 100 Class-wise Passenger Earnings and Passenger-kilometers. 101 Class-wise Revenue per Passenger-kilometer 102 Operating Revenue and Their Percentage 103 Operating Expenses and Their Percentage 104 Net Operating Income (Without Considering PSO & Welfare Grant) 105 Net Operating Income and Operating Ratio (Considering PSO Compensation & Welfare Grant) 106 Zone-wise Operating Revenue 107 Zone-wise Operating Expenses 108 Operating Ratio (Without Considering PSO & Welfare Grant) 109 Number and Cost of Employees 110 Department-wise Number of Employees 111 Zone-wise Number of Employees 112 Department-wise Percentage of Employees 113 Department-wise Employees of Project Management Organization 114 List of Closed Branch Line 114 LIST OF PRINCIPAL OFFICERS Director General`s Office 115 East Zone 116 West Zone 117 Project Management Organization 118 Other Principal Officers 118 INFORMATION BOOK 2015 BANGLADESH RAILWAY BRIEF HISTORY BANGLADESH RAILWAY, covering a length of 2877.10 route kilometers managed by 27,620 regular staff, is Government -owned and Government managed transportation agency of the country. Some Historical Events : 15 Nov.1862 : Construction of 53.11 Km. of Broad Gauge line between Darsana and Jagati of Kushtia district by Eastern Bengal Railway. 1 Jan.1871 : Extension of Darsana - Jagati Railway line upto Goalanda by Eastern Bengal Railway. 1874-1879 : Construction of Metre Gauge railway line from Sara (near Paksey) to Chilahati, Parbatipur to Dinajpur and Parbatipur to Kaunia and construction of Broad Gauge Railway line from Damukdia (Opposite to Sara) to Poradaha. 1882-84 : Bengal Central Railway Company constructed Benapole-Khulna Broad Gauge railway line. 1 Jul.1884 : Government took over the management of Eastern Bengal Railway. 4 Jan.1885 : Railway Metre Gauge connection between Dhaka and Narayangonj, a distance of 14.98 km. by Dhaka State Railway, which was later on merged with Eastern Bengal State Railway. 1885 : Construction of Dhaka - Mymensingh Railway section by Dhaka State Railway. 1 Apr.1887 : Eastern Bengal Railway was merged with Northern Bengal State Railway. 1891 : Construction of the Assam - Bengal Railway taken up with British Government assistance but was later on taken over by Assam-Bengal Railway Company. 1 Jul.1895 : Opening of 149.89 km. Metre Gauge lines between Chittagong and Comilla and 50.89 km. Metre Gauge lines between Laksam and Chandpur by Assam Bengal Railway. 3 Nov.1895 : Chittagong to Chittagong port line was constructed. 1896 : Construction of Metre Gauge Railway line from Comilla to Akhaura and Akhaura to Karimgonj. 1897 : Single line section between Darsana and Poradaha converted into double line section. 1898-99 : Mymensingh - Jagannathgonj Metre Gauge Railway constructred. 1899-1900 : Metre Gauge Railway line constructed between SantaharJn. to Fulchhari by Brahmaputra-Sultanpur Railway Company. 1903 : Laksam - Noakhali section constructed by Noakhali (Bengal) Railway Company. 1 April.1904 : Bengal Central Railway Company and Brahmaputra-Sultanpur Railway Company taken over by Govt. managed Eastern Bengal Railway. 1905 : Opening of Kaunia-Bonarpara Metre Gauge section. : Govt. purchased the Noakhali (Bengal) Railway Company. 1 Jan. 1906 : Noakhali (Bengal) Railway Company merged with Assam Bengal Railway. 1909 : Poradaha-Bhairamara single line converted into double line. 1910-1914 : Akhaura -Tongi section opened. Conversion of Shakole to Santahar Metre Gauge section into Broad Gauge. 1912-1915 : Kulaura - Sylhet section opened. 1 Jan.1915 : Hardinge Railway Bridge was opened over the river Padma at Paksey. 1915-1916 : Sara - Sirajganj line constructed by Sara - Sirajganj Railway Company. 1916 : Bhairamara-Raita Broad Gauge section opened. 1912-1918 : Gouripur - Mymensingh - Netrokona and Shamgonj-Jharia-janjail sections constructed by Mymensingh - Bhairab Bazar Railway Company. 1915-1932 : Bhairamara - Ishurdi - Abdulpur single line section converted into double line. 10 Jun.1918 : Rupsha - Bagerhat Narrow Gauge section constructed by a Branch line Company. Jul.1924 : Conversion of Santahar - Parbatipur Metre Gauge section into Broad Gauge. Sep.1926 : Conversion of Parbatipur - Chilahati Metre Gauge section into Broad Gauge. 1928 : Opening of Shaistagonj-Habigonj section. 1928-29 : Tista - Kurigram Narrow Gauge section converted into Broad Gauge. 1929 : Shaistagonj-Balla and Chittagong-Hathazari sections opened. 1930 : Hathajari - Nazirhat Metre Gauge and Abdulpur - Amnura Broad Gauge sections opened. 1931 : Sholashahar-Dohazari section opened. 6 Dec.1937 : Opening of king VI George Bridge connecting Bhairab Bazar and Ashugonj over the river Meghna. 1941 : Jamalpur-Bahadurabad Metre Gauge section opened. 1 Jan.1942 : Assam - Bengal Railway taken over by Government and amalgamated with the Eastern Bengal Railway under the name '' Bengal and Assam Railway ''. 1 Oct.1944 : Government took over Sara-Sirajganj Railway Company. 1947 : Bengal and Assam Railway was split up and the portion within the boundary of erstwhile East Pakistan was named as '' Eastern Bengal Railway '' , the control remaining with Central Government of Pakistan. 1948-1949 : Government takes over Mymensingh-Bhairab Bazar Railway