Cogeneration: an ELECTRICAL PERSPECTIVE
Total Page:16
File Type:pdf, Size:1020Kb
Cogeneration: An ELECTRICAL PERSPECTIVE - Diep Nguyen, PE, Principal - DTN Engineers, Inc. www. dtnengrs.com SF IAS Jan 2010 Meeting DTN Engrs, Inc. RENEWABLE DISTRIBUTED ENERGY SOURCES (DER) WIND WATER (HYDRO POWER) SUN GEOTHERMAL BIOMASS SF IAS Jan 2010 Meeting DTN Engrs, Inc. WIND TURBINES IN LIVERMORE, CA SF IAS Jan 2010 Meeting DTN Engrs, Inc. 300KW HYDROTURBINES AT ACWD SF IAS Jan 2010 Meeting DTN Engrs, Inc. DUAL -AXIS SOLAR TRACKER AT WEST COUNTY WPCP RICHMOND CA SF IAS Jan 2010 Meeting DTN Engrs, Inc. MANTRIA BIOFUEL POWER PLANT KNOXVILLE TN. SF IAS Jan 2010 Meeting DTN Engrs, Inc. TRADITIONAL COGEN PLANT STEAM HEAT RECOVER ELECTRICITY SYSTEM GEN GAS ENGINE TURBINE SF IAS Jan 2010 Meeting FUEL DTN Engrs, Inc. 7.5MW DIGESTER GAS COGEN PLANT SF IAS Jan 2010 Meeting DTN Engrs, Inc. COGEN SWITCHGEAR SF IAS Jan 2010 Meeting DTN Engrs, Inc. 5MW DIGESTER GAS COGEN PLANT SF IAS Jan 2010 Meeting DTN Engrs, Inc. 100KW DIGESTER GAS MICROTURBINE SF IAS Jan 2010 Meeting DTN Engrs, Inc. DISTRIBUTED GENERATION/MICROGRIDS MICRO- TURBINES UTILITY GRID MICRO WIND FUEL CELL HYDRO- TURBINES FARM COGEN PV SYSTEM PV SOLAR PLANTS THERMAL SF IAS Jan 2010 Meeting DTN Engrs, Inc. TWO IMPORTANT PG&E RULES RULE NO. 2 RULE NO. 21 SF IAS Jan 2010 Meeting DTN Engrs, Inc. PG&E ELECTRIC RULE 2 DESCRIPTION OF SERVICES . VOLTAGE . SERVICE CONFIGURATION . LOAD LIMITATIONS . INTERFERENCES SF IAS Jan 2010 Meeting DTN Engrs, Inc. PG&E ELECTRIC RULE 21 GENERAL FACILITY INTERCONNECTIONS Application Process Interconnection Requirements Protection Relays StSystem PfPerformance Metering, monitoring and Telemetry SStystem C Ctifitiertification and dTti Testing PG&E INTERCONNECTION HANDBOOK (updated 2009) SF IAS Jan 2010 Meeting DTN Engrs, Inc. IEEE 1547 IEEE Standard for Interconnecting Distributed Energy Resources (DER) with Electric Power System . Functional Requirements for interconnections. Not a design handbook or application guide . Section 2 – Guide for interconnection . Section 3 – Guide for monitoring, information exchange and control . Section 4 – Guide for design, operation and integration of island system . Section 5 – GfGuide for interconnection of sources larger than 10 MVA . Section 6 – Recommended practice for interconnection w/seconda ry Ne tw ork SF IAS Jan 2010 Meeting DTN Engrs, Inc. MAIN CONSIDERATIONS IN COGEN FACILITY DESIGN: 1. RELIABILITY 2. EQUIPMENT QUALITY 3. COSTS 4. REGULATION COMPLIANCE SF IAS Jan 2010 Meeting DTN Engrs, Inc. TYPICAL SINGLE-LINE DIAGRAM SF IAS Jan 2010 Meeting DTN Engrs, Inc. COGEN SYSTEM – SINGLE UTILITY SERVICE SF IAS Jan 2010 Meeting DTN Engrs, Inc. COGEN SYSTEM – DUAL UTILITY SERVICE SF IAS Jan 2010 Meeting DTN Engrs, Inc. BASIC PARALLELING PROTECTION SF IAS Jan 2010 Meeting DTN Engrs, Inc. ELECTRICAL SWITCHGEAR STANDARD RATINGS Short Circuits Circuits Breakers UL 250 MVA 1200A ANSI/IEEE C37.20.2 350 MVA 2000A 500 MVA 3000A (Formerly UL-1670 750 MVA 4000A Metal-Clad SWGR) 1000 MVA (UL-891 Switchboards UL-1558 Metal-enclosed SWGR 1500 MVA Low voltage) SF IAS Jan 2010 Meeting DTN Engrs, Inc. LOAD SHEDDING SYSTEM: A. FREQUENCY-BASED (Hz) B. LOAD –BASED (KW) LOAD INHIBITING SYSTEM A. ESSENTIAL LOADS B. NON-ESSENTIAL LOADS SF IAS Jan 2010 Meeting DTN Engrs, Inc. COGEN FACILITY AUXLIARY SYSTEMS 1. FUEL SUPPLY 2. CONTROL SYSTEM (SCADA) 3. STANDBY POWER (BLACK START) 4. FIRE PROTECTION SYSTEM 5. COMMUNICATIONS SF IAS Jan 2010 Meeting DTN Engrs, Inc. QUESTIONS ??? SF IAS Jan 2010 Meeting DTN Engrs, Inc..