February-2021 Executive Summary on Power Sector
Total Page:16
File Type:pdf, Size:1020Kb
भारत सरकार Government of India वि饍युत मंत्रालय Ministry of Power के न्द्रीय वि饍युत प्राधिकरण Central Electricity Authority Executive Summary on Power Sector February-2021 Executive Summary for the Month of February-2021 Contents SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Feb-2021 (BU) 1A & 1B 2 Generating Capacity Addition for Feb-2021 (MW) 2 3 List of Projects Commissioned in Feb-2021 3 4 All India Installed Capacity (MW) Region-wise as on 28-02-2021 3 5 All India Installed Capacity (MW) Sector-wise as on 28-02-2021 4 6 Transmission Lines Added during Feb-2021 (Ckms) 5 7 Transformation Capacity Addition during Feb-2021 (MVA) 6 8 Power Supply Position (Energy & Peak) in Feb-2021 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 10 All India PLF Sector-wise for Feb-2021 10 11 T & D and AT & C Losses (%) 12 All India Village Electrification 11 13 Average cost of Power & Average Realisation 14 All India Coal consumption for Power Generation (MT) Section B - Capacity Addition 1 Capacity Addition Targets and Achievements in 12th Plan, 2017-18 , 2018-19 and 2019-20 12 2 Capacity Addition Targets & Achievements during Feb-2021 13 3 Installed Capacity in various Regions including their shares. 14-19 Section C - Transmission Lines 1 Programme and Achievements of Transmission Lines in Feb-2021 20 2 List of Transmission Lines Commissioned during Feb-2021 Section D - Sub Stations Programme and Achievements of Sub-Stations in Feb-2021 1 21 2 List of Sub Stations commissioned during Feb-2021 Section E - Electricity Generation 1 Electricity Generation (MU) Targets and Achievements for 2020-21 22 Section F - Power supply position 1 Power Supply Position (Provisional) for Feb-2021 23 2 Peak Demand and Peak Met (Provisional) for Feb-2021 24 3 Power Supply Position (Revised) for Jan-2021 25 4 Peak Demand and Peak Met (Revised) for Jan-2021 26 5 Notified Power cuts / Restrictions on Industries during Feb-2021 27 6 Power Supply to Agricultural Sector during Feb-2021 28 Section G - Growth of Power Sector 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 30 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since 2006 31 5 Average cost of power supply & Average realisation (Paisa/kWh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 Section H - Rate of sale of power 1 Rate of sale of power 33-46 2 Outstanding dues of Power Utilities Payable to CPSUs on Monthly basis 47 ABBREVIATION Sr.No Short Form Full Form 1 Ach Achievements 2 ACS Average Cost of Supply Average Revenue 3 ARR Realization Aggregate Technical 4 AT&C and Commercial 5 BU Billion Units Central Electricity 6 CEA Authority 7 CKMs Circuit Kilo Meters Central Public Sector 8 CPSUs Undertakings Damodar valley 9 DVC Corporation High Voltage Direct 10 HVDC Current Transmission Independent Power 11 IPP Producer 12 IR Inter Regional 13 kV Kilo Volts 14 kWh Kilo Watt Hours 15 MT Million Tonnes 16 MU Million Units 17 MVA Mega Volt Ampere 18 MW Mega Watt 19 NA Not Applicable 20 PLF Plant Load Factor Renewable Energy 21 RES Sources State Load Dispatch 22 SLDC Centre Transmission and 23 T&D Distribution 24 UTL. Utilities 25 w.r.t With Respect To Section A - Highlights of Power Sector SN Contents Page 1 Electricity Generation (Conventional Sources) for Feb-2021 (BU) 1 2 Generating Capacity Addition for Feb-2021 (MW) 2 3 List of Projects Commissioned in Feb-2021 3 4 All India Installed Capacity (MW) Region-wise as on 28-02-2021 3 5 All India Installed Capacity (MW) Sector-wise as on 28-02-2021 4 6 Transmission Lines Added during Feb-2021 (Ckms) 5 7 Transformation Capacity Addition during Feb-2021 (MVA) 6 8 Power Supply Position (Energy & Peak) in Feb-2021 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 10 All India PLF Sector-wise for Feb-2021 10 11 T & D and AT & C Losses (%) 12 All India Village Electrification 11 13 Average cost of Power & Average Realisation 14 All India Coal consumption for Power Generation (MT) 1. Electricity Generation for Feb-2021 (BU) Achievement Targets Achievement* % Change of Type Achievement Feb-20 Feb-21 Feb-21 w.r.t. Feb-2020 Thermal 89.300 95.764 91.034 1.9 Nuclear 3.172 2.929 2.649 -16.5 Hydro 8.435 7.047 7.251 -14.0 Bhutan Import 0.068 0.237 0.123 80.9 All India 100.98 105.98 101.06 0.1 *Provisional 101.08 101.06 101.06 101.04 101.02 101.00 BU 100.98 100.98 100.96 100.94 100.92 Feb-20 Feb-21 Electricity Generation During Apr-19 to Feb-20 & Apr-20 to Feb-21 (BU) Type Apr-19 to Feb-20 Apr-20 to Feb-21* % Change w.r.t Apr-19 to Feb-20 Thermal 959.935 925.143 -3.62 Nuclear 42.418 39.812 -6.14 Hydro 146.679 141.859 -3.29 Bhutan Import 5.688 8.664 52.32 All India 1,154.72 1,115.48 -3.40 * Provisional 1,400.00 1,154.72 1,200.00 1,115.48 1,000.00 800.00 BU 600.00 400.00 200.00 0.00 Apr-19 to Feb-20 Apr-20 to Feb-21* 1A Electricity Generation (Including Hydro as conventional) Feb-2021* Feb-2020 % Growth Generation from Growth in Growth in Growth in Generation from Renewable Generation from Generation from Conventional Total* Total Conventional Renewable Total Sources* Conventional Sources Renewable Sources Sources* Generation Generation Generation (BU) (BU) (BU) (BU) (BU) (BU) (%) (%) (%) 101.06 10.919 111.98 100.98 11.246 112.221 0.08 -2.91 -0.22 Note: * Tentative Electricity Generation (Including Hydro as Renewable Energy Sources) Feb-2021* Feb-2020 % Growth Generation from Growth in Growth in Growth in Generation from Renewable Generation from Generation from Conventional Total* Total Conventional Renewable Total Sources* Conventional Sources Renewable Sources Sources* Generation Generation Generation (BU) (BU) (BU) (BU) (BU) (BU) (%) (%) (%) 93.81 18.170 111.98 92.54 19.681 112.221 1.37 -7.68 -0.22 Note: * Tentative All India Generation From Renewables (All Figures are in MU) Source-Wise All India For the Month of Cummulative for the period Sl.No. Generation from Renewables Jan-2021 Jan-2020 Apr-20 to Jan-21 Apr-19 to Jan-20 1 Wind 3562.30 3319.95 53745.27 57721.89 2 Solar 4865.41 4612.72 48212.20 39407.14 3 Biomass 339.05 273.21 2876.69 2347.05 4 Bagasse 2005.00 1906.91 7965.38 7741.14 5 Small Hydro 574.17 562.16 9342.72 8255.16 6 Others 164.50 23.95 1285.88 300.26 Total : 11510.43 10698.90 123428.14 115772.64 Note: 1) All figures are provisional 1B 2. Generating Capacity Addition for Feb-2021 (MW) Achievement Targets Achievement % Achivement Type Feb-20 Feb-21 w.r.t. Feb-2020 Thermal 0 250 1300 NA Hydro 300 0 150 NA Nuclear 0 0 0 NA All India 300 250 1450 NA NA- Not Applicable 1600 1,450.0 1400 1200 1000 800 600 400 300.0 200 0 Feb-20 1 Feb-21 Generating Capacity Addition during Apr-19 to Feb-20 & Apr-20 to Feb-21 Apr-19 to Feb-20 Apr-20 to Feb-21 % Change w.r.t Previous Year Thermal 5445.00 3336.15 -38.7 Hydro 300.00 510.00 NA Nuclear 0.00 0.00 NA All India 5745.00 3846.15 -33.1 NA- Not Applicable 7000.00 6000.00 5000.00 4000.00 3000.00 2000.00 1000.00 0.00 Apr-19 to Feb-20 Apr-20 to Feb-21 2 3. List of Projects Commissioned During Feb-2021 1 Thermal i) Neyveli New TPP Unit 2 Thermal (Lignite), Central Sector of 500 MW was commissioned on 03.02.2021 in Tamil Nadu ii) Gadarwara STPP Unit 2 Thermal (Coal), Central Sector of 800 MW was commissioned on 16.02.2021 in Madhya Pradesh 2 Hydro Kameng HEP Unit 4 , Hydro, Central Sector of 150 MW was commissioned on 11.02.2021 in Arunachal Pradesh. 3 Nuclear NIL 4. All India Installed Capacity (MW) Region-wise as on 28-02-2021 Thermal Nuclear Hydro RES** Grand Total Region Coal Lignite Gas Diesel Total Northern 54097.79 1580.00 5781.26 0.00 61459.05 1620.00 20288.77 18259.23 101627.05 Western 74295.12 1400.00 10806.49 0.00 86501.61 1840.00 7562.50 28630.62 124534.73 Southern 44634.52 3640.00 6491.80 433.66 55199.99 3320.00 11774.83 44094.34 114389.16 Eastern 27287.05 0.00 100.00 0.00 27387.05 0.00 4639.12 1581.90 33608.07 North-East 770.02 0.00 1776.96 36.00 2582.98 0.00 1944.00 369.17 4896.14 Islands 0.00 0.00 0.00 40.05 40.05 0.00 0.00 35.22 75.27 ALL INDIA 201084.50 6620.00 24956.51 509.71 233170.72 6780.00 46209.22 92970.48 379130.41 ** RES as on 28.02.2021 400000.00 Total = 379130.413 379130.41 350000.00 300000.00 250000.00 233170.72 200000.00 150000.00 92970.48 100000.00 46209.22 54932 50000.00 6780.00 0.00 Thermal Nuclear Hydro RES Total Captive Thermal Nuclear Hydro RES Total Captive Note: Captive Genaration is not included in the Total *Captive Power capacity as on 31.03.2018 3 5.