Appendix a of the Hazardous Materials Technical Report

Total Page:16

File Type:pdf, Size:1020Kb

Appendix a of the Hazardous Materials Technical Report HAZARDOUS MATERIALS TECHNICAL REPORT Appendix A: Sites of Concern Priority Ranking Table Priority Definition # of Sites Ranking 1 High Priority 65 2 Listed Site/Unknowns 22 3 Moderate/High Priority 83 4 Moderate Priority 34 Alternative 5: 147 5 Low Priority (Outside LOD) Alternatives 8, 9, 10, 13B, 13C: 145 Alternative 5:64 6 Low Priority (Inside LOD) Alternatives 8, 9, 10, 13B, 13C: 66 7 Not Included 86 Total Sites 501 Notes: 1. Each site has a unique number from 1 to 501. 2. Site numbering begins west to east along the I-495 corridor, then south to north along the I-270 corridor. 3. The map number corresponds to the mapping provided in Appendix B. MAY 2020 HAZARDOUS MATERIALS TECHNICAL REPORT Appendix A: Sites of Concern Priority Ranking Table Site App B Hazardous Materials Priority Section Site Name Address City Database Records & Field Observation Summary # Map # Investigation Area Ranks Records: UST. 1 I-495 West 1 Cooper Intermediate School 977 Balls Hill Rd McLean 2,800 feet southwest 7 Recon: Outside 1/4-mile buffer. US Naval Surface Warfare Center, Records: Orphan MD LRP site, unknown military research use. 2 I-495 West 1, 2 9500 MacArthur Blvd Bethesda 350 feet west 2 Carderock Taylor Testing Recon: No access. 3 I-495 West 1 Todd Schenk Residence 8521 Carlynn Dr Bethesda 2880 feet east Records: Closed heating oil UST. 5 4 I-495 West 1 Silvio Krvaric Residence 8505 River Rock Ter Bethesda 900 feet east Records: Closed heating oil UST. 5 5 I-495 West 1, 3 Eric Gilbertson Residence 6820 Carlynn Ct Bethesda 585 feet east Records: Closed heating oil UST. 5 6 I-495 West 1, 3 Sydney Hutchinson Residence 6910 Carlynn Ct Bethesda Adjacent to the east Records: Closed heating oil UST. 6 7 I-495 West 1, 3 Nilotpol Kundagrami Residence 6920 Carlynn Ct Bethesda Adjacent to the east Records: Closed heating oil UST. 6 8 I-495 West 1, 3 David Boucree Residence 8409 Carlynn Dr Bethesda 825 feet east Records: Open heating oil UST. 5 9 I-495 West 1, 3 Yanina Riedel Residence 8404 Carlynn Dr Bethesda 1,095 feet east Records: Closed heating oil UST. 5 10 I-495 West 1, 3 Mark Kushnir Residence 6718 Persimmon Tree Rd Bethesda 1,230 feet east Records: Closed heating oil UST. 5 11 I-495 West 3 Carderock Springs Elementary School 7401 Persimmon Tree Rd Bethesda Adjacent to the north Records: Closed heating oil UST. 6 12 I-495 West 3 James Worley Residence 8021 Thornley Ct Bethesda 400 feet north Records: Closed heating oil UST. 5 13 I-495 West 3 Donalds Park 7801 Seven Locks Rd Bethesda 75 feet west Records: Historical UST. 5 14 I-495 West 3 Tri State Stone Co. 8200 Seven Locks Rd Bethesda 695 feet west Records: Gasoline UST. 5 Records: MD OCPCASES – closed case, with release and cleanup, 02/1999; closed case, with no release or cleanup reported, 02/1994; closed case, commercial heating oil tank closure, with no release or cleanup reported, 02/1995; closed case, residential heating oil tank MCI Telecommunications closure, with no release or cleanup reported, 08/1995; closed case, with no release or 15 I-270 North 3 (Central Data Building), 11511 Fortune Ter Potomac 370 feet west cleanup reported, 02/1994. UST – one 15,000-gallon and 6,000-gallon diesel fuel tanks, and 5 US Department of Justice 3,000-gallon heating oil tank, permanently out of use. Historical UST – one 15,000-gallon diesel fuel tank, removed; one 6,000-gallon diesel fuel tank, in use. Recon: Low brick office building with a large parking lot. Two large heating oil USTs on south side of building, protected by concrete pad. Almost no staining on pavement. Records: Orphan EDR site. 16 I-495 West 3 River Quarry Residences 8205-8221 River Quarry Pl Bethesda Adjacent to the north 7 Recon: No indication of environmental impact. 17 I-495 West 3, 4 Robert Evans Residence 7612 Arrowood Rd Bethesda 600 feet east Records: Misidentified EDR dry cleaner. 7 18 I-495 West 3, 4 Cevon Wallace Residence 7613 Dwight Dr Bethesda Adjacent to the west Records: Open heating oil UST. 6 19 I-495 West 4 Jeffrey Sussman Residence 7627 Carteret Rd Bethesda 715 feet west Records: Closed dumping. 5 20 I-495 West 4 Kian Kaviani Residence 7324 Arrowood Rd Bethesda 585 feet east Records: Closed heating oil UST. 5 21 I-495 West 4 Bo Wang Residence 7327 Bradley Blvd Bethesda Adjacent to the east Records: Closed heating oil UST. 6 22 I-495 West 4 Torsak Rossaki Residence 7604 Barnum Rd Bethesda 750 feet west Records: Misidentified service station. 7 23 I-270 South 4, 23 Bethesda Country Club 7601 Bradley Blvd Bethesda Adjacent to the west Records: UST, Closed USTs, closed MDE LRP. 6 24 I-270 South 4, 23 Residence 7207 Thomas Branch Dr Bethesda 245 feet north Records: Closed OCP case. 5 25 I-495 West 4, 23 Yuxia Gao Residence 7208 Grubby Thicket Way Bethesda 380 feet east Records: Closed heating oil UST. 5 26 I-270 South 4, 23 Bhavya Lal Residence 7201 Grubby Thicket Way Bethesda 325 feet east Records: Closed heating oil UST. 5 27 I-270 South 4, 23 Howard Ruben Residence 7209 Greentree Rd Bethesda 345 feet east Records: Closed heating oil UST. 5 Records: AST, Closed heating oil UST. 28 I-495 West 4, 23 WMAL Radio Transmitter Site 7115 Greentree Rd Bethesda Adjacent to the north 6 Recon: AST in good condition with secondary protection. 29 I-495 West 4 Jim Chaloshteri Residence 9403 Fernwood Rd Bethesda 870 feet south Records: Closed heating oil UST. 5 30 I-495 West 4 Cathleen Enright Residence 9411 Fernwood Rd Bethesda 510 feet south Records: Closed heating oil UST. 5 MARCH 2020 DRAFT, PRE-DECISIONAL 1 HAZARDOUS MATERIALS TECHNICAL REPORT Site App B Hazardous Materials Priority Section Site Name Address City Database Records & Field Observation Summary # Map # Investigation Area Ranks 31 I-495 West 4 Michael Toman Residence 9317 Friars Rd Bethesda 595 feet south Records: Closed heating oil UST. 5 32 I-495 West 4 Patrice Caporossi Residence 9313 Friars Rd Bethesda 825 feet south Records: Closed heating oil UST. 5 33 I-495 West 4, 5 Vusizihlobo Nkosinathi Residence 9801 Singleton Dr Bethesda Adjacent to the south Records: Misidentified EDR service station. 7 Adjacent to the 34 I-495 West 5 St. Jane de Chantal Church 9701 Old Georgetown Rd Bethesda Records: Closed heating oil UST. 6 southeast 35 I-495 West 5 French International School 9600 Forest Rd Bethesda 315 feet south Records: Closed heating oil UST. 5 36 I-495 West 5, 24 Jahed Kouchak Residence 9904 Broad St Bethesda 1,025 feet north Records: Misidentified EDR dry cleaner. 7 37 I-495 West 5, 24 Whitley Park Condominium Assoc. 5400 Whitley Park Ter Bethesda Adjacent to the south Records: Heating oil UST. 6 38 I-495 West 5, 24 William Osborne Residence 10002 Fleming Ave Bethesda 1,025 northwest Records: Misidentified EDR dry cleaner. 7 39 I-495 West 5, 24 The Promenade Towers 5225 Pooks Hill Rd Bethesda Adjacent to the south Records: EDR dry cleaner, UST. 1 40 I-270 South 5, 24 Society of American Foresters 5400 Grovesnor Ln Rockville Adjacent to the west Records: UST, Closed OCP case. 6 41 I-270 South 5, 24 Avalon Apartments 10301 Grosvenor Pl Bethesda 165 feet east Records: Closed UST. 5 42 I-270 South 24 Grosvenor Park III Condos 10401 Grosvenor Pl Bethesda 630 feet northeast Records: Closed UST, UST. 5 43 I-270 South 5, 24 Grosvenor House Apartments 10201 Grosvenor Pl Bethesda 100 feet northeast Records: Closed UST. 5 44 I-495 West 5 Bethesda Marriott 5151 Pooks Hill Rd Bethesda Adjacent to the south Records: UST permanently out of service. 6 Records: Misidentified EDR Historical Cleaner – 1989-1993. 45 I-495 Center 5 Angela Hvitved Residence 4902 Asbury Ln Bethesda 400 feet south 7 Recon: Site is private residence with no noted concerns. Records: Misidentified EDR Historical Cleaner – 2005-2010. 46 I-495 Center 5 Sibe Bhattacharyya Residence 9703 Parkwood Dr Bethesda 700 feet northeast 7 Recon: Site is private residence with no noted concerns. Records: MD State Hazardous Waste Sites, unknown landfill areas, MDE LRP – mercury pool Walter Reed National Adjacent to the 47 I-495 Center 5, 6 8975 Wisconsin Ave Bethesda cleanup. 2 Military Medical Center southwest Recon: No access. Uniformed Services 48 I-495 Center 6 4301 Jones Bridge Rd Bethesda 50 feet south Records: Orphan site RCRA-LQG, manifests. 5 University of the Health Sciences 49 I-495 Center 6 St. Luke's House 6 Spring Hill Ct Chevy Chase 625 feet south Records: RCRA-NonGen. 7 50 I-495 Center 6 William Wallace Residence 9119 Le Velle Dr Chevy Chase 528 feet southeast Records: Closed dumping. 5 51 I-495 Center 6 Washington DC Temple 9900 Stoneybrook Dr Kensington 620 feet north Records: Closed heating oil UST. 5 52 I-495 Center 6 Residence 9711 Stoneybrook Dr Kensington 550 feet northwest Records: Closed heating oil UST. 5 Walter Reed Army Medical Center, 53 I-495 Center 6, 7 2460 Linden Ln Silver Spring 100 feet south Records: MDE historical landfills. 5 Forest Glen Annex Records: Former motor pool, Historical LUST, LRP and HWS. Associates in Cardiology / 54 I-495 Center 6 2900 Linden Ln Silver Spring Within the LOD Recon: Office building with no external activities or observable environmental concerns. No 2 former Walter Reed A.M.C. Motor Pool tanks were present.
Recommended publications
  • Forest Glen Apartments Montgomery County, Maryland August 14, 2020
    Forest Glen Apartments Montgomery County, Maryland August 14, 2020 Traffic Impact Analysis Prepared for: Montgomery Housing Partnership, Inc. Mr. Donald R. Hague 12200 Tech Road, Suite 250 Silver Spring, MD 20904 TABLE OF CONTENTS INTRODUCTION AND SUMMARY OF FINDINGS ............................................................... 1 EXISTING TRAFFIC CONDITIONS ....................................................................................... 3 1 Site Location Map ........................................................................................................ 6 1A Site Plan ....................................................................................................................... 7 2 Existing Lane Use ......................................................................................................... 8 3A Existing Peak Hour Traffic Volumes ............................................................................. 9 3B Updated Existing Peak Hour Traffic Volumes ............................................................ 10 3C Existing Peak Hour Pedestrian Volumes .................................................................... 11 4 Existing Pedestrian, Bicycle, and Transit Facilities ..................................................... 12 4A Results of Pedestrian Crossing Timing Analysis ......................................................... 13 TOTAL TRAFFIC CONDITIONS ......................................................................................... 14 5 Trip Generation for Subject Site
    [Show full text]
  • WMATA Upcoming Opportunities
    Metro’s Capital Program Overview American Council of Engineering Companies of Metropolitan Washington (ACEC/MW) Transit Panel January 28, 2021 Laura Mason, EVP Capital Delivery 1 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Metro’s Capital Program Overview Moving the Region . Metro provides transit to move essential workers and is vital to commerce in the region • 54% of region’s pre-pandemic jobs are within a 1/2-mile radius of all Metro rail stations and Metro bus stops . Metro is accelerating safety and state of good repair programs during period of low ridership . Capital Program invested $1.7 billion in FY2020; FY2021 forecast ~$2 billion, FY2022 proposed $2.6 billion. 2 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Metro’s Capital Program Overview $28 Billion $22 Billion $12.3 Billion in known estimated 10-Year Six-Year Capital capital needs Capital Plan Improvement Program Identified key investments for safety & Design & engineer projects reliability projects, and enhancements to before implementation improve operating efficiencies Purpose: • Employ Best Practices to Advance the Capital Program Objectives: • Effective & Efficiently Advance $2.1 Billion Average Annual Program • Expand Competition to Attract Top Talent and Best Solutions Note: Preliminary forecast subject to Board review and approval 3 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY Metro’s Capital Program Overview FY2021-FY2027 Capital Program Priorities Rail Bus & Paratransit Operations and Admin Support • Station Platform Rehabilitation • Bus Acquisition/Replacement
    [Show full text]
  • Washington D.C
    Calvin College Off Campus Programs Semester in Washington D.C. Important Numbers and Information Cell phone number for Professor Koopman: 616/328-4693 Address for Professor Koopman: 114 11th St., SE; Unit A Washington D.C. 20003 Washington Intern Housing Network (WIHN): 202/608-6276 Greystone House Address: 1243 New Jersey Avenue, N.W. Washington DC 20001 Maintenance emergency in House: 202/579-9446 (leave a message if no one picks up) Non-emergency in building (repairs, etc.): email notification to [email protected] Wifi access—information posted at the house inside the front door Quiet Hours: 9:00 pm to 7:00 am daily Internship Supervisor at your workplace: Name: _________________________________ Phone Number: __________________________ Ellen Hekman at Calvin College: 616/526-6565 Others: _____________________________________________ _____________________________________________ _____________________________________________ _____________________________________________ _____________________________________________ _____________________________________________ _____________________________________________ _____________________________________________ CALVIN COLLEGE SEMESTER IN WASHINGTON DC Spring 2018 Introduction 1 Course Information Prerequisites 1 General Internships 1 Social Work Program 2 Preparation Clothing 2 Climate 4 Medical Issues 4 Semester Schedule 4 Housing Information Washington Intern Housing Network (WIHN) 4 WIHN Rules and Policies 6 Food and Meals 9 Travel Travel to Washington DC 10 Directions to Greystone House 10 Travel within Washington DC 12 Professor’s Housing and Contact Information 13 The City of Washington DC Directions and Maps 13 Visitor Information 13 Neighborhoods 13 Leaving the City 14 Cultural Information Group Outings 15 Cultural Opportunities and Site-seeing 15 Safety 17 Churches 18 Behavior and Health 21 Visitors 22 Attitude and Inclusiveness 22 communicate issues, problems and feelings. Furthermore, the entire group is responsible INTRODUCTION for each other during the semester.
    [Show full text]
  • Creating a Future for Greenbelt Road/MD-193
    TECHNICAL ASSISTANCE PANEL REPORT Creating a Future for Greenbelt Road/MD-193 WASHINGTON, DC SPONSORED BY: City of Greenbelt City of College Park Town of Berwyn Heights Metropolitan Washington Council of Governments June 4-5, 2018 Washington ABOUT ULI WASHINGTON A DISTRICT COUNCIL OF THE URBAN LAND INSTITUTE ULI Washington is a district council of the Urban Land Institute (ULI), a nonprofit education and research organization supported by its members. Founded in 1936, the Institute today has over 32,000 members worldwide representing the entire spectrum of land use planning and real estate development disciplines working in private enter-prise and public service. As the preeminent, multidisciplinary real estate forum, ULI facilitates the open exchange of ideas, information, and experi- ence among local, national, and international industry leaders and policy makers dedicated to creating better communities. ULI’s mission is to provide leadership in the responsible use of land and in creat- ing and sustaining thriving communities worldwide. ULI Washington carries out the ULI mission locally by sharing best practices, building consensus, and advanc- ing solutions through educational programs and community outreach initiatives. ABOUT THE TECHNICAL ASSISTANCE PANEL (TAP) PROGRAM The objective of ULI Washington’s Technical Assistance Panel (TAP) program is to provide expert, multidisciplinary, and objective advice on land use and real estate is-sues facing public agencies and nonprofit organizations in the Metropolitan Washing-ton Region. Drawing from its extensive membership base, ULI Washington conducts one and one-half day Panels offering objec- tive and responsible advice to local decision-makers on a wide variety of land use and real estate issues, ranging from site-specific projects to public pol- icy questions.
    [Show full text]
  • September 4, 1997
    Agenda for Meeting 12-2015 CITY OF ROCKVILLE PLANNING COMMISSION Don Hadley, Chair Anne Goodman Charles Littlefield David Hill Gail Sherman Jack Leiderman John Tyner, II Wednesday, June 24, 2015 7:00 p.m. Mayor and Council Chamber City Hall, 111 Maryland Avenue Andrew Gunning, Staff Liaison Marcy Waxman, Senior Assistant City Attorney Planning Commission Agenda and Staff Reports online: http://www.rockvillemd.gov/AgendaCenter/Planning-Commission-4 I. REVIEW AND ACTION Request for Street Name Change. At the request of Choice Hotels International, a proposal has been made to change the name of Renaissance Street, which is currently being constructed between Middle Lane and E. Montgomery Avenue in Rockville Town Center. Several options have been suggested by the applicant for consideration. Planner: Margaret Hall, 240-314-8226. II. WORKSESSIONS A. Comprehensive Master Plan Update – Presentation of the Transportation Report. Staff will discuss the transportation scan with the Commission, which describes trends and data regarding transportation conditions in the City. Emad Elshafei, Chief of Traffic and Transportation, 240-314-8508. B. Draft Bikeways Master Plan. The draft bikeways plan will also be discussed and direction will be requested from the Commission. Planner: Kevin Belanger, Traffic and Transportation, 240-314-8509. City of Rockville Planning Commission Agenda for Meeting No. 10-2015 June 24, 2015 Page 2 III. COMMISSION ITEMS A. Staff Liaison Report B. Old Business C. New Business D. Minutes (none) E. FYI Correspondence IV. ADJOURN City of Rockville Planning Commission Agenda for Meeting No. 10-2015 June 24, 2015 Page 3 HELPFUL INFORMATION FOR STAKEHOLDERS AND APPLICANTS I.
    [Show full text]
  • Senior Mobility and Accessibility Needs and Barriers Study
    Senior Mobility and Accessibility Needs and Barriers Study Draft Report June 7, 2017 Prepared for National Capital Region Transportation Planning Board Transportation/Land-Use Connections (TLC) Technical Assistance Program and the City of Greenbelt Photo credit: www.pedbikeimages.org / Laura Sandt (2009) Prepared by KFH KFH Group, Inc. Ciii•l1111 Bethesda, Maryland Senior Mobility and Accessibility Needs and Barriers Study EXECUTIVE SUMMARY The Senior Mobility and Accessibility Needs and Barriers Study, funded through the National Capital Region Transportation Planning Board Transportation/Land-Use Connections (TLC) Technical Assistance Program, brought together stakeholders in the Greenbelt community and solicited residents’ input to: Identify key areas where Greenbelt’s older adult and disabled populations are underserved, and Recommend transportation projects to best serve these populations. To accomplish this, a Needs and Barriers Assessment was conducted to identify transportation needs and barriers for older adults and people with disabilities living in Greenbelt. The assessment includes a review of demographic and land use data, outreach to the community through a survey and meetings with stakeholders in the Greenbelt community. Following these efforts, options were developed to address the needs and barriers identified. The Needs and Barriers Assessment found that the majority of older adults live in the northwest section of Greenbelt. The percent increase in population for the age 90 and over group from 2000 to 2010 is significantly
    [Show full text]
  • New Carrollton Station Future Bus Facility Needs and Short-Term Access Assessment
    New Carrollton Station Future Bus Facility Needs and Short-Term Access Assessment May 2011 New Carrollton Station Future Bus Facility Needs and Short-Term Access Assessment Final Report Washington Metropolitan Area Transit Authority Department of Planning and Joint Development Office of Station Area Planning and Asset Management May 2011 Lead Agency: Consultant: Washington Metropolitan Area Transit Parsons Brinckerhoff Authority Dudley Whitney, AICP, Project Manager Station Area Planning and Asset Management 1401 K Street NW Steven E. Goldin, Director Suite 701 Robin McElhenny, Manager of Station Area Planning Washington, DC 20005 John Magarelli, PE, Project Manager 600 5th Street NW Washington, DC 20001 New Carrollton Station Future Bus Facility Needs and Short-Term Access Assessment Contents Executive Summary ES-1 Assessment of Existing Conditions ES-1 Future Bus Bay Requirements ES-3 Introduction 1 Existing Conditions 7 Station Characteristics 7 Rail Service 9 Bus Service 10 Assessment of Existing Conditions at New Carrollton Metro Station and Recommended Short-Term Improvements 15 Estimate of Future Bus Bay Requirements 25 Future Land-Use 26 Methodology 29 Bus Bay Requirements 30 Future Estimates 31 Appendix A: Calculation of Future Bus Bay Requirements 35 New Carrollton Station Future Bus Facility Needs and Short-Term Access Assessment List of Figures Figure ES-1: Passenger Queues on the East Side ES-2 Figure 1: New Carrollton Metrorail Station Surrounding Area 1 Figure 2: Overview of the New Carrollton Bus Bays 7 Figure 3: Overview
    [Show full text]
  • REQUEST for QUOTATION #1111691 Timetable Distribution By
    DEPARTMENT OF TRANSPORTATION Marc Elrich Al R. Roshdieh County Executive Director REQUEST FOR QUOTATION #1111691 For Timetable Distribution by Persons with Developmental Disabilities ISSUE DATE: November 20, 2019 SUBMISSION DEADLINE: 3:00 PM on December 2, 2019 The Montgomery County Department of Transportation (DOT), Transit Services Division is soliciting bids for the above-referenced Request For Quotation. Bids must be returned not later than the date and time listed above. If a bidder is interested in submitting a bid but cannot make the submission deadline, the bidder must call the Montgomery County Department of Transportation, Transit Services Division to see if an extension may be granted. The following pages contain the terms, conditions and specifications for this Request For Quotation. NOTE: All submitted quotations must reference the Quotation Number and Title above and be signed by an authorized representative of the responding firm. Deliver one original, four copies in a sealed envelope containing bid sheet, quotation sheets, acknowledgment form, proposal, Minority, Female, Disabled Person Subcontractor Performance Plan and the Wage Requirements Certification to the address below by no later than the closing date and time as stated above. The sealed envelope should be marked with the quotation number, quotation title, due date and due time. Montgomery County Department of Transportation Division of Transit Services 101 Monroe Street, 5th Floor Rockville, Maryland 20854 ATTN: Starr C. Montout Should you have questions regarding the specifications in this solicitation, please contact Beverly LeMasters at (240) 777-5880 or [email protected] Page 1 of 28 RFQ #1111691 Attachments A. General Conditions of Contract Between County and Contractor A1 B.
    [Show full text]
  • Current Issue
    Inside Stories GREENBELT From its earliest days, Greenbelt was created with a City Limits reverence for non-motorized modes of transporta- Historic Greenbelt Inner tion. The inner walkway system was created as a Walkway System means for people to walk to almost any destination Roadside Pedestrian Trail Raiders Girls Retro Town Fair without having to cross a street at grade. Street (Includes Sidewalks) underpasses allowed pedestrians to avoid interac- Public Off-Road Pedestrian Trail Soccer, p.11 Winners, p.2 tion with automobiles. An Independent Newspaper eviewHistoric Greenbelt Inner As the city has grown to areas east of the FOREST Walkway Underpass Baltimore-Washington Parkway and west of the PRESERVE Capital Beltway, some of the planning features which Walking Tour were built into old Greenbelt have been lost. The ews American Discovery Trail Capital Beltway and Baltimore-Washington Parkway Use Metro N R VOL. 84, No. 44 15 Crescent Rd., Suite 100, Greenbelt, MD 20770-1887 SEPTEMBER 23, 2021 have divided the city in thirds and have limited the Underpass East Coast Greenway opportunities for getting from one area to another. Caution (Busy Intersection) In an effort to unite Greenbelt’s disparate sections and rekindle the spirit of free non-motorized move- Public Facility ment throughout the city, the Greenbelt City Council has worked with its advisory boards and interested Retail Facility/Dining citizens to develop a comprhensive city-wide master trails map for pedestrians and bicyclists. FOREST ElectionCampground 2021 PRESERVE Walking or bicycling for transportation or recreation enhances the quality of life for Greenbelt residents Council Tackles Park Issues, Picnic Area by reducing pollution and congestion, enhancing 16-, 17-Year-olds Can Vote health and fitness, and promoting a sense of FOREST School community.
    [Show full text]
  • FTA WMATA Safetrack Project Management Oversight Report May
    FOIA Exemption: All (b)(6 Monthly Report SafeTrack Program Washington Metropolitan Area Transit Authority (WMATA) May 2017 Progress Surge 14 – Prince George’s Plaza Station to Greenbelt Station – Track 2 at completion of Surge 14. June 26, 2017 PMOC Contract Number: DTFT60-14-D-00011 Task Order Number: 006, Project Number: DC-27-5272, Work Order No. 01 OPs Referenced: 01, 25 Hill International, Inc. One Commerce Square 2005 Market Street, 17th Floor Philadelphia, PA 19103 PMOC Lead: Michael E. Radbill, P.E. Length of Time PMOC Assigned to Project under current Contract: 3 Years, 1 Month Length of Time PMOC Lead Assigned to Project: 5 Years, 2 Months TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... 1 A. PROGRAM DESCRIPTION .............................................................................................. 1 B. PROGRAM STATUS ....................................................................................................... 2 C. CORE ACCOUNTABILITY INFORMATION ....................................................................... 3 D. MAJOR PROBLEMS/ISSUES ........................................................................................... 4 MAIN REPORT ....................................................................................................................... 6 1. PROGRAM STATUS ........................................................................................................... 6 2. PROGRAM COST ............................................................................................................
    [Show full text]
  • 10B-FY2020-Budget-Adoption-FINALIZED.Pdf
    Report by Finance and Capital Committee (B) 03-28-2019 Washington Metropolitan Area Transit Authority Board Action/Information Summary MEAD Number: Resolution: Action Information 202068 Yes No TITLE: Adopt FY2020 Operating Budget and FY2020-2025 CIP PRESENTATION SUMMARY: Staff will review feedback received from the public and equity analysis on the FY2020 Proposed Budget and request approval of the Public Outreach and Input Report, FY2020 Operating Budget and FY2020-2025 Capital Improvement Program (CIP). PURPOSE: The purpose of this item is to seek Board acceptance and approval of the Public Outreach and Input Report and Title VI equity analysis, and the FY2020 Operating Budget and FY2020-2025 CIP. DESCRIPTION: Budget Priorities: Keeping Metro Safe, Reliable and Affordable The budget is built upon the General Manager/CEO's Keeping Metro Safe, Reliable and Affordable (KMSRA) strategic plan. Metro is making major progress to achieve the goals of this plan by ramping up to average capital investment of $1.5 billion annually, establishing a dedicated capital trust fund exclusive to capital investment, and limiting jurisdictional annual capital funding growth to three percent. Metro continues to encourage the U.S. Congress to reauthorize the Passenger Rail Investment and Improvement Act (PRIIA) beyond FY2020, which provides $150 million in annual federal funds matched by $150 million from the District of Columbia, State of Maryland, and Commonwealth of Virginia. In order to establish a sustainable operating model, Metro is limiting jurisdictional operating subsidy growth to three percent and deploying innovative competitive contracting. The items on the KMSRA agenda that remain to be completed include restructuring retirement benefits and creating a Rainy Day Fund.
    [Show full text]
  • Background Information for State Transportation Priorities Letter
    DEPARTMENT OF TRANSPORTATION Marc Elrich Christopher R. Conklin County Executive Director February 25, 2020 Mr. Sidney Katz, President Montgomery County Council 100 Maryland Avenue Rockville, MD 20850 Dear Council President Katz: Each year, the Maryland Department of Transportation (MDOT) compiles a Consolidated Transportation Plan (CTP) that outlines the State's capital investment program. The projects included in the CTP are determined by MDOT based on their assessment of project priorities. A component of their analysis is letters provided by Counties and other jurisdictions that outline local priorities. Montgomery County last updated its priorities in 2017. Since that time, numerous factors have changed including the initiation of construction of the Purple Line and the US 29 Flash. Additionally, Vision Zero has been adopted by the County and MDOT has advanced a Traffic Relief Plan for 1-270 and 1-495. These significant changes, coupled with change of County Executive and Council indicate that it is time to update the County Priorities Letter. On behalf of County Executive Ehich, the Montgomery County Department of Transportation began work on a new priorities letter in the fall of 2019. A preliminary draft was developed and refined to reflect the priorities of the Executive Branch, including MCDOT. This draft was provided to the County's State Delegation for review and comment and was provided to the Montgomery County Planning Board. In December 2019, the Planning Board was provided with a briefing and held a work session to discuss the preliminary letter. Additionally, several suggestions were received from members of our State delegation. It is now time for the County Council to review the preliminary draft, with the benefit of the comments from the Planning Board and our Delegation.
    [Show full text]