Natural Resources Management Plan for South-East Wales Uplands Prepared by TACP for 2166 Torfaen County Borough Council -1

Total Page:16

File Type:pdf, Size:1020Kb

Natural Resources Management Plan for South-East Wales Uplands Prepared by TACP for 2166 Torfaen County Borough Council -1 Natural Resources Management Plan for South-east Wales Uplands TORFAEN COUNTY BOROUGH COUNCIL OCTOBER 2015 Natural Resources Management Plan for South-east Wales Uplands Prepared by TACP for 2166 Torfaen County Borough Council -1- Torfaen County Borough Council NATURAL RESOURCES MANAGEMENT PLAN FOR SOUTH-EAST WALES UPLANDS October 2015 TACP 10 PARK GROVE CARDIFF CF10 3BN Project Number: 2166 Revision: Rev. 3 Revision No. Date of Revision Written by Date Approved by Date 0 30.03.15 TR/JH/JB 30.03.15 JW 30.03.15 1 26.06.15 TR/JH/JB/TW/PS 29.06.15 JW 29.06.15 2 06.08.15 TR/JH/JB/TW/PS 06.08.15 JW 06.08.15 3 13.10.15 TR/JH/JB/TW/PS 13.10.15 JW 20.10.15 SUGGESTED CITATION: TACP (2015). Natural resources management plan for South-east Wales Uplands. Report to Torfaen County Borough Council. October 2015. TACP UK Ltd. Natural Resource Management Plan for SE Wales Uplands Prepared by TACP for 2166 Torfaen County Borough Council Natural Resource Management Plan for SE Wales Uplands Prepared by TACP for 2166 Torfaen County Borough Council CONTENTS EXECUTIVE SUMMARY ..................................................................................................................................... 1 1 INTRODUCTION ....................................................................................................................................... 5 1.1 AIMS AND OBJECTIVES ................................................................................................................................. 5 1.2 NATURAL RESOURCE MANAGEMENT .............................................................................................................. 5 1.3 BIODIVERSITY ............................................................................................................................................ 6 1.4 ECOSYSTEM SERVICES ................................................................................................................................. 6 1.5 WATER FRAMEWORK DIRECTIVE ................................................................................................................... 6 2 STUDY AREA ............................................................................................................................................ 7 2.1 LOCATION AND HISTORY .............................................................................................................................. 7 2.2 COMMON LAND ......................................................................................................................................... 7 3 RESOURCE ASSESSMENT ......................................................................................................................... 9 3.1 DATA SOURCES .......................................................................................................................................... 9 3.1.1 Phase 1 habitat survey ...................................................................................................................... 9 3.1.2 Ecological connectivity modelling ..................................................................................................... 9 3.1.3 Geology and soils ............................................................................................................................ 10 3.1.4 Water .............................................................................................................................................. 10 3.1.5 Ecosystem services .......................................................................................................................... 10 3.1.6 Cultural and Historical Heritage...................................................................................................... 12 3.2 PHYSICAL ENVIRONMENTAL CONDITIONS ...................................................................................................... 12 3.2.1 Topography ..................................................................................................................................... 12 3.2.2 Geology ........................................................................................................................................... 12 3.2.3 Soils ................................................................................................................................................. 13 3.2.4 Hydrology ........................................................................................................................................ 13 3.3 BIODIVERSITY AND NATURE CONSERVATION ................................................................................................... 14 3.3.1 Designated Sites within the Study Area .......................................................................................... 14 3.3.2 Habitats within the Study Area ....................................................................................................... 18 3.3.3 Priority Species in South-east Wales Uplands ................................................................................. 24 3.3.4 Other species of interest in South-east Wales Uplands .................................................................. 27 3.3.5 Habitat Connectivity ....................................................................................................................... 28 3.4 ECOSYSTEM SERVICES ................................................................................................................................ 29 3.4.1 Provisioning Ecosystem Services ..................................................................................................... 29 3.4.2 Regulating Ecosystem Services ....................................................................................................... 31 3.4.3 Cultural Ecosystems Services .......................................................................................................... 34 3.4.4 Supporting Ecosystem Services ....................................................................................................... 34 3.4.5 Other ecosystem services ................................................................................................................ 35 3.4.6 Total ecosystem services ................................................................................................................. 35 3.5 CULTURAL AND HISTORICAL HERITAGE ......................................................................................................... 35 3.6 EXISTING UPLAND MANAGEMENT ................................................................................................................ 36 3.6.1 Farming and agriculture ................................................................................................................. 36 3.6.2 Consultation with Commoners ........................................................................................................ 38 3.7 CLIMATE CHANGE RESILIENCE...................................................................................................................... 41 3.7.1 Climate change predictions ............................................................................................................. 41 3.7.2 Predicted impacts of climate change on priority species and habitats ........................................... 42 3.7.3 Predicted impacts of climate change on ecosystem services .......................................................... 43 3.8 AIR POLLUTION ........................................................................................................................................ 45 Natural Resource Management Plan for SE Wales Uplands Prepared by TACP for Job Number: 2166 Torfaen County Borough Council 4 MAJOR ISSUES AND OPPORTUNITIES FOR MANAGEMENT OF THE SOUTH WALES UPLANDS 2015-2025 46 4.1 ECONOMIC LAND MANAGEMENT AND CONSERVING THE COMMONS ................................................................. 46 4.2 ECOLOGICAL LAND MANAGEMENT AND WILDLIFE CONSERVATION .................................................................... 47 4.3 ECOSYSTEM SERVICES ENHANCEMENT .......................................................................................................... 48 4.4 COMMUNITY ENGAGEMENT AND SUSTAINABLE USE OF UPLANDS...................................................................... 49 4.5 LANDSCAPE CRIME ................................................................................................................................... 49 4.5.1 Arson ............................................................................................................................................... 49 4.5.2 Fly-tipping ....................................................................................................................................... 50 4.5.3 Illegal off-roading ........................................................................................................................... 51 4.5.4 Other landscape crime issues .......................................................................................................... 51 4.5.5 Next steps ....................................................................................................................................... 51 4.6 MECHANISMS FOR TAKING THE UPLANDS MANAGEMENT PLAN FORWARD ............................................................ 51 4.6.1 South-east Wales Directors of Environment and Regeneration (SEWDER) ...................................
Recommended publications
  • PROJECT Taxi Strategy for South East Wales
    Independent, not -for - profit, low emission vehicle and energy for transport experts PROJECT REPORT Taxi Strategy for South East Wales Cardiff Capital Region October 2019 729-001-02 Page 1 of 91 Prepared for: Clare Cameron Cardiff Council [email protected] Disclaimer 03000 040414 ext. 19009 Cenex has exercised all reasonable skill and care in the performance of our services and we shall be liable only to the extent we are in Prepared by: breach of such obligation. While the information is provided in good faith, the ideas presented in the report must be subject to further investigation, and take into account other Carl Christie factors not presented here, before being taken Technical Specialist forward. Cenex shall not in any circumstances be liable in contract, or otherwise for (a) any loss of investment, loss of contract, loss of Approved by: production, loss of profits, loss of time or loss of use; and/or (b) any consequential or indirect loss sustained by the client or any third parties. Document Revisions No. Details Date Fergus Worthy Senior Transport Consultant 1 Issued to CCR for review 2 Includes summary of 02/10/2019 workshop with licensing Company Details officers Cenex Holywell Building Holywell Park Ashby Road Loughborough Leicestershire LE11 3UZ Registered in England No. 5371158 VAT Registered No: 933596983 Tel: 01509 642 500 Email: [email protected] Twitter: @CenexLCFC Website: www.cenex.co.uk 729-001-02 Page 2 of 91 Contents 1 Executive Summary .......................................................................... 6 2 Introduction ..................................................................................... 10 2.1 Scope and Approach ....................................................................................................... 12 2.2 Background ..................................................................................................................... 12 3 Review of Current Vehicle Fleet .....................................................
    [Show full text]
  • South East Wales Transport Model Mode-Destination Model Estimation
    EUROPE South East Wales Transport Model Mode-destination model estimation James Fox, Bhanu Patruni For more information on this publication, visit www.rand.org/t/RR1927z2 Published by the RAND Corporation, Santa Monica, Calif., and Cambridge, UK © Copyright 2018 Welsh Government R® is a registered trademark. RAND Europe is a not-for-profit organisation whose mission is to help improve policy and decision making through research and analysis. RAND’s publications do not necessarily reflect the opinions of its research clients and sponsors. All rights reserved. No part of this book may be reproduced in any form by any electronic or mechanical means (including photocopying, recording, or information storage and retrieval) without permission in writing from the Welsh Government. Support RAND Make a tax-deductible charitable contribution at www.rand.org/giving/contribute www.rand.org www.rand.org/randeurope Preface This report has been produced for Llywodraeth Cymru / the Welsh Government. It documents the development of travel demand models for the South East Wales transport model. Mode-destinations models have been estimated for eight home-based tour purposes and for non-home-based tours and detours. While the primary audience for the document is the Welsh Government, it may be of wider interest for transport researchers and transport planners involved in transport demand forecasting and strategic planning. RAND Europe is an independent not-for-profit policy research organisation that serves the public interest by improving policymaking and informing public debate. Our clients are European governments, institutions and companies with a need for rigorous, impartial, multidisciplinary analysis. This report has been peer-reviewed in accordance with RAND’s quality assurance standards (see http://www.rand.org/about/standards/) and therefore may be represented as a RAND Europe product.
    [Show full text]
  • Contribution to the Knowledge of the Fauna of Bombyces, Sphinges And
    driemaandelijks tijdschrift van de VLAAMSE VERENIGING VOOR ENTOMOLOGIE Afgiftekantoor 2170 Merksem 1 ISSN 0771-5277 Periode: oktober – november – december 2002 Erkenningsnr. P209674 Redactie: Dr. J–P. Borie (Compiègne, France), Dr. L. De Bruyn (Antwerpen), T. C. Garrevoet (Antwerpen), B. Goater (Chandlers Ford, England), Dr. K. Maes (Gent), Dr. K. Martens (Brussel), H. van Oorschot (Amsterdam), D. van der Poorten (Antwerpen), W. O. De Prins (Antwerpen). Redactie-adres: W. O. De Prins, Nieuwe Donk 50, B-2100 Antwerpen (Belgium). e-mail: [email protected]. Jaargang 30, nummer 4 1 december 2002 Contribution to the knowledge of the fauna of Bombyces, Sphinges and Noctuidae of the Southern Ural Mountains, with description of a new Dichagyris (Lepidoptera: Lasiocampidae, Endromidae, Saturniidae, Sphingidae, Notodontidae, Noctuidae, Pantheidae, Lymantriidae, Nolidae, Arctiidae) Kari Nupponen & Michael Fibiger [In co-operation with Vladimir Olschwang, Timo Nupponen, Jari Junnilainen, Matti Ahola and Jari- Pekka Kaitila] Abstract. The list, comprising 624 species in the families Lasiocampidae, Endromidae, Saturniidae, Sphingidae, Notodontidae, Noctuidae, Pantheidae, Lymantriidae, Nolidae and Arctiidae from the Southern Ural Mountains is presented. The material was collected during 1996–2001 in 10 different expeditions. Dichagyris lux Fibiger & K. Nupponen sp. n. is described. 17 species are reported for the first time from Europe: Clostera albosigma (Fitch, 1855), Xylomoia retinax Mikkola, 1998, Ecbolemia misella (Püngeler, 1907), Pseudohadena stenoptera Boursin, 1970, Hadula nupponenorum Hacker & Fibiger, 2002, Saragossa uralica Hacker & Fibiger, 2002, Conisania arida (Lederer, 1855), Polia malchani (Draudt, 1934), Polia vespertilio (Draudt, 1934), Polia altaica (Lederer, 1853), Mythimna opaca (Staudinger, 1899), Chersotis stridula (Hampson, 1903), Xestia wockei (Möschler, 1862), Euxoa dsheiron Brandt, 1938, Agrotis murinoides Poole, 1989, Agrotis sp.
    [Show full text]
  • Check List of Noctuid Moths (Lepidoptera: Noctuidae And
    Бiологiчний вiсник МДПУ імені Богдана Хмельницького 6 (2), стор. 87–97, 2016 Biological Bulletin of Bogdan Chmelnitskiy Melitopol State Pedagogical University, 6 (2), pp. 87–97, 2016 ARTICLE UDC 595.786 CHECK LIST OF NOCTUID MOTHS (LEPIDOPTERA: NOCTUIDAE AND EREBIDAE EXCLUDING LYMANTRIINAE AND ARCTIINAE) FROM THE SAUR MOUNTAINS (EAST KAZAKHSTAN AND NORTH-EAST CHINA) A.V. Volynkin1, 2, S.V. Titov3, M. Černila4 1 Altai State University, South Siberian Botanical Garden, Lenina pr. 61, Barnaul, 656049, Russia. E-mail: [email protected] 2 Tomsk State University, Laboratory of Biodiversity and Ecology, Lenina pr. 36, 634050, Tomsk, Russia 3 The Research Centre for Environmental ‘Monitoring’, S. Toraighyrov Pavlodar State University, Lomova str. 64, KZ-140008, Pavlodar, Kazakhstan. E-mail: [email protected] 4 The Slovenian Museum of Natural History, Prešernova 20, SI-1001, Ljubljana, Slovenia. E-mail: [email protected] The paper contains data on the fauna of the Lepidoptera families Erebidae (excluding subfamilies Lymantriinae and Arctiinae) and Noctuidae of the Saur Mountains (East Kazakhstan). The check list includes 216 species. The map of collecting localities is presented. Key words: Lepidoptera, Noctuidae, Erebidae, Asia, Kazakhstan, Saur, fauna. INTRODUCTION The fauna of noctuoid moths (the families Erebidae and Noctuidae) of Kazakhstan is still poorly studied. Only the fauna of West Kazakhstan has been studied satisfactorily (Gorbunov 2011). On the faunas of other parts of the country, only fragmentary data are published (Lederer, 1853; 1855; Aibasov & Zhdanko 1982; Hacker & Peks 1990; Lehmann et al. 1998; Benedek & Bálint 2009; 2013; Korb 2013). In contrast to the West Kazakhstan, the fauna of noctuid moths of East Kazakhstan was studied inadequately.
    [Show full text]
  • If You Love Cycling You'll Love SE Wales
    If you love cycling you’ll www.velothon-wales.co.uk www.tourofbritain.co.uk love SE Wales. www.juniortourofwales.org www.abergavennyfestivalofcycling.co.uk South East Wales has become a favourite destination for professional & amateur road cyclists. You want hill climbs ? We’ve got them ! South East Wales is already host to several We have many challenging road routes that high profile races for snake high up through some of the most the professional and inspiring scenery in our country. And if you are amateur cyclist alike. Thousands of individual looking to swap tarmac for something a bit riders and teams more natural, we have hundreds of miles of converge on our region mountain and forestry trails to choose from. to compete in races like the Velothon Wales. To help you plan your next adventure, we have The race starts in created an online interactive map that will Cardiff and attracts up to 18,000 riders in the make it even easier to explore our region Sportive category, by bike. Look out for the NCN (National Cycle and the world’s most prestigious teams and Network) symbols that accompany most sites - professional riders they make extremely useful navigational tools. entering the Pro Race. Velothon Wales Stage - Aberdare Plan your next cycling adventure with our online Interactive Map Our online Interactive Map for use on desktop PC’s is the must-see guide for anyone planning to explore South East Wales on two wheels. Eat & Drink See Stay Toilets Repairs Click on the icon to launch the map or The Interactive Map is a mine full of information.
    [Show full text]
  • Annual Performance May 2013 to April 2014
    annual performance Stagecoach Customer Services Stagecoach in South Wales 1 St. David’s Road May 2013 to April 2014 Cwmbran Torfaen key facts NP44 1PD 26.9 million passenger journeys 17.1 million miles operated [email protected] carrying customers on our network 367 buses stagecoachbus.com/southwales operating on routes throughout South East Wales in the unitary authorities of Blaenau Gwent, Bridgend, Caerphilly, Cardiff, Merthyr, Newport, Monmouthshire, Powys, Rhondda Cynon Taf and Torfaen as well as services into Herefordshire £3.4 million investment on 31 new buses bus users uk exists to help you get the best from your bus service. If you need advice or if you have complained about 878 employees a bus service and have not had a satisfactory response, working across the 8 depots they can be contacted on: Tel: 02920 221370 99.5% service reliability email: [email protected] 90% service punctuality Bus timetable information: 0871 200 22 33* www.traveline.info * Calls cost 10p per minute from BT landline. Calls from other service providers and mobiles may vary. annual report stagecoachbus.com/southwales May 2013 to April 2014 Greener Smarter Travel 2013-2014 results about us Stagecoach in South Wales provides local bus services throughout South East Wales in the unitary authorities of Blaenau our staff Gwent, Bridgend, Caerphilly, Cardiff, Merthyr Tydfil, Newport, We are a major local employer with 695 drivers, 125 engineers and Monmouthshire, Powys, Rhondda Cynon Taf and Torfaen and cleaners, and 58 supervisors supervisors and managers all based locally. operates services into Herefordshire. We also operate express We have continued to invest in training all our staff.
    [Show full text]
  • A Powerhouse for the West July 2019
    Great Western Powerhouse March 2019 A Powerhouse for the West July 2019 3 Waterhouse Square Elliot House 138 Holborn 151 Deansgate London EC1N 2SW Manchester M3 3WD 020 3868 3085 0161 393 4364 Designed by Bristol City Council, Bristol Design July 19 BD11976 Great Western Powerhouse March 2019 A Powerhouse for the West July 2019 CONTENTS EXECUTIVE SUMMARY 2 THE UK POLICY CONTEXT 8 DEVOLUTION AND THE EMERGING REGIONAL DIMENSION TO UK ECONOMIC AND INDUSTRIAL POLICY 10 INTERNATIONAL MODELS OF CROSS-BORDER COLLABORATION 15 GREAT WESTERN POWERHOUSE GEOGRAPHY 18 ECONOMIC STRENGTHS AND OPPORTUNITIES 30 WHAT THE GREAT WESTERN POWERHOUSE SHOULD BE AIMING TO ACHIEVE 44 c 1 A Powerhouse for the West July 2019 A Powerhouse for the West July 2019 EXECUTIVE SUMMARY The economic map of Britain is being reshaped by devolution and the • The Northern Powerhouse and the Midlands The economic geography emergence of regional powerhouses that can drive inclusive growth at scale, Engine have established themselves as formidable regional groupings driving economic The inner core of the region is the cross-border through regional collaboration But, there is a missing piece of the jigsaw in rebalancing and promoting trade and economic relationship between the two metro regions the West of Britain along the M4 from Swindon across the Welsh Border to investment through the internationalisation of of the West of England Region (including Bristol and Swansea, and the intersecting M5 axis, through Bristol, north to Tewkesbury their regions These powerhouses have been
    [Show full text]
  • South East Wales Regional Strategic Framework Matrix Project Details
    South East Wales Regional Strategic Framework Matrix Project details Local Authority(s) All SE Wales Authorities Activity Cross Cutting Themes Sub-set Natural Resources Schemes/Project Title: City Region Landscape Park - making the most of our USP (working title) Project Description: Please provide a general overview of the project: The Well Being of Future Generations (Wales) Act 2015 creates a duty for specified public bodies to meet wellbeing goals whilst observing the sustainable development principle. It includes 7 well-being goals to create a resilient Wales, including “a nation which maintains and enhances a biodiverse natural environment with healthy functioning ecosystems that support social, economic and ecological resilience and the capacity to adapt to change (for example climate change)”. Part 1 of The Environment (Wales) Act 2016 focuses on the sustainable management of natural resources, creating duties to manage Wales’ natural resources in a more proactive, sustainable and joined-up way. It also helps to tackle the challenges we face and is focused on the opportunities our resources provide. In this context the term natural resources covers our landscapes and habitats (including coastlines, rivers, canals, lakes, urban & rural greenspaces, forests, wildlife/biodiversity) and air, together with the interconnecting trails that allow our communities, businesses and visitors to utilise and benefit from them. The outstanding natural resources and cultural heritage of the South Wales City Region are recognised by visitors and communities as some of the area’s very best assets. With such variety in a relatively small geographical area, it provides a unique selling point and major opportunity for growth.
    [Show full text]
  • Welsh Route Study March 2016 Contents March 2016 Network Rail – Welsh Route Study 02
    Long Term Planning Process Welsh Route Study March 2016 Contents March 2016 Network Rail – Welsh Route Study 02 Foreword 03 Executive summary 04 Chapter 1 – Strategic Planning Process 06 Chapter 2 – The starting point for the Welsh Route Study 10 Chapter 3 - Consultation responses 17 Chapter 4 – Future demand for rail services - capacity and connectivity 22 Chapter 5 – Conditional Outputs - future capacity and connectivity 29 Chapter 6 – Choices for funders to 2024 49 Chapter 7 – Longer term strategy to 2043 69 Appendix A – Appraisal Results 109 Appendix B – Mapping of choices for funders to Conditional Outputs 124 Appendix C – Stakeholder aspirations 127 Appendix D – Rolling Stock characteristics 140 Appendix E – Interoperability requirements 141 Glossary 145 Foreword March 2016 Network Rail – Welsh Route Study 03 We are delighted to present this Route Study which sets out the The opportunity for the Digital Railway to address capacity strategic vision for the railway in Wales between 2019 and 2043. constraints and to improve customer experience is central to the planning approach we have adopted. It is an evidence based study that considers demand entirely within the Wales Route and also between Wales and other parts of Great This Route Study has been developed collaboratively with the Britain. railway industry, with funders and with stakeholders. We would like to thank all those involved in the exercise, which has been extensive, The railway in Wales has seen a decade of unprecedented growth, and which reflects the high level of interest in the railway in Wales. with almost 50 per cent more passenger journeys made to, from We are also grateful to the people and the organisations who took and within Wales since 2006, and our forecasts suggest that the time to respond to the Draft for Consultation published in passenger growth levels will continue to be strong during the next March 2015.
    [Show full text]
  • Kalser Dorfertal, Osttirol)
    Nationalpark Hohe Tauern Tag der Artenvielfalt 2007 (Kalser Dorfertal, Osttirol) Patrick Gros Wolfgang Dämon Christine Medicus © Patrick Gros - Juli 2007 2007 2 3 Nationalpark Hohe Tauern Tag der Artenvielfalt 2007 (Kalser Dorfertal, Osttirol) Endbericht über die Ergebnisse und Diskussion der erhobenen Daten auf der Basis der Biodiversitätsdatenbank des Nationalparks Hohe Tauern Patrick Gros Wolfgang Dämon Christine Medicus unter Mitarbeit von Heribert Köckinger, Andreas Maletzky, Christian Schröck, Oliver Stöhr, Claudia Taurer-Zeiner, Roman Türk 2007 Gefördert aus Nationalparkmitteln des Bundesministeriums für Land- und Forstwirtschaft, Umwelt und Wasserwirtschaft sowie der Länder Salzburg, Kärnten und Tirol. Herausgeber: Haus der Natur Museum für darstellende und angewandte Naturkunde Museumsplatz 5 A-5020 Salzburg, Österreich Auftraggeber: Verein Sekretariat Nationalparkrat Hohe Tauern Kirchplatz 2 A-9971 Matrei in Osttirol, Österreich Zitiervorschlag: GROS, P., DÄMON, W. und MEDICUS C. (2007): Nationalpark Hohe Tauern - Tag der Artenvielfalt 2007 (Kalser Dorfertal, Osttirol). Unveröffentlichter Endbericht im Auftrag des Nationalparks Hohe Tauern. Haus der Natur, Salzburg: 66 Seiten. 4 Inhalt Zusammenfassung ....................................................................................... 5 Einleitung ...................................................................................................... 6 Untersuchungsgebiet .................................................................................... 8 Ergebnis – Übersicht
    [Show full text]
  • Sites of Importance for Nature Conservation Wales Guidance (Pdf)
    Wildlife Sites Guidance Wales A Guide to Develop Local Wildlife Systems in Wales Wildlife Sites Guidance Wales A Guide to Develop Local Wildlife Systems in Wales Foreword The Welsh Assembly Government’s Environment Strategy for Wales, published in May 2006, pays tribute to the intrinsic value of biodiversity – ‘the variety of life on earth’. The Strategy acknowledges the role biodiversity plays, not only in many natural processes, but also in the direct and indirect economic, social, aesthetic, cultural and spiritual benefits that we derive from it. The Strategy also acknowledges that pressures brought about by our own actions and by other factors, such as climate change, have resulted in damage to the biodiversity of Wales and calls for a halt to this loss and for the implementation of measures to bring about a recovery. Local Wildlife Sites provide essential support between and around our internationally and nationally designated nature sites and thus aid our efforts to build a more resilient network for nature in Wales. The Wildlife Sites Guidance derives from the shared knowledge and experience of people and organisations throughout Wales and beyond and provides a common point of reference for the most effective selection of Local Wildlife Sites. I am grateful to the Wales Biodiversity Partnership for developing the Wildlife Sites Guidance. The contribution and co-operation of organisations and individuals across Wales are vital to achieving our biodiversity targets. I hope that you will find the Wildlife Sites Guidance a useful tool in the battle against biodiversity loss and that you will ensure that it is used to its full potential in order to derive maximum benefit for the vitally important and valuable nature in Wales.
    [Show full text]
  • Entomologiske Meddelelser
    Entomologiske Meddelelser Indeks for Bind 1-67 (1887-1999) Entomologisk Forening København 2000 FORORD Tidsskriftet "Entomologiske Meddelelser" - Entomologisk Forenings medlemsblad - blev grundlagt i 1887, og er således det ældste danske entomologiske tidsskrift, som stadig udgives. Det har siden sin start haft til formål at udbrede kendskabet til entomologien i almindelighed og dansk entomologi i særdeleshed. De første 5 bind udkom i årene 1887-1896 og omhandlede primært artikler af særlig relevans for dansk entomologi. Herefter skiftede det format, såvel rent fysisk som (mere gradvis) indholdsmæssigt, og fik efterhånden et mere internationalt tilsnit med en vis andel af bl.a. tysk- og engelsksprogede artikler. I forbindelse med overgangen til det nye format, benævntes tidsskriftet nu som "Entomologiske Meddelelser, 2. Række" og nummereringen af de enkelte bind startede forfra. Efter at have praktiseret denne nummerering i nogle år, droppedes dog betegnelsen "2. Række", og man vendte tilbage til at nummerere bindene fortløbende fra det først udkomne bind. Efter at tidsskriftet op igennem 1900-tallet havde fået et stigende indhold af artikler med internationalt sigte, blev det fra bind 39 (1971) besluttet at koncentrere indholdet til primært dansksprogede artikler af særlig relevans for den danske fauna. Samtidig overgik de enkelte bind til at udgøre årgange i stedet for, som tidligere, at være flerårige. "Entomologiske Meddelelser" har siden sin start bragt hen mod 1600 originale, videnskabelige artikler eller mindre meddelelser, næsten 500 boganmeldelser, over 100 biografier eller nekrologer over primært danske entomologer, samt enkelte meddelelser af anden slags. For at lette overskueligheden over den meget betydelige mængde af information disse publikationer rummer, har Entomologisk Forenings bestyrelse fundet tiden moden til at sammenstille et indeks over indholdet af samtlige udkomne numre af "Entomologiske Meddelser" til og med bind 67 (årgang 1999).
    [Show full text]