UNCLASSIFIED
Possibilities for logistic support from Joint Arctic Command 2021 DTU Logistikworkshop 2020
Bettina Ovgaard Science Liaison Officer JOINT ARCTIC COMMAND
UNCLASSIFIED UNCLASSIFIED
AREA OF RESPONSIBILITY
3 December2020 UNCLASSIFIED
JACO TASKS
Military: • Military defence of Greenland and Faroe Islands • Surveillance and maintenance of territorial sovereignty
Coast guard: • Anti-pollution and oil spill recovery • Fishery Protection
Search and Rescue: • Joint Rescue Coordination Centre (JRCC Greenland)
Additional: • Hydrographical surveys of Greenland • Support to local communities • Police support
UNCLASSIFIED
3 December2020 UNCLASSIFIED
ASSETS
UNCLASSIFIED
3 December2020 UNCLASSIFIED
REQUEST FOR SUPPORT
UNCLASSIFIED
3 December2020 UNCLASSIFIED
INTRUSIVE AND NON-INTRUSIVE PROJECTS
Intrusive support is defined as binding the ship in time and space. Request for support from the Royal Danish Navy for an intrusive project (with or with out finance) is through DANISH CENTER FOR MARITIME RESEARCH.
Non-intrusive support is defined as assistance done en route while patrolling and with flexibility of time. Application for support from the Royal Danish Navy for a non-intrusive project is through ISAAFFIK.ORG.
UNCLASSIFIED
3 December2020 UNCLASSIFIED
RULES OF ENGAGEMENT
• Support in remote areas without commercial infrastructure.
• Cost free for the Danish Defense.
• Cancellation of support can happen with little notice due to operational tasks and weather.
• All support is executed given that permits and other documents are obtained and in order inclusive approval of entry from the Greenlandic Covid-19 Secretariat.
UNCLASSIFIED
3 December2020 UNCLASSIFIED
DEADLINE FOR APPLICATION
Apply through DCH (intrusive) with or without funding Deadline: 1 April for the year to come.
Apply through Isaaffik.org (non-intrusive)
First priority Deadline: 15 January 2021 for 2021 Feedback: At the latest ultimo February 2021.
Second priority Any request received after 15 January have second priority. Feedback: Ad hoc.
UNCLASSIFIED
3 December2020 ISAAFFIK OG DCH REQUESTS 2017-2021
Isaaffik Requests Approved Not Cancelled In proces approved by applicant 2021 6 2 4
2020 28 14 4 9 (8*) 1**
2019 30 23 5 1 1
2018 16 14 2
DCH Requests Not approved
2017 3 0 2018 4 0 2019 3 0 2020 3 0 (2*) 2021 5 2
* Godkendte projekter aflyst af ansøger pga. Covid-19, typisk skibsstøtte ** Godkendt, men ikke udført
3 December2020 UNCLASSIFIED
SHIP SUPPORT 2019 - 2021
2019: Ship days for intrusive and non-intrusive support: 92 days Total ship day used: 112 days ( 32 extra days minus 12 as a patrol was cancelled)
2020: Ship days for intrusive and non-intrusive support: 90 days Total ship days used: 18 ship days
2021: Ship days for intrusive and non-intrusive support: 90 days
UNCLASSIFIED
3 December2020 UNCLASSIFIED
PLANNED SUPPORT FROM NAVY SHIPS 2021
Date: 3 Juni – 17 Juni (reserved for intrusive project)
Date: 10 Juni – 26 Juni
Date: 13 August – 3 September (reserved for intrusive project)
Date: 30 August – 19 September (reserved for intrusive project)
Date: 7 September– 21 September
UNCLASSIFIED
3 December2020
UNCLASSIFIED
SUPPORT TO SCIENCE 2020 ECOpolaris
UNCLASSIFIED
3 December2020 UNCLASSIFIED
SUPPORT TO SCIENCE 2020 MarinBasis
UNCLASSIFIED
3 December2020 UNCLASSIFIED
SUPPORT TO SCIENCE 2020 DCE - Nationalt Centerfor Miljø og Energi
UNCLASSIFIED
3 December2020 UNCLASSIFIED
SUPPORT TO SCIENCE 2020 DMI, US National Ice Center, North American Ice Service, FMI, US Coast Guard
UNCLASSIFIED
3 December2020 UNCLASSIFIED
COVID-19?
UNCLASSIFIED
3 December2020 UNCLASSIFIED
QUESTIONS?
UNCLASSIFIED
3 December2020