UNCLASSIFIED Possibilities for logistic support from Joint Arctic Command 2021 DTU Logistikworkshop 2020 Bettina Ovgaard Science Liaison Officer JOINT ARCTIC COMMAND UNCLASSIFIED UNCLASSIFIED AREA OF RESPONSIBILITY 3 December2020 UNCLASSIFIED JACO TASKS Military: • Military defence of Greenland and Faroe Islands • Surveillance and maintenance of territorial sovereignty Coast guard: • Anti-pollution and oil spill recovery • Fishery Protection Search and Rescue: • Joint Rescue Coordination Centre (JRCC Greenland) Additional: • Hydrographical surveys of Greenland • Support to local communities • Police support UNCLASSIFIED 3 December2020 UNCLASSIFIED ASSETS UNCLASSIFIED 3 December2020 UNCLASSIFIED REQUEST FOR SUPPORT UNCLASSIFIED 3 December2020 UNCLASSIFIED INTRUSIVE AND NON-INTRUSIVE PROJECTS Intrusive support is defined as binding the ship in time and space. Request for support from the Royal Danish Navy for an intrusive project (with or with out finance) is through DANISH CENTER FOR MARITIME RESEARCH. Non-intrusive support is defined as assistance done en route while patrolling and with flexibility of time. Application for support from the Royal Danish Navy for a non-intrusive project is through ISAAFFIK.ORG. UNCLASSIFIED 3 December2020 UNCLASSIFIED RULES OF ENGAGEMENT • Support in remote areas without commercial infrastructure. • Cost free for the Danish Defense. • Cancellation of support can happen with little notice due to operational tasks and weather. • All support is executed given that permits and other documents are obtained and in order inclusive approval of entry from the Greenlandic Covid-19 Secretariat. UNCLASSIFIED 3 December2020 UNCLASSIFIED DEADLINE FOR APPLICATION Apply through DCH (intrusive) with or without funding Deadline: 1 April for the year to come. Apply through Isaaffik.org (non-intrusive) First priority Deadline: 15 January 2021 for 2021 Feedback: At the latest ultimo February 2021. Second priority Any request received after 15 January have second priority. Feedback: Ad hoc. UNCLASSIFIED 3 December2020 ISAAFFIK OG DCH REQUESTS 2017-2021 Isaaffik Requests Approved Not Cancelled In proces approved by applicant 2021 6 2 4 2020 28 14 4 9 (8*) 1** 2019 30 23 5 1 1 2018 16 14 2 DCH Requests Not approved 2017 3 0 2018 4 0 2019 3 0 2020 3 0 (2*) 2021 5 2 * Godkendte projekter aflyst af ansøger pga. Covid-19, typisk skibsstøtte ** Godkendt, men ikke udført 3 December2020 UNCLASSIFIED SHIP SUPPORT 2019 - 2021 2019: Ship days for intrusive and non-intrusive support: 92 days Total ship day used: 112 days ( 32 extra days minus 12 as a patrol was cancelled) 2020: Ship days for intrusive and non-intrusive support: 90 days Total ship days used: 18 ship days 2021: Ship days for intrusive and non-intrusive support: 90 days UNCLASSIFIED 3 December2020 UNCLASSIFIED PLANNED SUPPORT FROM NAVY SHIPS 2021 Date: 3 Juni – 17 Juni (reserved for intrusive project) Date: 10 Juni – 26 Juni Date: 13 August – 3 September (reserved for intrusive project) Date: 30 August – 19 September (reserved for intrusive project) Date: 7 September– 21 September UNCLASSIFIED 3 December2020 UNCLASSIFIED SUPPORT TO SCIENCE 2020 ECOpolaris UNCLASSIFIED 3 December2020 UNCLASSIFIED SUPPORT TO SCIENCE 2020 MarinBasis UNCLASSIFIED 3 December2020 UNCLASSIFIED SUPPORT TO SCIENCE 2020 DCE - Nationalt Centerfor Miljø og Energi UNCLASSIFIED 3 December2020 UNCLASSIFIED SUPPORT TO SCIENCE 2020 DMI, US National Ice Center, North American Ice Service, FMI, US Coast Guard UNCLASSIFIED 3 December2020 UNCLASSIFIED COVID-19? UNCLASSIFIED 3 December2020 UNCLASSIFIED QUESTIONS? UNCLASSIFIED 3 December2020 .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages17 Page
-
File Size-