Residents' Service Route No. : NR960A

Total Page:16

File Type:pdf, Size:1020Kb

Residents' Service Route No. : NR960A Residents’ Service Route No. : NR960A Destinations : The Scenicwoods – Yuen Long Tai Cheung Street (Circular) Routeing (The Scenicwoods – Yuen Long Tai Cheung Street) via Kam Shui South Road, Kam Sheung Road, Tung Wui Road, Kam Sheung Road Station Public Transport Interchange, Tung Wui Road, Kam Sheung Road, Kam Tin Road, Au Tau Interchange, Castle Peak Road, Yuen Long On Lok Road, Yuen Long Tai Cheung Street, Sai Tai Street, Kuk Ting Street, Castle Peak Road, Long Yat Road, Castle Peak Road, Au Tau Interchange, Kam Tin Road, Kam Sheung Road, Tung Wui Road, Kam Sheung Road Station Public Transport Interchange, Tung Wui Road, Kam Sheung Road and Kam Shui South Road. Stopping Places To Yuen Long Pick Up : 1. Estate road inside The Set Down : 1. The general lay-by at Kam Sheung Scenicwoods Road Station near exit D 2. Kam Shui South Road 2. No. 26 Yuen Long Tai Cheung near L/P 4984 Street 3. Kam Shui South Road near L/P FA7010 4. Kam Shui South Road near L/P V7081 To The Scenicwoods Pick Up : 1. No. 26 Yuen Long Tai Set Down : 1. Kam Shui South Road opposite to Cheung Street L/P V7081 2. The general lay-by at 2. Kam Shui South Road near L/P Kam Sheung Road FA7010 Station near exit D 3. Kam Shui South Road near L/P 4984 4. Estate road inside The Scenicwoods Departure time : Mondays to Saturdays (except public holidays) 1. 10.20 a.m. 2. 1.20 p.m. 3. 5.20 p.m. Sundays and public holidays 1. 10.20 a.m. 2. 5.20 p.m. Fare : $8.0 per single journey Name of the operator : Hing Lung Property Consultants Contact Number : 5910 1733 .
Recommended publications
  • M / Sp / 14 / 168 Fairview Park Road West flk“
    BAUHINIA ROAD NORTH flK“ NULLAH A»f DRIVE CYPRESS LYCHEE ROAD NORTH A§j fl LYCHEE ROAD SOUTH FAIRVIEW PARK ROAD NORTH 40 構 20 Yau Mei 20 LYCHEE RD E San Tsuen “¸ƒ ¨» SAN TIN HIGHWAY `²WÆ s•—¥§⁄ł§¤‚˛†p›ˇ M / SP / 14 / 168 FAIRVIEW PARK ROAD WEST flK“ C«s⁄‰⁄‚ SEE PLAN REF. No. M / SP / 14 / 168 YAU POK ROAD GOLDEN BAMBOO ROAD NORTH KAM POK ROAD FOR SAN TIN VILLAGE CLUSTER BOUNDARIES GINKGO RD A§j NULLAH ‰« ‰« A§ ı‹ Mong Tseng Tsuen Mong Tseng Wai Ï¥ ROSE WOOD RD BAUHINIA ROAD WEST Fairview Park 20 LUT CHAU s·Ð¥ ¨» õ® ˦é Tai Yuen Chuk Yuen Tsuen FAIRVIEW PARK RD EAST LOTUS ROAD DEEP BAY ROAD ˦ñ Q“ fl'” Hang Fook A§j Gardens CASTLE PEAK ROAD - TAM MI W¤Ë s•—¥§⁄ł§¤‚˛†p›ˇ Sheung Chuk Yuen 40 M / SP / 14 / 168 SEE PLAN REF. No. M / SP / 14 / 168 FOR SAN TIN VILLAGE CLUSTER BOUNDARIES A§Æ“ s• fiA San Wai Tsuen Villa Camellia FAIRVIEW PARK BOULEVARD 81 20 y¬B fiA łfi 20 Royal Camellia s±A Greenery 75 ⁄ ⁄b Garden 39 º­ 38 Man Yuen Meister j¤Í Chuen WETLAND PARK ROAD House Tai Sang Wai TIN YING ROAD Tin Heng Estate KAM POK ROAD NULLAH 20 40 ñ§P fi »›·ª Long Ha T«» Hong Kong Wetland Park · AP Jetties Grandeur Terrace ⁄v 37 ˆƒ⁄B 30 n«Í¥ Sewage Treatment YAU POK ROAD Works ⁄A y¬B 29 1 Tin Chak 31 Lau Fau Shan Estate 62 ªaƒ‰ 35 ⁄h y¬B KAM POK ROAD ®®I´ SHAN PUI RIVER Merry Garden LAU FAU SHAN Tin Yat Estate ⁄ z¼º Vianni Cove s·y TIN SAU ROAD 32 San Hing 36 »§Q Pé LAU FAU SHAN ROAD ⁄~ Pok Wai Tsuen TIN YIP ROAD `²WÆ »§ |§f ⁄q 33 C«s⁄‰⁄‚ Hang Hau Tsuen · d§Î Ng Uk Tsuen AP Ngau Hom ⁄I SAN TIN HIGHWAY 7 F¨¿ Tin Fu Court NULLAH TIN KWAI ROAD Sha Kong Wai 34 FUK SH 25 26 UN TIN SHUI ROAD S Tin Ching Estate T ûºé¶ R E Vienna Villa E ⁄‚ T ⁄ƒ ⁄fi Tin Yuet Estate ”¶ 27 3 Tin Yan Estate 28 j¤« WANG LEE STREET ⁄“ Tai Tseng Wai WANG LOK STREET NAM SANG WAI ROAD ñ§P F¨¿¦ ±²Î ”Y Sha Kong Shing Uk Tsuen n«Í y¬B¯ Wai Tsai ⁄ »›·˝¥O TIN WAH ROAD NULLAH San Miguel Brewery NAM SANG WAI a” ‹ Hong Kong Ltd.
    [Show full text]
  • WORKING PAPER No. 30 BROADBRUSH ENVIRONMENTAL COMPARISON of DEVELOPMENT OPTIONS
    This subject paper is intended to be a research paper delving into different views and analyses from various sources. The views and analyses as contained in this paper are intended to stimulate public discussion and input to the planning process of the "HK2030 Study" and do not necessarily represent the views of the HKSARG. WORKING PAPER No. 30 BROADBRUSH ENVIRONMENTAL COMPARISON OF DEVELOPMENT OPTIONS Purpose 1. This paper provides the broad-brush environmental comparison of the development options formulated under the Reference Scenario of the HK2030 Study and an overview of the environmental issues related to the options. It should be noted that the current assessment is part of the staged Strategic Environmental Assessment (SEA) of the HK2030 Study and there are still uncertainties as regards many of the current results. Reference Scenario and development options 2. The Reference Scenario has been developed under the HK2030 Study illustrating the key planning assumptions as well as land use and infrastructure requirements, based on which the long-term spatial development patterns would be formulated and assessed. Under the Reference Scenario, a population of 9.2 million and an employment of 4.0 million by 2030 have been assumed (a summary of the key planning assumptions is at Annex A). 3. With the forecasted demand, various planning choices, including intensification of existing and planned development areas as well as identification of new growth areas, are devised to accommodate the additional demand for various land uses. After that, an Initial Scoping Exercise has been conducted to identify the more realistic and practical development options by examining the key considerations of various planning choices.
    [Show full text]
  • Historic Building Appraisal 1 Tsang Tai Uk Sha Tin, N.T
    Historic Building Appraisal 1 Tsang Tai Uk Sha Tin, N.T. Tsang Tai Uk (曾大屋, literally the Big Mansion of the Tsang Family) is also Historical called Shan Ha Wai (山廈圍, literally, Walled Village at the Foothill). Its Interest construction was started in 1847 and completed in 1867. Measuring 45 metres by 137 metres, it was built by Tsang Koon-man (曾貫萬, 1808-1894), nicknamed Tsang Sam-li (曾三利), who was a Hakka (客家) originated from Wuhua (五華) of Guangdong (廣東) province which was famous for producing masons. He came to Hong Kong from Wuhua working as a quarryman at the age of 16 in Cha Kwo Ling (茶果嶺) and Shaukiwan (筲箕灣). He set up his quarry business in Shaukiwan having his shop called Sam Lee Quarry (三利石行). Due to the large demand for building stone when Hong Kong was developed as a city since it became a ceded territory of Britain in 1841, he made huge profit. He bought land in Sha Tin from the Tsangs and built the village. The completed village accommodated around 100 residential units for his family and descendents. It was a shelter of some 500 refugees during the Second World War and the name of Tsang Tai Uk has since been adopted. The sizable and huge fortified village is a typical Hakka three-hall-four-row Architectural (三堂四横) walled village. It is in a Qing (清) vernacular design having a Merit symmetrical layout with the main entrance, entrance hall, middle hall and main hall at the central axis. Two other entrances are to either side of the front wall.
    [Show full text]
  • Yuen Long / Hung Shui Kiu / Tin Shui
    Effective Date: From The First Departure on 30 August 2021 Suggested Choices Between Yuen Long / Tin Shui Wai And Airport / Hong Kong Port of Hong Kong‐Zhuhai‐Macao Bridge (“HZMB HKP”) Airport and Airport HZMB Cargo Terminal 1 Cathay HZMB HKP AsiaWorld‐ and Pacific HKP Expo Catering Yuen Long, City Tin Shui Wai Area ⇋ YOHO MALL, A36 A36 E36 / E36 / A36 Yuen Long Station E32 / E41 E36S E36S Castle Peak Road – A36 ⇋ E36 / E36 / Yuen Yuen Long (Yuen A36 E32 / E41 E36S E36S A36 Long Long Main Road) Long Ping Estate, A37 ⇋ A37 ⇋ A37 ⇋ A37 ⇋ Long Ping Station, S64/S64X/ E33/E33P/ A37 E32 / E41 Wang Fu Count S65 E36/E37 A33X/A36 Riva, A36 ⇋ E36 / E36P Ko Po A36 E32 / E41 A36 Au Tau, KMB 251A KMB 64K ⇋ E36; KMB 64K Kam Tin, Kam Sheung Road E36P or E36P Pat ⇋A43/A43P ⇋ A36 Kam Tin Road Heung KMB 251B KMB 54 / 77K ⇋ E36; KMB 54/ (Sheung Tsuen to E36P or E36P Kam Tin) ⇋A43/A43P 77K ⇋ A36 A37 (Rapid)/ A37 (Rapid)/ Hung Shui Kiu, A37 (Rapid)/ A37(Rapid)/ Hung A37(Rapid)/ A34 ⇋ A34 ⇋ Hung Fuk Estate / A34 ⇋ Shui Kiu S64/S64X/ E33 / E33P A34 ⇋ Shek Po Tsuen A34 E32 / E41 S65 / E36 / E37 A33X/A36 Tin Shui Wai Town Centre, Harbour Plaza Resort City, A37 ⇋ Kenswood Court, A37 ⇋ E37 E37 Lynwood Court, A37 E32 / E41 A33X / Tin Shui Tin Ching, Tin Yuet, A36 Wai Tin Chung Court, Central Tin Fu Court Tin Wah Estate, E37 ⇋ E37 ⇋ Tin Shui Estate, A33/A33X/ E37 ⇋ E37 E37 A33X / Chestwood Court, A34/A36/ E32 / E41 Locwood Court A37 A36 Tin Heng, Tin Yat, Tin Shui A37 ⇋ Hong Kong Wetland A37 ⇋ Wai E37 E37 Park, A37 E32 / E41 A33X / North Vianni Cove A36 Tin Yiu,
    [Show full text]
  • Chapter 7: Healthcare in Hong Kong
    Chapter 7: Healthcare in Hong Kong The Hong Kong Hospital Authority The Hong Kong Hospital Authority (HA) is responsible for managing all local public hospitals in Hong Kong. Staff of the HA can communicate in Chinese (mainly the Cantonese dialect) and / or English. If interpretation is needed for other languages, the HA will use reasonable endeavours to arrange for patients free interpretation services provided by third parties / consulates. Information about the HA, including the contact details of public hospitals, can be found on its website at www.ha.org.hk.Information on Accident and Emergency Departments and General Out-patient Clinics is also available in eight other languages, namely Bahasa Indonesian, Hindi, Nepali, Punjabi (Indian), Punjabi (Pakistani), Tagalog, Thai, Urdu on the website. Accident & Emergency services The Accident & Emergency (A&E) services are provided at 18 public hospitals under the HA. They deliver a high standard of service for critically ill or injured persons who need urgent medical attention. They also provide medical support for victims of disasters. To ensure that patients with more serious conditions are accorded higher priority in medical treatment, the HA adopts a triage system which classifies patients attending the A&E Departments into five categories according to their clinical conditions: critical, emergency, urgent, semi-urgent or non-urgent. Patients who do not require emergency attendance should seek medical treatment in public or private clinics. Hospital Address Telephone Service Hours Alice Ho Miu Ling 11 Chuen On Road 2689-2000 Nethersole Hospital Tai Po, NT Caritas Medical 111 Wing Hong Street 3408-7911 24 hours Centre Sham Shui Po, Kowloon KwongWah 25 Waterloo Road, Kowloon 2332-2311 Hospital 46 Chapter 7 North District 9 Po Kin Road 2683-8888 Hospital Sheung Shui, NT North Lantau 1/F, 8 Chung Yan Road 3467-7000 Hospital Tung Chung, Lantau, N.T.
    [Show full text]
  • Mainlaying Between Au Tau Treatment Works and Yuen Long Town – Remaining Works
    For discussion PWSC(2002-03)23 on 22 May 2002 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 709 - WATERWORKS Water Supplies – Fresh water supplies 227WF – Mainlaying between Au Tau treatment works and Yuen Long Town – remaining works Members are invited to recommend to Finance Committee the upgrading of the remaining part of 227WF to Category A at an estimated cost of $25.7 million in money-of-the-day prices. PROBLEM The existing trunk main between Au Tau treatment works and Yuen Long Town will not be able to cope with anticipated increase in water demand arising from planned developments in the Tuen Mun – Yuen Long Corridor and the north-western part of Tuen Mun by 2005. PROPOSAL 2. The Director of Water Supplies (DWS), with the support of the Secretary for Works, proposes to upgrade the remaining part of 227WF to Category A at an estimated cost of $25.7 million in money-of-the-day (MOD) prices for the laying of fresh water mains in conjunction with the roadworks under 27CG1 “Yuen Long south eastern extension – site formation, roads and drainage works” and 28CG1 “Yuen Long south western extension – site formation, roads and drainage works” along the proposed Road L4 and the existing Ma Tong Road and Ma Tin Road. /PROJECT ..... _____________________________________________________________________________________ 1 A related paper, PWSC(2002-03)29, for the upgrading of 27CG and part of 28CG under Head 707 to Category A is submitted for Members' consideration at this meeting. PWSC(2002-03)23 Page 2 PROJECT SCOPE AND NATURE 3. The scope of works under 227WF comprises the laying of about 5 000 metres (m) of fresh water mains of 1 400 millimetres (mm) in diameter between Au Tau treatment works and Yuen Long Town via the access road of Au Tau treatment works, Kam Tin Road, Castle Peak Road, Yuen Ching Road, Yuen Lung Street, Fung Yau Street East, Fung Yau Street South, the proposed Road L4, Ma Tong Road, Ma Tin Road and Town Park Road South.
    [Show full text]
  • Our Network Hong Kong Operating Network with Future Extensions
    OUR NETWORK HONG KONG OPERATING NETWORK WITH FUTURE EXTENSIONS Shenzhen Lo Wu Intercity Through Train Route Map Beijing hau i C Lok Ma Shanghai Sheung Shu g Beijing Line Guangzhou Fanlin Shanghai Line Kwu Tung Guangdong Line n HONG KONG SAR Dongguan San Ti Tai Wo Long Yuen Long t Ping 48 41 47 Ngau a am Tam i Sh i K Mei a On Shan a Tai Po Marke 36 K Sheungd 33 M u u ui Wa W Roa Au Tau Tin Sh 49 Heng On y ui Hung Shui Ki g ng 50 New Territories Tai Sh Universit Han Siu Ho 30 39 n n 27 35 Shek Mu 29 Tuen Mu cecourse* e South Ra o Tan Area 16 F 31 City On Tuen Mun n 28 a n u Sha Ti Sh n Ti 38 Wai Tsuen Wan West 45 Tsuen05 Wa Tai Wo Ha Che Kung 40 Temple Kwai Hing 07 i 37 Tai Wa Hin Keng 06 l Kwai Fong o n 18 Mei Fo k n g Yi Diamond Hil Kowloon Choi Wa Tsin Tong n i King Wong 25 Shun Ti La Lai Chi Ko Lok Fu d Tai Si Choi Cheung Sha Wan Hung Sau Mau Ping ylan n ay e Sham Shui Po ei Kowloon ak u AsiaWorld-Expo B 46 ShekM T oo Po Tat y Disn Resort m Po Lam Na Kip Kai k 24 Kowl y Sunn eong g Hang Ha Prince n Ba Ch o Sungong 01 53 Airport M Mong W Edward ok ok East 20 K K Toi ong 04 To T Ho Kwa Ngau Tau Ko Cable Car n 23 Olympic Yau Mai Man Wan 44 n a Kwun Ti Ngong Ping 360 19 52 42 n Te Ti 26 Tung Chung East am O 21 L Tung Austi Yau Tong Tseung Chung on Whampo Kwan Tung o n Jordan Tiu g Kowl loo Tsima Hung 51 Ken Chung w Sh Hom Leng West Hong Kong Tsui 32 t Tsim Tsui West Ko Eas 34 22 ha Fortress10 Hill Hong r S ay LOHAS Park ition ew 09 Lantau Island ai Ying Pun Kong b S Tama xhi aus North h 17 11 n E C y o y Centre Ba Nort int 12 16 Po 02 Tai
    [Show full text]
  • M / SP / 14 / 146 Tsuen 400 Shek Tong 2 a …D 5.4.1 O 6.1 Mo Fan ‡¿«⁄⁄§⁄S…‘†·“ 6 1 340
    y¬B¯ Tin Yan Tin Ching Estate 5 6 4 1 170 F¨¿¦ Estate ⁄fi 5.1.6 j¤« 500 ·¥ ±²Î 7 5.4.4 Sha Kong Tin Yuet Estate Tai Tseng a” Ta Shek Wu 2 Shing Uk 3 5 Wai Tsai ⁄ Wai 5.1.4 TIN WAH ROAD Tsuen Wing Kei Tsuen 4 12 2 ‚⁄fiu 1 F¨¿ ⁄⁄‡§⁄ TIN TSZ ROAD Yuen Long Industrial Estate N A M S A N G W A I 5 3 – 200 ·¥¥ Sha Kong 8 5.4 5.4.4 11 Wah Shing 15 Ta Shek Wu Tsuen 1 \ˇ„ D M / SP / 14 / 146 Tsuen 400 Shek Tong 2 A …d 5.4.1 O 6.1 Mo Fan ‡¿«⁄⁄§⁄s…‘†·“ 6 1 340 R 100 40 Heung SEE PLAN REF. No. M / SP / 14 / 146 100 K 121 Lªø§¥­ A 6.1.0 W g E FOR TIN SHUI WAI STREET BLOCK SAN TIN HIGHWAY 2 ` æ» KAI SHAN 9 û¤º 11 P 9 ‰ KAM TIN RIVER LAM TSUEN COUNTRY PARK Fung Kong ⁄ 4 ¶a E {³N NGAU KWU KOK BOUNDARIES CHU WONG L Tsuen TIN YING ROAD 6 Fung Ka Wai T TIN SHUI WAI 8 LING Fung Kat Heung 108 ⁄ S 7 ROAD A Tin Shui Estate 52 ⁄⁄ 3 C 50 2 łfi¤V Tin Shui Wai Park 300 10 TAM ⁄O 3 32 85 Fire Services 6 ”y DEEP BAY ROAD 118 F“Y F¯f¤®º Training School Ȩ½ 5.1.7 Fuk Hing Tung Tau Wai Chung Hau SAN 100 WANG CHAU A Kung Tin Tsuen San Tsuen dªY 29 Yu Man San Tsuen 1 …‰§ 200 Lai Tau Tsim ⁄R 1 ½ 4 76 ' s¤©¨F 16 F¨H ·' Tin Oi ‰ Ha Mei Chung Sam Wai 17 7 FªY Shan Pui A 5 ¯„· Sherwood Sha Po ³²H 100 Ngau Hom Shek 6 Court San Tsuen Tung Tau Wai 3 FªY Kingswood Court Chung Hau Tsuen Tsuen Chung Yan Pei 200 ⁄v s• è¦Y » ⁄ Tung Tau Villas « ⁄O Sai Tau Wai LªÎ Shui Kan Shek Tsuen 2 Tin Tsz 53 Lam Uk s¤ 4 5.3.2 Hong Mei … ⁄£ ¨·Î s· 5 Estate Yeung Uk Tsuen Shan Pui Tsuen 4 9 100 San Wai Tin Yiu Tsuen é¶ ¹ÃÎ Locwood LIGHT RAIL Estate YUEN SHAN ¿ Lo Uk Court ⁄§ ˆ¥ 300 5.1.1 L 7 s¤©¨x
    [Show full text]
  • Download the Journal
    ARUP 60TH ANNIVERSARY YEAR KCRC WEST RAIL SPECIAL ISSUE The Arup Journal 3/2006 Foreword For 20 years the Kowloon-Canton F a1lway Corporat on has been a significant client for Arup in Hong Kong This period has seen a substantial growth of th KCRC's railway network to meet the needs of an expanding population in Hong Kong, and rapidly developing domestic and inter-city services with maJor cities in mainland China. As the first railway company in Hong Kong opening in 1910, the KCRC operated domestic, cross-boundary and inter-city railway services for most of the 20th century on what 1s now known as East Rail. However, the KCRC in its role as a public corporation has become a planner, designer and builder of maJor new railway networks, in response to Hong Kong's development. Since 2003, new lines have been added to the network with the 1rnt1al phase of West Rail which 1s covered in this special issue of The Arup Journal followed in 2004 by the extensions for East Rail on Ma On Shan Rail and the Ts1m Sha Tsu, Extension. Our projects for these lines, together with our involvement in the Lok Ma Chau Spur Line, will be covered in a further special issue of The Arup Journal. Arup has played a very significant role in the design and provision of many specialist inputs as well as construction superv1s1on in all of these proJects and I am pleased that this special issue has been devoted to recording our achievements on West Rail Andrew Chan Chairman, Arup East Asia Region The Arup Journal 3/2006 3 Introduction Arup and thE3 In 1863 plans were proposed to link Peking (now Beijing), Tientsin, Shanghai, Hankow, and Canton (now Guangzhou) by a rail network.
    [Show full text]
  • Acrobat Document
    As at 15 March 2021 Service Boundary of Integrated Home Care Services Teams (Ordinary Cases) in Central & Western District No. Agency Service Unit Address Phone / Fax Service Boundary 1 St. James’ Central & Western 11/F., Sheung Wan 2805 1256, Admiralty, Central, Sheung Wan, Mid-levels,Sai Ying Pun Settlement Integrated Home Care Municipal Bldg., 345 2805 1257 / (Connaught Road West all numbers, Des Voeux Road West from Services Team Queen’s Road Central , 2851 6557 number 1 to 408 ),Centre Street (all odd numbers, even numbers Hong Kong. from 2 to 40),Queen’s Road West (odd numbers from 1 to 451 even numbers from 2 to 290), Western Street (even numbers from 2 to 22), Water Street (numbers from 1 to 3), First Street (odd numbers from 1 to 55, even numbers from 2 to 60), Second Street (odd numbers from 1 to 55, even numbers from 2 to 32), Third Street (odd numbers from 1 to 61, even numbers from 2 to 54), High Street (odd numbers from 1 to 51, even numbers from 2 to 44), Mid-levels (Boham Road odd numbers from 1 to 31, all even numbers), Caine Road (all numbers) 1 As at 15 March 2021 No. Agency Service Unit Address Phone / Fax Service Boundary 2 Hong Kong Family i) Sheung Wan Service i) G/F, Low Block, Grand 2546 3332 / Sai Ying Pun, Centre Street (even numbers from 42 to 62), Queen Welfare Society Centre Millennium Plaza, 181 to 2167 8987 Road West (odd numbers from 453 onwards, even numbers 183 Queen’s Road from 292 to 504), Hing Hon Road (all numbers) Central, Hong Kong Western Street (all odd numbers, even numbers from 24 to 52) Water
    [Show full text]
  • 704 Drainage
    Capital Works Reserve Fund STATEMENT OF PROJECT PAYMENTS FOR 2007-08 Head 704 — DRAINAGE Subhead Approved Original Project Estimate Estimate Cumulative Expenditure Amended to 31.3.2008 Estimate Actual $’000 $’000 $’000 Environment Civil Engineering — Drainage and erosion protection 4064CD Rural Drainage Rehabilitation Scheme — drainage 60,900 3,700 rehabilitation works at Sha Po Tsuen Stream 43,549 3,700 2,650 4067CD Rural Drainage Rehabilitation Scheme — 18,640 200 consultants’ fees and investigations 16,664 200 - 4090CD Regulation of Shenzhen River, stage 3 563,700 30,222 351,416 30,222 9,374 4091CD Rural Drainage Rehabilitation Scheme, stage 1 231,100 380 phase 1A — rehabilitation works at Ng Tung River 200,451 380 102 4092CD Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui 202,400 30,500 Wai drainage improvements, stage 1 phase 2B — 2,925 30,500 2,925 remaining works 4096CD Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui 20,600 810 Wai drainage improvement, stage 1 — consultants’ 16,244 810 485 fees and site investigations 4099CD West Kowloon drainage improvement, stage 2 phase 1,762,900 4,500 1 works 674,919 4,500 2,129 4101CD Rural Drainage Rehabilitation Scheme, stage 2 16,900 100 phase 1 — Nam Hang drainage improvement 16,330 100 - 4102CD Drainage improvement in Tuen Mun and Sham 76,500 5,666 Tseng — package B 6,611 7,100 6,611 4103CD Drainage improvement in Northern Hong Kong 3,044,700 39,000 Island — Hong Kong West drainage tunnel 72,763 75,000 72,763 4106CD West Kowloon drainage improvement, stage 2 phase 1,767,200 32,400 2 and
    [Show full text]
  • Legislative Council Brief
    File Ref: ETWB(T)CR 1/16/581/99 LEGISLATIVE COUNCIL BRIEF NORTHERN LINK AND HONG KONG SECTION OF GUANGZHOU – SHENZHEN – HONG KONG EXPRESS RAIL LINK INTRODUCTION At the meeting of the Executive Council on 17 January 2006, the Council ADVISED and the Chief Executive ORDERED that – (a) the proposed Northern Link (NOL) should be proceeded with; (b) the Hong Kong section of the Guangzhou – Shenzhen – Hong Kong Express Rail Link (ERL) should be proceeded with to link up with the Guangdong section of the ERL; (c) the Hong Kong section of the ERL should share tracks with the existing West Rail (WR), the proposed NOL and the Kowloon Southern Link (KSL) now under construction, with a terminus at West Kowloon (alignment shown as “Shared Corridor Option” in A Annex A); (d) the NOL and the Hong Kong section of the ERL should be implemented as one combined project; (e) the Kowloon-Canton Railway Corporation (KCRC) should be asked to proceed with further planning of the combined project; (f) negotiation with the KCRC on the scope, costs and implementation programme of the combined project should commence; and (g) the KCRC should be asked to undertake necessary protection works in the KSL project now under construction to preserve the technical feasibility of the Hong Kong section of the ERL. 2. Background information on the NOL and the ERL is set out at B Annex B. JUSTIFICATIONS Construction of NOL 3. Currently, cross-boundary travellers in the western part of the New Territories rely mainly on road-based transport for commuting to the boundary for their onward journey to the Mainland.
    [Show full text]