Chapter 7: Healthcare in Hong Kong
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Historical Appraisal
Serial No.: N86 Historic Building Appraisal Old Quarry Site Structures Lei Yue Mun, Kwun Tong, Kowloon Hong Kong has been well favoured with its building stones. The high quality, Historical fine-grained granite was commonly used in construction by the time the island of Interest Hong Kong was taken over by the British in 1841. This situation continued after the British arrival, with quarries stretching along the northern coastline of the Island, ranging from Shek Tong Tsui (䞛⠀) in the western part to Quarry Bay (殪欂㴴) and A Kung Ngan (旧℔ⱑ) in the east. There were many new colonial buildings and structures which, at this date, were rich in local granite. Surviving examples include Flagstaff House and St John’s Cathedral. The general topography of the villages of Lei Yue Mun (歱欂攨), Ngau Tau Kok (䈃柕奺), Sai Cho Wan (勄勱䀋) and Cha Kwo Ling (勞㝄ⵢ) in Kowloon was quite hilly, offering little arable land for crop growing, but they were rich in granite. They were well known for the production of stones, and thus got the name of ‘Si Shan’ (⚃Ⱉ, ‘Four Hills’). The Qing government appointed a ‘Tau Yan’ (柕Ṣ) (headman) in each of the ‘Four Hills’ to manage the quarries. There was a ‘Sze Shan Kung So’ (⚃Ⱉ℔, Communal Hall of Four Hills) to discuss matters relating to stone business. The famous Canton Cathedral (⺋ⶆ䞛⭌) was built with granite cut in the “Four Hills”. The British takeover of Kowloon and the New Territories led to a greater demand of stone for construction. At the time, the more prominent stone-cutting stores in Lei Yue Mun included Tung Li Tong (⎴⇑➪) owned by Ip Wa-shing (叱厗⊅) (1844-1914), Tung Tai Tong (⎴㲘➪) owned by Tsang Lam-on (㚦㜿 ⬱) and Tung Fuk Tong (⎴䤷➪) owned by Ip Fuk (叱䤷). -
LC Paper No. CB(1)531/20-21(05)
LC Paper No. CB(1)531/20-21(05) For discussion on 23 February 2021 Legislative Council Panel on Development Progress of Work by the Sustainable Lantau Office (SLO), and Staffing Proposals of SLO, Planning Department and Railway Development Office of Highways Department for Taking Forward and Implementation of Development and Conservation Projects related to Lantau PURPOSE The paper aims to brief members on: (a) the proposal of the Sustainable Lantau Office (SLO) of the Civil Engineering and Development Department (CEDD) to retain four supernumerary directorate posts, and create two supernumerary directorate posts up to 31 March 2025 to provide directorate support for the implementation of new and on-going development and conservation initiatives in Lantau (details at Enclosure 1); (b) the proposal of the Planning Department to create one supernumerary directorate post of Chief Town Planner up to 31 March 2025 to provide high-level steer for various strategic planning tasks for the sustainable development of Lantau (details at Enclosure 2); (c) the proposal of the Railway Development Office of the Highways Department to create one supernumerary directorate post of Chief Engineer up to 31 March 2025 to provide technical support for the planning and implementation of the proposed priority rail links and the possible rail links for the longer term under the “Studies related to Artificial Islands in the Central Waters” (details at Enclosure 3); and (d) the progress of work made by SLO of CEDD (details at Enclosure 4). ADVICE SOUGHT 2. Members are invited to comment on the above staffing proposals1. After soliciting Members’ comments, we intend to submit the proposals to the Establishment Subcommittee for consideration and to the Finance Committee for approval at the soonest opportunity. -
Standard Chartered Bank (Hong Kong)
Consumption Voucher Scheme Locations with drop-box for collection of paper registration forms Standard Chartered Bank (Hong Kong) Number Location Bank Branch Branch Address 1 HK Shek Tong Tsui Branch Shops 8-12, G/F, Dragonfair Garden, 455-485 Queen's Road West, Shek Tong Tsui, Hong Kong 2 HK 188 Des Voeux Road Shop No. 7 on G/F, whole of 1/F - 3/F Branch Golden Centre, 188 Des Voeux Road Central, Hong Kong 3 HK Central Branch G/F, 1/F, 2/F and 27/F, Two Chinachem Central, 26 Des Voeux Road Central, Hong Kong 4 HK Des Voeux Road Branch Shop G1, G/F & 1/F, Standard Chartered Bank Building, 4-4A Des Voeux Road Central, Central, Hong Kong 5 HK Exchange Square Branch The Forum, Exchange Square, 8 Connaught Place, Central, Hong Kong 6 HK Admiralty Branch Shop C, UG/F, Far East Finance Centre, 16 Harcourt Road, Admiralty, Hong Kong 7 HK Queen's Road East Branch G/F & 1/F, Pak Fook Building, 208-212 Queen's Road East, Wanchai, Hong Kong 8 HK Wanchai Southorn Branch Shop C2, G/F & 1/F to 2/F, Lee Wing Building, 156-162 Hennessy Road, Wanchai, Hong Kong 9 HK Wanchai Great Eagle Shops 113-120, 1/F, Great Eagle Centre, 23 Branch Harbour Road, Wanchai, Hong Kong 10 HK Causeway Bay Branch G/F to 2/F, Yee Wah Mansion, 38-40A Yee Wo Street, Causeway Bay, Hong Kong 11 HK Times Square Priority Whole of Third Floor & Sixth Floor, No. 8 Banking Centre Branch Russell Street, Causeway Bay, Hong Kong 12 HK Happy Valley Branch G/F, 16 King Kwong Street, Happy Valley, Hong Kong 13 HK North Point Centre Branch Shop G2, G/F, North Point Centre, 278-288 King's Road, -
SUMMARY ACCREDITATION REPORT Nursing Services
SUMMARY ACCREDITATION REPORT Nursing Services Department, Hospital Authority Head Office Learning Programme Re-accreditation Higher Diploma in Nursing MARCH 2018 - 1 - 1. TERMS OF REFERENCE 1.1 Based on the Service Agreement (No.: VA790), the Hong Kong Council for Accreditation of Academic and Vocational Qualifications (HKCAAVQ), in the capacity of the Accreditation Authority as provided for under the Accreditation of Academic and Vocational Qualifications Ordinance (Cap 592) (hereafter Ordinance), was commissioned by the Nursing Services Department, Hospital Authority Head Office (Operator) to conduct a Learning Programme Re-accreditation Exercise with the following Terms of Reference: (a) To conduct an accreditation test as provided for in the Ordinance to determine whether the programme of the Nursing Services Department, Hospital Authority Head Office (the Operator) meets the stated objectives and QF standard and can continue to be offered as an accredited programme (i) Higher Diploma in Nursing (b) To issue to the Operator an accreditation report setting out the results of the determination in relation to (a) by HKCAAVQ. 1.2 The accreditation exercise was conducted according to the relevant accreditation guidelines referred to in the Service Agreement. The Education Bureau’s “Updated Revised Common Descriptors for Associate Degree and Higher Diploma Programmes under the New Academic Structure” was also a guiding document used by the Panel and the Operator in conducting this exercise for the Higher Diploma programme. 2. HKCAAVQ’S DETERMINATION Learning Programme Re-accreditation 2.1 HKCAAVQ has determined that the Higher Diploma in Nursing meets the stated objectives and QF standard at Level 4, and can be offered as an accredited programme with a validity period from 01 September 2018 to 30 September 2020. -
3 PROJECT DESCRIPTION 3.1 Scope of the Project 3.2 South Apron
3 PROJECT DESCRIPTION 3.1 Scope of the Project 3.1.1.1 Further to the recommendations of the Option Assessment and subsequent alignment developments detailed in Section 2 of this report, the preferred Trunk Road T2 is shown in Figure 3.1 and will comprise: • a dual two-lane trunk road of approximately 3.0km long with about 2.7km of the trunk road in form of tunnel; • ventilation and administration buildings and a traffic control and surveillance system; and • associated civil, electrical, mechanical, landscaping and environmental protection and mitigation works. 3.1.1.2 The works for the Trunk Road T2 project are grouped under the following major geographical headings: a) The South Apron Section – all works for the Trunk Road T2 Project located at the South Apron of the former Kai Tak Airport, including a ventilation building, a section of at-grade road, a section of depressed road, a section of cut and cover tunnel, a vertical launching shaft for the tunnel boring machines (TBM), a section of twin TBM tunnel and ancillary works. b) The Subsea Tunnel Section – all works for the Trunk Road T2 project in the sea between the South Apron and Cha Kwo Ling, including twin subsea TBM tunnels. c) The Cha Kwo Ling Section – all works for the Trunk Road T2 project located at the former Cha Kwo Ling Public Cargo Works Area (PCWA), including a section of cut and cover tunnel, a vertical receiving shaft for the TBMs, a section of twin TBM tunnels, a ventilation building and an administration building located inside the Lam Tin Interchange. -
L.N. 121 of 2003 Declaration of Constituencies (District Councils) Order 2003 (Made by the Chief Executive in Council Under Sect
L.N. 121 of 2003 Declaration of Constituencies (District Councils) Order 2003 (Made by the Chief Executive in Council under section 6 of the District Councils Ordinance (Cap. 547)) 1. Commencement This Order shall--- (a) come into operation on 10 July 2003 for the purpose only of enabling arrangements to be made for the holding of the District Council ordinary election in 2003; and (b) in so far as it has not come into operation under paragraph (a), come into operation on 1 January 2004. 2. Interpretation In this Order--- "approved map" (獲批准㆞圖), in relation to any District, means the map or any of the maps of that District--- (a) submitted together with the report referred to in section 18(1)(b) of the Electoral Affairs Commission Ordinance (Cap. 541) by the Electoral Affairs Commission to the Chief Executive on 22 April 2003; (b) specified in column 3 of the Schedule; (c) identified by reference to a plan number (Plan No.) prefixed "DCCA"; (d) approved by the Chief Executive in Council on 13 May 2003; and (e) copies of which are deposited in the respective offices of the Electoral Registration Officer and the Designated Officer; "constituency boundary" (選區分界), in relation to an area declared to be a constituency in this Order, means--- (a) the boundary represented in the relevant approved map by the unbroken edging coloured red delineating, or partially delineating, that area and described as "Constituency Boundary" in the legend of that map; or (b) where any part of a district boundary joins or abuts any boundary partially delineating that area as mentioned in paragraph (a), or circumscribes or otherwise partially delineates that area--- (i) that part of that district boundary; and (ii) that boundary partially delineating that area as so mentioned; "district boundary" (㆞方行政區分界), in relation to any District, means the boundary of the District area delineated as mentioned in section 3(1) of the Ordinance which is represented in the relevant approved map by the broken edging coloured red and described as "District Boundary" in the legend of that map. -
Fast Facts Hong Kong
Member Organisation – Fast Facts Hong Kong: Name of Member Organisation Canossa Hospital (Caritas) Location Hong Kong ACHSI Accredited Since September 2011 Website Link http://www.canossahospital.org.hk/ Sector Private Type Hospital Number of Beds 146 Name of Member Organisation Caritas Medical Centre Location Kowloon, Hong Kong ACHSI Accredited Since October 2011 Website Link http://www.ha.org.hk/visitor/ha_hosp_details.asp?C ontent_ID=100163&Lang=ENG Sector Public Type Hospital Number of Beds 1,206 Name of Member Organisation Castle Peak Hospital Location Hong Kong ACHSI Accredited Since August 2014 Website Link http://www3.ha.org.hk/cph/en/ Sector Public Type Hospital Number of Beds 1156 Name of Member Organisation Dental Implant & Maxillofacial Centre DIMFC Location Hong Kong ACHSI Accredited Since January 2016 Website Link http://www.aboc.com.hk/ Sector Private Type Day Procedure Centre Number of Beds N/A Name of Member Organisation Evangel Hospital Location Hong Kong ACHSI Accredited Since April 2014 Website Link http://www.evangel.org.hk/eng/ Sector Private Type Hospital Number of Beds 70 Name of Member Organisation Fresenius Medical Care Hong Kong Limited - NephroCare Tuen Mun Dialysis Clinic (NCTM) Location Tuen Mun, Hong Kong ACHSI Accredited Since July 2015 Website Link http://www.freseniusmedicalcare.com Sector Private Type Day Procedure Centre Number of Beds 15 Updated February 2018 Name of Member Organisation Fresenius Medical Care Hong Kong Limited - NephroCare Wan Chai Dialysis Clinic (NCWC) Location Wan Chai, Hong Kong -
Branch List English
Telephone Name of Branch Address Fax No. No. Central District Branch 2A Des Voeux Road Central, Hong Kong 2160 8888 2545 0950 Des Voeux Road West Branch 111-119 Des Voeux Road West, Hong Kong 2546 1134 2549 5068 Shek Tong Tsui Branch 534 Queen's Road West, Shek Tong Tsui, Hong Kong 2819 7277 2855 0240 Happy Valley Branch 11 King Kwong Street, Happy Valley, Hong Kong 2838 6668 2573 3662 Connaught Road Central Branch 13-14 Connaught Road Central, Hong Kong 2841 0410 2525 8756 409 Hennessy Road Branch 409-415 Hennessy Road, Wan Chai, Hong Kong 2835 6118 2591 6168 Sheung Wan Branch 252 Des Voeux Road Central, Hong Kong 2541 1601 2545 4896 Wan Chai (China Overseas Building) Branch 139 Hennessy Road, Wan Chai, Hong Kong 2529 0866 2866 1550 Johnston Road Branch 152-158 Johnston Road, Wan Chai, Hong Kong 2574 8257 2838 4039 Gilman Street Branch 136 Des Voeux Road Central, Hong Kong 2135 1123 2544 8013 Wyndham Street Branch 1-3 Wyndham Street, Central, Hong Kong 2843 2888 2521 1339 Queen’s Road Central Branch 81-83 Queen’s Road Central, Hong Kong 2588 1288 2598 1081 First Street Branch 55A First Street, Sai Ying Pun, Hong Kong 2517 3399 2517 3366 United Centre Branch Shop 1021, United Centre, 95 Queensway, Hong Kong 2861 1889 2861 0828 Shun Tak Centre Branch Shop 225, 2/F, Shun Tak Centre, 200 Connaught Road Central, Hong Kong 2291 6081 2291 6306 Causeway Bay Branch 18 Percival Street, Causeway Bay, Hong Kong 2572 4273 2573 1233 Bank of China Tower Branch 1 Garden Road, Hong Kong 2826 6888 2804 6370 Harbour Road Branch Shop 4, G/F, Causeway Centre, -
Official Record of Proceedings
LEGISLATIVE COUNCIL ― 24 June 2020 8723 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 24 June 2020 The Council met at Eleven o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE ANDREW LEUNG KWAN-YUEN, G.B.S., J.P. THE HONOURABLE JAMES TO KUN-SUN THE HONOURABLE LEUNG YIU-CHUNG THE HONOURABLE ABRAHAM SHEK LAI-HIM, G.B.S., J.P. THE HONOURABLE TOMMY CHEUNG YU-YAN, G.B.S., J.P. PROF THE HONOURABLE JOSEPH LEE KOK-LONG, S.B.S., J.P. THE HONOURABLE JEFFREY LAM KIN-FUNG, G.B.S., J.P. THE HONOURABLE WONG TING-KWONG, G.B.S., J.P. THE HONOURABLE STARRY LEE WAI-KING, S.B.S., J.P. THE HONOURABLE CHAN HAK-KAN, B.B.S., J.P. THE HONOURABLE CHAN KIN-POR, G.B.S., J.P. DR THE HONOURABLE PRISCILLA LEUNG MEI-FUN, S.B.S., J.P. 8724 LEGISLATIVE COUNCIL ― 24 June 2020 THE HONOURABLE WONG KWOK-KIN, S.B.S., J.P. THE HONOURABLE MRS REGINA IP LAU SUK-YEE, G.B.S., J.P. THE HONOURABLE PAUL TSE WAI-CHUN, J.P. THE HONOURABLE CLAUDIA MO THE HONOURABLE MICHAEL TIEN PUK-SUN, B.B.S., J.P. THE HONOURABLE STEVEN HO CHUN-YIN, B.B.S. THE HONOURABLE FRANKIE YICK CHI-MING, S.B.S., J.P. THE HONOURABLE WU CHI-WAI, M.H. THE HONOURABLE YIU SI-WING, B.B.S. THE HONOURABLE MA FUNG-KWOK, S.B.S., J.P. THE HONOURABLE CHARLES PETER MOK, J.P. THE HONOURABLE CHAN CHI-CHUEN THE HONOURABLE CHAN HAN-PAN, B.B.S., J.P. -
Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link
Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link Proposed Scheme – Consultation Digest Kwun Tong Tseung Kwan O Lam Tin Tiu Keng Leng TKO Town Centre South Yau Tong Junk Bay Lam Tin Interchange TKO Area 86 January 2012 Project Information Legends: Benefits Proposed Interchange • Upon completion of Route 6, the new road • The existing Tseung Kwan O Tunnel is operating Kai Tak Tseung Kwan O - Lam Tin Tunnel network will relieve the existing heavily near its maximum capacity at peak hours. The trafficked road network in the central and TKO-LT Tunnel and CBL will relieve the existing Kowloon Bay Cross Bay Link eastern Kowloon areas, and hence reduce travel traffic congestion and cater for the anticipated Kwun Tong Trunk Road T2 time for vehicles across these areas and related traffic generated from the planned development Yau Ma Tei Central Kowloon Route environmental impacts. of Tseung Kwan O. To Kwa Wan Lam Tin Tseung Kwan O Table 1: Traffic Improvement - Kwun Tong District Yau Tong From Yau Tong to Journey Time West Kowloon Area (Peak Hour) Current (2012) 22 min. Schematic Alignment of Route 6 and Cross Bay Link Via Route 6 8 min. Traffic Congestion at TKO Tunnel The Tseung Kwan O - Lam Tin Tunnel (TKO-LT Tunnel) At present, the existing Tseung Kwan O Tunnel is towards Kowloon in the morning is a dual-two lane highway of approximately 4.2km the main connection between Tseung Kwan O and Table 2: Traffic Improvement - Tseung Kwan O long, connecting Tseung Kwan O (TKO) and East urban areas of Kowloon. -
Police Report Rooms Receiving 992 Emergency SMS Service Applications S/N Region Report Room Address of Report Room 1
Police Report Rooms receiving 992 Emergency SMS Service Applications S/N Region Report Room Address of Report Room 1. Central District No.2 Chung Kong Road, Sheung Wan, Hong Kong 2. Peak Sub-Division No.92 Peak Road, Hong Kong 3. Western Division No.280 Des Voeux Road West, Hong Kong 4. Aberdeen Division No.4 Wong Chuk Hang Road , Hong Kong Hong Kong 5. Stanley Sub-Division No.77 Stanley Village Road, Stanley, Hong Kong Island 6. Wan Chai Division No. 1 Arsenal Street, Wanchai, Hong Kong 7. Happy Valley Division No.60 Sing Woo Road, Happy Valley, Hong Kong 8. North Point Division No.343 Java Road, Hong Kong 9. Chai Wan Division No.6 Lok Man Road, Chai Wan , Hong Kong 10. Tsim Sha Tsui Division No.213 Nathan Road, Kowloon 11. Yau Ma Tei Division No.3 Yau Cheung Road, Yau Ma Tei, Kowloon 12. Sham Shui Po Division No. 37A Yen chow Street, Kowloon Kowloon 13. Cheung Sha Wan Division No. 880 Lai Chi Kok Road, Kowloon West 14. Mong Kok District No. 142 Prince Edward Road West, Kowloon 15. Kowloon City Division No. 202 Argyle Street, Kowloon 16. Hung Hom Division No.99 Princess Margaret Road, Kowloon 17. Wong Tai Sin District No.2 Shatin Pass Road, Wong Tai Sin, Kowloon 18. Sai Kung Division No.1 Po Tung Road, Sai Kung, Kowloon 19. Kowloon Kwun Tong District No.9 Lei Yue Mun Road, Kwun Tong, Kowloon 20. East Tseung Kwan O District No.110 Po Lam Road North, Tseung Kwan O, Kowloon 21. -
Fung Shui Woods Animals Have Been Collected, Verified, and Stored Preliminarily on 漁農自然護理署風水林的植物調查 2 Spreadsheets
Issue No. 8 March 2005 Guest Editorial Contents To better understand our biological assets and to facilitate the page formulation of the new nature conservation policy and measures, Guest Editorial 1 we have initiated the ecological survey programme in 2002 with a view to establishing a more comprehensive territory-wide ecological Feature Articles: database for Hong Kong in phases by 2005. AFCD Survey of So far, over 35,000 records of about 1,500 species of plants and Local Fung Shui Woods animals have been collected, verified, and stored preliminarily on 漁農自然護理署風水林的植物調查 2 spreadsheets. We have also established a web, the HK Biodiversity Online (www.hkbiodiversity.net), to make part of the baseline Endemic Species Highlights information available to the public for education purpose. - Romer’s Tree Frog 5 Our findings so far confirm that Hong Kong has a rich Working Group Column: biodiversity. We have found a number of species which are new to Short-tailed Shearwater, Hong Kong or even new to science and there are many species its first record in Hong Kong 9 awaiting our discovery/rediscovery. House Crows (Corvus splendens) Our surveys also enrich our knowledge on the distribution of - Notes on their Population and our animals and plants. Findings suggest that our protected areas Control in Hong Kong 10 are protecting a very significant portion of our biodiversity. For the species groups surveyed and analyzed, over 95% of the terrestrial Distribution of Seagrasses and freshwater representatives which are regularly seen in Hong in Hong Kong 12 Kong have representative population(s) inside our protected areas.