Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link

Total Page:16

File Type:pdf, Size:1020Kb

Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link Proposed Scheme – Consultation Digest Kwun Tong Tseung Kwan O Lam Tin Tiu Keng Leng TKO Town Centre South Yau Tong Junk Bay Lam Tin Interchange TKO Area 86 January 2012 Project Information Legends: Benefits Proposed Interchange • Upon completion of Route 6, the new road • The existing Tseung Kwan O Tunnel is operating Kai Tak Tseung Kwan O - Lam Tin Tunnel network will relieve the existing heavily near its maximum capacity at peak hours. The trafficked road network in the central and TKO-LT Tunnel and CBL will relieve the existing Kowloon Bay Cross Bay Link eastern Kowloon areas, and hence reduce travel traffic congestion and cater for the anticipated Kwun Tong Trunk Road T2 time for vehicles across these areas and related traffic generated from the planned development Yau Ma Tei Central Kowloon Route environmental impacts. of Tseung Kwan O. To Kwa Wan Lam Tin Tseung Kwan O Table 1: Traffic Improvement - Kwun Tong District Yau Tong From Yau Tong to Journey Time West Kowloon Area (Peak Hour) Current (2012) 22 min. Schematic Alignment of Route 6 and Cross Bay Link Via Route 6 8 min. Traffic Congestion at TKO Tunnel The Tseung Kwan O - Lam Tin Tunnel (TKO-LT Tunnel) At present, the existing Tseung Kwan O Tunnel is towards Kowloon in the morning is a dual-two lane highway of approximately 4.2km the main connection between Tseung Kwan O and Table 2: Traffic Improvement - Tseung Kwan O long, connecting Tseung Kwan O (TKO) and East urban areas of Kowloon. TKO-LT Tunnel together District Kowloon. The TKO–LT Tunnel, together with the with CBL will form a new external road network for Trunk Road T2 in Kai Tak Development and Central the TKO New Town. From Tseung Kwan O Journey Time Kowloon Route, will form Route 6 in the strategic Town Centre to East- In addition, the two interchanges at Lam Tin and (Peak Hour) road network providing an East-West Express Link Tseung Kwan O will connect Route 6 to the existing ern Harbour Crossing between Kowloon and Tseung Kwan O areas. road network at Kwun Tong and Tseung Kwan O, The Cross Bay Link (CBL) is a dual two-lane providing convenient connections for traffic to Current (2012) 15 min. carriageway of approximately 1.8km long with a different destinations. cycle track and a footpath stretching across Junk Upon Completion of 5 min. Traffic Congestion at TKO Tunnel Bay, connecting the TKO-LT Tunnel at the west and TKO-LT Tunnel towards TKO in the evening Wan Po Road near Area 86 of TKO at the east. Traffic Congestion at TKO Tunnel towards Kowloon in the morning Traffic Congestion at Kwun Tong Bypass 2 3 Proposed Scheme of TKO-LT Tunnel and CBL The proposed TKO-LT Tunnel runs beneath the Chiu Keng Wan Shan At Tseung Kwan O, the TKO-LT Tunnel in a straight alignment with a branch tunnel for direct connection to 6 7 links to the CBL and Po Yap Road via the the Eastern Harbour Crossing. Tseung Kwan O Interchange. At Kwun Tong side, the tunnel connects to the Lam Tin Interchange The proposed CBL stretches across (next to the toll plaza of the Eastern Harbour Crossing), which links Junk Bay from the TKO-LT Tunnel to Wan the TKO-LT Tunnel to the Trunk Road T2, Eastern Harbour Crossing Po Road near Area 86 of Tseung Kwan and local road network of Kwun Tong. The main carriageway of the O at the east bank. The feature bridge Interchange is around 20m below the existing ground level. of the CBL adopts the “Eternity Arch” configuration with a main span of 200m. To the west of the Lam Tin Interchange, the tunnel is embedded in Shun Road Po bedrock running beneath the Cha Kwo Ling Village. This section of Junction of Road P2/ tunnel connects to the proposed Trunk Road T2 at the waterfront Po Yap Road while maintaining a distance from the Road P2 at TKO Cha Kwo Ling Tin Hau Temple. 3 Lam Tin Hill Section Po Yap Road 4 Tseung Kwan O Section Tiu Keng Leng 1 Cha Kwo Ling Section Lam Tin Tseung Kwan O Town Centre South Tseung Kwan O - Lam Tin Tunnel 5 Yau Lai Ocean Estate Shores Cha Kwo Ling Village Yau Tong Chiu Keng Wan Shan Junk Bay Cross Bay Link 2 EasternCrossing Harbour Cemetery Tunnel Portal Legends: (Tseung Kwan O) Tseung Kwan O Tunnel Area 86 TKO Interchange (LOHAS Park) Bridge Cross Bay Link At-grade Road Wan Po Road Po Wan Reclamation Lam Tin Interchange Longitudinal Profile Chiu Keng Wan Pik Wan Road Junk Bay Shan Elevation Tseung Kwan O Elevation 2 Lam Tin Interchange Area 86 (mPD) Cha Kwo Ling (mPD) Village Lei Yue Mun Road Wan Po Road Feature Bridge CBL (m) 1 Cha Kwo Ling Section 3 Lam Tin Hill Section 4 Tseung Kwan O Section 5 Cross Bay Link 4 5 Cha Kwo Ling Section Lam Tin Interchange Layout Plan of Cha Kwo Ling Section Physical Model of Lam Tin Interchange To Kai Tak To Lam Tin Interchange Cha Kwo Ling Road Cha Kwo Ling Village Former Four Hills Public School Legends: Tin Hau Temple Tunnel At-grade Road The Lam Tin Interchange is a major connection light nuisance. In addition, shrubs and trees will Cha Kwo Ling (CKL) Section of the TKO-LT Tunnel preserved and only the underground strata of few of TKO-LT Tunnel and other adjoining roads be planted at the landscape deck and adjacent is located near the toll plaza of Eastern Harbour private land lots will be affected. No clearance of (including the proposed Trunk Road T2, Eastern areas. Crossing connecting the Trunk Road T2 at west building structure is required. Harbour Crossing and road network in Kwun To further alleviate visual and noise impacts, Tong). Comprehensive assessments have been and the Lam Tin Interchange at east. This section In view of the geological conditions and the site some parts of the slip roads are in form of tunnel of road runs in tunnels embedded in bedrock at undertaken for identifying the best location for or located between cut-slopes. The slopes at constraints, the CKL Section will be constructed the Lam Tin Interchange. The site adjacent to the about 25m below the ground level of the Cha Kwo by mechanical breaking rather than conventional the interchange are carefully designed with Ling Village. toll plaza of Eastern Harbour Crossing is found to streamlined profile with planting at intermediate blasting method. Therefore, the potential impacts be the most suitable location of the interchange The proposed alignment is an optimum design on the residents and the building structures in the platforms in harmony with the surrounding for providing the best road connections landscape. Besides, the tunnel facilities with striking a balance among the site constraints, construction phase (such as vibration, noise and arrangement. public views and various engineering factors. In settlement) will be minimized. In addition, we will green terrace roof and planting seamlessly particular, it avoids local landmarks including the closely monitor the contractor’s works and the The interchange not only provides a convenient integrate with the topology of the area to enhance Cha Kwo Ling Tin Hau Temple and the former Four ground conditions to ensure that the daily life of connection for traffic to different destinations, the green environment of the interchange. Hills Public School. residents will not be affected. but also helps diverting the traffic from the Layout Plan of Lam Tin Interchange existing road network of Kwun Tong and thereby In addition, as the tunnel is built below ground, Former Four Hills alleviates the heavy traffic load in the area. the integrity of the Cha Kwo Ling Village could be Public School The Lam Tin Interchange has adopted an Cha Kwo Ling Village Tin Hau Temple integrated design to address the environmental concerns (including noise, air quality, visual Yau Lai impacts and light nuisances) as well as potential Estate flooding risk. Soil CKL EHC Legends: The main carriageways are located at around Village Toll Plaza 20m below ground covered by a landscape Tunnel Bedrock deck and light green-colored noise enclosures Bridge to minimize the environmental concerns of the At-grade TKO-LT Tunnel Cross Section of Cha Kwo Ling Section public including noise, air quality, visual and Road 6 7 Lam Tin Hill Section Tseung Kwan O (TKO) Section From traffic design point of Layout Plan of Lam Tim Hill Section Layout Plan of TKO Section and TKO Interchange view (e.g. optimum tunnel curvature), the proposed tunnel Po Yap Road alignment is an optimum Kwong Ching House scheme, which complies with Hong Nga the current desirable road Court design standards. Owing to the Main Tunnels geographical constraints, road Chui Ling Road design standards and various Kwong Tin TKO Town Centre factors, two main tunnels run Estate South in the bedrock beneath Kwong Ocean Ching House and only parts of Shores the underground strata of Hong Pik Wan Road Branch Tunnel Nga Court and Hong Pak Court Hong Pak at considerable depth within Court the amenity areas of these Tunnel Portal Junk Bay Chiu Keng Wan (Tseung Kwan O) two Home Ownership Scheme Legends: Legends: Estates will be affected. Shan Tunnel Tunnel Bridge The tunnel is embedded in At-grade Road Cross Section of TKO-LT Tunnel under Cemetery the bedrock of at least 67m Reclamation Kwong Ching House beneath the foundation of Kwong Ching House. Hence, Kwong Ching TKO Interchange the tunnel construction and House operation will have no impact on the existing building The “straight tunnel alignment without toll plaza The tunnel portal is located next to the Junk Bay structure of Kwong Ching option” is adopted for the TKO Section of the TKO- Chinese Permanent Cemetery.
Recommended publications
  • Tseung Kwan O – Lam Tin Tunnel Terrestrial Archaeological Review and and Associated Works – Investigation Marine Archaeological Investigation (Final)
    Agreement No. CE 42/2008 (CE) Working Paper on Tseung Kwan O – Lam Tin Tunnel Terrestrial Archaeological Review and and Associated Works – Investigation Marine Archaeological Investigation (Final) Agreement No. CE 42/2008 (CE) Tseung Kwan O – Lam Tin Tunnel and Associated Works – Investigation Working Paper on Terrestrial Archaeological Review and Marine Archaeological Investigation (Final) Contents Page 1 INTRODUCTION ................................................................................................... 1 1.1 Background .................................................................................................... 1 1.2 Objectives of this Working Paper ................................................................... 2 1.3 Structure of this Paper .................................................................................... 3 2 ENVIORNMENTAL LEGISLATION AND STANDARDS................................... 5 2.1 Overview ....................................................................................................... 5 2.2 Enviornmental Impact Assessment Ordinance (Cap.499) ............................... 5 2.3 Technical Memorandum on Environmental Impact Assessment Process ........ 5 2.4 Antiquities and Monuments Ordinance (Cap.53) ............................................ 5 2.5 Hong Kong Planning Standards and Guidelines ............................................. 6 2.6 Guidelines for Cultural Heritage Impact Assessment ...................................... 6 2.7 Guidelines for Marine Archaeological
    [Show full text]
  • Historical Appraisal
    Serial No.: N86 Historic Building Appraisal Old Quarry Site Structures Lei Yue Mun, Kwun Tong, Kowloon Hong Kong has been well favoured with its building stones. The high quality, Historical fine-grained granite was commonly used in construction by the time the island of Interest Hong Kong was taken over by the British in 1841. This situation continued after the British arrival, with quarries stretching along the northern coastline of the Island, ranging from Shek Tong Tsui (䞛⠀␨) in the western part to Quarry Bay (殪欂㴴) and A Kung Ngan (旧℔ⱑ) in the east. There were many new colonial buildings and structures which, at this date, were rich in local granite. Surviving examples include Flagstaff House and St John’s Cathedral. The general topography of the villages of Lei Yue Mun (歱欂攨), Ngau Tau Kok (䈃柕奺), Sai Cho Wan (勄勱䀋) and Cha Kwo Ling (勞㝄ⵢ) in Kowloon was quite hilly, offering little arable land for crop growing, but they were rich in granite. They were well known for the production of stones, and thus got the name of ‘Si Shan’ (⚃Ⱉ, ‘Four Hills’). The Qing government appointed a ‘Tau Yan’ (柕Ṣ) (headman) in each of the ‘Four Hills’ to manage the quarries. There was a ‘Sze Shan Kung So’ (⚃Ⱉ℔㇨, Communal Hall of Four Hills) to discuss matters relating to stone business. The famous Canton Cathedral (⺋ⶆ䞛⭌) was built with granite cut in the “Four Hills”. The British takeover of Kowloon and the New Territories led to a greater demand of stone for construction. At the time, the more prominent stone-cutting stores in Lei Yue Mun included Tung Li Tong (⎴⇑➪) owned by Ip Wa-shing (叱厗⊅) (1844-1914), Tung Tai Tong (⎴㲘➪) owned by Tsang Lam-on (㚦㜿 ⬱) and Tung Fuk Tong (⎴䤷➪) owned by Ip Fuk (叱䤷).
    [Show full text]
  • LC Paper No. CB(1)531/20-21(05)
    LC Paper No. CB(1)531/20-21(05) For discussion on 23 February 2021 Legislative Council Panel on Development Progress of Work by the Sustainable Lantau Office (SLO), and Staffing Proposals of SLO, Planning Department and Railway Development Office of Highways Department for Taking Forward and Implementation of Development and Conservation Projects related to Lantau PURPOSE The paper aims to brief members on: (a) the proposal of the Sustainable Lantau Office (SLO) of the Civil Engineering and Development Department (CEDD) to retain four supernumerary directorate posts, and create two supernumerary directorate posts up to 31 March 2025 to provide directorate support for the implementation of new and on-going development and conservation initiatives in Lantau (details at Enclosure 1); (b) the proposal of the Planning Department to create one supernumerary directorate post of Chief Town Planner up to 31 March 2025 to provide high-level steer for various strategic planning tasks for the sustainable development of Lantau (details at Enclosure 2); (c) the proposal of the Railway Development Office of the Highways Department to create one supernumerary directorate post of Chief Engineer up to 31 March 2025 to provide technical support for the planning and implementation of the proposed priority rail links and the possible rail links for the longer term under the “Studies related to Artificial Islands in the Central Waters” (details at Enclosure 3); and (d) the progress of work made by SLO of CEDD (details at Enclosure 4). ADVICE SOUGHT 2. Members are invited to comment on the above staffing proposals1. After soliciting Members’ comments, we intend to submit the proposals to the Establishment Subcommittee for consideration and to the Finance Committee for approval at the soonest opportunity.
    [Show full text]
  • The Maryknoll Sisters in Hong Kong, 1921–1969 This Page Intentionally Left Blank the Maryknoll Sisters in Hong Kong, 1921–1969
    The Maryknoll Sisters in Hong Kong, 1921–1969 This page intentionally left blank The Maryknoll Sisters in Hong Kong, 1921–1969 In Love with the Chinese Cindy Yik-yi Chu THE MARYKNOLL SISTERS IN HONG KONG, 1921–1969 © Cindy Yik-yi Chu, 2004 Softcover reprint of the hardcover 1st edition 2004 978-1-4039-6586-8 All rights reserved. No part of this book may be used or reproduced in any manner whatsoever without written permission except in the case of brief quotations embodied in critical articles or reviews. First published 2004 by PALGRAVE MACMILLAN™ 175 Fifth Avenue, New York, N.Y. 10010 and Houndmills, Basingstoke, Hampshire, England RG21 6XS Companies and representatives throughout the world PALGRAVE MACMILLAN is the global academic imprint of the Palgrave Macmillan division of St. Martin’s Press, LLC and of Palgrave Macmillan Ltd. Macmillan® is a registered trademark in the United States, United Kingdom and other countries. Palgrave is a registered trademark in the European Union and other countries. ISBN 978-1-349-52919-3 ISBN 978-1-4039-8161-5 (eBook) DOI 10.1057/9781403981615 Library of Congress Cataloging-in-Publication Data Chu, Cindy Yik-yi The Maryknoll Sisters in Hong Kong, 1921–1969 : In love with the Chinese / Cindy Yik-yi Chu. p. cm. Includes bibliographical references and index. 1. Catholic Foreign Mission Society of America—Missions—China— Hong Kong—History—20th century. 2. Maryknoll Sisters—Missions— China—Hong Kong—History—20th century. I. Title. BV2300.C35C49 2004 266’.25125—dc22 2004044460 A catalogue record for this book is available from the British Library.
    [Show full text]
  • List of Buildings with Confirmed / Probable Cases of COVID-19
    List of Buildings With Confirmed / Probable Cases of COVID-19 List of Residential Buildings in Which Confirmed / Probable Cases Have Resided (Note: The buildings will remain on the list for 14 days since the reported date.) Related Confirmed / District Building Name Probable Case(s) Islands Hong Kong Skycity Marriott Hotel 5482 Islands Hong Kong Skycity Marriott Hotel 5483 Yau Tsim Mong Block 2, The Long Beach 5484 Kwun Tong Dorsett Kwun Tong, Hong Kong 5486 Wan Chai Victoria Heights, 43A Stubbs Road 5487 Islands Tower 3, The Visionary 5488 Sha Tin Yue Chak House, Yue Tin Court 5492 Islands Hong Kong Skycity Marriott Hotel 5496 Tuen Mun King On House, Shan King Estate 5497 Tuen Mun King On House, Shan King Estate 5498 Kowloon City Sik Man House, Ho Man Tin Estate 5499 Wan Chai 168 Tung Lo Wan Road 5500 Sha Tin Block F, Garden Rivera 5501 Sai Kung Clear Water Bay Apartments 5502 Southern Red Hill Park 5503 Sai Kung Po Lam Estate, Po Tai House 5504 Sha Tin Block F, Garden Rivera 5505 Islands Ying Yat House, Yat Tung Estate 5506 Kwun Tong Block 17, Laguna City 5507 Crowne Plaza Hong Kong Kowloon East Sai Kung 5509 Hotel Eastern Tower 2, Pacific Palisades 5510 Kowloon City Billion Court 5511 Yau Tsim Mong Lee Man Building 5512 Central & Western Tai Fat Building 5513 Wan Chai Malibu Garden 5514 Sai Kung Alto Residences 5515 Wan Chai Chee On Building 5516 Sai Kung Block 2, Hillview Court 5517 Tsuen Wan Hoi Pa San Tsuen 5518 Central & Western Flourish Court 5520 1 Related Confirmed / District Building Name Probable Case(s) Wong Tai Sin Fu Tung House, Tung Tau Estate 5521 Yau Tsim Mong Tai Chuen Building, Cosmopolitan Estates 5523 Yau Tsim Mong Yan Hong Building 5524 Sha Tin Block 5, Royal Ascot 5525 Sha Tin Yiu Ping House, Yiu On Estate 5526 Sha Tin Block 5, Royal Ascot 5529 Wan Chai Block E, Beverly Hill 5530 Yau Tsim Mong Tower 1, The Harbourside 5531 Yuen Long Wah Choi House, Tin Wah Estate 5532 Yau Tsim Mong Lee Man Building 5533 Yau Tsim Mong Paradise Square 5534 Kowloon City Tower 3, K.
    [Show full text]
  • 3 PROJECT DESCRIPTION 3.1 Scope of the Project 3.2 South Apron
    3 PROJECT DESCRIPTION 3.1 Scope of the Project 3.1.1.1 Further to the recommendations of the Option Assessment and subsequent alignment developments detailed in Section 2 of this report, the preferred Trunk Road T2 is shown in Figure 3.1 and will comprise: • a dual two-lane trunk road of approximately 3.0km long with about 2.7km of the trunk road in form of tunnel; • ventilation and administration buildings and a traffic control and surveillance system; and • associated civil, electrical, mechanical, landscaping and environmental protection and mitigation works. 3.1.1.2 The works for the Trunk Road T2 project are grouped under the following major geographical headings: a) The South Apron Section – all works for the Trunk Road T2 Project located at the South Apron of the former Kai Tak Airport, including a ventilation building, a section of at-grade road, a section of depressed road, a section of cut and cover tunnel, a vertical launching shaft for the tunnel boring machines (TBM), a section of twin TBM tunnel and ancillary works. b) The Subsea Tunnel Section – all works for the Trunk Road T2 project in the sea between the South Apron and Cha Kwo Ling, including twin subsea TBM tunnels. c) The Cha Kwo Ling Section – all works for the Trunk Road T2 project located at the former Cha Kwo Ling Public Cargo Works Area (PCWA), including a section of cut and cover tunnel, a vertical receiving shaft for the TBMs, a section of twin TBM tunnels, a ventilation building and an administration building located inside the Lam Tin Interchange.
    [Show full text]
  • L.N. 121 of 2003 Declaration of Constituencies (District Councils) Order 2003 (Made by the Chief Executive in Council Under Sect
    L.N. 121 of 2003 Declaration of Constituencies (District Councils) Order 2003 (Made by the Chief Executive in Council under section 6 of the District Councils Ordinance (Cap. 547)) 1. Commencement This Order shall--- (a) come into operation on 10 July 2003 for the purpose only of enabling arrangements to be made for the holding of the District Council ordinary election in 2003; and (b) in so far as it has not come into operation under paragraph (a), come into operation on 1 January 2004. 2. Interpretation In this Order--- "approved map" (獲批准㆞圖), in relation to any District, means the map or any of the maps of that District--- (a) submitted together with the report referred to in section 18(1)(b) of the Electoral Affairs Commission Ordinance (Cap. 541) by the Electoral Affairs Commission to the Chief Executive on 22 April 2003; (b) specified in column 3 of the Schedule; (c) identified by reference to a plan number (Plan No.) prefixed "DCCA"; (d) approved by the Chief Executive in Council on 13 May 2003; and (e) copies of which are deposited in the respective offices of the Electoral Registration Officer and the Designated Officer; "constituency boundary" (選區分界), in relation to an area declared to be a constituency in this Order, means--- (a) the boundary represented in the relevant approved map by the unbroken edging coloured red delineating, or partially delineating, that area and described as "Constituency Boundary" in the legend of that map; or (b) where any part of a district boundary joins or abuts any boundary partially delineating that area as mentioned in paragraph (a), or circumscribes or otherwise partially delineates that area--- (i) that part of that district boundary; and (ii) that boundary partially delineating that area as so mentioned; "district boundary" (㆞方行政區分界), in relation to any District, means the boundary of the District area delineated as mentioned in section 3(1) of the Ordinance which is represented in the relevant approved map by the broken edging coloured red and described as "District Boundary" in the legend of that map.
    [Show full text]
  • Final Report
    Transport and Housing Bureau The Government of the Hong Kong SAR FINAL REPORT Consultancy Services for Providing Expert Advice on Rationalising the Utilization of Road Harbour Crossings In Association with September 2010 CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT September 2010 WILBUR SMITH ASSOCIATES LIMITED CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT TABLE OF CONTENTS Chapter Title Page 1 BACKGROUND AND INTRODUCTION .......................................................................... 1-1 1.1 Background .................................................................................................................... 1-1 1.2 Introduction .................................................................................................................... 1-1 1.3 Report Structure ............................................................................................................. 1-3 2 STUDY METHODOLOGY .................................................................................................. 2-1 2.1 Overview of methodology ............................................................................................. 2-1 2.2 7-stage Study Methodology ........................................................................................... 2-2 3 IDENTIFICATION OF EXISTING PROBLEMS ............................................................. 3-1 3.1 Existing Problems
    [Show full text]
  • Branch List English
    Telephone Name of Branch Address Fax No. No. Central District Branch 2A Des Voeux Road Central, Hong Kong 2160 8888 2545 0950 Des Voeux Road West Branch 111-119 Des Voeux Road West, Hong Kong 2546 1134 2549 5068 Shek Tong Tsui Branch 534 Queen's Road West, Shek Tong Tsui, Hong Kong 2819 7277 2855 0240 Happy Valley Branch 11 King Kwong Street, Happy Valley, Hong Kong 2838 6668 2573 3662 Connaught Road Central Branch 13-14 Connaught Road Central, Hong Kong 2841 0410 2525 8756 409 Hennessy Road Branch 409-415 Hennessy Road, Wan Chai, Hong Kong 2835 6118 2591 6168 Sheung Wan Branch 252 Des Voeux Road Central, Hong Kong 2541 1601 2545 4896 Wan Chai (China Overseas Building) Branch 139 Hennessy Road, Wan Chai, Hong Kong 2529 0866 2866 1550 Johnston Road Branch 152-158 Johnston Road, Wan Chai, Hong Kong 2574 8257 2838 4039 Gilman Street Branch 136 Des Voeux Road Central, Hong Kong 2135 1123 2544 8013 Wyndham Street Branch 1-3 Wyndham Street, Central, Hong Kong 2843 2888 2521 1339 Queen’s Road Central Branch 81-83 Queen’s Road Central, Hong Kong 2588 1288 2598 1081 First Street Branch 55A First Street, Sai Ying Pun, Hong Kong 2517 3399 2517 3366 United Centre Branch Shop 1021, United Centre, 95 Queensway, Hong Kong 2861 1889 2861 0828 Shun Tak Centre Branch Shop 225, 2/F, Shun Tak Centre, 200 Connaught Road Central, Hong Kong 2291 6081 2291 6306 Causeway Bay Branch 18 Percival Street, Causeway Bay, Hong Kong 2572 4273 2573 1233 Bank of China Tower Branch 1 Garden Road, Hong Kong 2826 6888 2804 6370 Harbour Road Branch Shop 4, G/F, Causeway Centre,
    [Show full text]
  • By Hong Kong Institute of Landscape Architects
    1 2 • In 1908, options for building Kowloon Station at Tsimshatsui were studied. • At that time, Salisbury Road was running directly to the pier. • Thesouthernsideof the site along Salisbury Road was a private lot. http://industrialhistoryhk.org/wp‐content/uploads/2015/12/Slide4‐500x375.jpg 3 • Land lots to the south of Salisbury Road were acquired to facilitate construction of the railway and the station. • Construction commenced in 1913 and completed in 1916. http://industrialhistoryhk.org/wp‐content/uploads/2015/12/Slide6‐500x375.jpg 4 • The section of Salisbury Road was widened upon completion of the station. http://industrialhistoryhk.org/wp‐content/uploads/2015/12/Slide10‐e1450087942643‐500x315.jpg 5 http://i.imgur.com/3Xe2U.jpg 6 https://gwulo.com/sites/gwulo.com/files/styles/extra‐ large__640x640_/public/thumbnails/image/1918%20Sanitary%20Department%20Water%20Cart.jpg?itok=usrClznb 7 http://www.seewide.com/upload/article/201603/1456819808191314562.jpg 8 https://gwulo.com/sites/gwulo.com/files/styles/extra‐large__640x640_/public/images/batgung‐moddsey‐ 1930s_kcr__ymca__pen.jpg?itok=R7RKw8yW 9 https://gwulo.com/sites/gwulo.com/files/styles/large/public/flickr/32907076701.jpg?itok=Wi0qxRa1 10 http://industrialhistoryhk.org/wp‐content/uploads/2015/12/Slide11‐e1450087999925‐500x443.jpg 11 • The Star Ferry Pier was still a simple single‐storey structure along the harbourfront. 12 http://www.weshare.hk/uploads/15685/9ajPSWBuRnskfAzWo7baQQ.jpg https://upload.wikimedia.org/wikipedia/commons/thumb/c/c3/Battle_of_HK_03.jpg/800px‐Battle_of_HK_03.jpg
    [Show full text]
  • Transport Infrastructure and Traffic Review
    Transport Infrastructure and Traffic Review Planning Department October 2016 Hong Kong 2030+ 1 TABLE OF CONTENTS 1 PREFACE ........................................................... 1 5 POSSIBLE TRAFFIC AND TRANSPORT 2 CHALLENGES ................................................... 2 ARRANGEMENTS FOR THE STRATEGIC Changing Demographic Profile .............................................2 GROWTH AREAS ............................................. 27 Unbalanced Spatial Distribution of Population and Synopsis of Strategic Growth Areas ................................. 27 Employment ........................................................................3 Strategic Traffic and Transport Directions ........................ 30 Increasing Growth in Private Vehicles .................................6 Possible Traffic and Transport Arrangements ................. 32 Increasing Cross-boundary Travel with Pearl River Delta Region .......................................................................7 3 FUTURE TRANSPORT NETWORK ................... 9 Railways as Backbone ...........................................................9 Future Highway Network at a Glance ................................11 Connecting with Neighbouring Areas in the Region ........12 Transport System Performance ..........................................15 4 STRATEGIC DEVELOPMENT DIRECTIONS FROM TRAFFIC AND TRANSPORT PERSPECTIVE ................................................. 19 Transport and Land Use Optimisation ...............................19 Railways Continue to be
    [Show full text]
  • Electoral Affairs Commission Report
    i ABBREVIATIONS Amendment Regulation to Electoral Affairs Commission (Electoral Procedure) Cap 541F (District Councils) (Amendment) Regulation 2007 Amendment Regulation to Particulars Relating to Candidates on Ballot Papers Cap 541M (Legislative Council) (Amendment) Regulation 2007 Amendment Regulation to Electoral Affairs Commission (Financial Assistance for Cap 541N Legislative Council Elections) (Application and Payment Procedure) (Amendment) Regulation 2007 APIs announcements in public interest APRO, APROs Assistant Presiding Officer, Assistant Presiding Officers ARO, AROs Assistant Returning Officer, Assistant Returning Officers Cap, Caps Chapter of the Laws of Hong Kong, Chapters of the Laws of Hong Kong CAS Civil Aid Service CC Complaints Centre CCC Central Command Centre CCm Complaints Committee CE Chief Executive CEO Chief Electoral Officer CMAB Constitutional and Mainland Affairs Bureau (the former Constitutional and Affairs Bureau) D of J Department of Justice DC, DCs District Council, District Councils DCCA, DCCAs DC constituency area, DC constituency areas DCO District Councils Ordinance (Cap 547) ii DO, DOs District Officer, District Officers DPRO, DPROs Deputy Presiding Officer, Deputy Presiding Officers EAC or the Commission Electoral Affairs Commission EAC (EP) (DC) Reg Electoral Affairs Commission (Electoral Procedure) (District Councils) Regulation (Cap 541F) EAC (FA) (APP) Reg Electoral Affairs Commission (Financial Assistance for Legislative Council Elections and District Council Elections) (Application and Payment
    [Show full text]