Final Report

Total Page:16

File Type:pdf, Size:1020Kb

Final Report Transport and Housing Bureau The Government of the Hong Kong SAR FINAL REPORT Consultancy Services for Providing Expert Advice on Rationalising the Utilization of Road Harbour Crossings In Association with September 2010 CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT September 2010 WILBUR SMITH ASSOCIATES LIMITED CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT TABLE OF CONTENTS Chapter Title Page 1 BACKGROUND AND INTRODUCTION .......................................................................... 1-1 1.1 Background .................................................................................................................... 1-1 1.2 Introduction .................................................................................................................... 1-1 1.3 Report Structure ............................................................................................................. 1-3 2 STUDY METHODOLOGY .................................................................................................. 2-1 2.1 Overview of methodology ............................................................................................. 2-1 2.2 7-stage Study Methodology ........................................................................................... 2-2 3 IDENTIFICATION OF EXISTING PROBLEMS ............................................................. 3-1 3.1 Existing Problems .......................................................................................................... 3-1 3.2 Implications of the existing traffic conditions on ideal traffic levels across the three RHCs .............................................................................................................................. 3-3 3.3 Diversion of traffic from CHT to EHC and WHC ......................................................... 3-4 3.4 Analysis of Previous Suggestions .................................................................................. 3-9 3.5 Toll Structures of the Three RHCs and Composition of RHC traffic .......................... 3-18 4 TRAFFIC ANALYSIS ........................................................................................................... 4-1 4.1 Introduction .................................................................................................................... 4-1 4.2 Toll structures ................................................................................................................ 4-1 4.3 Identification of Preliminary Toll Scenarios .................................................................. 4-4 4.4 Toll Scenarios Evaluations ............................................................................................ 4-5 4.5 Better Toll Scenarios – Selection Criteria ..................................................................... 4-6 4.6 Base Case Scenario ........................................................................................................ 4-6 4.7 The 'Ideal' toll scenario .................................................................................................. 4-7 4.8 The Failed Cases Examples ........................................................................................... 4-8 4.9 The Nine Better Toll Scenarios.................................................................................... 4-10 4.10 Traffic Analysis for the Better Toll Scenarios ............................................................. 4-11 5 LEGAL, MANAGEMENT AND ORGANISATION IMPLICATIONS ........................... 5-1 5.1 Option 1: Increase CHT Tolls ........................................................................................ 5-1 5.2 Option 2: Buy-back EHC and/or WHC ......................................................................... 5-2 5.3 Option 3: Forming a common ownership of CHT, EHC and/or WHC ......................... 5-4 5.4 Option 4: Extension of EHC and/or WHC franchises ................................................... 5-7 5.5 Option 5: Provision of concessions to EHC and/or WHC franchisees .......................... 5-9 5.6 Option 6: Increase CHT Tolls and rebate to EHC and WHC users ............................. 5-12 6 FINANCIAL ANALYSIS ...................................................................................................... 6-1 6.1 Scope and basis .............................................................................................................. 6-1 6.2 Basis of value ................................................................................................................. 6-1 6.3 Objective and purpose ................................................................................................... 6-1 6.4 Financial analysis ........................................................................................................... 6-2 WILBUR SMITH ASSOCIATES LIMITED PAGE i CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT 7 EVALUATION OF PROPOSALS AND RECOMMENDATIONS ................................... 7-1 7.1 Assessment of Better Toll Scenarios Performance ........................................................ 7-1 7.2 Implementability of each of the Implementation options .............................................. 7-3 7.3 Proposal Recommendations ......................................................................................... 7-10 7.4 Timing for Implementation .......................................................................................... 7-12 WILBUR SMITH ASSOCIATES LIMITED PAGE ii CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT LIST OF TABLES Table Title Page Table 1-1 Consultancy Scope and Tasks ......................................................................................... 1-2 Table 3-1 Existing Traffic Throughput ............................................................................................ 3-3 Table 3-2 Ideal/Tolerable/Congested Traffic Levels (vehicles/day) Under Existing Restraints .... 3-5 Table 3-3 Ideal/Tolerable/Congested traffic levels of EHC and WHC, .......................................... 3-6 Table 3-4 Summary of tolerable queue locations ............................................................................ 3-7 Table 3-5 Previous Suggestions ....................................................................................................... 3-9 Table 3-6 Change of CHT Toll Structure ...................................................................................... 3-19 Table 3-7 2010 Toll Structures at CHT, EHC and WHC .............................................................. 3-20 Table 4-1 Year 2010 Toll Structure ................................................................................................. 4-2 Table 4-2 Changes in toll levels for each vehicle type user at CHT with "s" structure ................... 4-2 Table 4-3 Changes in toll levels for each vehicle type user at CHT with "0.5s" structure ............. 4-3 Table 4-4 Comparison of the Three Toll Structures at CHT ........................................................... 4-4 Table 4-5 Time Horizon when Government can effect toll changes ............................................... 4-5 Table 4-6 Base Case Scenario ......................................................................................................... 4-7 Table 4-7 'Ideal' Toll Scenario – Toll Levels in Year 2011 ............................................................. 4-7 Table 4-8 'Ideal' Toll Scenario ......................................................................................................... 4-7 Table 4-9 Toll Scenario for Increasing CHT Private Car Toll Only ............................................... 4-8 Table 4-10 Toll Scenario for Equalised Tolls with Private Car Toll at $25 ...................................... 4-9 Table 4-11 Toll Scenario for Low Toll Option at the three RHCs .................................................... 4-9 Table 4-12 Toll Scenario for Initial toll adjustment only ................................................................ 4-10 Table 4-13 Better Toll Scenarios ..................................................................................................... 4-11 Table 4-14 Toll Scenario for WHC Toll Reduction ........................................................................ 4-12 Table 4-15 Traffic Analysis of Toll Scenario A1 ............................................................................ 4-13 Table 4-16 Traffic Analysis of Toll Scenario A2 ............................................................................ 4-14 Table 4-17 Traffic Analysis of Toll Scenario A3 ............................................................................ 4-15 Table 4-18 Traffic Analysis of Toll Scenario B1 ............................................................................ 4-16 Table 4-19 Traffic Analysis of Toll Scenario B2 ............................................................................ 4-16 Table 4-20 Traffic Analysis of Toll Scenario B3 ............................................................................ 4-17 Table 4-21 Traffic Analysis of Toll Scenario C1 ...........................................................................
Recommended publications
  • T and Analysis of Walkability in Hong Kong
    Measurement and Analysis of Walkability in Hong Kong By: Michael Audi, Kathryn Byorkman, Alison Couture, Suzanne Najem ZRH006 Measurement and Analysis of Walkability in Hong Kong An Interactive Qualifying Project Report Submitted to the faculty of the Worcester Polytechnic Institute In partial fulfillment of the requirements for Degree of Bachelor of Science In cooperation with Designing Kong Hong, Ltd. and The Harbour Business Forum On March 4, 2010 Submitted by: Submitted to: Michael Audi Paul Zimmerman Kathryn Byorkman Margaret Brooke Alison Couture Dr. Sujata Govada Suzanne Najem Roger Nissim Professor Robert Kinicki Professor Zhikun Hou ii | P a g e Abstract Though Hong Kong’s Victoria Harbour is world-renowned, the harbor front districts are far from walkable. The WPI team surveyed 16 waterfront districts, four in-depth, assessing their walkability using a tool created by the research team and conducted preference surveys to understand the perceptions of Hong Kong pedestrians. Because pedestrians value the shortest, safest, least-crowded, and easiest to navigate routes, this study found that confusing routes, unsafe or indirect connections, and a lack of amenities detract from the walkability in Hong Kong. This report provides new data concerning the walkability in harbor front districts and a tool to measure it, along with recommendations for potential improvements. iii | P a g e Acknowledgements Our team would like to thank the many people that helped us over the course of this project. First, we would like to thank our sponsors Paul Zimmerman, Dr. Sujata Govada, Margaret Brooke, and Roger Nissim for their help and dedication throughout our project and for providing all of the resources and contacts that we required.
    [Show full text]
  • Historical Appraisal
    Serial No.: N86 Historic Building Appraisal Old Quarry Site Structures Lei Yue Mun, Kwun Tong, Kowloon Hong Kong has been well favoured with its building stones. The high quality, Historical fine-grained granite was commonly used in construction by the time the island of Interest Hong Kong was taken over by the British in 1841. This situation continued after the British arrival, with quarries stretching along the northern coastline of the Island, ranging from Shek Tong Tsui (䞛⠀␨) in the western part to Quarry Bay (殪欂㴴) and A Kung Ngan (旧℔ⱑ) in the east. There were many new colonial buildings and structures which, at this date, were rich in local granite. Surviving examples include Flagstaff House and St John’s Cathedral. The general topography of the villages of Lei Yue Mun (歱欂攨), Ngau Tau Kok (䈃柕奺), Sai Cho Wan (勄勱䀋) and Cha Kwo Ling (勞㝄ⵢ) in Kowloon was quite hilly, offering little arable land for crop growing, but they were rich in granite. They were well known for the production of stones, and thus got the name of ‘Si Shan’ (⚃Ⱉ, ‘Four Hills’). The Qing government appointed a ‘Tau Yan’ (柕Ṣ) (headman) in each of the ‘Four Hills’ to manage the quarries. There was a ‘Sze Shan Kung So’ (⚃Ⱉ℔㇨, Communal Hall of Four Hills) to discuss matters relating to stone business. The famous Canton Cathedral (⺋ⶆ䞛⭌) was built with granite cut in the “Four Hills”. The British takeover of Kowloon and the New Territories led to a greater demand of stone for construction. At the time, the more prominent stone-cutting stores in Lei Yue Mun included Tung Li Tong (⎴⇑➪) owned by Ip Wa-shing (叱厗⊅) (1844-1914), Tung Tai Tong (⎴㲘➪) owned by Tsang Lam-on (㚦㜿 ⬱) and Tung Fuk Tong (⎴䤷➪) owned by Ip Fuk (叱䤷).
    [Show full text]
  • Interim Report 2019 Corporate Information & Key Dates
    20201919 QUICK FACTS 53 countries & territories 46,000+ employees worldwide 70M ft² land & facilities 10,000+ self-owned operating vehicles CONTENTS 02 Corporate Information & Key Dates 03 Financial Highlights 05 Management Discussion and Analysis Results Overview 05 Business Review 06 Financial Review 12 Staff and Remuneration Policies 12 GLOBAL NETWORK 13 Corporate Governance and Other Information 25 Independent Auditor’s Review Report 27 Interim Financial Statements 54 Definitions CHINA FOCUS ASIA SPECIALIST 1 INTERIM REPORT 2019 CORPORATE INFORMATION & KEY DATES KERRY LOGISTICS NETWORK LIMITED COMPANY SECRETARY (Incorporated in the British Virgin Islands and continued Ms LEE Pui Nee into Bermuda as an exempted company with limited liability) AUDITOR PricewaterhouseCoopers BOARD OF DIRECTORS Executive Directors LEGAL ADVISER Mr KUOK Khoon Hua (Chairman) Davis Polk & Wardwell Mr MA Wing Kai William (Group Managing Director) Mr NG Kin Hang REGISTERED OFFICE Victoria Place, 5th Floor, 31 Victoria Street Non-executive Director Hamilton HM 10, Bermuda Ms TONG Shao Ming CORPORATE HEADQUARTERS AND Independent Non-executive Directors PRINCIPAL PLACE OF BUSINESS IN HONG KONG Ms KHOO Shulamite N K 16/F, Kerry Cargo Centre, 55 Wing Kei Road Ms WONG Yu Pok Marina Kwai Chung, New Territories, Hong Kong Mr YEO Philip Liat Kok Mr ZHANG Yi Kevin PRINCIPAL SHARE REGISTRAR AND TRANSFER AGENT AUDIT AND COMPLIANCE COMMITTEE Estera Management (Bermuda) Limited Ms WONG Yu Pok Marina (Chairman) Victoria Place, 5th Floor, 31 Victoria Street Ms TONG Shao Ming
    [Show full text]
  • 3 PROJECT DESCRIPTION 3.1 Scope of the Project 3.2 South Apron
    3 PROJECT DESCRIPTION 3.1 Scope of the Project 3.1.1.1 Further to the recommendations of the Option Assessment and subsequent alignment developments detailed in Section 2 of this report, the preferred Trunk Road T2 is shown in Figure 3.1 and will comprise: • a dual two-lane trunk road of approximately 3.0km long with about 2.7km of the trunk road in form of tunnel; • ventilation and administration buildings and a traffic control and surveillance system; and • associated civil, electrical, mechanical, landscaping and environmental protection and mitigation works. 3.1.1.2 The works for the Trunk Road T2 project are grouped under the following major geographical headings: a) The South Apron Section – all works for the Trunk Road T2 Project located at the South Apron of the former Kai Tak Airport, including a ventilation building, a section of at-grade road, a section of depressed road, a section of cut and cover tunnel, a vertical launching shaft for the tunnel boring machines (TBM), a section of twin TBM tunnel and ancillary works. b) The Subsea Tunnel Section – all works for the Trunk Road T2 project in the sea between the South Apron and Cha Kwo Ling, including twin subsea TBM tunnels. c) The Cha Kwo Ling Section – all works for the Trunk Road T2 project located at the former Cha Kwo Ling Public Cargo Works Area (PCWA), including a section of cut and cover tunnel, a vertical receiving shaft for the TBMs, a section of twin TBM tunnels, a ventilation building and an administration building located inside the Lam Tin Interchange.
    [Show full text]
  • Property Management Revenue from Property Management for 2003 Increased by 11.0% Over 2002 to HK$94 Million
    032 Executive management’s report Property review This caused revenue from investment properties for the year of our properties further and establishing them as a to decline slightly by 1% over 2002 to HK$888 million. benchmark for the industry in Hong Kong. Our staff performed outstandingly during the period of SARS For Two IFC, the quality of the office building and its to ensure shoppers’safety and mitigate the effects of the management enabled MTR to attract tenants despite the outbreak on public confidence. We also supported tenants lingering cautious sentiment resulting from SARS, the war in through aggressive promotion campaigns, including an Iraq and the weak economy. Considerable effort was taken attractive rebate promotion. Within this context, we took full to explain to potential tenants, agents and the business advantage of the relaxation of travel restrictions on tourists community the merits of the building, which is ideally suited from Mainland China through proactive, tailor-made to the sophisticated needs of multi-national corporations. programmes, such as organising shopping tours, designed The decision by Swiss banking giant UBS to lease seven floors to bring high spending Mainland visitors to our shopping represented one of the largest and highest profile relocations centres. These programmes proved successful in boosting of an office tenant in Hong Kong in 2003. UBS joined a growing the business turnover of our tenants. list of leading institutions in the building, including the Hong The Total Quality Service Regime, our pioneering customer Kong Monetary Authority, reinforcing Two IFC’s position as the service enhancement programme, and our computerised building of choice for top-tier corporations.
    [Show full text]
  • By Hong Kong Institute of Landscape Architects
    1 2 • In 1908, options for building Kowloon Station at Tsimshatsui were studied. • At that time, Salisbury Road was running directly to the pier. • Thesouthernsideof the site along Salisbury Road was a private lot. http://industrialhistoryhk.org/wp‐content/uploads/2015/12/Slide4‐500x375.jpg 3 • Land lots to the south of Salisbury Road were acquired to facilitate construction of the railway and the station. • Construction commenced in 1913 and completed in 1916. http://industrialhistoryhk.org/wp‐content/uploads/2015/12/Slide6‐500x375.jpg 4 • The section of Salisbury Road was widened upon completion of the station. http://industrialhistoryhk.org/wp‐content/uploads/2015/12/Slide10‐e1450087942643‐500x315.jpg 5 http://i.imgur.com/3Xe2U.jpg 6 https://gwulo.com/sites/gwulo.com/files/styles/extra‐ large__640x640_/public/thumbnails/image/1918%20Sanitary%20Department%20Water%20Cart.jpg?itok=usrClznb 7 http://www.seewide.com/upload/article/201603/1456819808191314562.jpg 8 https://gwulo.com/sites/gwulo.com/files/styles/extra‐large__640x640_/public/images/batgung‐moddsey‐ 1930s_kcr__ymca__pen.jpg?itok=R7RKw8yW 9 https://gwulo.com/sites/gwulo.com/files/styles/large/public/flickr/32907076701.jpg?itok=Wi0qxRa1 10 http://industrialhistoryhk.org/wp‐content/uploads/2015/12/Slide11‐e1450087999925‐500x443.jpg 11 • The Star Ferry Pier was still a simple single‐storey structure along the harbourfront. 12 http://www.weshare.hk/uploads/15685/9ajPSWBuRnskfAzWo7baQQ.jpg https://upload.wikimedia.org/wikipedia/commons/thumb/c/c3/Battle_of_HK_03.jpg/800px‐Battle_of_HK_03.jpg
    [Show full text]
  • Transport Infrastructure and Traffic Review
    Transport Infrastructure and Traffic Review Planning Department October 2016 Hong Kong 2030+ 1 TABLE OF CONTENTS 1 PREFACE ........................................................... 1 5 POSSIBLE TRAFFIC AND TRANSPORT 2 CHALLENGES ................................................... 2 ARRANGEMENTS FOR THE STRATEGIC Changing Demographic Profile .............................................2 GROWTH AREAS ............................................. 27 Unbalanced Spatial Distribution of Population and Synopsis of Strategic Growth Areas ................................. 27 Employment ........................................................................3 Strategic Traffic and Transport Directions ........................ 30 Increasing Growth in Private Vehicles .................................6 Possible Traffic and Transport Arrangements ................. 32 Increasing Cross-boundary Travel with Pearl River Delta Region .......................................................................7 3 FUTURE TRANSPORT NETWORK ................... 9 Railways as Backbone ...........................................................9 Future Highway Network at a Glance ................................11 Connecting with Neighbouring Areas in the Region ........12 Transport System Performance ..........................................15 4 STRATEGIC DEVELOPMENT DIRECTIONS FROM TRAFFIC AND TRANSPORT PERSPECTIVE ................................................. 19 Transport and Land Use Optimisation ...............................19 Railways Continue to be
    [Show full text]
  • Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link
    Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link Proposed Scheme – Consultation Digest Kwun Tong Tseung Kwan O Lam Tin Tiu Keng Leng TKO Town Centre South Yau Tong Junk Bay Lam Tin Interchange TKO Area 86 January 2012 Project Information Legends: Benefits Proposed Interchange • Upon completion of Route 6, the new road • The existing Tseung Kwan O Tunnel is operating Kai Tak Tseung Kwan O - Lam Tin Tunnel network will relieve the existing heavily near its maximum capacity at peak hours. The trafficked road network in the central and TKO-LT Tunnel and CBL will relieve the existing Kowloon Bay Cross Bay Link eastern Kowloon areas, and hence reduce travel traffic congestion and cater for the anticipated Kwun Tong Trunk Road T2 time for vehicles across these areas and related traffic generated from the planned development Yau Ma Tei Central Kowloon Route environmental impacts. of Tseung Kwan O. To Kwa Wan Lam Tin Tseung Kwan O Table 1: Traffic Improvement - Kwun Tong District Yau Tong From Yau Tong to Journey Time West Kowloon Area (Peak Hour) Current (2012) 22 min. Schematic Alignment of Route 6 and Cross Bay Link Via Route 6 8 min. Traffic Congestion at TKO Tunnel The Tseung Kwan O - Lam Tin Tunnel (TKO-LT Tunnel) At present, the existing Tseung Kwan O Tunnel is towards Kowloon in the morning is a dual-two lane highway of approximately 4.2km the main connection between Tseung Kwan O and Table 2: Traffic Improvement - Tseung Kwan O long, connecting Tseung Kwan O (TKO) and East urban areas of Kowloon.
    [Show full text]
  • TFHK/01/2021 on 17 May 2021
    Task Force on Harbourfront Developments on Hong Kong Island For discussion TFHK/01/2021 on 17 May 2021 Boardwalk underneath Island Eastern Corridor PURPOSE The purpose of this paper is to brief the Task Force on the latest architectural and landscaping design of the proposed Boardwalk underneath Island Eastern Corridor (IEC) (Boardwalk). The paper will also update the Task Force on the latest progress, works area requirements and proposed management arrangement of the Boardwalk. BACKGROUND 2. The proposed Boardwalk is a major harbourfront enhancement initiative on Hong Kong Island. Successful implementation of the proposed Boardwalk could set a role model for the forth-coming promenade projects, especially those coastal areas which cannot be developed into a promenade due to various reasons. 3. The proposed Boardwalk is approximately 2.2 kilometres (km) long and maintains a width of at least 10 metres (m) wide throughout and comprises a western and eastern section. The western section will run from Oil Street to Tong Shui Road (approximately 0.7 km long), while the eastern section will run from Tin Chiu Street to Hoi Yu Street (approximately 1.1 km long). These two sections will be connected by the North Point Promenade (approximately 0.4 km long). Upon completion, the proposed Boardwalk will connect the existing or planned promenade at Shek Tong Tsui in Western District and Aldrich Bay in Shau Kei Wan, providing a continuous promenade of some 12 km long for public enjoyment. 4. Both the Task Force and the Eastern District Council (EDC) have been closely engaged in the planning of the Boardwalk project over the past few years.
    [Show full text]
  • List of Projects Under the “Universal Accessibility” Programme and Their Present Status (As at 28 February 2021)
    List of projects under the “Universal Accessibility” Programme and their present status (as at 28 February 2021) Expanded Programme: Highways Location Present Status Department Structure No. Central & Western District HF46 Across Possession Street near Lower Lascar Completed Row HF135 Along Cochrane Street near Tun Wo Lane Completed HF142 Across Connaught Road West leading to Completed Sun Yat Sen Memorial Park Eastern District HF63 Across Chai Wan Road near Shan Tsui Completed Court HF92 & HF92A# Across Island Eastern Corridor near Quarry Completed Bay Park HF163 Across Siu Sai Wan Road near Harmony Completed Road Southern District HF104 Across Aberdeen Praya Road near Nam Completed Ning Street HF105 Across Aberdeen Praya Road near Ocean Completed Court H186 Elevated walkway connecting Tin Wan Completed Praya Road and Tin Wan Hill Road Wan Chai District HF154 Across Gloucester Road and Percival Street Under construction near Sino Plaza HS9 Across Canal Road East near Sports Road Completed HF85 At the Junction of Yee Wo Street, Implementation Pennington Street and Sugar Street programme under review Kowloon City District K14 Pui Ching Road Flyover across Princess Completed Margaret Road KF102 Across Hung Hom South Road near Hung Under construction Ling Street and Whampoa Street KF106 Across Hung Hom South Road near Hung Completed Hom Road Kwun Tong District KF90 Across Lei Yue Mun Road near Tsui Ping Completed Road Highways Location Present Status Department Structure No. KF109 Across Shun Lee Tsuen Road near Shun Completed Lee Estate
    [Show full text]
  • Lei Yue Mun (LYM) Phases 1 to 3 and 4
    PLANNING BRIEF Project Name : Lei Yue Mun (LYM) Phases 1 to 3 and 4 Approved Scheme for Current Proposal for Total Remarks LYM Phases 1- 3* LYM Phase 4 1. Site Particulars 1.1 District Location Kwun Tong Kwun Tong 1.2 Site Location Ko Chiu Road / Yan Wing Yan Wing Street, Lei Yue Mun Street, Lei Yue Mun 1.3 Site Area (ha) Subject to detailed site survey. Gross Site Area 5.37 1.14 6.33 Around 0.18ha from the approved scheme for (GSA) LYM Phases 1-3 is proposed to be included into (about) LYM Phase 4. Net Site Area (NSA) 2.90 1.06 3.96 Subject to detailed site survey. (about) 1.4 Existing Land Use The then temporary bus terminus has been Public Housing Estate and Mainly Vacant - developed into LYM Phase 3. Temporary Bus Terminus 1.5 Existing Zoning As stipulated in the approved Cha Kwo Ling, Yau “Residential (Group A)” Tong, Lei Yue Mun Outline Zoning Plan (“R(A)”) & “Green Belt” “R(A)” - No. S/K15/25, the site for LYM Phases 4 is zoned (“GB”) as “R(A)”. 1.6 Existing Land Status Government Land Government Land and Portion of VO206 *Metro District Planning Conference on 14 May 2009 1 Approved Scheme for Current Proposal for Total Remarks LYM Phases 1- 3 LYM Phase 4 2 Development Parameters 2.1 Proposed Housing Public Rental Housing PRH Flexibility in housing type should be allowed to cater Type (PRH) for the demand change between PRH and subsidised sale flats where provision of ancillary facilities will be adjusted in accordance with the HKPSG as appropriate.
    [Show full text]
  • New Service Arrangements for NWFB Routes 18, 43X and 720A
    New Service Arrangements for NWFB Routes 18, 43X and 720A (14 October 2011, Hong Kong )Effective 17 October 2011 (Monday), New World First Bus (“NWFB”) will implement new service arrangements for Routes 18, 43X and 720A. Details are as follows: Route 18 Departures from Kennedy Town (Belcher Bay) of Route 18 will divert via Tim Mei Avenue, Lung Wui Road, Fenwick Pier Street, Harbour Road and Fleming Road after Harcourt Road, then resume its original routeing to North Point (Healthy Street Central). New bus stops will be located opposite to CITIC Tower of Lung Wui Road and outside Hong Kong Convention and Exhibition Centre of Harbour Road while the original bus stops outside The Hong Kong Academy for Performing Arts and Immigration Tower of Gloucester Road will be cancelled. Route 43X Departures from Wah Kwai Estate of Route 43X, after 9:10am on Mondays to Saturdays and all the departures on Sundays and public holidays, will divert via Tim Mei Avenue, Lung Wui Road, Fenwick Pier Street, Harbour Road, Fleming Road and Convention Avenue after Harcourt Road, then run via Fenwick Pier Street, flyover and Harcourt Road, and resume its original routeing to Wah Kwai Estate. New bus stops will be located opposite to CITIC Tower of Lung Wui Road and outside Hong Kong Convention and Exhibition Centre of Harbour Road while the original bus stops outside The Hong Kong Academy for Performing Arts of Gloucester Road, Central Plaza and Shui On Centre of Harbour Road will be cancelled. Route 720A All the departures from Grand Promenade of Route 720A will divert via Harcourt Road, Tim Mei Avenue, Performing Arts Avenue, Fenwick Pier Street and Gloucester Road after Admiralty Centre, then resume its original routeing to Grand Promenade.
    [Show full text]