LIST OF EXECUTED WORKS: BRIDGES & TUNNELS

INTEGRAL INŽENJERING PLC

Contracted Value of Value of commence- Name and Ordinal Internal Contractor (C) Project name and location Contract Contract ment and address of the Type and description of the works No. No. Subcontractor (S) (BAM) (EUR) completion Employer date

Koridori Srbije, Construction of highway section in total length l= 6,75 km, with all structures, Corridor X Highway Project, Construction of d.o.o. (Serbia Construction of 7 bridges on highway section, one bridge on local road, one railway Highway E 75, Section: CaričinaDolina – Corridors) bridge, 3 RC grille structures with prestressed anchors for permanent protection of September JV Integral-Inter- Vladičin Han, LOT 5: Road and bridges at Beograd, slopes, 28 culverts, relocation of 1 km of railway, relocation of 1,3 km of local roads, works 43 273 224.407.629,56 114.737.799,07 2013 - kop-Prijedorputevi sub-section CaričinaDolina – Tunnel Kralja Petra 21 on regulation of Južna Morava river, Sokolica river and Koznička river. June 2018 (60-20-20) Manajle, 11000 Beograd project involve relocation of HV, MV and LV lines, construction of TC chanellization, PS, ICB br. CORRX.E75.EIB.PACK2-LOT5.ICB phone 11 33 44 drainage works, supply and installation of traffic signalization and equipment, noise 174 protection walls and landscaping.

Construction of the Main Road M-17.3 JP Ceste Neum –Stolac LOT 1 Federacije BiH Pavement of road section Stari Neum – d.o.o. Sarajevo Project included construction of main road in total lenght of 7,00 km. Works includes Babin Do L=5,3km 01.02.2018. - Terazije 54 42 272 6.027.207,03 3.081.662,02 construction of tunnel Oštrovac, in total lenght of 190 m1 and construction of C Construction of road section Babin Do – 24/04/2019 tel: +387 33 250 underpass Oskrusnica. Oštrovac L=1,7km and 370 Construction of the tunnel Oštrovac L=190m1.

MH "ERS" - MP a.d. Trebinje ZP Project included construction of hydrotechnical tunnel in the length of 1,725.00 m, circular "Hidroelektrane cross-section and day of 2.70 m. Tunnel is straight, vertical grade is 0.40%, with Construction of the drainage tunnel of 03.11. 2014 - na Trebišnjici" reinforced-concrete single-layer lining thickness 25 cm, constructed by applying New 41 271 6.750.609,38 3.451.531,77 C Bileća Polje 01.11.2018 a.d. Trebinje Austrian Tunneling Method. Obala Luke The project also included construction of entrance structure with catchment tank and Vukalovića br.2 gallery in the length of 16 m and exit structures in the length of 11 m. +387 59 260 782

Works on design and construction of full profile motorways section (l=35,300.00 m) with all belonging elements, two motorway intersections with toll plazas, traffic control and maintenance centre, rest and service area, structures at the motorway, of which the most important are viaducts with length l=449 m, and l=400 m, bridge with length l=340.00 m, and artificial tunnel. Project includes construction of total of 21,529.24 m local roads, geomechanical works, relocation of power installation, power supply installations of the toll plazas, rest and Public Company Design and construction of Banja Luka - service area and artificial tunnel, works on illumination of interchanges, works on setting "Republic of Doboj Motorway, Section Banja Luka - 01 Sept 2014 - up traffic signalization and equipment, and noise protection. JV Integral-Granit 40 268 445.558.204,83 227.810.292,73 Srpska Prnjavor (km 0+000 to km 35+300) 30 Sept 2018 Project includes design and implementation of intelligent traffic systems, video (60-40) Motorways" Contract no. RS/EIB-2012/W surveillance and traffic management; works on dewatering of pavement, regulation of +387 51 233 670 watercourses, installations of optical cables and emergency call system, and toll collection system. Pavement structure: driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous road base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm stopping lane: asphalt concrete 7 cm, bituminous bearing course BNS 7 cm, road base 52 cm

1272 calendar Design and construction of motorway section in total length l=36.609.72 m, with all days after structures, two motorway intersections with toll plazas, traffic control and maintenance Commencemen centre, rest and service area, structures at the motorway, of which the most important t Date are the River bridge L=425.40 m, Ukrina River bridge L=103.06 m, Slatinci artificial tunnel l=80.50m. 09 November Project includes construction of total of 21.422,48 m local roads, geomechanical works, 2012 -10 Public Company relocation of power installation, power supply installations of the toll plazas, rest and Design and construction of Banja Luka - September "Republic of service area and artificial tunnel, works on illumination of interchanges, works on setting Doboj Motorway, Section Prnjavor - Doboj JV Integral-Granit 39 265 452.807.085,58 231.516.586,61 2016 (Taking- Srpska up traffic signalization and equipment. (km 35+300 to km 71+909.72) Contract no. (60-40) over) Motorways" Project shall include design and implementation of intelligent traffic systems, video RS/EBRD-2012/W of 24 August 2012 DNP in duration +387 51 233 670 surveillance and traffic management; works on dewatering of pavement, installations of of 730 days optical cables and emergency call system, and noise protection. starts as from Pavement structure: 11 September driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous 2016, ends on road base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm; 10 September stopping lane: asphalt-concrete 7 cm, bituminous bearing course BNS 7 cm, road base 2018 52 cm

Construction of bridge No. 446 over river Vrbanja with access roads in Ćorin Lug, on Public Company Construction of new bridge over river Vrbanja with access roads. New bridge will be RC 01. July 2013. regional road R-440, section Border RS/FBIH "Republic of monolith structure, with two traffic lanes width 3.0 m, two edge lanes width 0.30 m, and JV Pijedorputevi i 38 264 529.134,69 270.542,27 -24. December (Bukovica) - Obodnik on chainage km Srpska Roads" two pedestrian lanes width 1,2 m. Total length of new bridge is 30 m, two spans 15 m Integralinženjering 2014 29+000 +387 51 334 500 length. Reference No. 112/12

Public Company Construction of bridge No. 409 Over river "Republic of Construction of new bridge on location of existing bridge in Karanovac. New bridge on 29. May 2013. - JV in Karanovac on junction of regional Srpska Roads" regional road R414 in Karanovac, length 60 m, with two traffic lanes width 3,5 m, two lanes 37 263 1.999.772,25 1.022.467,32 24. December Integralinženjering road R-414 and Main road M-16 Duško Gojić, for bicycles width 1 m, and two pedestrian lanes width 1,2 m. Structure of old bridge will 2014 i Pijedorputevi Reference No. 163/12 Director be relocated downstream for traffic diversion during construction of new bridge. +387 51 334 500

Project included construction of main road in total length of 8.9 km. Two tunnels constructed were: tunnel Čemerno and tunnel Surdup, in total length of l=2.305.00m. Tunnel Čemerno is 2,109.00 m long, and tunnel Surdup is 196.00m long. Both tunnels were constructed by applying the New Austrian construction method (NATM), including all electrical and mechanical installation. Clearance of each tunnel is 55sq.m, and excavation profile of both tunnels is 97.54sq.m each. Tunnel works included underground and open cut excavations. Rocky mass was secured by installation of SN anchors and reinforcing mesh at tunnel portals, and installation Public Company Permanent solution for the landslide September of SN and IBO anchors, steel reinforcing mesh and centerings in the other parts of "Republic of 36 260 Čemerno at the trunk road M-20 Gacko- 71.846.761,91 36.734.666,05 2008 - 06 the tunnel. Following installation of anchors, mesh and centerings, the tunnel C Srpska Roads" Foča August 2013 surface was protected by sprayed concrete MB 30, waterproofing coat, and +387 51 334 500 construction of the secondary tunnel lining. The project further included the structures: viaduct ''Trnova Luka'', length: L=408.00 (steel composite structure with columns of over 50m high), one viaduct length l=88.00m, the "Hrštica" Bridge l=37.36m and the bridge over the Ždralov potok l=12m. In order to secure stability of the road structure, total of 1,605.00m of reinforced- concrete walls were constructed. In addition, slope stabilisation in this geologically very complex terrain was obtained by installation of steel anchors and applying up-to-date geotehnical methods.

Federation of Construction of an intersection at the trunk road M4 Tuzla - Šićki Brod. The work B&H 2 2 encompasses construction of 5 bridges (l1=9,80m/P1= 88 m ; l2=13,80m/P2=136,6 m ; Road 2 2 2 Construction of intesection Šićki Brod (Lot March 2010 - l3=18,40m/P3=184m ; l4=42,50m/P4=415 m ; l5=26,50m/P5=258 m ), reconstruction of 4 JV Integral, CPM 35 254 6.466.914,00 3.306.480,62 Directorate of 2) 31-Dec-2011 bridges (P=185,4+187,41+184,00+388m2), alignment works (reconstruction of existing BH, REWEUS FB&H. and construction of a new pavement) works on intersection branches, drainage, lighting, Tel. +387 33 563 traffic signalization and equipment. 468

Public Company "Republic of Srpska Roads" Execution of works at construction of motorway section (l=6.736 m) with all additional +387 51 334 500 Construction of the highway Gradiška - elements, earthmoving works, concrete and insulation works on two bridges of spans 27-April-2011 - /Public 34 249 Banja Luka (Mahovljani): 46.927.945,37 23.993.877,47 28,80 m and 19,60m and three overbridges. C 24-Nov-2011 Company Lot 3: km 30+000 to km 36+736 Bridges are prefabricated monolith structure, prestressed concrete prefabricated "Republic of girders MB45, M150, V8, structure funded on bored HW piles Ø1000, length 14,0m. Srpska Motorways" +387 51 233 670

Execution of works at construction of entire motorway (l=9,500 m) with all additional

1 Execution of works at construction of entire motorway (l=9,500 m) with all additional elements, four overbridges, three double bridges (spans 30m each) on the motorway and two bridges on local roads, and one underbridge Jazovac bridge - two bridges length 2x37.60 m, prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 14,0m Jurkovica II bridge - two bridges length 2x37.51 m, prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored Public Company HW piles Ø800, length 14,0m "Republic of Borna bridge - two bridges length 2x37.64 m, prefabricated monolith structure, Srpska Roads" prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored Director: HW piles Ø800, length 12,0m Nedeljko Bridge at VL 27A - bridge length 53,84 m, bridge structure (2x20=40m), prefabricated Knežević, Construction of the highway Gradiška - monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure 11-Dec-2007 - B.Sc.Oec. JV Konstruktor Banja Luka (Mahovljani): funded on bored HW piles Ø800, length 12,0m 33 248 82.586.511,74 42.225.812,95 24-Nov-2011 +387 51 334 500 Inženjering - Lot 2: km 20+500 to km 30+000 including Bridge on RAMP A- bridge length 53,84 m, bridge structure (2x20=40m), prefabricated /Public Integral Inženjering local roads monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure Company funded on bored HW piles Ø800, length 13,0m "Republic of Overbridges in length 54.04m each, overbridge structure (2x20=40m), prefabricated Srpska monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure Motorways" funded on bored HW piles Ø1000 Dušan Topić Underbridge at km 29+515.000 - monolith RC structure, underbridge clear span 9.50 x +387 51 233 670 5.30m Pavement structure: driving lane: SMA 5cm, binding bituminous course 7 cm, bituminous road base BNS 10 cm, cement stabilisation 20 cm, road base 30 cm overtaking lane: SMA 5cm, binding bituminous course 7 cm, bituminous road base 10 cm, road base 35 cm stopping lane: bituminous bearing course BNS 5 cm, binding bituminous course 7 cm, road base 35 cm

Execution of works at construction of entire motorway (l=10.755 m) with all additional elements, six overbridges and one double carriageway bridge (span 40m) Jurkovica Bridge - two bridges in the length 2x53.29m, bridge structure (2x20=40m) prefabricated monolith structure, prestressed prefabricated concrete girders MB45, M150, V8, structure funded on bored HW piles Ø1000, length 14.0m. Overbridge at km 13+688.902 - length 113.84m, Overbridge structure (4x25=100m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000 for middle piers Ø800. Abutments funded on 5 piles each, length 18m, that is 22m. Foundation of the middle pier is funded on 6 piles. Overbridge at km 11+662.045 - length 54.04m, Overbridge structure (2x20=40m), Public Company prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, "Republic of V8, structure funded on bored HW piles Ø1000 Srpska Roads" Overbridge at km 12+348.955 - length 54.04m, Overbridge structure (2x20=40m), B.Sc.Oec. prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, Construction of the highway Gradiška - +387 51 334 500 JV Konstruktor 11-Dec-2007 - V8, structure funded on bored HW piles Ø1000 32 247 Banja Luka (Mahovljani): 97.663.418,74 49.934.513,09 /Public Inženjering - 24-Nov-2011 Overbridge at km 14+910.00 - length 54.04m, Overbridge structure (2x20=40m), Lot 1: km 10+254,59 to km 20+500 Company Integral Inženjering prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, "Republic of V8, structure fundd on bored HW piles Ø1000 Srpska Overbridge at km 17+550.00 - length 54.04m, Overbridge structure (2x20=40m), Motorways" prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, +387 51 233 670 V8, structure funded on bored HW piles Ø1000 Overbridge at km 20+252.50 - length 54.04m, Overbridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000 Pavement structure: driving lane: SMA 5cm, binding bito course 7 cm, Bituminous road base BNS 10 cm, cement stabilisation 20 cm, road base 30 cm overtaking lane: SMA 5cm, binding bito course 7 cm, Bituminous road base BNS 10 cm, road base 35 cm stopping lane: Bituminous road base BNS 5 cm, binding bituminous course 7 cm, road base 35 cm

Construction of footbridge No. 2 over City of Banja Construction of reinforcement-concrete footbridge in composite sheet metal framework, Desanka Maksimović Boulevard, near October 2008 - Luka 31 228 2.119.292,22 1.083.576,91 length 56.64m. Footbridge girders are made of steel. Construction of drainage system out C primary school "Branko Radičević", in Banja July 2009 + 387 51 216 of INOX is predicted within the project execution, as well. Luka 688

Government of Montenegro; Traffic Construction of the Obalska Street in Berane, length 3117,36m: construction of 3 sections Directorate, and main road in the widening zone, construction of sidewalks and pedestrian passes, Construction of Obalska Street in Berane April - Novaka construction of vertical and horizontal signallization, and precipitation sewerage. and construction of Bridge over the Bistrica 30 216 6.586.161,24 3.367.450,77 December Miloševa St, 18, Construction of prestressed RC bridge over the Bistrica river and preparation of design C River 2008 Podgorica documentation; including the construction of access road to the new bridge, mechanical Contract no. 07/08 from 03 April 2008 Tel: +381 81 230 excavation and contact concreting of drilled piles Ø 880 mm that the bridge is based 133 upon. Piers have been casted at situ in metal formwork Fax: +381 81 230 650

Construction of section of Gradiška – Banja Luka motorway in the toatl length of 5700 m with four traffic lanes, 3.75 m wide, two stopping lanes, 2.50 m wide, two marginal strips along verge 0.50 m wide, two marginal strips along central reserve, 0.20 m wide, two shoulders, 1.50 m wide, central reserve of app. width of 4.00 m between lanes. Beside the construction of the whole highway profile, the project included: Bridge veza 5: the structure constructivelly, rigid RC carcass with three spans and surfacing, two bridges of the total length of L=9+12+9m= 30 m; Bridge veza 4: constructivelly, rigid RC carcass with three spans and surfacing, two bridges of the total length of L=9+12+9m= 30 m; Bridge veza 3: overpass L=2x25=50 m, continuous plate with T-section; Viaduct veza 2: two viaducts of the total length of L=7x35=245 m, precast prestressed September main girders; 2004 - Public Company Bridge veza 1: two bridges of the total length of L=10 m, constructive solution is precast Execution of works on highway E661, September "Republic of plate made of two types of prestressed elements and elements of which work in-situ. 29 209 section Gradiška - Banja Luka, section 109.995.198,57 56.239.652,00 C 2009 (technical Srpska Roads" Construction of 4 tunnels of the total length of 1673 m (391+389+477+416) with Banja Luka Airport - Glamočani acceptance on +387 51 334 500 complete lightning and ventilation installation. The tunnels are constructed with 28 June 2010) the new Austrian method of constructing (NATM). The area of the tunnel profile is 55 m2. The works on construction of tunnels meant the underground and wide excavation (open cut). Protection of slopes is done by placing of SN anchors and reinforcement on the outlets and inlets from the tunnel and placing of SN and IBO anchors, reinforcement and centres in the other part of the tunnel. After the placing of anchors, mesh and centres, the protection of sprayed concrete MB 30, the waterproofing layer and construction of secondary concrete tunnel lining. Construction of service communications of the total length of 2700 m. Construction of motorway drainage system with PP pipes, DN 250-500, the total length of 7330 m, installation of system for atmpsheric water treatment - 15 pieces of separators.

Reconstruction of RC bridge over the railway - rehabilitation of piers, bridge supports, connection of existing piers in single RC carcass, rehabilitation of the bridge substruction, works on carriageway and guardrail replacement. Works on piers recontruction are executed by excavation of earth to the level of existing foundations, the anchors are fixed on the whole pier height for making wall carcass between the piers. After placing the additional piers reinforcement, the formwork is placed on the whole height of the carcass for concreting the carcass. Public Company On the span structure, the existing asphalt layers and waterproofing are removed, and the April - "Republic of Bridge reconstruction in Novi Grad over the surface layers of deck slab. The works on removing of existing layers are executed 28 190 1.355.257,71 692.932,26 September Srpska Roads" C railway B28 on M04-1 mechanically, using equipment that would not induce significant dynamic impacts. On the 2007 and EUFOR places of expansion joints which are removed, the continual slab was constructed, and +387 51 334 500 the expansion joint on the side toward Novi Grad was replaced with new one. The rehabilitation of the surface of the deck slab was executed by the applying of epoxide for grouting and restoration mortar. After rehabilitation of the deck surface and placing anchors for reinforcing cantilever of footway, the removing of concrete is executed to the foreseen plate level.The rehabilitation of the surface layer of concrete on the lower surface of the bridge is executed from the scaffolds which are placed below the structure, using grouting mass and restoration mortar.

P. E . R a i l w a y Communication Construction of overpass from km 79 to km Construction of overpass across the railway included: material excavation for construction s p.o. Doboj 594,20, double track railway line between S. September of foundations and construction of strip foundations for the overpass posts. Overpass PC RS Roads 27 187 Kostajnica and Doboj, including access 750.486,84 383.717,83 2004 - May structure is a composite structure, span appr. 20m, lean on the posts which are C Municipality roads 2007 constructed in the metal formworks. The project included the construction of access road, Doboj Contract no. 1526/04 app. length of 1000m. +387 53 242 047

Construction of Modriča Bridge:

2 Construction of Modriča Bridge: The project included the construction of bridge, the total length of 240 m, with six spans of the total length of 40 m. The width of the bridge is 12 m. The works include: the construction of temporal access to location of the works execution, the excavation of the unquality materials and preparation of the work platforms for the boring piles. The piles for abutmnets are made from the bank, and for the construction of the piles for the river piers, the temporary islands are constructed for the access of the mechanization. The cofferdams for pile cnstruction are made of the steel planks. The piles are concreted according to the contract procedures with the protection of pile body from the steel pipes. The bridge structure is leaned on two abutments and four river piers which are made in steel formwork, and the bridge structure is made of precast prestressed girders, L=40 m, T-2600. The girders are mounted with crane. Over the precast prestressed girders are Obayashi placed cross girders, and deck slab is partially constructed in-situ. After the completion of Corporation works on bridge construction, the waterproofing is constructed, the curbs are placed, the Tokio Japan wearing course AB is palced, thickness 7 cm. The works are finished by arrangemnet of Consultant: the bridge slope round heads and construction of illumination on the bridge and access to Construction of Modriča Bridge and Doboj October 2004 - "Nippon Koei the bridge and palcing of the guard-rail on the bridge. 26 184 9,839,389.64 5,030,800.04 S Bridge December 2006 Co," Ltd. In Construction of Doboj Bridge: consortium with The project included the construction of bridge, the total length of 200 m, with five spans "Central of the total length of 40 m. The width of the bridge is 12 m. The works include: the Consultant Co" construction of temporal access to location of the works execution, the excavation of the unquality materials and preparation of the work platforms for the boring piles. The piles for abutmnets are made from the bank, and for the construction of the piles for the river piers, the temporary islands are constructed for the access of the mechanization. The cofferdams for pile cnstruction are made of the steel planks. The piles are concreted according to the contract procedures with the protection of pile body from the steel pipes. The bridge structure is leaned on two abutments and four river piers which are made in steel formwork, and the bridge structure is made of precast prestressed girders, L=40 m, T-2600. The girders are mounted with crane. Over the precast prestressed girders are placed cross girders, and deck slab is partially constructed in-situ. After the completion of works on bridge construction, the waterproofing is constructed, the curbs are placed, the wearing course AB is palced, thickness 7 cm. The works are finished by arrangemnet of the bridge slope round heads and construction of illumination on the bridge and access to the bridge and palcing of the guard-rail on the bridge.

Construction of RC bridge including preliminary, earth, concrete, reinforced and other ancillary works. Bridge span is 10,50m, total width 10,00 m (footways 2m). The works started with demolition of existing bridge, material excavation for abutments and placing Construction of reinforced-concrete bridge City of Banja July - October of lean concrete. Bridge is based on RC foundation lines on which is leaned abutments. 25 179 over the River Široka Rijeka in Mlađe Ćusića 169.261,05 86.541,80 Luka C 2006 Bridge span structures are made of prefabricated girders MB 40, assembled by crane, RC Street, Banja Luka 051/216 688 bridge deck which is immediatelly and jointlessly constructed. The works are finished by construction of waterproofing, placing of asphalt concrete layer on the bridge and access road.

Construction of RC bridge of effective span Lo=13,30 m. The works started with excavation for foundations of abutments and placing of lean concrete, after which is done concreting of footings, RC walls of abutment bearing beams, Construction of reinforced-concrete bridge June - City of Banja RC deck, construction of waterproofing, asphalt work and bridge metal railing 24 178 over the River Suturlija in Donja Kola, Banja 89.814,17 45.921,26 September Luka C construction. Luka 2006 051/216 688 RC bridge deck is done monolithly. The project included the regulation of river Saturlija in the total length of 10 m upstream and downstream on the both sides of the river.

The project included the preparing of design and construction of bridge of the total length of 148.25 m1, the total width of 8.16 m1. Bridge is based on reinforced-concrete piles of ø 1500 mm with five spans in the length of of 30,60 m1. The main bridge construction are precast prestressed reinforced-concrete girders on which the pavement slab is concreted in-situ. Technologically, the bridge construction started on the left side by mechanically construction of bored piles for abutments No. 1, and then filling of island and river piles. Preparation of preliminary design and Municipality The protection of island for construction of bored piles is executed by stone mound, and construction of bridge over the River Vrbas Sep 2005 - May Laktaši for the needs of pile concreting, the construction of cofferdam with steel planks. Piles are 23 174 3.370.690,45 1.723.406,66 C in Miloševci, municipality Laktaši 2006 Tel.: 051 / concreted by contract procedures. The posts are concreted in steel formwork. RS, B&H 532-370 The pile heads are made by concreting with scaffold and formwork. Precast prestressed reinforced-concrete girders are made on the plateau near the bridge in steel formwork, and they are mounted by cranes. Pavement concreting was done in stages, after placing of reinforcement. After completing of structure construction, the bridge waterproofing is done, placing of curbs, making the layer of asphalt concrete and installation of expansion joints. The works were completed by construction of slope round head and pavement on the both sides of thr river Vrbas.

Construction of footbridge "Pasarela" over City of Banja September Construction of reinforcement concrete footbridge,bridge length 6.75+30.00+6.75 = 43.50 22 165 West Trunk road at the intersection with 543.840,18 278.061,07 Luka C 2004 - May 2005 m, main span length of 30m. Njegoševa Street, Banja Luka, RS, 051/216 688

JMDP "Elektroprivreda RS", ZDP Completion of Road Prestressed Bridge No.: April 2004 - Reconstruction of prestressed box bridge, span 116 m. Inspection of previously executed 21 157 956.292,49 488.944,59 "Hidroelektrane C 1 over Trebišnjica River November 2004 works and quality of incorporated material, possible raconstruction of damaged spots. na Trebišnjici" + 00 387 59 220 243

Bosnia and Herzegovina Reconstruction of the Railway Bridge over Railways Public Reconstruction of the railway bridge in length of 32,0 m; Track rehabilitation in length of River near Dobrljin Corporation April - October 55,0 m (including bridge length); - Partial rehabilitation of the border station building 20 156 and Rehabilitation of Station Building 531.088,42 271.541,20 Project C 2004 Dobrljin, works relate to rehabilitation of the deed-level roof, walls, ceilings, floors, joinery Dobrljin Contract No. EIB-BHRPC Implementation and electric installations. RB1/04/2003 Unit +387 53 201 000

Reconstruction of the road bridge No.3 Public Company Reconstruction of bridge deck, asphalt wearing course with waterproof, replacement of "Petlja" on the Main road M-5.2 in Mrkonjić August - "Republic of 19 154 465.258,05 237.882,66 cast iron gullies, replacement of crash barrier, replacement of footway and other bridge C Grad, on km 74+714 (MSR BLUEBIRD)- October 2004 Srpska Roads" facilities. No.SFOR/56-2003 +387 51 334 500

Construction works on replacement of P. E . R a i l w a y parapet wall at the "Vrbas" bridge, December Communication Preparing of design documentation, earth works (excavation), shutter erection, reinforcing 18 141 km 92-115 (earth, concrete, reinforcing and 47.196,26 24.131,06 2003-March C s p.o. Doboj works and concreting of retaining wall. other works, including design 2004 +387 53 241 012 documentation)

City of Banja Construction of bridge, 150 m in length, Luka Construction of continuous concrete bridge, with prestressed main girders, total span of over the Vrbas river in Delibašino village, July 2003- 17 138 2.065.740,10 1.056.196,14 Dragoljub 150 m, width of 12 m. Assemblying of main girders will be done by launch truss. Bridge is C Banja Luka, Contract No. 07/I-G-925/03 & December 2003 Davidović founded on drilled piles ф 125 cm 07/I-G-925-1/03 051/216 688

Theater Allied Reconstruction of culvert bridge "Jezero" on Contracting August 2003 - Construction of bridge founded on piles ф80, approximate span 13m,construction of 16 137 the Bluebird road, Contract No. SA-03- 299.594,51 153.180,24 Office Sarajevo C December 2003 concrete pile heads, pre-stressed bearers, and bridge deck. Placing of asphalt. C-0254 SFOR +387 33 495 723

European Union; Delegation of Reconstruction of the existing damaged bridge over the Una river in Jasenovac, total Reconstruction of the bridge Jasenovac over January2003- the European length 129,10 m; construction of new and reconstruction of old bearings, construction of 15 136 the Una river, Contract No. RE/YOU/ 2.989.717,59 1.528.618,33 C December 2003 Commission to new piers and pavement structure. The bridge is of a composed structure and funded on 29/11/98 Bosnia and drilled piles ф 1500. Herzegovina 033/666 036

Europen Agency for February 2003 - Footbridge is built as covered arched steel span structure on reinforced concrete 14 124 Footbridge "Zlatička Duga" Podgorica 533.380,48 272.713,11 Reconstruction, C May 2003 foundations Podgorica Tel. 081 231 741

3 Fund for Urban Land, Real "UNION " bridge Podgorica Estate and August 2001 - Construction of bridge over the Morača river, out of reinforced concrete prestressed JV Integral - 13 121 Montenegro, Contract No. EAR/00/ 8.572.237,35 4.382.915,36 Roads , maj 2003 girders, span 110 m Primorje MTG01/01/01 Podgorica Tel. + 381 81 234 817

European Agency for Remedial Works to Vojnik Road Tunnel March 2002 - Reconstruction , Rehabilitation works on precipitation sewage, repair of tunnel, tunnel road and access 12 112 Montenegro, Contract No. EAT/00/ 1.358.385,09 694.531,27 September C Podgorica road to the tunnel with fittings MTG02/01/006 2002 Tel. + 381 81 406 600

City of Banja Construction of pedestrian crossing Luka via "Pasarela" over West Trunk road at the January 2002 - Construction Building and handycraft works for constructing of pedestrian crossing, drainage of 11 108 340.658,94 174.176,15 C intersection with Slobodana Jovanovića August 2002 Establishment atmospheric waters, electrical works and landscaping Street, Banja Luka, RS Banja Luka Tel. 051 216 688

Ministry of Transport and Communication Design and reconstruction of the bridge s of RS, and intersection over the Vrbas river in September Road Klašnice at the intersection of trunk roads 2001 - Directorate of Designing and construction of the bridge and infrastructure as well as intersection and 10 107 M16.1 Klašnice - Derventa and M16 9.157.170,46 4.681.986,91 C September RS traffic accesss over the Vrbas river in Banja Luka Gradiška - Banja Luka 2002 Banja Luka Republic of Srpska Public Company Bosnia & Herzegovina "Republic of Srpska Roads". +387 51 334 500

Ministry of Transport Project Implementation Reconstruction of bridge over the river March 2002 - Directorate,B.Lu Removing of an old damaged bridge construction, excavation for widening of the new 9 101 Ponor 452.634,90 231.428,55 C August 2002 ka footing, concrete girders of the new bridge Bosnia & Herzegovina Public Company "Republic of Srpska Roads" +387 51 334 500

Rehabilitation of the Tunnel "Ljeskove P. E . R a i l w a y Widening of the tunnel opening, replacing of the old steel fabric, boring of drainage holes, vode" at the railway Doboj - Banja Luka in January - June Communication 8 94 395.150,10 202.037,04 drainage of walls and making grainage cannals, placing of new Q mesh, plastering of the C the lenght 20+544,50 do 22+058,00 km 2002 s p.o. Doboj openings, cleaning of the tunnel Bosnia & Herzegovina Tel. 053 242 047

Parsons August 2001 - Reconstruction of the bridge over the Bosna River, rehabilitation of access bridges and 7 82 Reconstruction of the bridge in Šamac 953.308,39 487.418,84 Delaware Inc. C January 2002 roads Tel. 033 220 948

Reconstruction of the bridge in Donji Parsons July - October Construction design of the bridge in Donji Klakar, work performance on the bridge 6 81 Klakar 189.043,80 96.656,56 Delaware Inc. S 2001 construction Bosnia & Herzegovina Tel. 033 220 948

Municipality of Construction of the bridge over Ukrina September - Kalenderovci 5 54 River on the road Kalenderovci - Palačkovci 519.508,70 265.620,58 October Construction of main beam abutments, access roads and pavement structure C Derventa Bosna & Herzegovina 2000 Tel. 053 829 563

Reconstruction of the Bridge over the river June - August USAID,Parsons Construction of RC beams between two bridge abutments with construction of pavement 4 38 Una,Novi Grad 337.089,00 172.350,87 C 2000 Delaware structure Bosnia & Herzegovina

PID Transport of RS Banja Luka May - Reconstruction of the Bridge - Crna Rijeka Public Company Construction of prestressed beam between two bridge abutments with pavement 3 35 702.173,00 359.015,35 September C Bosnia & Herzegovina "Republic of structure 2000 Srpska Roads" +387 51 334 500

Parsons Construction of the bridge over the Brka December 1999 Delaware / 2 27 river, Brčko District 141.372,00 72.282,36 - Construction of the bridge at piles with construction of pavement structure C Tuzla Bosnia & Herzegovina April 2000 Tel. 035 282 200

Parsons Reconstruction of the bridge/road Modriča - April - June Delaware / Scraping of delevelled surfaces, construction of new asphalt surface, horizontal and 1 14 Gradačac 196.000,00 100.213,21 C 1999 Tuzla vertical signalisation Bosnia & Herzegovina Tel. 035 282 200