LIST OF EXECUTED WORKS: BRIDGES & TUNNELS INTEGRAL INŽENJERING PLC Contracted Value of Value of commence- Name and Ordinal Internal Contractor (C) Project name and location Contract Contract ment and address of the Type and description of the works No. No. Subcontractor (S) (BAM) (EUR) completion Employer date Koridori Srbije, Construction of highway section in total length l= 6,75 km, with all structures, Corridor X Highway Project, Construction of d.o.o. (Serbia Construction of 7 bridges on highway section, one bridge on local road, one railway Highway E 75, Section: CaričinaDolina – Corridors) bridge, 3 RC grille structures with prestressed anchors for permanent protection of September JV Integral-Inter- Vladičin Han, LOT 5: Road and bridges at Beograd, slopes, 28 culverts, relocation of 1 km of railway, relocation of 1,3 km of local roads, works 43 273 224.407.629,56 114.737.799,07 2013 - kop-Prijedorputevi sub-section CaričinaDolina – Tunnel Kralja Petra 21 on regulation of Južna Morava river, Sokolica river and Koznička river. June 2018 (60-20-20) Manajle, 11000 Beograd project involve relocation of HV, MV and LV lines, construction of TC chanellization, PS, ICB br. CORRX.E75.EIB.PACK2-LOT5.ICB phone 11 33 44 drainage works, supply and installation of traffic signalization and equipment, noise 174 protection walls and landscaping. Construction of the Main Road M-17.3 JP Ceste Neum –Stolac LOT 1 Federacije BiH Pavement of road section Stari Neum – d.o.o. Sarajevo Project included construction of main road in total lenght of 7,00 km. Works includes Babin Do L=5,3km 01.02.2018. - Terazije 54 42 272 6.027.207,03 3.081.662,02 construction of tunnel Oštrovac, in total lenght of 190 m1 and construction of C Construction of road section Babin Do – 24/04/2019 tel: +387 33 250 underpass Oskrusnica. Oštrovac L=1,7km and 370 Construction of the tunnel Oštrovac L=190m1. MH "ERS" - MP a.d. Trebinje ZP Project included construction of hydrotechnical tunnel in the length of 1,725.00 m, circular "Hidroelektrane cross-section and day of 2.70 m. Tunnel is straight, vertical grade is 0.40%, with Construction of the drainage tunnel of 03.11. 2014 - na Trebišnjici" reinforced-concrete single-layer lining thickness 25 cm, constructed by applying New 41 271 6.750.609,38 3.451.531,77 C Bileća Polje 01.11.2018 a.d. Trebinje Austrian Tunneling Method. Obala Luke The project also included construction of entrance structure with catchment tank and Vukalovića br.2 gallery in the length of 16 m and exit structures in the length of 11 m. +387 59 260 782 Works on design and construction of full profile motorways section (l=35,300.00 m) with all belonging elements, two motorway intersections with toll plazas, traffic control and maintenance centre, rest and service area, structures at the motorway, of which the most important are viaducts with length l=449 m, and l=400 m, bridge with length l=340.00 m, and artificial tunnel. Project includes construction of total of 21,529.24 m local roads, geomechanical works, relocation of power installation, power supply installations of the toll plazas, rest and Public Company Design and construction of Banja Luka - service area and artificial tunnel, works on illumination of interchanges, works on setting "Republic of Doboj Motorway, Section Banja Luka - 01 Sept 2014 - up traffic signalization and equipment, and noise protection. JV Integral-Granit 40 268 445.558.204,83 227.810.292,73 Srpska Prnjavor (km 0+000 to km 35+300) 30 Sept 2018 Project includes design and implementation of intelligent traffic systems, video (60-40) Motorways" Contract no. RS/EIB-2012/W surveillance and traffic management; works on dewatering of pavement, regulation of +387 51 233 670 watercourses, installations of optical cables and emergency call system, and toll collection system. Pavement structure: driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous road base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm stopping lane: asphalt concrete 7 cm, bituminous bearing course BNS 7 cm, road base 52 cm 1272 calendar Design and construction of motorway section in total length l=36.609.72 m, with all days after structures, two motorway intersections with toll plazas, traffic control and maintenance Commencemen centre, rest and service area, structures at the motorway, of which the most important t Date are the Bosna River bridge L=425.40 m, Ukrina River bridge L=103.06 m, Slatinci artificial tunnel l=80.50m. 09 November Project includes construction of total of 21.422,48 m local roads, geomechanical works, 2012 -10 Public Company relocation of power installation, power supply installations of the toll plazas, rest and Design and construction of Banja Luka - September "Republic of service area and artificial tunnel, works on illumination of interchanges, works on setting Doboj Motorway, Section Prnjavor - Doboj JV Integral-Granit 39 265 452.807.085,58 231.516.586,61 2016 (Taking- Srpska up traffic signalization and equipment. (km 35+300 to km 71+909.72) Contract no. (60-40) over) Motorways" Project shall include design and implementation of intelligent traffic systems, video RS/EBRD-2012/W of 24 August 2012 DNP in duration +387 51 233 670 surveillance and traffic management; works on dewatering of pavement, installations of of 730 days optical cables and emergency call system, and noise protection. starts as from Pavement structure: 11 September driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous 2016, ends on road base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm; 10 September stopping lane: asphalt-concrete 7 cm, bituminous bearing course BNS 7 cm, road base 2018 52 cm Construction of bridge No. 446 over river Vrbanja with access roads in Ćorin Lug, on Public Company Construction of new bridge over river Vrbanja with access roads. New bridge will be RC 01. July 2013. regional road R-440, section Border RS/FBIH "Republic of monolith structure, with two traffic lanes width 3.0 m, two edge lanes width 0.30 m, and JV Pijedorputevi i 38 264 529.134,69 270.542,27 -24. December (Bukovica) - Obodnik on chainage km Srpska Roads" two pedestrian lanes width 1,2 m. Total length of new bridge is 30 m, two spans 15 m Integralinženjering 2014 29+000 +387 51 334 500 length. Reference No. 112/12 Public Company Construction of bridge No. 409 Over river "Republic of Construction of new bridge on location of existing bridge in Karanovac. New bridge on 29. May 2013. - JV Vrbas in Karanovac on junction of regional Srpska Roads" regional road R414 in Karanovac, length 60 m, with two traffic lanes width 3,5 m, two lanes 37 263 1.999.772,25 1.022.467,32 24. December Integralinženjering road R-414 and Main road M-16 Duško Gojić, for bicycles width 1 m, and two pedestrian lanes width 1,2 m. Structure of old bridge will 2014 i Pijedorputevi Reference No. 163/12 Director be relocated downstream for traffic diversion during construction of new bridge. +387 51 334 500 Project included construction of main road in total length of 8.9 km. Two tunnels constructed were: tunnel Čemerno and tunnel Surdup, in total length of l=2.305.00m. Tunnel Čemerno is 2,109.00 m long, and tunnel Surdup is 196.00m long. Both tunnels were constructed by applying the New Austrian construction method (NATM), including all electrical and mechanical installation. Clearance of each tunnel is 55sq.m, and excavation profile of both tunnels is 97.54sq.m each. Tunnel works included underground and open cut excavations. Rocky mass was secured by installation of SN anchors and reinforcing mesh at tunnel portals, and installation Public Company Permanent solution for the landslide September of SN and IBO anchors, steel reinforcing mesh and centerings in the other parts of "Republic of 36 260 Čemerno at the trunk road M-20 Gacko- 71.846.761,91 36.734.666,05 2008 - 06 the tunnel. Following installation of anchors, mesh and centerings, the tunnel C Srpska Roads" Foča August 2013 surface was protected by sprayed concrete MB 30, waterproofing coat, and +387 51 334 500 construction of the secondary tunnel lining. The project further included the structures: viaduct ''Trnova Luka'', length: L=408.00 (steel composite structure with columns of over 50m high), one viaduct length l=88.00m, the "Hrštica" Bridge l=37.36m and the bridge over the Ždralov potok l=12m. In order to secure stability of the road structure, total of 1,605.00m of reinforced- concrete walls were constructed. In addition, slope stabilisation in this geologically very complex terrain was obtained by installation of steel anchors and applying up-to-date geotehnical methods. Federation of Construction of an intersection at the trunk road M4 Tuzla - Šićki Brod. The work B&H 2 2 encompasses construction of 5 bridges (l1=9,80m/P1= 88 m ; l2=13,80m/P2=136,6 m ; Road 2 2 2 Construction of intesection Šićki Brod (Lot March 2010 - l3=18,40m/P3=184m ; l4=42,50m/P4=415 m ; l5=26,50m/P5=258 m ), reconstruction of 4 JV Integral, CPM 35 254 6.466.914,00 3.306.480,62 Directorate of 2) 31-Dec-2011 bridges (P=185,4+187,41+184,00+388m2), alignment works (reconstruction of existing BH, REWEUS FB&H. and construction of a new pavement) works on intersection branches, drainage, lighting, Tel. +387 33 563 traffic signalization and equipment. 468 Public Company "Republic of Srpska Roads" Execution of works at construction of motorway section (l=6.736 m) with all additional +387 51 334 500 Construction of the highway Gradiška - elements, earthmoving works, concrete and insulation works on two bridges of spans 27-April-2011 - /Public 34 249 Banja Luka (Mahovljani): 46.927.945,37 23.993.877,47 28,80 m and 19,60m and three overbridges.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages4 Page
-
File Size-