Confederation Line Structures Geometric Structural Requirements Scope of Work Bridge Rehabilitation3 5
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Appendix 5 Station Descriptions And
Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint. -
Former CFB Rockcliffe Redevelopment Community Transportation Study
June 2014 Former CFB Rockcliffe Redevelopment Community Transportation Study Prepared by: 12 February 2015 ERRATA SHEET The land use statistics associated with the Development Concept Plan for the Former CFB Rockcliffe Redevelopment are continually being refined as part of the on-going planning process. During the Summer 2014, the Plan was modified slightly from that used as the basis for the ensuing Community Transportation Study (dated 27 June 2014) resulting in approximate 40 additional residential units and 40 additional retail-related jobs. As a result of this land use change, the net change in two-way, peak hour vehicle trips to/from the site is noted to be an increase of approximately 60 veh/h, which is considered very minor in scale in comparison to the total projected generation of approximately 2,000 veh/h two-way. This small discrepancy in vehicle trip generation would have no bearing on the report’s finding or recommendations. A subsequent update to the Development Concept Plan was received in January 2015 reflecting very minor adjustments to the proposed land use. In September 2014, the National Capital Commission announced the renaming of the Rockcliffe Parkway to the Sir George-Étienne Cartier Parkway (Promenade Sir George-Étienne Cartier). This name change has not been reflected within the current version of the report. In December 2014, the City of Ottawa requested that the CTS include commentary/analyses related to multi-modal level of service as outlined within the 2013 update of the Transportation Master Plan, Ottawa Cycling Plan and Ottawa Pedestrian Plan. The draft analysis related to this most recent City request is included herein as an Addendum No. -
Project Synopsis
Final Draft Road Network Development Report Submitted to the City of Ottawa by IBI Group September 2013 Table of Contents 1. Introduction .......................................................................................... 1 1.1 Objectives ............................................................................................................ 1 1.2 Approach ............................................................................................................. 1 1.3 Report Structure .................................................................................................. 3 2. Background Information ...................................................................... 4 2.1 The TRANS Screenline System ......................................................................... 4 2.2 The TRANS Forecasting Model ......................................................................... 4 2.3 The 2008 Transportation Master Plan ............................................................... 7 2.4 Progress Since 2008 ........................................................................................... 9 Community Design Plans and Other Studies ................................................................. 9 Environmental Assessments ........................................................................................ 10 Approvals and Construction .......................................................................................... 10 3. Needs and Opportunities .................................................................. -
Kanata Light Rail Transit Planning and Environmental Assessment Study (Moodie Drive to Hazeldean Road) – Recommendations
1 Report to Rapport au: Transportation Committee Comité des transports 2 May 2018 / 2 mai 2018 and Council et au Conseil 9 May 2018 / 9 mai 2018 Submitted on April 17, 2018 Soumis le 17 avril 2018 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: Vivi Chi, Director / Directeur, Transportation Planning / Planification des transports, Transportation Services Department / Direction générale des transports (613) 580-2424, 21877, [email protected] Ward: KANATA NORTH (4) / KANATA File Number: ACS2018-TSD-PLN-0002 NORD (4) / STITTSVILLE (6) / BAY (7) / BAIE (7) / COLLEGE (8) / COLLÈGE (8) / KANATA SOUTH (23) / KANATA-SUD (23) SUBJECT: Kanata Light Rail Transit Planning and Environmental Assessment Study (Moodie Drive to Hazeldean Road) – Recommendations OBJET: Étude de planification et d’évaluation environnementale du Train léger sur rail proposé vers Kanata (de la promenade Moodie au chemin Hazeldean) – Recommandations 2 REPORT RECOMMENDATIONS That Transportation Committee recommend that Council: 1. Approve the functional design for the Kanata Light Rail Transit (Moodie Drive to Hazeldean Road), as described in this report and supporting documents one and two; and, 2. Direct Transportation Planning staff to initiate the Transit Project Assessment Process in accordance with the Ontario Environmental Assessment Act (Regulation 231/08), including the preparation and filing of the Environmental Project Report for final public review and comment. RECOMMANDATIONS DU RAPPORT Que le Comité des transports recommande au Conseil : 1. d’approuver la conception fonctionnelle du Train léger sur rail vers Kanata (de la promenade Moodie au chemin Hazeldean), comme présentée dans le présent rapport et dans les documents un à deux; et, 2. -
L.Corsini Page 211
Ottawa Community Resource List 211 www.211ontario.ca free, confidential, live answer, 24/7, 150 languages, community and social services Addictions ➢ OAARS Ottawa Addictions Access and Referral Services 613-241-5202 http://www.saato.ca/en/ ➢ Rideauwood Addiction and Family Services http://rideauwood.org/ Assault Physical / Sexual Assault ➢ Assaulted Women’s Help Line: 1-866-863-0511 (24 hour crisis counselling and referral for men and women); ➢ Ottawa Rape Crisis Centre Crisis Line: 613-562-2333 (24 hour crisis counselling and referral); ➢ Centre for Treatment of Sexual Abuse and Childhood Trauma http://www.centrefortreatment.com/ ➢ Sexaul Assault Support Centre of Ottawa SASC 613-725-2160 [email protected] ➢ Sexual Assault & Partner Abuse Centre —TOH Civic Campus http://www.ottawahospital.on.ca/ Children & Child Care #311 www.ottawa.ca ➢ Child Care Registry of Ottawa https://onehsn.com/Ottawa/ ➢ Children’s Aid Society of Ottawa 613-747-7800 http://www.casott.on.ca/ ➢ Parent Resource Centre 613-565-2467 http://www.parentresource.ca/en/ottawaprc/index.php Counselling Services: ➢ Bereaved Families of Onartio-Ottawa 613-567-4278 http://www.bfo-ottawa.org ➢ Coalition of Community Health & Resource Centres of Ottawa http://coalitionottawa.ca/en/home.aspx ➢ KIND [email protected] | 613-563-4818 | 222 Somerset Street W., Suite 404— serving the LGBQT community ➢ Walk In clinics: http://familyservicesottawa.org/adults/the-walk-in-counselling- clinic-ottawa/ o Family Service Centre www.familyservicesottawa.org o Catholic Family Services www.cfsottawa.ca o Jewish Family Services Ottawa www.jfsottawa.com ➢ Youth Services Bureau 613-729-1000 http://www.ysb.on.ca http://www.youturn.ca/ ➢ Centre for Psychological Services, University of Ottawa, 613-562-5289 http://socialsciences.uottawa.ca/psy/cpsr 1 Page Revised March 2017 –L.Corsini Ottawa Community Resource List ➢ Centre for Counselling and Pastoral Services, St. -
Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa
Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa Updated March 8, 2021 Do you know the history behind a street name not on the list? Please contact us at [email protected] with the details. • - The Gloucester Historical Society wishes to thank others for sharing their research on street names including: o Société franco-ontarienne du patrimoine et de l’histoire d’Orléans for Orléans street names https://www.sfopho.com o The Hunt Club Community Association for Hunt Club street names https://hunt-club.ca/ and particularly John Sankey http://johnsankey.ca/name.html o Vanier Museoparc and Léo Paquette for Vanier street names https://museoparc.ca/en/ Neighbourhood Street Name Themes Neighbourhood Theme Details Examples Alta Vista American States The portion of Connecticut, Michigan, Urbandale Acres Illinois, Virginia, others closest to Heron Road Blackburn Hamlet Streets named with Eastpark, Southpark, ‘Park’ Glen Park, many others Blossom Park National Research Queensdale Village Maass, Parkin, Council scientists (Queensdale and Stedman Albion) on former Metcalfe Road Field Station site (Radar research) Eastway Gardens Alphabeted streets Avenue K, L, N to U Hunt Club Castles The Chateaus of Hunt Buckingham, Club near Riverside Chatsworth, Drive Cheltenham, Chambord, Cardiff, Versailles Hunt Club Entertainers West part of Hunt Club Paul Anka, Rich Little, Dean Martin, Boone Hunt Club Finnish Municipalities The first section of Tapiola, Tammela, Greenboro built near Rastila, Somero, Johnston Road. -
Finance and Economic Development Committee Approved the Following Directions to Staff
FINANCE AND ECONOMIC 107 COMITÉ DES FINANCES ET DU DEVELOPMENT COMMITTEE DÉVELOPPEMENT ÉCONOMIQUE REPORT 27 RAPPORT 27 13 SEPTEMBER 2017 LE 13 SEPTEMBRE 2017 7. STAGE 2 LIGHT RAIL TRANSIT PROJECT AND PROCUREMENT UPDATE MISE À JOUR SUR L'ÉTAPE 2 DU PROJET DE TRAIN LÉGER SUR RAIL ET LE PLAN D'APPROVISIONNEMENT COMMITTEE RECOMMENDATIONS That Council: 1. Receive the functional design for the Bayshore to Moodie LRT as described in this report; 2. Direct staff to initiate an Environmental Project Report (EPR) Addendum to Trillium Line Extension approved EPR, as described in this report, and file the Addendum with the Ministry of the Environment and Climate Change in accordance with section 15 of Ontario Regulation231/08, Transit Projects and Metrolinx Undertakings; 3. Delegate authority to the City Manager to include the extension of the Trillium Line to Limebank Road in the Trillium procurement documents via an addendum, subject to the recommendation cost, operational and maintenance, legislative approval and assessment parameters, as described in this report, and direct staff to undertake the necessary supporting activities required to bring forward a recommendation to Committee and Council as part of the contract award, as described in this report; 4. Approve the Stage 2 governance plan and additions to the Executive Steering Committee’s mandate, as further described in this report; 5. Approve the plan to refinance the long term debt on Confederation Line, as further described in this report, and delegate authority to the City Treasurer to execute an Assignment and Assumption Agreement to assume the Lenders’ obligations under the existing Credit Agreement to Project Co., and to execute and issue debentures directly to each of the Long Term Lenders to finance capital works previously approved; FINANCE AND ECONOMIC 108 COMITÉ DES FINANCES ET DU DEVELOPMENT COMMITTEE DÉVELOPPEMENT ÉCONOMIQUE REPORT 27 RAPPORT 27 13 SEPTEMBER 2017 LE 13 SEPTEMBRE 2017 6. -
15 Bus Time Schedule & Line Route
15 bus time schedule & line map 15 Blair View In Website Mode The 15 bus line (Blair) has 2 routes. For regular weekdays, their operation hours are: (1) Blair: 12:24 AM - 11:57 PM (2) Parliament ~ Parlement: 12:09 AM - 11:39 PM Use the Moovit App to ƒnd the closest 15 bus station near you and ƒnd out when is the next 15 bus arriving. Direction: Blair 15 bus Time Schedule 55 stops Blair Route Timetable: VIEW LINE SCHEDULE Sunday 12:18 AM - 11:51 PM Monday 12:21 AM - 11:57 PM Laurier / Élisabeth-Bruyère 69 Rue Laurier, Gatineau Tuesday 12:24 AM - 11:57 PM Allumettières / Laurier Wednesday 12:24 AM - 11:57 PM 103 Rue Laurier, Gatineau Thursday 12:24 AM - 11:57 PM Maisonneuve / Allumettières Friday 12:24 AM - 11:57 PM Boulevard Maisonneuve, Gatineau Saturday 12:24 AM - 11:48 PM Maisonneuve / Papineau 60 Rue Dollard-Des Ormeaux, Gatineau Maisonneuve / Place D'Accueil Promenade du Portage, Gatineau 15 bus Info Direction: Blair Wellington / Bay Stops: 55 344 Wellington St, Ottawa Trip Duration: 37 min Line Summary: Laurier / Élisabeth-Bruyère, Lyon A Allumettières / Laurier, Maisonneuve / Allumettières, 383 Albert Street, Ottawa Maisonneuve / Papineau, Maisonneuve / Place D'Accueil, Wellington / Bay, Lyon A, Slater / Kent, Slater / Kent Queen / Kent, Parliament / Parlement, Queen / 345 Slater Street, Ottawa Metcalfe, Elgin / Wellington, Rideau B, Rideau / Cumberland, Rideau / King Edward, Rideau / Nelson, Queen / Kent Rideau / Friel, Rideau / Augusta, Rideau / Charlotte, 310 Queen Street, Ottawa Rideau / Wurtemburg, Montréal / Montgomery, Montréal -
REAL PROPERTY CHALLENGES New Light Rail Project Revitalizes Ottawa’S Downtown Core
REAL PROPERTY CHALLENGES New light rail project revitalizes Ottawa’s downtown core BY GORDON E. MACNAIR, SR/WA, AACI, P.APP The Canadian city of Ottawa has long suffered operational in 2018, it will provide rapid and high- the effects of severe bus bottlenecks through the quality transit service from the Tunney’s Pasture downtown core area. With increasingly slowing mixed-use center/employment node in the west service and the declining reliability of the city’s transit to Blair Station Mixed Use Center/employment system, action was clearly needed to address the node in the east. This 13-station electric Light Rail ongoing congestion problem. Transit system will span 12.5-kilometres (7.7 miles), including a 2.5-km (1.5 mile) tunnel that connects the In December 2012, the Ottawa City Council awarded downtown core. the contract to design, build, finance and maintain the first leg of Ottawa’s Light Rail Transit system – the The real property challenges associated with a Confederation Line – to the Rideau Transit Group. project of this magnitude were considerable, as were The project is part of the city’s overarching and long- encouraging transit-oriented development and other term smart-growth objectives laid out in the Official initiatives to support intensification. Plan, Transportation Master Plan and Infrastructure Master Plan. Together, these plans call for the creation Securing the Rights of densified, mixed-use neighborhoods surrounding Confederation Line stations. The property requirements for the Confederation Line consist of four project components: the Confederation The $2.13 billion line is the largest infrastructure Line guideway and stations, the integrated station project in the City of Ottawa since the construction entrances, a maintenance and storage facility and the of the Rideau Canal in 1826. -
The Confederation Line Ottawa LRT Project
The Confederation Line Ottawa LRT Project Tom Middlebrook, P.Eng Senior Vice President, Business Development – Canada Dragados Canada PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook Project Stakeholders Sponsors Equity Developers Project Co Design Build Joint Venture Maintenance Team Engineering Joint Venture PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 1 City of Ottawa • Canada’s Capital City with population of 950,000 • Problem: saturated with buses (BRT) • Solution: replace BRT with Light Rail Transit (LRT) Yukon Northwest Territories Nunavut Newfoundland / Labrador British Columbia Alberta Manitoba Quebec Saskatchewan Ontario Prince Edward Island New Brunswick Nova Scotia PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 2 Confederation Line • 12.5 km LRT line with 13 stations • 10 km at grade in existing BRT Right-of-Way • 2.5 km tunnel between Ottawa University (uOttawa) and Pimisi • 3 underground stations: Lyon, Parliament and Rideau PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 3 Initial Design Approach • Running tunnel: TBM tunnel (mono tube or twin-tube) • Underground stations: cut- and-cover PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 4 Design Options Option Pros Cons Design Single • Lower cost • Higher risk of settlement minimized by Scheme Tunnel • Flexibility in operation rock quality • Multiple faces • Higher cost and longer -
September 2020 Update
September 2020 Update Transportation Services Department FEDCo September 1, 20201 2 O-Train South Design Progress • The following submissions have been Issued-For- Construction: – Structures throughout the alignment including Rail Bridges at Airport Parkway, Uplands, Leitrim, Bowesville, Earl Armstrong and Lester; and, – Utility Relocations throughout the alignment. 3 O-Train South Design Progress • The City has received construction drawings of the following project elements: – Airport Station; – Guideway for the Airport Link; and, – Structures throughout the alignment including High Road MUP Bridge, Limebank Road Elevated Guideway, Airport Elevated Guideway, VIA Grade Separation, Rideau River Pedestrian Bridge. 4 O-Train South Design Progress • The City has received final design drawings of the following project elements: – Guideway for the South Extension to Limebank; – Guideway for the existing portion of the line; – Landscape design for the existing line and Airport Link; – Dow’s Lake Tunnel, including Tunnel Ventilation; and – Vehicle elements, including the driver’s cab, interior layout and HVAC System. 5 O-Train South Design Progress • The City has received pre-final design drawings of the following project elements: – Walkley Yard Maintenance and Storage Facility (MSF); – Operational Modelling for the Overall System and the MSF; – Signaling and Train Control System; – Greenboro, Carleton, Mooney’s Bay, Gladstone and Walkley Stations; and, – Communication Systems designs for Greenboro and Carleton Stations and interface control documents for several subsystems on the project. 6 O-Train South Construction Progress • Rock excavation started on Gladstone Station; • Walkley Maintenance and Storage Facility structure construction has commenced; • Work has commenced at Ellwood Diamond grade separation. Caisson construction is underway; • Work has begun on Carleton south MUP; and, • Commenced work at South Keys and Bowesville Stations. -
Report Template
1 Report to/Rapport au : Transportation Committee Comité des transports and Council / et au Conseil November 7, 2013 7 novembre 2013 Submitted by/Soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale adjointe, Planning and Infrastructure/Urbanisme et Infrastructure Contact Person / Personne ressource: Vivi Chi, Manager/Gestionnaire, Transportation Planning/Planification des transports, Planning and Growth Management/Urbanisme et Gestion de la croissance (613) 580-2424 x 21877, [email protected] CITY WIDE / À L'ÉCHELLE DE LA VILLE Ref N°: ACS2013-PAI-PGM-0230 SUBJECT: TRANSPORTATION MASTER PLAN, OTTAWA PEDESTRIAN PLAN AND OTTAWA CYCLING PLAN UPDATE – ADDENDUM REPORT OBJET : PLAN DIRECTEUR DES TRANSPORTS, PLAN DE LA CIRCULATION PIÉTONNIÈRE D’OTTAWA ET PLAN SUR LE CYCLISME D’OTTAWA – ADDENDA REPORT RECOMMENDATION That Transportation Committee recommend Council approve the recommended changes identified in this report (Table 1) to the draft Transportation Master Plan, Ottawa Pedestrian Plan and Ottawa Cycling Plan that was tabled on October 9, 2013 at the Joint Transportation Committee and Transit Commission meeting. RECOMMANDATION DU RAPPORT Que le Comité des transports recommande au Conseil d’approuver les modifications recommandées et précisées dans le présent rapport (tableau 1) pour la version provisoire du Plan directeur des transports, le Plan de la circulation piétonnière d’Ottawa et le Plan sur le cyclisme d’Ottawa qui ont été déposé le 9 octobre 2013 lors de la réunion conjointe du Comité des transports et de la Commission du transport en commun. 2 EXECUTIVE SUMMARY Assumptions and Analysis This is an addendum to the October 9, 2013 joint Transportation Committee and Transit Commission staff report (ACS2013-PAI-PGM-0193) to summarize the consultation feedback and proposed changes following the tabling and public release of the draft 2013 Transportation Master Plan (TMP), Ottawa Pedestrian Plan (OPP) and Ottawa Cycling Plan (OCP).