September 2020 Update September 2020 Update Transportation Services Department FEDCo September 1, 20201 2 O-Train South Design Progress • The following submissions have been Issued-For- Construction: – Structures throughout the alignment including Rail Bridges at Airport Parkway, Uplands, Leitrim, Bowesville, Earl Armstrong and Lester; and, – Utility Relocations throughout the alignment. 3 O-Train South Design Progress • The City has received construction drawings of the following project elements: – Airport Station; – Guideway for the Airport Link; and, – Structures throughout the alignment including High Road MUP Bridge, Limebank Road Elevated Guideway, Airport Elevated Guideway, VIA Grade Separation, Rideau River Pedestrian Bridge. 4 O-Train South Design Progress • The City has received final design drawings of the following project elements: – Guideway for the South Extension to Limebank; – Guideway for the existing portion of the line; – Landscape design for the existing line and Airport Link; – Dow’s Lake Tunnel, including Tunnel Ventilation; and – Vehicle elements, including the driver’s cab, interior layout and HVAC System. 5 O-Train South Design Progress • The City has received pre-final design drawings of the following project elements: – Walkley Yard Maintenance and Storage Facility (MSF); – Operational Modelling for the Overall System and the MSF; – Signaling and Train Control System; – Greenboro, Carleton, Mooney’s Bay, Gladstone and Walkley Stations; and, – Communication Systems designs for Greenboro and Carleton Stations and interface control documents for several subsystems on the project. 6 O-Train South Construction Progress • Rock excavation started on Gladstone Station; • Walkley Maintenance and Storage Facility structure construction has commenced; • Work has commenced at Ellwood Diamond grade separation. Caisson construction is underway; • Work has begun on Carleton south MUP; and, • Commenced work at South Keys and Bowesville Stations. 7 O-Train South Construction Progress • Bridge girder installation complete at Airport Parkway, Uplands Drive, Lester Road, and Bowesville Road; • Airport guideway girder installation underway; • Guideway construction is 40% complete between South Keys Station and Limebank/Airport Link; and, • Rail welding has started. 8 Gladstone Station May 2020 August 2020 9 Ellwood Diamond Rail Bridge Sawmill Creek Transitway Bridge Rail Diamond Ellwood Diamond Rail Bridge foundation construction is underway. 10 Walkley Maintenance and Storage Facility Steel structure installation is underway at Walkley Maintenance and Storage Facility. 11 South Keys Station Crews broke ground on South Keys Station in late July. 12 Lester Road Rail Bridge Preparations for deck formwork and rebar are underway at Lester Road Rail Bridge. 13 Leitrim Road Rail Bridge Retaining wall construction is progressing at the Leitrim Road Rail Bridge. 14 Bowesville Road Rail Bridge Crews hoist girders into place at Bowesville Road. 15 Limebank Elevated Guideway Foundation and embankment work are underway at Limebank Road. 16 Airport Parkway Rail Bridge Crews install girders over the Airport Parkway in early July. 17 Uplands Drive Rail Bridge Deck panel work completed at Uplands Drive Rail Bridge in preparations for deck formwork. 18 Upcoming Work • Trench widening to continue between Gladstone Avenue and Beech Street as well as at Carling Station; • Caisson excavation to continue at Ellwood Diamond Rail Bridge (grade separation with VIA Rail); • Walkley Maintenance and Storage Facility steel structure construction to continue; • Hunt Club Rail Bridge construction to commence; and, • Construction to begin at South Keys, Bowesville, and Uplands Stations. 19 Traffic and Mobility Impacts Location Timeline Traffic & Mobility Impacts The existing Trillium Line will be closed to May 2020 to O-Train Line 2 allow upgrades to the line, existing stations August 2022 and the construction of new stations. Multi-use path (MUP) Summer 2020 to Extension of the station will require at Carleton Station Fall 2021 temporary closure of the MUP in this area. Drilling and rock excavation to widen the MUP at Gladstone Summer 2020 rail corridor at Gladstone will temporarily impact access to the MUP in this area. Minor detour to Trillium Pathway north of MUP at Carling Fall 2020 Carling Avenue 20 Traffic and Mobility Impacts (Cont'd) Location Timeline Traffic & Mobility Impacts The temporary closure of the MUP on the west MUP at Walkley Fall 2020 side of the Marriott Hotel and Warehouse Lofts will be required for Walkley Station construction. Signage in place indicating a pedestrian/cyclist Summer 2020 MUP at South Keys detour via a temporary pathway connection to to Fall 2020 the southbound Transitway platform Th existing MUP that passes under the existing Fall 2020 to Brookfield MUP rail line will be modified to allow for rail structure Fall 2021 construction at the Ellwood Diamond. 21 22 O-Train East Design Update • The City is reviewing construction drawings for the following project elements: – Trim Station Park and Ride; – Jeanne D’Arc Station; – Roadway/Drainage Works; and – Utility Expansion Works. 23 O-Train East Design Update (Cont'd) • The City is reviewing final designs for the following elements: – Track and Guideway – Overall Design – Montreal Station Bridge – Existing Bridges – Traction Power System – Overhead Catenary System – Train Control & Signaling 24 O-Train East Design Update • The City has received pre-final design drawings of the following project elements: – Public artwork. 25 O-Train East Construction Progress • Rail bridge from Blair to OR174 centre caisson and pier work in the highway median continues; • Culvert, utility, lane and ramp relocation work is ongoing from Blair Road to Champlain Street to facilitate widening; • Montreal Interchange overpass bridge work: Caisson, pier work, girder installation, pre-cast panel & deck pour complete; • Sir George-Étienne Cartier Bridge wall widening has begun with realignment of eastbound highway lanes; and, • Trim Road Park & Ride parking lot construction ongoing. 26 Highway 174 Roadwork Highway 174 roadwork is progressing between Blair Road and Montreal Road. 27 Highway 174 Roadwork Highway 174 road paving of eastbound lanes, east of Blair Road. 28 Montreal Road Crews hoist girders into place at Montreal Road in late July. 29 Montreal Road Bridge work is progressing at the Highway 174 Montreal Road Interchange. 30 Montreal Road May 2020 August 2020 31 Upcoming Work • Culvert and utility work along Highway 174 to continue at Orléans Boulevard and Champlain Street; • Montreal Interchange overpass installation of barriers and paving of new bridges; • Rail bridge from Blair to OR174 centre median caisson & pier work to begin on east abutment; and, • Sir George-Étienne Cartier Bridge temporary support wall construction. 32 Traffic & Mobility Impacts Location Timeline Traffic & Mobility Impacts Highway 174 February to Continued lane and ramp closures in (Blair Road to late Fall 2020 both directions during off-peak hours. Trim Road) 33 34 O-Train West Design Progress • The following submissions have been Issued-For- Construction: – Various Bridges; – Parkway Tunnel (partial) – Bell and Rogers Utility works along Richmond Road; – Wet Utilities; and, – Sir John A Macdonald Parkway Detour. 35 O-Train West Design Update • The City has received construction drawings of the following project elements: – Parkway Tunnel – Overall Design; – Highway 417 Richmond Road Interchange; – Various Bridges/Structures; – Sir John A Macdonald Overall Design; – Baseline Station – Bus Operator Building; – Roadway/Drainage Works; and, – Utility Expansion Works. 36 O-Train West Design Update • The City has received final design drawings of the following project elements: – Baseline Station; – Lincoln Fields Station; – Track and Guideway (Overall Design); – Existing Bridges; – Utility Expansion Works; – Traction Power System; – Lincoln Fields Temporary Bus Loop; – Overhead Catenary System; and, – Train Control & Signaling. 37 O-Train West Design Update • The City has received pre-final design drawings of the following project elements: – Iris Station; – Dominion Station; – Bayshore Station; – Roadway/Drainage Works; and, – Pedestrian Bridges. 38 O-Train West Construction Progress • Culvert and utility work ongoing: – Sir John A Macdonald Parkway; – Byron Linear Park; – Lincoln Fields; – Connaught Park; – Pinecrest Creek Pond; and, – Moodie Light Maintenance and Storage Facility. • Golden Rod Bridge support of excavation underway; • Sir John A Macdonald detour roadwork has been completed with additional storm sewer work continuing; and, • Byron Linear Park has closed for tunnel site preparation work. 39 O-Train West Construction Progress (Cont'd) • Lincoln Fields bus loop excavation ongoing; • West Split Rail Bridge drill shafts are complete and crews continue to construct bridge piers; • Iris Street culvert bridge and detour roadwork ongoing; and, • Moodie Light Maintenance and Storage Facility culvert bridge caisson work is complete, abutment and drainage work continues. 40 Iris Station / Iris Road Bridge Iris Street culvert bridge and detour roadwork ongoing 41 Moodie Light Maintenance and Storage Facility Abutment and drainage work continues at Moodie LMSF. 42 Connaught Avenue Tunnel Preparatory activities are underway for Connaught Tunnel cut and cover construction. 43 West Split Rail Bridge (Lincoln Fields Flyover) Pier construction is underway at the West Split Rail Bridge (Lincoln Fields Flyover). 44 Lincoln
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • Please Sign in So We Can Provide Updates and Information on Future Events
    HURONTARIO LIGHT RAIL TRANSIT PROJECT Welcome Please sign in so we can provide updates and information on future events. metrolinx.com/HurontarioLRT [email protected] @HurontarioLRT WHAT IS THE HURONTARIO LRT PROJECT? The Hurontario Light Rail Transit (LRT) Project will bring 20 kilometres of fast, reliable, rapid transit to the cities of Mississauga and Brampton along the Hurontario corridor. New, modern light rail vehicles will travel in a dedicated right-of-way and serve 22 stops with connections to GO Transit’s Milton and Lakeshore West rail lines, Mississauga MiWay, Brampton Züm, and the Mississauga Transitway. Metrolinx is working in coordination with the cities of Mississauga and Brampton and the Region of Peel to advance the Hurontario LRT project. Preparatory construction is underway. The project is expected to be completed at the end of 2022. The Hurontario LRT project is funded through a $1.4 billion commitment from the Province of Ontario as part of the Moving Ontario Forward plan. Allandale LAKE SIMCOE Waterfront OUR RAPID TRANSIT NETWORK Barrie South Innisfil SIMCOE Bradford East Gwillimbury Newmarket NewmarketSouthlakeHuron Heights Leslie TODAY AND TOMORROW GO Bus Terminal Hwy 404 Eagle LEGEND Mulock Main Mulock Savage Longford Aurora Lincolnville Every train, subway and bus helps to keep us moving, connecting us to the people and places Bloomington King City Stouffville GO Rail that matter most. As our region grows, our transit system is growing too. Working with 19th- Gamble Bernard Gormley municipalities across the Greater Toronto and Hamilton Area, and beyond, we’re delivering Kirby Elgin Mills Mount Joy Crosby Centennial new transit projects,making it easier, better, and faster for you to get around.
    [Show full text]
  • Former CFB Rockcliffe Redevelopment Community Transportation Study
    June 2014 Former CFB Rockcliffe Redevelopment Community Transportation Study Prepared by: 12 February 2015 ERRATA SHEET The land use statistics associated with the Development Concept Plan for the Former CFB Rockcliffe Redevelopment are continually being refined as part of the on-going planning process. During the Summer 2014, the Plan was modified slightly from that used as the basis for the ensuing Community Transportation Study (dated 27 June 2014) resulting in approximate 40 additional residential units and 40 additional retail-related jobs. As a result of this land use change, the net change in two-way, peak hour vehicle trips to/from the site is noted to be an increase of approximately 60 veh/h, which is considered very minor in scale in comparison to the total projected generation of approximately 2,000 veh/h two-way. This small discrepancy in vehicle trip generation would have no bearing on the report’s finding or recommendations. A subsequent update to the Development Concept Plan was received in January 2015 reflecting very minor adjustments to the proposed land use. In September 2014, the National Capital Commission announced the renaming of the Rockcliffe Parkway to the Sir George-Étienne Cartier Parkway (Promenade Sir George-Étienne Cartier). This name change has not been reflected within the current version of the report. In December 2014, the City of Ottawa requested that the CTS include commentary/analyses related to multi-modal level of service as outlined within the 2013 update of the Transportation Master Plan, Ottawa Cycling Plan and Ottawa Pedestrian Plan. The draft analysis related to this most recent City request is included herein as an Addendum No.
    [Show full text]
  • Fall 2020 Final
    CITY COUNCILLOR / CONSEILLER MUNICIPAL RILEY BROCKINGTON River Ward Ward / Quartier/ Quartier Rivière Rivière 613--580580-2486-2486 ● [email protected][email protected] @RiverWardRiley October 2020 Website: RileyBrockington.ca Proudly serving all residents of River Ward Dear Neighbours and Residents, I anticipate reopening the Ward Office in I trust you are well, had a restful summer the Hunt Club - Riverside Park Community and continue to enjoy autumn. As the Centre once the centre fully reopens to cooler weather arrives we will soon be the public. Currently only those registered spending more time indoors. for classes or a fitness session may enter the building. However, if you wish to meet Don’t forget that River Ward has some of with me face-to-face, please call my office the City’s best wooded walking trails, a and we can make the necessary 5km groomed cross country ski trail at the arrangements. Terry Fox Athletic Centre and Mooney’s Bay Park, spectacular toboggan hills, the I have used my time during the pandemic Carleton Heights Curling rink, dozens of to successfully champion a number of outdoor community-run ice rinks, the JA battles including allowing community Dulude Arena and Deborah Anne Kirwan gardens to open during the shutdown, staggered reopening of library services, indoor pool. Enjoy the bounty that our Supporting River’s Ward small businesses will be the key to our recovery. Premier ward has to offer. With the on-going offering summer camp programs, advanced the re-opening of the City’s Cleaners on Merivale Road in Carlington is a family-run business that has felt the COVID pandemic, it is important to ensure brunt of COVID-19 like so many others.
    [Show full text]
  • Notice of Open House #1 Barrhaven Light Rail Transit
    NOTICE OF OPEN HOUSE #1 BARRHAVEN LIGHT RAIL TRANSIT (BASELINE STATION TO BARRHAVEN TOWN CENTRE) AND RAIL GRADE-SEPARATIONS PLANNING AND ENVIRONMENTAL ASSESSMENT STUDY (TPAP) Wednessday October 30, 2019 Nepean Sportsplex, Richmond Ballroom Please use entrance #4 1701 Woodroffe Ave 6 to 8:30 pm Presentation 7 pm The City of Ottawa has initiated the Barrhaven Light Rail Transit (Baseline Station to Barrhaven Town Centre) and Rail Grade-Separations Planning and Environmental Assessment (EA) Study to develop a Recommended Plan for extending Light Rail Transit (LRT) from Baseline Station to Barrhaven Town Centre, as well as grade-separations of Woodroffe Avenue, Southwest Transitway and Fallowfield Road where these corridors cross the VIA Rail line. The study area is approximately 10 km in length and illustrated in the key map. The EA study is being conducted in accordance with the Transit Project Assessment Process (TPAP) Ontario Regulation 231/08 in accordance with the Ontario Environmental Assessment Act. The study process will involve developing and evaluating alternatives, leading to a Recommended Plan in consideration of the surrounding environmental (social, natural, physical and economic) conditions. There will be ongoing public consultation activities during the course of the study. This first Open House will provide: • An overview of the study objectives, need and opportunities, existing conditions and study progress to-date • Design options for the LRT alignment from Baseline Station to the Nepean Sportsplex, • A preliminary plan to convert the Southwest Transitway to LRT from the Nepean Sportsplex to Barrhaven Town Centre including rail grade-separations of Woodroffe Avenue, Southwest Transitway and Fallowfield Road, and • Next steps Yo ur participation in the Open House is an important component of the study where you can discuss the project with the study team and provide feedback.
    [Show full text]
  • Project Synopsis
    Final Draft Road Network Development Report Submitted to the City of Ottawa by IBI Group September 2013 Table of Contents 1. Introduction .......................................................................................... 1 1.1 Objectives ............................................................................................................ 1 1.2 Approach ............................................................................................................. 1 1.3 Report Structure .................................................................................................. 3 2. Background Information ...................................................................... 4 2.1 The TRANS Screenline System ......................................................................... 4 2.2 The TRANS Forecasting Model ......................................................................... 4 2.3 The 2008 Transportation Master Plan ............................................................... 7 2.4 Progress Since 2008 ........................................................................................... 9 Community Design Plans and Other Studies ................................................................. 9 Environmental Assessments ........................................................................................ 10 Approvals and Construction .......................................................................................... 10 3. Needs and Opportunities ..................................................................
    [Show full text]
  • Specifications
    Administrative Services and Property Management SPECIFICATIONS SOLICITATION #: 19-58065 BUILDING: S77 100 Sussex Drive, Ottawa, Ontario PROJECT: S77- Fan Coil Replacemnt S77-5443 PROJECT #: November 2019 Date: SPECIFICATION TABLE OF CONTENTS Construction Tender Form Buyandsell Notice Instructions to Bidders Ontario Sales Tax Acceptable Bonding Companies Articles of Agreement Plans and Specifications A Terms of Payment B General Conditions C Labour Conditions and Fair Wage Schedule D N/A Insurance Conditions E Contract Security Conditions F Security Requirement Check List G Directions to the Ottawa Research Facilities — Sussex Drive 100 Sussex Drive Ottawa, Ontario, Canada NRC Steacie Institute for Molecular Sciences (NRC-SIMS) Tel: 613-991-5419 NRC Institute for Biological Sciences (NRC-IBS) Tel: 613-993-5812 By Road, from the OTTAWA International Airport 1. Take the AIRPORT PARKWAY 2. Drive on the AIRPORT PARKWAY as it becomes BRONSON ST 3. Turn RIGHT at LAURIER ST 4. From LAURIER ST turn LEFT on BAY ST 5. From BAY ST, turn RIGHT on WELLINGTON ST 6. Pass the Parliament buildings and turn LEFT on SUSSEX DR 7. Drive on SUSSEX DR until you see the NRC-CNRC sign at 100 Sussex, on your LEFT. By Road, from MONTREAL RD FACILITIES 1. Drive Southwest on MONTREAL RD (REGIONAL ROUTE 34 W) 2. Turn RIGHT onto VANIER PARKWAY / REGIONAL ROUTE 19 N 3. Turn LEFT onto ST PATRICK ST (You will cross the ST PATRICK ST BRIDGE) 4. Turn RIGHT on KING EDWARD AVE/REGIONAL ROUTE 99 N 5. Take EXIT to the RIGHT to SUSSEX 6. At the LIGHT, go straight into 100 Sussex PARKING lot.
    [Show full text]
  • 2019 City Wide Development Charges Background Study
    2019 City-Wide Development Charges Background Study Version for Public Consultation HEMSON C o n s u l t i n g L t d. March 15, 2019 Table of Contents List of Acronyms .......................................................................................... 1 Executive Summary ...................................................................................... 2 A. Purpose of 2019 Development Charges (DC) Background Study .. 2 B. City-Wide and Area-Specific DCs Have Been Calculated ............... 3 C. Development Forecast .................................................................... 4 D. Public Transit Ridership Forecast ................................................... 5 E. Calculated Development Charges .................................................. 5 F. Cost of Growth Analysis .................................................................. 6 G. Development Charges Administration & Policy Considerations ...... 7 I Purpose of 2019 Development Charges Background Study ............. 8 A. Introduction and Background .......................................................... 8 B. Legislative Context .......................................................................... 9 C. The 2019 DC Study is Intended to be an Interim Update ................ 9 D. Consultation And Approval Process ................................................ 9 E. Key Steps In Determining DCs for Future Development-Related Projects ......................................................................................... 10 F. Long-Term Capital
    [Show full text]
  • No. 48, Port Lands Flood Protection and Enabling Infrastructure, Page 54 Credit: Waterfront Toronto/Vid Ingelevics/Ryan Walker
    2021 No. 48, Port Lands Flood Protection and Enabling Infrastructure, Page 54 Credit: Waterfront Toronto/Vid Ingelevics/Ryan Walker Top100 Projects 2021 Changing the Language of Top100 Projects — 2021 An annual report inserted in Infrastructure ReNew Canada’s had an interesting encounter following the release of last January/February 2021 issue year’s report, and I wanted to share in an effort to get I feedback from the rest of the industry. MANAGING Andrew Macklin We had released the 2020 Top100 Projects report and were EDITOR [email protected] getting set for the Key Players and Owners Dinner, which we host every February in Toronto as a celebration of the accomplishments GROUP Todd Latham PUBLISHER of the industry in developing infrastructure megaprojects. I had heard through one of my colleagues that a couple of well-respected PUBLISHER Nick Krukowski members of the industry wanted to chat with me at the event and I should seek them out. So I did. ART DIRECTOR AND Donna Endacott SENIOR DESIGN My first thought was that, not having nearly the expertise as many of you, that I had somehow managed to royally screw something ASSOCIATE Simran Chattha up. Or perhaps they wanted to tell me that I should try a different EDITOR tact to the report? Maybe a new idea for adding a complementary DIGITAL MARKETING Becky Umweni piece for this report? But as it turned out, they wanted to have a COORDINATOR conversation with me about… language. DIGITAL The language of this report has become, to some, quite convoluted. Connie Vitello EDITOR As different jurisdictions use the language familiar to them, it can often mean that, from one project to the next, different words are EVENT Natasha Mawji MANAGER used to describe the same thing.
    [Show full text]
  • Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa
    Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa Updated March 8, 2021 Do you know the history behind a street name not on the list? Please contact us at [email protected] with the details. • - The Gloucester Historical Society wishes to thank others for sharing their research on street names including: o Société franco-ontarienne du patrimoine et de l’histoire d’Orléans for Orléans street names https://www.sfopho.com o The Hunt Club Community Association for Hunt Club street names https://hunt-club.ca/ and particularly John Sankey http://johnsankey.ca/name.html o Vanier Museoparc and Léo Paquette for Vanier street names https://museoparc.ca/en/ Neighbourhood Street Name Themes Neighbourhood Theme Details Examples Alta Vista American States The portion of Connecticut, Michigan, Urbandale Acres Illinois, Virginia, others closest to Heron Road Blackburn Hamlet Streets named with Eastpark, Southpark, ‘Park’ Glen Park, many others Blossom Park National Research Queensdale Village Maass, Parkin, Council scientists (Queensdale and Stedman Albion) on former Metcalfe Road Field Station site (Radar research) Eastway Gardens Alphabeted streets Avenue K, L, N to U Hunt Club Castles The Chateaus of Hunt Buckingham, Club near Riverside Chatsworth, Drive Cheltenham, Chambord, Cardiff, Versailles Hunt Club Entertainers West part of Hunt Club Paul Anka, Rich Little, Dean Martin, Boone Hunt Club Finnish Municipalities The first section of Tapiola, Tammela, Greenboro built near Rastila, Somero, Johnston Road.
    [Show full text]
  • Finance and Economic Development Committee Approved the Following Directions to Staff
    FINANCE AND ECONOMIC 107 COMITÉ DES FINANCES ET DU DEVELOPMENT COMMITTEE DÉVELOPPEMENT ÉCONOMIQUE REPORT 27 RAPPORT 27 13 SEPTEMBER 2017 LE 13 SEPTEMBRE 2017 7. STAGE 2 LIGHT RAIL TRANSIT PROJECT AND PROCUREMENT UPDATE MISE À JOUR SUR L'ÉTAPE 2 DU PROJET DE TRAIN LÉGER SUR RAIL ET LE PLAN D'APPROVISIONNEMENT COMMITTEE RECOMMENDATIONS That Council: 1. Receive the functional design for the Bayshore to Moodie LRT as described in this report; 2. Direct staff to initiate an Environmental Project Report (EPR) Addendum to Trillium Line Extension approved EPR, as described in this report, and file the Addendum with the Ministry of the Environment and Climate Change in accordance with section 15 of Ontario Regulation231/08, Transit Projects and Metrolinx Undertakings; 3. Delegate authority to the City Manager to include the extension of the Trillium Line to Limebank Road in the Trillium procurement documents via an addendum, subject to the recommendation cost, operational and maintenance, legislative approval and assessment parameters, as described in this report, and direct staff to undertake the necessary supporting activities required to bring forward a recommendation to Committee and Council as part of the contract award, as described in this report; 4. Approve the Stage 2 governance plan and additions to the Executive Steering Committee’s mandate, as further described in this report; 5. Approve the plan to refinance the long term debt on Confederation Line, as further described in this report, and delegate authority to the City Treasurer to execute an Assignment and Assumption Agreement to assume the Lenders’ obligations under the existing Credit Agreement to Project Co., and to execute and issue debentures directly to each of the Long Term Lenders to finance capital works previously approved; FINANCE AND ECONOMIC 108 COMITÉ DES FINANCES ET DU DEVELOPMENT COMMITTEE DÉVELOPPEMENT ÉCONOMIQUE REPORT 27 RAPPORT 27 13 SEPTEMBER 2017 LE 13 SEPTEMBRE 2017 6.
    [Show full text]
  • Official Plan and Zoning Amendments –Rochester Field
    January 12, 2018 ACS2018-PIE-EDP-0001 NOTICE OF PLANNING COMMITTEE Dear Sir/Madam: Re: Official Plan and Zoning Amendments –Rochester Field This is to advise you that the above-noted matter will be considered by the City of Ottawa Planning Committee on Tuesday, January 23, 2018. The Planning Committee meeting will begin at 9:30 a.m. in the Champlain Room, City Hall, 110 Laurier Avenue West, Ottawa. You are welcome to attend the meeting and present your views. Attached is a copy of the report outlining the Departmental recommendations, including a copy of the proposed Official Plan Amendment. The Planning Committee will consider any written submissions in respect to this matter if provided to the Committee Co-ordinator of the Planning Committee at 110 Laurier Avenue West, Ottawa, K1P 1J1 or by fax at 613-580-9609 or by e-mail at [email protected]. If you wish to speak to the Committee please call the Committee Coordinator, Melanie Duffenais at 613-580-2424, extension 20113 in advance of the meeting and preferably, by at least 4:30 p.m. on the day before the meeting. If you wish to listen to this meeting via audiocast on Ottawa.ca, you may do so by accessing the URL below when the meeting is underway: http://app05.ottawa.ca/sirepub/agendaminutes/index_en.aspx If you wish to be notified of the adoption of the proposed Official Plan Amendment, or of the refusal of the request to amend the official plan, you must make a written request to the City of Ottawa to the attention of Bruce Finlay, Planning, Infrastructure and Economic Development Department, 110 Laurier Avenue West, 4th floor, Ottawa, Ontario K1P 1J1 by facsimile at 613-580-2576, or e-mail at [email protected].
    [Show full text]