Project Overview-OLRT-June2021update3

Total Page:16

File Type:pdf, Size:1020Kb

Project Overview-OLRT-June2021update3 Project: Ottawa Light Rail Transit (OLRT) Project Overview Confederation Line Trillium Line Client: Ottawa Light Rail Daily Ridership: 159,000 Daily ridership: 20,000 Transit (OLRT) Length: 12.5 km Current Length: 8 km Current Stations: 13 Current Stations: 5 Ottawa Light Rail Constructors (OLRTC JV) wanted a solution for their expanding Ottawa Integrated Subsystems metro rail, O-Train, that would enable the integration of both control (SCADA) and • Closed Circuit Television (CCTV) communications, including multimedia. They • Communication Based Train Control were looking for a exible integration partner, (CBTC) so they chose us to provide our enterprise • Communication Transmission System Integrated Control and Communication System (CTS) (ICCS) solution, SCADACOM. • Fire Detection Alarm System (FDAS) • Guideway Intrusion Detection System Along with our ICCS, Willowglen provided (GIDS) Station E&M and Traction Power RTUs, • High Speed Data Radio (HSDRS) project management, professional software • Intrusion Access Control (IAC) development, conguration, and integration • Overhead Catenary System (OCS) services for the Confederation Line. We delivered • Passenger Information Display (PID) our latest generation SCADA (SCADACOM6) • Passenger Information System (PIS) server and workstation products for the Transit • Public Announcement (PA) Services Control Centre, Back-Up Control • Supervisory Control and Data Centre, and Yard Control Centre. Acquisition (SCADA) • Telephone System (Telephony) The O-Train Confederation Line saw the • Traction Power Sub System (TPSS) introduction of a modern light rail transit service • Tunnel Ventilation System (TVS) to Ottawa, Canada. The O-Train is a multimodal light metro system consisting of two lines, east–west electried Confederation Line and and the Trillium Line. Once Stage 2 is the north–south diesel-powered Trillium Line. complete, it will bring 77% of Ottawa residents within 5 km of rail. Willowglen is proud to be Willowglen is providing the RTUs and ICCS part of the great Team helping bring Ottawa’s solution for Stage 2 of the O-Train expansion, master rail improvement plan to life. which will extend both the Confederation Line .
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • REAL PROPERTY CHALLENGES New Light Rail Project Revitalizes Ottawa’S Downtown Core
    REAL PROPERTY CHALLENGES New light rail project revitalizes Ottawa’s downtown core BY GORDON E. MACNAIR, SR/WA, AACI, P.APP The Canadian city of Ottawa has long suffered operational in 2018, it will provide rapid and high- the effects of severe bus bottlenecks through the quality transit service from the Tunney’s Pasture downtown core area. With increasingly slowing mixed-use center/employment node in the west service and the declining reliability of the city’s transit to Blair Station Mixed Use Center/employment system, action was clearly needed to address the node in the east. This 13-station electric Light Rail ongoing congestion problem. Transit system will span 12.5-kilometres (7.7 miles), including a 2.5-km (1.5 mile) tunnel that connects the In December 2012, the Ottawa City Council awarded downtown core. the contract to design, build, finance and maintain the first leg of Ottawa’s Light Rail Transit system – the The real property challenges associated with a Confederation Line – to the Rideau Transit Group. project of this magnitude were considerable, as were The project is part of the city’s overarching and long- encouraging transit-oriented development and other term smart-growth objectives laid out in the Official initiatives to support intensification. Plan, Transportation Master Plan and Infrastructure Master Plan. Together, these plans call for the creation Securing the Rights of densified, mixed-use neighborhoods surrounding Confederation Line stations. The property requirements for the Confederation Line consist of four project components: the Confederation The $2.13 billion line is the largest infrastructure Line guideway and stations, the integrated station project in the City of Ottawa since the construction entrances, a maintenance and storage facility and the of the Rideau Canal in 1826.
    [Show full text]
  • The Confederation Line Ottawa LRT Project
    The Confederation Line Ottawa LRT Project Tom Middlebrook, P.Eng Senior Vice President, Business Development – Canada Dragados Canada PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook Project Stakeholders Sponsors Equity Developers Project Co Design Build Joint Venture Maintenance Team Engineering Joint Venture PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 1 City of Ottawa • Canada’s Capital City with population of 950,000 • Problem: saturated with buses (BRT) • Solution: replace BRT with Light Rail Transit (LRT) Yukon Northwest Territories Nunavut Newfoundland / Labrador British Columbia Alberta Manitoba Quebec Saskatchewan Ontario Prince Edward Island New Brunswick Nova Scotia PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 2 Confederation Line • 12.5 km LRT line with 13 stations • 10 km at grade in existing BRT Right-of-Way • 2.5 km tunnel between Ottawa University (uOttawa) and Pimisi • 3 underground stations: Lyon, Parliament and Rideau PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 3 Initial Design Approach • Running tunnel: TBM tunnel (mono tube or twin-tube) • Underground stations: cut- and-cover PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 4 Design Options Option Pros Cons Design Single • Lower cost • Higher risk of settlement minimized by Scheme Tunnel • Flexibility in operation rock quality • Multiple faces • Higher cost and longer
    [Show full text]
  • Consultation on the City of Ottawa O-Train Trillium Line Extension Project (Case No
    Consultation on the City of Ottawa O-Train Trillium Line extension project (Case No. 17-05428) Submissions of the National Research Council Canada WHEREAS the City of Ottawa submitted to the Canadian Transportation Agency (the “CTA”) an application for approval to construct a railway line under Section 98 of the Canada Transportation Act; WHEREAS the CTA is requesting public comments on the application by the City of Ottawa for approval to construct a railway line as part of its Stage 2 O-Train Trillium Line Project; WHEREAS the National Research Council Canada (“NRC”) is a federal departmental corporation incorporated pursuant to the National Research Council Act; WHEREAS NRC operates the Automotive and Surface Transportation Research Centre located at 2320 Lester Rd. in Ottawa, Ontario; AND WHEREAS NRC’s operations will be directly impacted by the Stage 2 O-Train Trillium Line Project; CONSEQUENTLY NRC submits the following for consideration by the CTA in relation to its consideration of the City of Ottawa’s Stage 2 O-Train Trillium Line Project. Background 1. Since 1965, Canadian businesses, the Canadian Railway industry and other Canadian federal government departments have relied upon NRC to provide vital and exclusive rail testing and research services at its rail testing and research facility located at 2320 Lester Rd. in Ottawa (“Lester Road Facility”). 2. NRC is dependent on the heavy rail access link that connects NRC’s Lester Road Facility to the broader North American railway network. Importance of NRC’s Lester Road Facility 3. NRC's Lester Road Facility performs research and certification work that is unique in Canada.
    [Show full text]
  • 1874862-2019-Trilliumconsultation-Submission
    29 March 2019 Dear Abdir, Re: RDIM- 1874862-2019-TrilliumConsultation-Submission Thank you for your inquiry regarding the O-Train Trillium Line, as part of the City of Ottawa’s Stage 2 Light Rail Transit (LRT) Project. We appreciate your feedback. As you are aware, the Stage 2 Trillium Line alignment will extend the existing passenger service line south from Greenboro Station to a new terminus at Limebank Station, in proximity to the Riverside South and Barrhaven communities. Previous feasibility and environmental assessment studies reviewed opportunities to extend the Trillium Line further west, however technical issues demonstrated that the planned Riverside South community would not be compatible with the existing Trillium Line diesel rail technology. In 2011, the City undertook the O-Train South Expansion Feasibility Study to investigate the possibility of an extension of the Trillium Line to Riverside South Town Centre. The study found that the extension of rapid transit service using the exiting diesel technology would require a larger infrastructure footprint due to the wider width of the vehicles and higher station platform height when compared to electric light rail, as well as grade separations throughout the alignment. The planned Riverside South community, with multiple at-grade roadway crossings, closely-spaced light rail stations, and semi-exclusive light rail operations in the median of the east-west spine street in the town center, would not have the necessary space to permit the rail extension. As noted in the City of Ottawa 2013 Transportation Master Plan, the City’s 2031 ultimate rapid transit and transit priority network includes twin-electric LRT from Bayview Station to Riverside South.
    [Show full text]
  • Appendix a Consultation Record
    APPENDIX A CONSULTATION RECORD MEETING REPORT Date: July 14, 2014 Project: O-Train Extension EA Date of meeting: June 26, 2014 Project Number: 3414015-000 Location: Honeywell Room, Author: E. Sangster Ottawa City Hall Purpose: Transit Design and Operations Workshop Attendees: Initial E-Mail Steven Boyle, City of Ottawa SB [email protected] Alex Carr, City of Ottawa AC [email protected] Vivi Chi, City of Ottawa VC [email protected] Dennis Gratton, City of Ottawa DG [email protected] Frank McKinney, City of Ottawa FM [email protected] Kornel Mucsi, City of Ottawa KM [email protected] Pat Scrimgeour, City of Ottawa PSC [email protected] Colin Simpson, City of Ottawa CS [email protected] Derek Washnuk, City of Ottawa DW [email protected] Yvon Larochelle, OMCIAA YL [email protected] Alex Stecky-Efantis, OMCIAA AS [email protected] Paul Croft, Parsons Corporation PC [email protected] David Hopper, Parsons Corporation DH [email protected] Scott Bowers, MMM Group SB [email protected] Tim Dickinson, MMM Group TD [email protected] Paul Nimigon, MMM Group PN [email protected] Emily Sangster, MMM Group ES [email protected] Peter Steacy, MMM Group PST [email protected] DISTRIBUTION: All Attendees Item Details Action By 1. Introductions CS and PST provided an introduction to the study team, objectives, process and rationale. 2. Operational Considerations DH provided an overview of the existing OC Transpo network, which the O-Train extension will support. Transit network planning principles to be considered as part of this study include coverage, capacity, reliability, and legibility.
    [Show full text]
  • BUS HISTORY ASSOCIATION 2019 CONVENTION Ottawa on and Gatineau QC – Wednesday, June 5Th to Saturday, June 8Th All Photos by Kevin Nicol, Unless Otherwise Indicated
    BUS HISTORY ASSOCIATION 2019 CONVENTION Ottawa ON and Gatineau QC – Wednesday, June 5th to Saturday, June 8th All photos by Kevin Nicol, unless otherwise indicated The Bus History Association (BHA) convention was held in Ottawa this year. It had been 16 years (2003) since the BHA held their convention there. As with the past 3 Canadian conventions (Montreal, Quebec City, Vancouver), Mario Seneviratne organized a fan trip on the day before the start of the convention. Société de transport de l’Outaouais (STO) is one of the few remaining transit systems in Canada that still operates high floor vehicles (not including cutaways). STO, along with Coast Mountain Bus Company (Orion V suburbans), Sarnia (1 Orion V) and Cold Lake (2 Classics as back up) are the only systems that still operate the venerable buses. Their days are clearly numbered though except possibly for Vancouver where they have a few years left. STO still operates MCI Classics that formerly operated in Calgary. Bus # 9136 was chosen for the charter which is ex-Calgary # 5106. The charter started at Terrasses de la Chaudière in Gatineau. BHA members had to take regular transit to get to the start location and most rode OC Transpo route 97 from the host hotel of Hilton Garden Inn and Suites – Ottawa Airport. Upon arriving at Mackenzie King bridge, we alighted route 97 and transferred to route 44 for the ride to Gatineau. People who arrived early were able to take many photos. OC Transpo services Terrasses and one of the new Nova LFS buses arrived during our time there.
    [Show full text]
  • Ottawa's LRT Project
    OTTAWA’S LIGHT RAIL TRANSIT PROJECT [1] Ottawa’s O-Train network is undergoing a two-phase expansion Confederation Line Stage 1 (2018): will improve transit efficiency and reliability through downtown core Stage 2 LRT Project (2021-2023): will extend the network farther east, west and south Within Ottawa, transportation is responsible for around 40% of all local greenhouse gas emissions. The completion of Ottawa’s upcoming light rail transit (LRT) projects will result in the single greatest reduction of emissions in Ottawa’s history. 70% “Ottawa’s Light Rail Transit invest- ment will change the way we move Will bring 70% of around the city creating shorter com- residents within 5 km mutes, cleaner air, and a stronger of rail by 2023 110,000 economy”. – Steve Cripps, Director O-Train Will reduce annual Construction, City of Ottawa greenhouse gas emis- sions by over 110,000 tonnes by 2048 OTTAWA’S LIGHT RAIL TRANSIT PROJECT: RIDING THE O-TRAIN TO A GREENER FUTURE SUSTAINABLEEASTERNONTARIO.CA INTRODUCTION RESULTS Residents of Ottawa have seen “Ready4Rail” and “pretpour- There are many anticipated bene�its to this LRT invest- letrain” across the city as OC Transpo prepares to launch the ment. One of the most recognizable results is the reduction new Confederation Line. To date, the Confederation Line is in greenhouse gases (GHGs) and critical air contaminants Ottawa’s largest infrastructure project and promises (CACs). These have direct implications for the overall “shorter commutes, cleaner air, and a stronger economy”[2]. sustainability of urban growth and direct consequences on the health of the city’s residents.
    [Show full text]
  • Green Line: Update on Funding, Staging and Delivery ATTACHMENT 1
    TT2015-0881 Green Line: Update on Funding, Staging and Delivery ATTACHMENT 1 Green Line Update on Funding, Staging and Delivery December 2015 Revision1.0 TT2015-0881 GREEN LINE FUNDING STAGING AND DELIVERY/Att1.pdf Page 1 of 97 ISC: Unrestricted Green Line: Update on Funding, Staging and Delivery TT2015-0881 GREEN LINE FUNDING STAGING AND DELIVERY/Att1.pdf Page 2 of 97 ISC: Unrestricted Green Line: Update on Funding, Staging and Delivery CONTENTS 1. THE GREEN LINE: CALGARY’S NEXT LIGHT RAIL TRANSIT LINE ..............................................4 2. MOBILITY STRATEGY .......................................................................................................................6 3. GREEN LINE CORRIDOR ................................................................................................................16 4. GREEN LINE PROJEct ...................................................................................................................24 5. QUANTIFYING THE INVESTMENT IN THE GREEN LINE ............................................................32 6. FINDINGS FROM A SCAN OF CANADIAN CITIES .....................................................................40 7. FUNDING AND FINANCING .........................................................................................................45 8. STAGING OPTIONS ........................................................................................................................56 9. RETURN ON INVESTMENT ............................................................................................................60
    [Show full text]
  • Report to Rapport Au
    1 Report to Rapport au: Transportation Committee Comité des transports 2 November 2020 / 2 novembre 2020 and Council et au Conseil 12 November 2020 / 12 novembre 2020 Submitted on October 22, 2020 Soumis le 22 octobre 2020 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: Vivi Chi, Director / Director, Transportation Planning / Planification des transports, Transportation Services Department / Direction générale des transports (613) 580-2424, 21877, [email protected] Ward: Barrhaven (3); College (8); Gloucester-South Nepean (22) Knoxdale-Merivale (9); and File Number: ACS2020-TSD-PLN-0006 SUBJECT: Barrhaven Light Rail Transit (Baseline Station to Barrhaven Town Centre) and Rail Grade-Separations, Planning and Environmental Assessment Study – Recommendations OBJET: Étude de planification et d’évaluation environnementale pour le train léger sur rail à Barrhaven (de la station Baseline au centre-ville de Barrhaven) et les sauts-de-mouton - recommandations 2 REPORT RECOMMENDATIONS That the Transportation Committee recommend that Council: 1. Approve the functional design for the Barrhaven Light Rail Transit (Baseline Station to Barrhaven Town Centre) and Rail Grade-Separations Planning and Environmental Assessment (EA) study and interim transit priority measures as described in this report and supporting documents; 2. Direct staff to complete the Transit Project Assessment Process (TPAP) in accordance with the Regulation 231/08 of the Ontario Environmental Assessment Act, including the preparation and filing of the Environmental Project Report for final public review and comment; and, 3. Direct staff to remove the 1005--1045 Greenbank Road site earmarked for affordable housing by Council on April 10, 2019 (Report ACS2019-PIE-GEN- 001) from the list of affordable housing development sites; and, 4.
    [Show full text]
  • TAO Ontario Report 2016-02
    TRANSPORT ACTION ONTARIO NEWSLETTER $JANUARY-FEBRUARY 2016 Ontario Report Transport Action Ontario March 4 - St.Marys, Ontario Featured in This Issue: Op-ed analysis (Part 2): TAO launches discussion paper ➢ Greg Gormick takes a VIA’s HFR scheme: separat- on the High Performance Rail critical look at VIA’s plan for ing the wheat from the chaff option for the Ontario-Quebec the Montreal-Ottawa-Toronto by Greg Gormick rail corridor...see story on p. 4 corridor; second part of a $ Is there anything right about VIA’s two-part series (pp. 1, 2-3) high-frequency rail (HFR) proposal? It’s di%cult to say because of the way VIA has ➢ St. Catharines supports spun its scheme. expanding VIA Rail service $For more than a year, the HFR proposal (pp. 4-5) has been promoted at business luncheons and in media interviews in vague generalities. ➢ Hamilton’s LRT and Even the authors of one of three rail transit underfunding (pp. 4-5) passenger backgrounders produced for the recent Canada Transport Act Review wrote ➢ TAO proposal for that they could only present their Scarborough Express Rail interpretation of the proposal because all they presented to the City and received was a briefing from two VIA Metrolinx (pp. 7-8) managers. $What is known about the HFR proposal ...continued on PAGE 2 in 2014 and 2015. These funds FROM THE PRESIDENT TRANSPORT ACTION ONTARIO are to be split 16/15 for the - PETER MIASEK Greater Toronto and Hamilton ANNUAL GENERAL MEETING Area (GTHA) and outside the SAT., APRIL 16, 2016, Metro Hall, Room 303, Ontario 2016 GTHA.
    [Show full text]
  • Canada Rail Opportunities Scoping Report Preface
    01 Canada Rail Opportunities Canada Rail Opportunities Scoping Report Preface Acknowledgements Photo and image credits The authors would like to thank the Agence Métropolitaine de Transport following organisations for their help and British Columbia Ministry of Transportation support in the creation of this publication: and Infrastructure Agence Métropolitaine de Transport BC Transit Alberta Ministry of Transport Calgary Transit Alberta High Speed Rail City of Brampton ARUP City of Hamilton Balfour Beatty City of Mississauga Bombardier City of Ottawa Calgary Transit Edmonton Transit Canadian National Railway Helen Hemmingsen, UKTI Toronto Canadian Urban Transit Association Metrolinx Edmonton Transit OC Transpo GO Transit Sasha Musij, UKTI Calgary Metrolinx Société de Transport de Montréal RailTerm TransLink SNC Lavalin Toronto Transit Commission Toronto Transit Commission Wikimedia Commons Wikipedia Front cover image: SkyTrain in Richmond, Vancouver Canada Rail Opportunities Contents Preface Foreword 09 About UK Trade & Investment 10 High Value Opportunities Programme 11 Executive Summary 12 1.0 Introduction 14 2.0 Background on Canada 15 2.1 Macro Economic Review 16 2.2 Public-Private Partnerships 18 3.0 Overview of the Canadian Rail Sector 20 4.0 Review of Urban Transit Operations and Opportunities by Province 21 4.1 Summary Table of Existing Urban Transit Rail Infrastructure and Operations 22 4.2 Summary Table of Key Project Opportunities 24 4.3 Ontario 26 4.4 Québec 33 4.5 Alberta 37 4.6 British Columbia 41 5.0 In-Market suppliers 45 5.1 Contractors 45 5.2 Systems and Rolling Stock 48 5.3 Consultants 49 6.0 Concluding Remarks 51 7.0 Annexes 52 7.1 Doing Business in Canada 52 7.2 Abbreviations 53 7.3 Bibliography 54 7.4 List of Reference Websites 56 7.5 How can UKTI Help UK Organisations Succeed in Canada 58 Contact UKTI 59 04 Canada Rail Opportunities About the Authors David Bill Helen Hemmingsen David is the International Helen Hemmingsen is a Trade Officer Development Director for the UK with the British Consulate General Railway Industry Association (RIA).
    [Show full text]