Project Overview-OLRT-June2021update3

Project Overview-OLRT-June2021update3

Project: Ottawa Light Rail Transit (OLRT) Project Overview Confederation Line Trillium Line Client: Ottawa Light Rail Daily Ridership: 159,000 Daily ridership: 20,000 Transit (OLRT) Length: 12.5 km Current Length: 8 km Current Stations: 13 Current Stations: 5 Ottawa Light Rail Constructors (OLRTC JV) wanted a solution for their expanding Ottawa Integrated Subsystems metro rail, O-Train, that would enable the integration of both control (SCADA) and • Closed Circuit Television (CCTV) communications, including multimedia. They • Communication Based Train Control were looking for a exible integration partner, (CBTC) so they chose us to provide our enterprise • Communication Transmission System Integrated Control and Communication System (CTS) (ICCS) solution, SCADACOM. • Fire Detection Alarm System (FDAS) • Guideway Intrusion Detection System Along with our ICCS, Willowglen provided (GIDS) Station E&M and Traction Power RTUs, • High Speed Data Radio (HSDRS) project management, professional software • Intrusion Access Control (IAC) development, conguration, and integration • Overhead Catenary System (OCS) services for the Confederation Line. We delivered • Passenger Information Display (PID) our latest generation SCADA (SCADACOM6) • Passenger Information System (PIS) server and workstation products for the Transit • Public Announcement (PA) Services Control Centre, Back-Up Control • Supervisory Control and Data Centre, and Yard Control Centre. Acquisition (SCADA) • Telephone System (Telephony) The O-Train Confederation Line saw the • Traction Power Sub System (TPSS) introduction of a modern light rail transit service • Tunnel Ventilation System (TVS) to Ottawa, Canada. The O-Train is a multimodal light metro system consisting of two lines, east–west electried Confederation Line and and the Trillium Line. Once Stage 2 is the north–south diesel-powered Trillium Line. complete, it will bring 77% of Ottawa residents within 5 km of rail. Willowglen is proud to be Willowglen is providing the RTUs and ICCS part of the great Team helping bring Ottawa’s solution for Stage 2 of the O-Train expansion, master rail improvement plan to life. which will extend both the Confederation Line .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us