REAL PROPERTY CHALLENGES New Light Rail Project Revitalizes Ottawa’S Downtown Core

Total Page:16

File Type:pdf, Size:1020Kb

REAL PROPERTY CHALLENGES New Light Rail Project Revitalizes Ottawa’S Downtown Core REAL PROPERTY CHALLENGES New light rail project revitalizes Ottawa’s downtown core BY GORDON E. MACNAIR, SR/WA, AACI, P.APP The Canadian city of Ottawa has long suffered operational in 2018, it will provide rapid and high- the effects of severe bus bottlenecks through the quality transit service from the Tunney’s Pasture downtown core area. With increasingly slowing mixed-use center/employment node in the west service and the declining reliability of the city’s transit to Blair Station Mixed Use Center/employment system, action was clearly needed to address the node in the east. This 13-station electric Light Rail ongoing congestion problem. Transit system will span 12.5-kilometres (7.7 miles), including a 2.5-km (1.5 mile) tunnel that connects the In December 2012, the Ottawa City Council awarded downtown core. the contract to design, build, finance and maintain the first leg of Ottawa’s Light Rail Transit system – the The real property challenges associated with a Confederation Line – to the Rideau Transit Group. project of this magnitude were considerable, as were The project is part of the city’s overarching and long- encouraging transit-oriented development and other term smart-growth objectives laid out in the Official initiatives to support intensification. Plan, Transportation Master Plan and Infrastructure Master Plan. Together, these plans call for the creation Securing the Rights of densified, mixed-use neighborhoods surrounding Confederation Line stations. The property requirements for the Confederation Line consist of four project components: the Confederation The $2.13 billion line is the largest infrastructure Line guideway and stations, the integrated station project in the City of Ottawa since the construction entrances, a maintenance and storage facility and the of the Rideau Canal in 1826. When complete and easements for the electricity provider, Hydro Ottawa. 20 Right of Way JULY/AUGUST 2014 With the exception of the tunnel section, Subterranean Tunnel Segments Creating a Positive Commuting the Confederation Line is a conversion Experience of the city’s surface Bus Rapid Transit An important aspect of the project is Network and therefore exists mostly the 2.5 km tunnel that will run directly Maximizing station integration within its existing right of way. A through the city’s downtown core. From opportunities in the downtown core range of real estate acquisitions were a valuation perspective, the acquisition of is a critical project element, as it required to permit the construction, subterranean tunnel segments presented creates functional entrances, business future operation and maintenance a range of challenges. Compensation for connections and a more desirable of the Confederation Line, including these takings has yet to be settled in some commuting experience. It also frees up the acquisition of fee simple interests, instances, however the city anticipates the right of way on downtown streets, easements (permanent and temporary), that factors such as the depth of the upper creating a more functional public licenses and encroachment permits. Many limit of the taking, the current use of realm that balances the needs of transit of these have been stratified to separate the properties at grade, and betterment users, pedestrians and cyclists while our surface, subsurface and aerial rights, associated with the construction of providing an opportunity for an improved as required to address complexities the new transportation infrastructure streetscape. Therefore, it was an important in property acquisition for tunnel will continue to play a central role in property acquisition objective to secure construction through the downtown. determining the market value of tunnel the property rights for these integrated segments and injurious affection to station entrances. Public lands represent approximately 75 remainder lands, if any. percent of the property requirements for Complementing this objective, and in the line. The vast majority of these lands Wherever possible, the city attempted recognition of the city’s goal to proactively have been secured through complex to minimize the need for property engage private or public participants to Memorandums of Understanding with acquisitions by making strategic use of promote transit-oriented developments federal, provincial and other institutional existing city property for various project and connections at or near stations, landowners such as Parks Canada, Public requirements, such as staging areas and the city undertook certain business Works and Government Services Canada, by entering into targeted agreements for development strategy initiatives in 2008. the Ontario Ministry of Transportation, limited property rights. For example, The first step was to send out Requests for the University of Ottawa and the the city negotiated a five-year lease of a Information to private sector businesses National Capital Commission. Since a downtown surface parking lot that was and landowners along the tunnel municipality does not have the power to being held for future development. The alignment. City staff also approached expropriate federal or provincial land, negotiated agreement provides access for numerous landlords, developers, retailers, detailed and multi-faceted processes tunneling equipment in the mid-section landowners and other interested parties BY GORDON E. MACNAIR, SR/WA, AACI, P.APP were required to secure the right of of the Confederation Line tunnel, while to explore and promote opportunities way. While these complex negotiations leaving ownership of the parcel and the to integrate into downtown stations. We presented many challenges, they also future development potential of the site have currently been successful in locating provided the city with the opportunity to with the property owner. five of the six entrances for the three resolve outstanding property issues with the National Capital Commission that date back to the 1980s and relate to the construction of the bus rapid transitway. Some of the property requirements for the Confederation Line were in private ownership. The majority of these property rights were secured through negotiated agreements, although some required the expropriation process. In those instances where construction timing made it necessary to initiate expropriation proceedings, the city continued to pursue negotiated settlements with these property owners. To date, the city has completed two rounds of expropriations and anticipates moving forward with a third round in 2014 to secure a number of temporary working easements should they be required. Moving ahead on time and on budget, the 13-station electric light rail transit system is expected to be completed and operational in 2018. JULY/AUGUST 2014 Right of Way 21 tunnel stations off the right of way. This Maintenance and Storage perspective, the relocation aspect strategy resulted in downtown properties presented some challenges for the city, as connecting to the Confederation Line The land assembly needed for the many replacement properties identified underground. Negotiating the property maintenance and storage facility involved by the expropriated owners/tenants rights required for these entrances proved 18 improved properties with a total of 26 represented substantial betterments, an interesting challenge, especially since acres, approximately 340,000 square feet including new construction and larger acquiring property rights within an of building space in office and industrial premises. Notwithstanding this, all of existing building is somewhat unique buildings, 12 owners and 19 tenants. The the expropriated owners/tenants have and uncommon in Ottawa. However, we acquisition included the expropriation now secured replacement properties, and remained focused on achieving a win-win of a 10-unit industrial/commercial the city has financially settled with the scenario for both parties, and our efforts condominium in its entirety, which is majority of them. proved successful. believed to be the first expropriation of this kind in the Province of Ontario (and The facility will provide the Term sheets have been executed with all possibly in Canada). The city registered maintenance and storage of vehicles five owners, with other documents, such the Expropriation Plan in January 2012, for the Confederation Line Light Rail as construction agreements, to follow at took possession in May 2012, and entered Transit system. Construction will be a later date. Three entrances will require into occupancy agreements with most of completed in time to allow it to be used integrating with or accommodating the owners and tenants. The last tenant to do the final assembly of the vehicles existing structures such as office, mixed was vacated in March 2013. prior to commissioning. The project use and shopping centers, while a constructor, Rideau Transit Group, was fourth integrated station will require an After completing the expropriation of handed possession of the property in existing retail/office building entrance be these properties, the city undertook a April 2013, and all of the improvements demolished. A fifth downtown location property management role with respect have since been completed. The land is on a vacant parcel of land, however, to the maintenance and storage facility assembly also allowed the city to through the granting of air rights, the properties for approximately one year capitalize on a strategic acquisition for a station entrance planned for the site will and amended
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • The Confederation Line Ottawa LRT Project
    The Confederation Line Ottawa LRT Project Tom Middlebrook, P.Eng Senior Vice President, Business Development – Canada Dragados Canada PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook Project Stakeholders Sponsors Equity Developers Project Co Design Build Joint Venture Maintenance Team Engineering Joint Venture PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 1 City of Ottawa • Canada’s Capital City with population of 950,000 • Problem: saturated with buses (BRT) • Solution: replace BRT with Light Rail Transit (LRT) Yukon Northwest Territories Nunavut Newfoundland / Labrador British Columbia Alberta Manitoba Quebec Saskatchewan Ontario Prince Edward Island New Brunswick Nova Scotia PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 2 Confederation Line • 12.5 km LRT line with 13 stations • 10 km at grade in existing BRT Right-of-Way • 2.5 km tunnel between Ottawa University (uOttawa) and Pimisi • 3 underground stations: Lyon, Parliament and Rideau PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 3 Initial Design Approach • Running tunnel: TBM tunnel (mono tube or twin-tube) • Underground stations: cut- and-cover PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 4 Design Options Option Pros Cons Design Single • Lower cost • Higher risk of settlement minimized by Scheme Tunnel • Flexibility in operation rock quality • Multiple faces • Higher cost and longer
    [Show full text]
  • Appendix a Consultation Record
    APPENDIX A CONSULTATION RECORD MEETING REPORT Date: July 14, 2014 Project: O-Train Extension EA Date of meeting: June 26, 2014 Project Number: 3414015-000 Location: Honeywell Room, Author: E. Sangster Ottawa City Hall Purpose: Transit Design and Operations Workshop Attendees: Initial E-Mail Steven Boyle, City of Ottawa SB [email protected] Alex Carr, City of Ottawa AC [email protected] Vivi Chi, City of Ottawa VC [email protected] Dennis Gratton, City of Ottawa DG [email protected] Frank McKinney, City of Ottawa FM [email protected] Kornel Mucsi, City of Ottawa KM [email protected] Pat Scrimgeour, City of Ottawa PSC [email protected] Colin Simpson, City of Ottawa CS [email protected] Derek Washnuk, City of Ottawa DW [email protected] Yvon Larochelle, OMCIAA YL [email protected] Alex Stecky-Efantis, OMCIAA AS [email protected] Paul Croft, Parsons Corporation PC [email protected] David Hopper, Parsons Corporation DH [email protected] Scott Bowers, MMM Group SB [email protected] Tim Dickinson, MMM Group TD [email protected] Paul Nimigon, MMM Group PN [email protected] Emily Sangster, MMM Group ES [email protected] Peter Steacy, MMM Group PST [email protected] DISTRIBUTION: All Attendees Item Details Action By 1. Introductions CS and PST provided an introduction to the study team, objectives, process and rationale. 2. Operational Considerations DH provided an overview of the existing OC Transpo network, which the O-Train extension will support. Transit network planning principles to be considered as part of this study include coverage, capacity, reliability, and legibility.
    [Show full text]
  • Project Overview-OLRT-June2021update3
    Project: Ottawa Light Rail Transit (OLRT) Project Overview Confederation Line Trillium Line Client: Ottawa Light Rail Daily Ridership: 159,000 Daily ridership: 20,000 Transit (OLRT) Length: 12.5 km Current Length: 8 km Current Stations: 13 Current Stations: 5 Ottawa Light Rail Constructors (OLRTC JV) wanted a solution for their expanding Ottawa Integrated Subsystems metro rail, O-Train, that would enable the integration of both control (SCADA) and • Closed Circuit Television (CCTV) communications, including multimedia. They • Communication Based Train Control were looking for a exible integration partner, (CBTC) so they chose us to provide our enterprise • Communication Transmission System Integrated Control and Communication System (CTS) (ICCS) solution, SCADACOM. • Fire Detection Alarm System (FDAS) • Guideway Intrusion Detection System Along with our ICCS, Willowglen provided (GIDS) Station E&M and Traction Power RTUs, • High Speed Data Radio (HSDRS) project management, professional software • Intrusion Access Control (IAC) development, conguration, and integration • Overhead Catenary System (OCS) services for the Confederation Line. We delivered • Passenger Information Display (PID) our latest generation SCADA (SCADACOM6) • Passenger Information System (PIS) server and workstation products for the Transit • Public Announcement (PA) Services Control Centre, Back-Up Control • Supervisory Control and Data Centre, and Yard Control Centre. Acquisition (SCADA) • Telephone System (Telephony) The O-Train Confederation Line saw the • Traction Power Sub System (TPSS) introduction of a modern light rail transit service • Tunnel Ventilation System (TVS) to Ottawa, Canada. The O-Train is a multimodal light metro system consisting of two lines, east–west electried Confederation Line and and the Trillium Line. Once Stage 2 is the north–south diesel-powered Trillium Line.
    [Show full text]
  • Ottawa's LRT Project
    OTTAWA’S LIGHT RAIL TRANSIT PROJECT [1] Ottawa’s O-Train network is undergoing a two-phase expansion Confederation Line Stage 1 (2018): will improve transit efficiency and reliability through downtown core Stage 2 LRT Project (2021-2023): will extend the network farther east, west and south Within Ottawa, transportation is responsible for around 40% of all local greenhouse gas emissions. The completion of Ottawa’s upcoming light rail transit (LRT) projects will result in the single greatest reduction of emissions in Ottawa’s history. 70% “Ottawa’s Light Rail Transit invest- ment will change the way we move Will bring 70% of around the city creating shorter com- residents within 5 km mutes, cleaner air, and a stronger of rail by 2023 110,000 economy”. – Steve Cripps, Director O-Train Will reduce annual Construction, City of Ottawa greenhouse gas emis- sions by over 110,000 tonnes by 2048 OTTAWA’S LIGHT RAIL TRANSIT PROJECT: RIDING THE O-TRAIN TO A GREENER FUTURE SUSTAINABLEEASTERNONTARIO.CA INTRODUCTION RESULTS Residents of Ottawa have seen “Ready4Rail” and “pretpour- There are many anticipated bene�its to this LRT invest- letrain” across the city as OC Transpo prepares to launch the ment. One of the most recognizable results is the reduction new Confederation Line. To date, the Confederation Line is in greenhouse gases (GHGs) and critical air contaminants Ottawa’s largest infrastructure project and promises (CACs). These have direct implications for the overall “shorter commutes, cleaner air, and a stronger economy”[2]. sustainability of urban growth and direct consequences on the health of the city’s residents.
    [Show full text]
  • Green Line: Update on Funding, Staging and Delivery ATTACHMENT 1
    TT2015-0881 Green Line: Update on Funding, Staging and Delivery ATTACHMENT 1 Green Line Update on Funding, Staging and Delivery December 2015 Revision1.0 TT2015-0881 GREEN LINE FUNDING STAGING AND DELIVERY/Att1.pdf Page 1 of 97 ISC: Unrestricted Green Line: Update on Funding, Staging and Delivery TT2015-0881 GREEN LINE FUNDING STAGING AND DELIVERY/Att1.pdf Page 2 of 97 ISC: Unrestricted Green Line: Update on Funding, Staging and Delivery CONTENTS 1. THE GREEN LINE: CALGARY’S NEXT LIGHT RAIL TRANSIT LINE ..............................................4 2. MOBILITY STRATEGY .......................................................................................................................6 3. GREEN LINE CORRIDOR ................................................................................................................16 4. GREEN LINE PROJEct ...................................................................................................................24 5. QUANTIFYING THE INVESTMENT IN THE GREEN LINE ............................................................32 6. FINDINGS FROM A SCAN OF CANADIAN CITIES .....................................................................40 7. FUNDING AND FINANCING .........................................................................................................45 8. STAGING OPTIONS ........................................................................................................................56 9. RETURN ON INVESTMENT ............................................................................................................60
    [Show full text]
  • Report to Rapport Au
    1 Report to Rapport au: Transportation Committee Comité des transports 2 November 2020 / 2 novembre 2020 and Council et au Conseil 12 November 2020 / 12 novembre 2020 Submitted on October 22, 2020 Soumis le 22 octobre 2020 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: Vivi Chi, Director / Director, Transportation Planning / Planification des transports, Transportation Services Department / Direction générale des transports (613) 580-2424, 21877, [email protected] Ward: Barrhaven (3); College (8); Gloucester-South Nepean (22) Knoxdale-Merivale (9); and File Number: ACS2020-TSD-PLN-0006 SUBJECT: Barrhaven Light Rail Transit (Baseline Station to Barrhaven Town Centre) and Rail Grade-Separations, Planning and Environmental Assessment Study – Recommendations OBJET: Étude de planification et d’évaluation environnementale pour le train léger sur rail à Barrhaven (de la station Baseline au centre-ville de Barrhaven) et les sauts-de-mouton - recommandations 2 REPORT RECOMMENDATIONS That the Transportation Committee recommend that Council: 1. Approve the functional design for the Barrhaven Light Rail Transit (Baseline Station to Barrhaven Town Centre) and Rail Grade-Separations Planning and Environmental Assessment (EA) study and interim transit priority measures as described in this report and supporting documents; 2. Direct staff to complete the Transit Project Assessment Process (TPAP) in accordance with the Regulation 231/08 of the Ontario Environmental Assessment Act, including the preparation and filing of the Environmental Project Report for final public review and comment; and, 3. Direct staff to remove the 1005--1045 Greenbank Road site earmarked for affordable housing by Council on April 10, 2019 (Report ACS2019-PIE-GEN- 001) from the list of affordable housing development sites; and, 4.
    [Show full text]
  • Canada Rail Opportunities Scoping Report Preface
    01 Canada Rail Opportunities Canada Rail Opportunities Scoping Report Preface Acknowledgements Photo and image credits The authors would like to thank the Agence Métropolitaine de Transport following organisations for their help and British Columbia Ministry of Transportation support in the creation of this publication: and Infrastructure Agence Métropolitaine de Transport BC Transit Alberta Ministry of Transport Calgary Transit Alberta High Speed Rail City of Brampton ARUP City of Hamilton Balfour Beatty City of Mississauga Bombardier City of Ottawa Calgary Transit Edmonton Transit Canadian National Railway Helen Hemmingsen, UKTI Toronto Canadian Urban Transit Association Metrolinx Edmonton Transit OC Transpo GO Transit Sasha Musij, UKTI Calgary Metrolinx Société de Transport de Montréal RailTerm TransLink SNC Lavalin Toronto Transit Commission Toronto Transit Commission Wikimedia Commons Wikipedia Front cover image: SkyTrain in Richmond, Vancouver Canada Rail Opportunities Contents Preface Foreword 09 About UK Trade & Investment 10 High Value Opportunities Programme 11 Executive Summary 12 1.0 Introduction 14 2.0 Background on Canada 15 2.1 Macro Economic Review 16 2.2 Public-Private Partnerships 18 3.0 Overview of the Canadian Rail Sector 20 4.0 Review of Urban Transit Operations and Opportunities by Province 21 4.1 Summary Table of Existing Urban Transit Rail Infrastructure and Operations 22 4.2 Summary Table of Key Project Opportunities 24 4.3 Ontario 26 4.4 Québec 33 4.5 Alberta 37 4.6 British Columbia 41 5.0 In-Market suppliers 45 5.1 Contractors 45 5.2 Systems and Rolling Stock 48 5.3 Consultants 49 6.0 Concluding Remarks 51 7.0 Annexes 52 7.1 Doing Business in Canada 52 7.2 Abbreviations 53 7.3 Bibliography 54 7.4 List of Reference Websites 56 7.5 How can UKTI Help UK Organisations Succeed in Canada 58 Contact UKTI 59 04 Canada Rail Opportunities About the Authors David Bill Helen Hemmingsen David is the International Helen Hemmingsen is a Trade Officer Development Director for the UK with the British Consulate General Railway Industry Association (RIA).
    [Show full text]
  • Light Rail Transit in Ottawa
    Light Rail Transit in Ottawa January 30, 2020 Michael Morgan Director, Rail Construction Program City of Ottawa 1 Agenda • Background • Stage 1 Project • Stage 2 Project Ottawa’s Transit Challenge BRT to LRT Conversion Stage 1 Project Confederation Line Alignment Project Overview Stage 1 Confederation Line • Conversion of the existing bus “Transitway” to a 12.5km dedicated light rail transit line running • 2.5km tunnel through the downtown core • 13 stations including 3 downtown underground stations • A new Maintenance and Storage Facility where the light rail vehicles will be assembled, maintained and stored • 30 year maintenance concession period Procurement Approach Project Solutions Affordability RFP Bundled Hwy 417 Provided station Cap Innovations Expansion “innovation Project zones” Defined Service Geotechnical risk Proven Vehicle ladder and System Flexibility in Operations construction & Bundled cash Matters tunnel allowance excavation projects methodology Energy Matters Mobility Matters Rideau Transit Group (RTG) • Design Build Finance Maintain • Owned and operated by the City of Ottawa • $2.1B project including $300M in private financing • 30-year maintenance term with performance incentives • Rideau Transit Group (RTG): Design Challenges • System had to be designed to allow for long term capacity needs: 18,000 pphpd by 2031; Ultimate ridership 24,000 pphpd. • System had to designed to be fully accessible, include public art, address the need of stakeholders and include cycling/pedestrian connections. • Design consideration had
    [Show full text]
  • Ottawa Light Rail Transit – Stage 2 Trillium Line Extension Infrastructure Investment, Funding & Regulatory Hurdles
    Ottawa Light Rail Transit – Stage 2 Trillium Line Extension Infrastructure Investment, Funding & Regulatory Hurdles November 15, 2018 Chartered Institute of Logistics and Transport North America (CILTNA) Ottawa’s Transit Challenge O-Train Network (2019) 3 Stage 2 Light Rail Transit (LRT) KM of new rail New Stations Ottawa residents within 5km of new rail Confederation Line East New LRT stations KM of new rail Of area residents within 5 km of rail Confederation Line West New LRT stations KM of new rail 6 Trillium Line South Extension New LRT stations KM of new rail • Extension of an existing operating diesel system . Key Challenges • Affordability. • Ensure procurement for Confederation Line expansion drove strong competition and was supported by federal and provincial funding partners. • Ensure procurement to expand Trillium Line would function and integrate seamlessly between existing and expanded line and the overall O-Train system. • Ensuring risk and financial profiles balance desired City outcomes. • Getting community buy-in. • Future-proofing the system. Guiding Principles • Meet the City’s affordability criteria for capital, maintenance and operations of the Stage 2 project; • Ensure Stage 2 can be competitively tendered and will attract private sector interest • Maximize system ridership; • Optimize risk transfer between City and Stage 2 Project Co; • Minimize mobility, environmental and quality of life impacts of Stage 2 construction & operation; Guiding Principles (cont’d) • Ensure customer familiarity throughout the entire O-Train system; • Ensure station investment returns maximum benefit to riders and adjacent community; • Maximize alternative revenue streams to the City; • Maximize local economic benefit of Stage 2 construction; and • Maximize resiliency and environmental sustainability.
    [Show full text]
  • A New Vision for the Lincoln Fields Community Queen’S University School of Urban and Regional Planning
    A NEW VISION FOR THE LINCOLN FIELDS COMMUNITY QUEEN’S UNIVERSITY SCHOOL OF URBAN AND REGIONAL PLANNING A NEW VISION FOR THE LINCOLN FIELDS COMMUNITY By Michael Beauchamp, Mark Gordon, Sean Harrigan, Gavin Luymes, Rachel MacKnight, Bridget Murphy, Adam Shaker, Adrian van Wyk & Victoria Webster Project Supervisors Ms. Natalie Persaud, City of Ottawa Dr. David Gordon, Queen’s University SURP 824 Project Course December 20, 2019 School of Urban and Regional Planning Department of Geography and Planning Queen’s University The Project Team would like to thank: Natalie Persaud, Policy Planner for the City of Ottawa, for her engagement and assistance throughout the duration of this project. Professor David Gordon, for his tireless dedication to this project and to our team’s professional development. embracing the project, and bringing it to the Lincoln Fields community. The various stakeholders and experts who helped guide the project, attended our design charrette, and provided invaluable feedback and assistance: Sereen Aboukarr, Carl Bray, Benjamin Cool-Fergus, Stuart Craig, Brigitte Desroches, Mary Dickinson, Lise Guevremont, Peter Giles, Nikita Jariwala, David Jones, Arto Keklikian, Stephan Kukkonen, Claire Lee, Marissa Mascaro, Marc Magierowicz, Marissa Mascaro, Alain Miguelez, Andrew Morton, Mike Schmidt, Holly Newitt, Natalie Pulcine, Sarah Richardson, Andrew Sacret, Robin Souchen, Miguel Tremblay, Eva Walrond, Randolph Wang, Chris Wicke, and Mark Young. December 10, 2019, and provided comments. Angela Balesdent, Kathy Hoover, and Jo-Anne Tinlin at Queen’s University for their administrative and logistical support. Finally, our friends, family, and colleagues at the School of Urban and Regional Planning, and the Department of Geography and Planning for their kind words and encouragement these past four months.
    [Show full text]
  • O-Train Confederation Line & Bus Service Update
    O-Train Confederation Line & Bus Service Update Transit Commission Transportation Services Department November 6, 2019 1 Agenda • Rail Service Update o Reliability Issues o Corrective Action Plan o System Performance o Overview Of Response Plans • Bus Service Update o What We’ve Heard o Data Analysis On Performance o Solutions For Improving Bus Service • Communications & Customer Information Update o TTC Suggestions For Customer Communications o TTC Suggestions For Station Platform Operations o Improvement Plan • Update On Ongoing Improvements To Stations And Issues / Ideas Identified By Customers And Councillors • Winter Operations o Rail Operations o Bus Stations 2 Confederation Line Contract Rideau Transit Responsible for design, construction, Ottawa Light Rail Transit testing, and commissioning of the Group (RTG) Constructors (OLRTC) complete integrated system including safety certification of the system. Responsible for maintenance of the Rideau Transit complete system including life cycle costs Maintenance (RTM) and system performance. RTM staff and contractors maintain the entire system. Rail cars, track, switches, catenary, stations, etc. City of Ottawa Responsible for contract management of Rail Implementation the OLRTC scope of work including Transportation Office / O-Train oversight for design, construction, and Services Construction testing. Responsible for contract management OC Transpo Rail of the RTM contract work including Operations oversight for system performance. OC Transpo staff operate the trains. 3 Confederation
    [Show full text]