.kr g.co ngen .sejo www

www.sejongeng.co.kr

11F, Hanhwa Bizmetro 1(il)-cha, 242, Digital-ro, Guro-gu, Seoul, Korea Tel +82.2.262.12345 Fax +82.2.262.12340 Although we are not the most advanced company, we will always welcome tomorrow in an exertive and researching attitude to become an enterprise that can give you the most trust.

We can say that a human life is about changes. Isn’t the case that the environment and the history of the earth are revolving like a spinning wheel because there are people thriving for a better place or for more efficient development?

Recently, words such as high-technology or first-rate are used in various places, and it is hard to properly foresee where the paths are leading to. However, it seems most people are thinking moving forward is the best way to construct the future for humans.

Although technology is new and being up-to-date is also important, sometimes it appears that how the equipment is created systematically in a appropriate and rational way cannot be ignored.

We, Sejong Engineering Co., Ltd., are devoting our full attention to the design and the supervision in the electrical business field since the foundation in 1985 until today. At present, we have no doubt that our work is contributing to the national development such as the electrical train, the urban railway, the light rail transit, harbour construc- tion, the express way, the plant industries and more.

I believe this is due to the hard work of all of our executives and staff members who did not spared any effort but only gave their devotion. I also believe that I have come to this far because of the many elders around me who did not spare their loves and guidance. I appreciate their helps all the time.

Although we are not the most advanced company, we will always welcome tomorrow in an exertive and researching attitude to become an enterprise that can give you the most trust.

Thank you.

CEO/PhD Jin-ho Song

02 | 03 World-class cutting-edge technology– History Enterprise to construct future– 2018-2004 ·Development of Roll Spring Type Automatic Tensioning Device & Performance Cerificate as Railway Facility Sejong Engineering ·Participation on Commercialization Project of Urban Magnetic Levitation ·Registration of a Manufacturing Plant for Roll Spring Type Automatic Tensioning Device ·Technical Cooperation for High-Speed R-bar Bracket System ·Certification of Environmental Management System(IS0 14001/KSA 14001) ·Registration for Engineering Business License(1 field) Our ultimate goals are to give out the best values to our customers through the ·Overseas Construction License(Electric Work Business No. 760) ·Overseas Construction License(Construction Engineering No. 422) best quality and services. ·Member of the Seoul Chamber of Commerce

Sejong Engineering is founded in 1985 and we have many project experiences in the field of the electrical train, the urban railway, the light rail transit, harbour 2003-2000 ·Member of Korea Electric Railway Technology Association construction, the express way, the plant industries and more. ·Registration of Electric Work Business ·Establishment of Sejong Engineering Annex R&D Center ·Certificate for Design Supervisor Based on our accumulated knowledge and experiences, Sejong Engineering will move forward correctly and honestly to be a trustworthy enterprise. 1999-1998 ·Registration for Engineering Business License(5 fields) ·Registration of Fire Fighting Facilities Design Business(No. Guro 98-8) ·Registration of Fire Fighting Facilities Supervision Business(No. Guro 98-9) ·Certificate of Quality Assurance System(ISO 9001/KSA 9001)

1997-1985 ·Establishment of Sejong Engineering(private company) ·Conversion into Corporation as Sejong Engineering Co., Ltd. ·Registration of General Design Business(No. Seoul E-1-042) ·Registration of General Supervision Business(No. Seoul S-1-094)

04 | 05 Sejong Engineering is– bringing up the spirit of Korea’s technology into the world with the idea and challenge one step ahead.

Business Field Patent & Utility Model PATENT Design Supervision Construction R&D Service Manufacturing Registration No. Title Patent No. 10-0341107 Pole in Electric Railroads Patent No. 10-0395172 Concrete Groundwork Construction Method Using Disposable Cast and Its Groundwork Concrete Patent No. 10-0838057 Dropper Clamp for Electric Railway Lines Patent No. 10-0892423 Monorail Power Supply System for Keeping Close Contact Power Man Power Patent No. 10-0934895 Power Rail Support Patent No. 10-0934367 Insulation Device for Monorail Classification(Persons) Patent No. 10-0938613 Groundwork Structure for the Electric Pole Total 124 Engineers Patent No. 10-1002784 Power Supply System for Magnetic Levitation Train Professional & High High-Class Mid-Class Senior Others Senior Enginee (59) Engineer(20) Engineer(6) Engineer(8) (31) Patent No. 10-1002786 Earth System of Magnetic Levitation Train Patent No. 10-1024706 Pantograph Monitoring System of Magnetic Levitation Train

Certificate of Qualification(%) Patent No. 10-1029718 Crime Prevention System for Magnetic Levitation Train Patent No. 10-1030924 Tunnel Power Display Lamp Engineer 59.16% Patent No. 10-1195168 Third Rail System, Equipped with Protective Cover Technician 4.22% Patent No. 10-1440283 Tensioning Device for Contact Wire Senior Engineer 19.72% Patent No. 10-1329632 Plate Spring Type Automatic Tensioning Device Professional Engineer 16.90% UTILITY MODEL Registration No. Title No. 0257288 Cast for Construction of Groundwork Concrete for Electric Railway Poles(1) No. 0257290 Cast for Construction of Groundwork Concrete for Electric Railway Poles(3) No. 0257292 Cast for Construction of Groundwork Concrete for Electric Railway Poles(5)

06 | 07 Design & Supervision

Design Supervision ·Basic and Detail Design for Transmission Line and Traction Power ·Full Responsibility Supervision Service for New Construction of Supply System from Suseo to Dongtan on Capital High Speed Railway Catenary and Power Supply System from Iksan to Jeungeup on Honam High Speed Railway ·Detail Design for Catenary System from Iksan to Kwangju on Honam High Speed Railway ·Supervision for Electrification of the Commercialization Project on Urban Magnetic Light Rail Transit of Levitation Type ·Detail Design for the Traction Power Supply System from Osong to ·Supervision for Electrification of Roadbed Facility and New Gongju on Hanam High Speed Railway Kimchun Station on Gyeongbu High Speed Railway ·Detail Design for Electrification of Honam High Speed Railway, ·Supervision for the Catenary System of the Double Track from Haman Section No.3-2 to Jinju on Kyungjun Line, Private Infrastructure Investment Project ·Detail Design for Relocation of Interfere ring Catenary System on ·Supervision for the Electrification of the Double Track from Dukso to Honam High Speed Railway Wonju on Joongang Line ·Basic Design for the Electrification of Honam High Speed Railway, ·Supervision for the Catenary System from Iksan to Seodo on Jeonla Line Section No.3-2 ·Supervision for New Catenary and Power Supply System from ·Detail Design for Electrification of Busan Rolling Stock Depot on Jochiwon to Daejun on Gyeongbu High Speed Railway, Phase No.2 ·Supervision for Catenary and Power Supply System from Anpyung ·Detail Design for Traction Power Supply System Improvement at the to Songjungli on Honam Line Gyeongbu High Speed Railway Rolling Stock Depot ·Supervision for New Catenary and Power Supply System from Chunan to Jochiwon on Gyeongbu Line LEV ·Detail Design for the Power Supply System at Goyang High Speed MAG Railway Rolling Stock Depot ·Construction management Supervision for Construction of SIT & Synthesize Railway Test Track(T/K) RAN ·Detail Design Supervision for the Catenary System from Daegu to IL, T Pusan on Gyeongbu High Speed Railway, Phase No. 2 ·Overall Construction Supervision for the Improvements of Catenary T RA System and Power Supply System of Line IGH ·Detail Design for the Power Supply System at 3 Places including Y, L ·Overall Construction Supervision for New Constructions of Traction WA Middle Point Sectioning Post of Busan Rolling Stock Depot UB Power Supply System between Jinbu and Gangneung in Wonju– S Substation on Gyeongbu High Speed Railway Gangneung Railway ·Detail Design for Catenary System of the Double Track between ·Construction Supervision for the Improvement of the Railway Trans- Pyeongchang and Gangneung in Wonju-Gangneung line mission Line and Uijeongbu Railway Substation on Kyungwon Line Design Supervision ·Basic and Detail Design for Bootwal-Kacarvita section of Nepal’s ·Supervision Service for Side Track Extension of Gaehwa Car Depot east-west Railway on No. 9 ·Basic and Detail Design for No.1 Line Extension Project of Algiers ·Overall Supervision Service for System of Extension Construction of Metro Enterprise, Algeria Phase 3, Seoul Metro No. 9 ·Basic Design for Kwang-Ju Subway Line No.2 ·Supervision for Incheon international Airport on Magnetic Light Rail Transit of Levitation Type ·Detail Design for Substation Equipment Replacement on Seoul ·Responsibility Supervision Service for 3rd Phase Construction Metropolitan Subway Line No.2 (Seoul Subway Line No.9) WAY ·Basic and Detailed Designs for train operating system on ·Supervision Service for Electric Work on Incheon Metro Line No.1, AIL Incheon Metro Line No.2 Extension of Songdo International City EED R H-SP ·Detailed Design Service for the Electrical Facilities and Catenary ·Full Responsibility Supervision Service for Electric Field of Yongin HIG System for the Extension to Gyeongsan of Daegu Subway Line No.2 Light Rail Transit, Private Investment Infrastructure Project ·Detailed Design Service for Extension of Seoul Subway Line ·Full Responsibility Supervision Service for Section No.3-2 of Seoul No.7(Electricity, Communication, Signal Fields) Subway Line No.3 ·Detailed Design Service for Complementary Work of Electric ·Supervision Service for Section No.9-1 of Seoul Subway Power Protection System ·Supervision Service for Electric Facility Construction of the Station ·Design Service for Substation and SCADA on Subway Line No.9 on the 1st Phase of Metro Line No.1 ·Full Responsibility Supervision Service for Lifting Facility Installation ·Detailed Design Service for the Replacement Work of Deteriorated Work in Transfer Stations[Construction Section No.5] Electric Power Facility on Line No.2 [Seonreung Substation] ·Full Responsibility Supervision for Gwangju Metro Line No.1 ·Basic and Detailed Designs for Subway Convenience Facility [Construction Section No.1-6] [Public Station Building in the Gangnam Section of Line No.1~4] ·Supervision Service for the Construction of Section No.9 of Seoul ·Basic and Detail Design for Model Line of Urban Magnetic Subway No.9 Levitation Vehicle Commercialization ·Supervision Service for the Construction of Section No.2 of Incheon Metro Line No.1

08 | 09 Design & Supervision

Design Supervision

·Detail Design of Electrical Power System of Inchon New Container ·Construction Supervision Service for Container Terminal of Phase Terminal(1-1 Phase) 2-4 at Busan New Port, Private Investment Infrastructure Project ·Detailed Design of Electricity Power Facility for Yeosu Kwangyang Port ·Construction Management of Electric Field for Busan International ·Detailed Design for Electric Work of RTGC Power Conversion at Passenger Terminal Gwangyang Port ·Design and Supervision Service of Reinforcement Construction for ·Detailed Design Service for Extra High Voltage Cable Replacement Undergrounded 154kV Incoming Power Line at Busan New Port Work at Coal Dock in Incheon South Port ·Responsibility Supervision Service for Phase No.2-2nd Electric ·Detailed Design Service for Electric Facility Repairing Work on Work at South Container Terminal of Busan New Port Inner Harbour of Incheon Port in 2009 ·Design and Supervision Service for Supplementary Work of 154kV ·Detailed Design for the Relocation Work of 154kV Underground Electric Power Inlet Line Undergrounded at Busan New Port Pipeline at Gwangyang Port ·Responsibility Supervision Service for Restoration Work of 154kV ·Basic and Detailed Design Services for Electric Work at North Electric Power Inlet Line at Gwangyang Port Container Terminal of Busan New Port ·Responsibility Supervision Service for Phase No.3-1st Electricity ·Detailed Design for Maintenance & Repairing Work of Electric Work of at Container Terminal of Gwangyang Port Power Facility at Busan Port ·Responsibility Supervision Service for Phase No.2-1st Electric & ·Basic and Detailed Designs for Phase No.3-1st Electric Work at the Communication Works at Container Terminal of Gwangyang Port Container Dock of Gwangyang Port ·Responsibility Supervision Service for Phase No.1 Repair and reinforcement work of at substation facility of Gwangyang Port

NNEL & TU ROAD

Design BOUR HAR ·Design of the Electric System for Three Highways Including ·Design Service for Installation Work of Tunnel Disaster Prevention Naengjeong–Busan Line Facility [Sunsan, Yongdam] ·Electricity Design Service for Jangheung–Gwangyang Highway ·Electricity Design Service for Seohaean Highway (Section No.7-11) ·Electricity Design Service for Miryang-Ulsan Highway(Section ·Electricity Design Service for 4 Highways Including Pangyo– No. 1-5) Giheung Highway ·Electricity Design Service for Changwon-Gimhae Highway ·Electricity Design Service for Jeonju–Namwon Highway (Section No. 1-5) ·Electricity Design Service for Damyang–Seongsan Highway ·Electricity Design Service for Chuncheon–East Hongcheon Highway ·Electricity Design Service for Hampyeong–Gwangju Expressway No.12 ·Electricity Design Service for Iksan–Jangsu Expressway No.20 Supervision

·Electricity Design Service for 3 Tunnels Including Ihwa Tunnel ·Supervision Service for Electric & Communication Works of on Jungbu Naeryuk Highway Daecheon Gas Stations and Rest Areas(Both Up and Down ·Electricity Design for New Gas Station at Yeoju Highway Service Directions) on West Sea Side Highway Area

10 | 11 Design & Supervision

Design Supervision

·Design of 345kV Traction Power Supply System for New ·Supervision Service for Relocation of 154kV Transmission Line Uijeongbu Substation between Yeomgok to Gaepo(Segok Bridge) ·Control Design Service of ShinChungju 345kV Substation ·Supervision Service for Electric Facility Improvement Work ·Design Service of New Model Transformer for Indoor Substation at Central Academy ·Design Service for Replacement Work of 362kV Circuit Breaker ·Construction Supervision Service for 345kV T/L Construction Work with GIS at ShinNamwon Substation at ShinGapyeong–Migeum Section ·Design Service for Lead-in Construction of 22.9kV Reserved Power ·Supervision Service for Blocking Electric Pole Relocation at Chungjeong Naengcheon District ·Detailed Electric Design for Bio-manufacturing Facility Project of Celltrion ·Supervision Service for Undergrounding Construction Work In Front of Geumcheon District Office ·Detailed Design for Automation of Busan Petroleum Refinery ·Supervision Service for Undergrounding Construction Work ·Design for 345kV Control System of ShinSuwon at the Reconstruction Area of Banpo Jugong Residential ·Design Service for Relocation Work of 154kV Transmission Complex No.2 Lines at Huvis and SKC Suwon Plant ·Supervision Service for Low Voltage Blocks Arranging Work ·Design for Blocking Steel Tower Relocation Work of 154kV T/L of at Dongjaro No.7 at Jungsu ·Supervision Service for Undergrounding Construction Work ·Design Service for Facility Work of Alternating Branch Common of Blocking Electric Poles in Front of the National Museum Duct of Korea ·Supervision Service for Relocation Work of Blocking Facility at Station No.923 of Subway Line No.9

URE ITECT ARCH

Field of Business Design ANT ·Basic and Detailed Design for Architecture Electrical Such ·Basic and Detailed Design for Oryue Happy House PL as Office Building, Factory Building, School, Apartment and ·Detailed Design for Hwasung–Dongtan the 8th Elemantary School and Housing Complex. etc the 4th Middle School ·Supervision for Architecture Electrical ·Detailed Design for Core’s Factory Building ·TURN-KEY for Architecture ·Detailed Design for Korea Gyoungjin School ·Basic and Detailed Design for Deawang School ·Detailed Design for Science High School of Seoul ·Detailed Design for Green Energy Center of Hwaseung, Dongtan ·Detailed Design for Happy House of GaJwa, Seoul ·Basic and Detailed Design for A-1BL of Hyangdong, Goyang ·Basic and Detailed Design for Happy House of Jingyoung, Kimhae ·Basic and Detailed Design for Happy House of Busan Kwahak District No.1 ·Detailed Design for Extension work of Dormitory of Hyupsung University ·Detailed Design for Construction of Public Health Office and Town Hall in Hongsung District

12 | 13 Construction R&D Center

Catenary & Electric Power System ·Construction for new Catenary System from Osong to Gongju on Honam High Speed Railway ·Construction for Bracket replacement of Messenger Wire from Kwangmyeung to Cheunahn on Gyeungbu High speed Railway ·Electric construction replacement for Gangneung Station of railway construction between Wonju and Gangneung, Section 9

R&D ACCOMPLISHMENT Registration of R&D Center

Year R&D Accomplishment 2001 Research on the facility standard for railway power distribution system 2002 Research on check-up frequency adjustment for electric railway power facility 2003 Safety control countermeasure for street furniture using electricity(street light) 2004 Research on higher harmonic wave analysis and improvement plan for better quality on electric power supply EM Development of optimization and diagnostic technique of protection system for electric railway/ YST electric power facility WER S RIC PO 2005 Improvement of ground protection system on subway high voltage distribution system ECT Ground connection design and simulation for electric railway Y & EL AR Study on the harmonic wave reduction system for Guro electric railway substation CATEN 2006 2007 Survey of the electric power system technology for urban magnetic levitation train 2008 Research on the protection of high-speed railway substation facility and numbering standardization of control circuit 2009 Research on the development of economical sized 154kV indoor substation Analysis of electric power characteristics of magnetic levitation train 2010 Research on actual design utilization of the automatic electric railway track design program 2011 Study on infra-structure improvement for commercial speed up Study on the power system analysis of electric railway traction 2012 Research on electric power installation system of MAGLEV 2014 Research for Status of Compensation Facility for Voltage drop at Electric Power Supply System 2015 Research and Analysis of Design Standard for Urban Railway

14 | 15 Commercialization of urban MAGLEV Roll Spring Type AUTOMATIC TENSIONING DEVICE

Economic & Safety Summary · Reduced Number of Installations by Longer Half Section Length(899m) ·Basic and Detailed Design for Commercial Line(2007) · Built-in Stopper Function (First MAGLEV System in Korea, Second in the World)

·Supervision for Construction of Commercial Line(2011) High Performance · Max. Tension: 26[kN] ·MOU Agreement(2011) · Stopper Function(stop in 70mm) · Max Operating Speed : Over 350[km/h] ·Plan to Construct a Line at Inchon International Airport · Tension Variation Rate: ±3(%) below (Max speed: 110km/h, 115 rider/car, ATO)

·Korea's first, World's Second Urban Maglev Compact & Light Weight · Easy Installation · Minimized Visual Appearance · Easy Installation in the Tunnel and Bridge

TRANSMISSION & TRANSFORMER COMPARISON OF AUTOMATIC TENSIONING DEVICE

Contents Description Roll Spring Type Coil Spring Type Pulley Type

Incoming Line Receive Electric Power from Local Power Grid · High Performance · High Tension Variation · Space Limitation for Traction Power Supply System Step Down the Voltage to the Normal Voltage · Light Weight / Compact Size Installation · Easy Installation · Short Working Stroke · Difficult Installation by Summary · Difficult Installation by DC1500V Rectifier Convert Alternating Current(Ac) to Direct Current(Dc) · Maintenance Free Heavy Weight and Many · Totally Enclosed Type Long Length and Heavy Weight Accessories · Uneconomic DC Feeder Provide Electric Power to Rail through Electric Cable · Economic · Uneconomic

Centralized Supervisory Control and Remote Control Units(Rtu) for Data Tension Variation ±3(%)Below ±15(%) Below ±5(%) Below SCADA Acquisition from Local Level Electric Devices Temperature Range 80°C(-40°C~+40°C) 60°C(-20°C~+40°C) 60°C(-20°C~+40°C)

Working Stroke of Rope 1,300(mm) 750(mm) 1,200(mm) FACILITY FOR ELECTRIC POWER SUPPLY Max. Half Section Length 899(m) 800(m) 830(m) Contents Description Third Rail Facility to Contact with Collector Shoe Installed under Bottom of Rolling Stock Stopper Function Yes (Stop in 70mm) No Yes Safety Supporter Facility to Support 3rd Rail Lock Function Yes No No

Maintenance Adjustment & Detail Adjustment Detail Inspection Inspection Free twice a year twice a year

ELECTRIC FACILITY FOR STATION Unit Weight(for 20kN) 253[kgf] 330[kgf] 598[kgf] Contents Description Size(for 20kN) 1000x325(mm) 2,257x241(mm) 5,500x1,050(mm) General Electricity Supply Electric Power to Station and Depot Endurance Strong Weak Weak Fire Electricity Supply Electric Power to Emergency Lighting and Automatic Fire Detection Facility (Wind & Vibration)

Economic Feasibility 100% 140% 164% (Life Cycle)

16 | 17 Business Certificate

Sejong Engineering Co., Ltd. has acquired the ISO9001 Quality Certificate from the environmental management system recognition institute on Jan. 18, 1998 and its quality has been approved. Certification Specification: ISO 9001:2008 Certification Scope: Design, supervision, and value added services of electric works Certification Date: 1998.01.18 (Construction Economy Research Institute of Korea) 2000.09.23 (Korea Productivity Center Quality Assurance) 2006.09.27 (BSI) 2009.09.19 (BSI) 2011.05.03 (BSI) 2012.09.18 (BSI) 2015.09.17 (BSI) 2016.06.20 (KPC)

Sejong Engineering Co., Ltd. has acquired the ISO14001 Environmental Management Certification from the environmental management system recognition institute on Jul. 24, 2004, and its quality has been approved. Certification Specification: ISO 14001:2004 Certification Scope: Environmental management system related to the design and supervision of electric works Certification Date: 2004.07.24 (Korea Productivity Center Quality Assurance) 2006.09.27 (BSI) 2009.09.19 (BSI) 2011.10.31 (BSI) 2012.09.18 (BSI) 2015.09.17 (BSI) 2016.06.20 (KPC)

Registration of Registration of Certificate of Supervision Business Design Business Engineering Service Principal

A enterprise to connect past times, present and future… Certificate of Report for Registration of Registration of Overseas Construction Business Electric Construction Business Fire-fighting Facility Business SEJONG ENGINEERING Co., Ltd.