Ottawa's Light Rail Transit Project

Total Page:16

File Type:pdf, Size:1020Kb

Ottawa's Light Rail Transit Project Ottawa’s Light Rail Transit Project November 11 – 14, 2012 Dennis Gratton, Manager - Rail Planning, City of Ottawa Presentation to the American Public Transportation Association Presentation Overview • Transit Vision for Ottawa • Challenge • Ottawa Planning Framework • Ottawa Light Rail Transit (OLRT) Project • Ottawa and TOD • Past vs. Present • Current OLRT TOD Studies • Current and Future Studies 2 Transit Vision for Ottawa 3 Challenge 4 Ottawa Planning Framework • Official Plan • Zoning By-Law • Transportation Master Plan • Community Design Plans • Transit Oriented Development Plans • Downtown Moves • Environmental Assessments 5 OLRT Project 6 OLRT Project 7 Ottawa and TOD • Mixed Land Use Density • Built Form • Pedestrian and Cyclist Connectivity with LRT Stations • Vehicles and Parking • Streetscape and the Environment 8 Past vs. Present • Medium to high density development located in a compact form within a 10-minute walking circle surrounding a transit stop or station; • Inclusion of a broad mix of uses supporting people wanting to live, work and play within a single community; • Allow people to make the majority of their daily or weekly trips without using a car; • Pedestrian oriented design; • Reduction in demand for parking inside the 10- minute walking circle around the station. 9 Current OLRT TOD Studies • TOD studies were undertaken for St. Laurent, Cyrville, and Train Stations by the City. • Additionally, the City won an IBM Smart Cities Challenge grant. • IBM provided recommendations to the City on how to increase market interest for residential and business growth in these areas. • Recommendations were presented fall 2012. 10 Current OLRT TOD Studies Density Projections TOD Plan Est. # People Est. # People Projected # Study Area Total TOD Capacity on Additional Study Area Short-term People on (long term) Sites Short-term (<20 yrs) Sites (<20 yrs) Train 39,500 25,500 10,000 St. 42,800 23,300 10,000 Laurent Cyrville 40,500 14,100 10,000 11 Current OLRT TOD Studies 12 Example – St. Laurent Station Existing Conditions St. Laurent Station 13 Example – St. Laurent Station Existing Conditions St. Laurent Station 14 Example – St. Laurent Station (south perspective) 15 Example – St. Laurent Station (north perspective) 16 Example – Train Station Existing Conditions Train Station 17 Example – Train Station Existing Conditions Train Station 18 Example – Train Station (south perspective) 19 Example – Train Station (north perspective) 20 Example – Train Station TOD Pedestrian Network 21 Example – Train Station TOD Cycling Network 22 Example – Train Station TOD Density and Height 23 Example – Cyrville Station Existing Conditions Cyrville Station 24 Example – Cyrville Station Existing Conditions Cyrville Station 25 Example – Cyrville Station (south east perspective) 26 Example – Cyrville Station (north east perspective) 27 Private Outdoor Amenity – Office Use 28 Private Outdoor Amenity – Residential Use 29 Active Frontage Street – St. Laurent Boulevard Example 30 Current and Future Studies Blair Station TOD Study (2014) LeBreton Flats Master Plan (Completed) Hurdman Station TOD Study (2014) Lees Station TOD Study (Completed) Tunney’s Pasture Master Plan (On-going) 31 QUESTIONS? www.ottawalightrail.ca 32 .
Recommended publications
  • 2. Faqs__Transit Service During Confed Line
    Transit Service During Confederation Line Construction – Updates for 2016 REPORT TRANSIT SERVICES DEPARTMENT REPORT FAQs REPORT Transit Service During Confederation Line Construction – Updates for 2016 TITLE DIVISION: Customer Systems and Planning BRANCH Service Planning REPORT Pat Scrimgeour, Assistant General Manager, Customer Date: January 26, 2016 AUTHOR Systems and Planning SCHEDULED DATES FOR REPORT GM’s REVIEW OF REPORT TRANSIT COMMISSION COUNCIL January 19, 2016 February 17, 2016 N/A Q1. How long will the Confederation Line construction service adjustments last for? What are the next phases for service adjustments? A1. The O-Train Confederation Line is scheduled to open in 2018. Service adjustments will take place in sequential phases as sections of the Transitway undergo construction work. Each section of Transitway that closes for conversion to light rail will never reopen for bus operations. The remaining Transitway closures are: • April 2016 – Laurier Station to Lees Station; and • June 2016 – Tunney's Pasture Station to Merton Street. Timelines will be updated as information becomes available. Service adjustment plans will be implemented as these closures take effect. Stations will remain open during the construction period, with the exceptions of Cyrville Station, which was closed in June 2015, and Campus Station, which will close in April 2016. Q2. What are the main highlights of upcoming transit service adjustments during Confederation Line Construction? A2. The following are the main highlights of upcoming transit service adjustments during O- Train Confederation Line Construction: • On April 24, 2016, the Transitway will close between Laurier Station and Lees Station. Most transit service along this section of the Transitway will be relocated to Nicholas Street and Highway 417, using the bus-only lanes that have been built for this purpose.
    [Show full text]
  • Project Synopsis
    Final Draft Road Network Development Report Submitted to the City of Ottawa by IBI Group September 2013 Table of Contents 1. Introduction .......................................................................................... 1 1.1 Objectives ............................................................................................................ 1 1.2 Approach ............................................................................................................. 1 1.3 Report Structure .................................................................................................. 3 2. Background Information ...................................................................... 4 2.1 The TRANS Screenline System ......................................................................... 4 2.2 The TRANS Forecasting Model ......................................................................... 4 2.3 The 2008 Transportation Master Plan ............................................................... 7 2.4 Progress Since 2008 ........................................................................................... 9 Community Design Plans and Other Studies ................................................................. 9 Environmental Assessments ........................................................................................ 10 Approvals and Construction .......................................................................................... 10 3. Needs and Opportunities ..................................................................
    [Show full text]
  • Ottawa Transportation Report.Pdf
    OTTAWA THE IMPACT OF TRANSPORTATION IMPROVEMENTS ON HOUSING VALUES IN THE OTTAWA REGION Don R Campbell, Senior Analyst Melanie Reuter, Director of Research Allyssa Epp, Research Analyst WWW.REINCANADA.COM AUTHORS Don R. Campbell, Senior Analyst, REIN Ltd Melanie Reuter, Director of Research, REIN Ltd Allyssa Fischer, Research Analyst, REIN Ltd © The Real Estate Investment Network Ltd. 6 – 27250 58 Cr Langley, BC V4W 3W7 Tel (604) 856-2825 Fax (604) 856-0091 E-Mail: [email protected] Web Page: www.reincanada.com Important Disclaimer: This Report, or any seminars or updates given in relation thereto, is sold, or otherwise provided, on the understanding that the authors – Don R. Campbell, Melanie Reuter, Allyssa Fischer, and The Real Estate Investment Network Ltd and their instructors, are not responsible for any results or results of any actions taken in reliance upon any information contained in this report, or conveyed by way of the said seminars, nor for any errors contained therein or presented thereat or omissions in relation thereto. It is further understood that the said authors and instructors do not purport to render legal, accounting, tax, investment, financial planning or other professional advice. The said authors and instructors hereby disclaim all and any liability to any person, whether a purchaser of this Report, a student of the said seminars, or otherwise, arising in respect of this Report, or the said seminars, and of the consequences of anything done or purported to be done by any such person in reliance, whether in whole or part, upon the whole or any part of the contents of this Report or the said seminars.
    [Show full text]
  • Recommended Plan.Pdf
    Blair Station 9-34 Maintenance and Storage Facility Track redundancy within the facility will be provided to ensure The proposed Maintenance and Storage Facility is an integral the ability to move LRVs under vehicle or system failure part of the project, as it will: conditions. • House and service all of the trains needed to operate the The preferred site for the Maintenance and Storage Facility has line been determined based on the following criteria: • Service vehicles to be used on future LRT lines • Site Characteristics (topography, grade, land use compatibility, expansion capability and environmental • House the operations control centre (signalling, considerations) communications) for the line • Facility Operations (turnaround loops, track redundancy, • Be the primary heavy maintenance facility for the LRT layout efficiency and municipal services) network Maintenance of the LRVs is crucial to maintain vehicle • System Operations (connectivity to the line, efficiency and manufacturer's warranties, minimize long term operating costs access to freight rail), and and provide for system safety and reliability. The Maintenance • Relative Costs (capital, operating, maintenance and and Storage Facility will accommodate the following elements property ownership and acquisition) on-site: The proposed Maintenance and Storage Facility for the DOTT 9-35 • Main facility building housing offices, roster areas, meeting project will be located on lands to the west of the existing OC rooms and control equipment Transpo headquarters and bus maintenance facility located on • Storage yard for regular cleaning and minor maintenance the north side of Belfast Road, west of St. Laurent Boulevard and south of the VIA rail corridor. In order to access this • Repair areas for heavy and light maintenance areas for location, a connecting track is required between the DOTT vehicles alignment and the Maintenance and Storage Facility.
    [Show full text]
  • 1 Report to Rapport Au
    1 Report to Rapport au: Transit Commission Commission du transport en commun 19 June 2019 / 19 juin 2019 Submitted on June 10, 2019 Soumis le 10 juin 2019 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: John Manconi, General Manager / Directeur général Transportation Services Department / Direction générale des transports 613-580-2424 ext./poste 52111, [email protected] Ward: CITY WIDE / À L'ÉCHELLE DE LA File Number: ACS2019-TSD-TS-0002 VILLE SUBJECT: Confederation Line: Customer Service Operational Readiness OBJET: Ligne de la Confédération : Préparation opérationnelle du service à la clientèle REPORT RECOMMENDATION That the Transit Commission receive this report for information. RECOMMANDATION DU RAPPORT Que la Commission du transport en commun prenne connaissance de ce rapport. 2 EXECUTIVE SUMMARY The opening of O-Train Line 1, the Confederation Line, will mark an exciting and historic transformation in the way transit service is delivered in the city of Ottawa. OC Transpo has been working with the Rideau Transit Group (RTG) and partners from across the city to transform the current transit service into a world-class multimodal transit system and ensure a positive end-to-end customer experience starting on day one. The opening of Line 1 and the major changes to the bus route network that will follow, will be the largest service change ever for OC Transpo customers. Because our customers are our priority and their experience through and beyond this transitional period is important to us, OC Transpo staff are committed to ensuring that customers are prepared, comfortable and knowledgeable about these changes and the transition period in which they will occur.
    [Show full text]
  • Line 1 Preparations Continue
    Transpo Express FALL 2017_Layout 1 2017-Oct-20 10:42 AM Page 1 TRANSPO express WINTERFall 2017 2019 Line 1 preparations continue 2. Derek Stevens 3. Tony Spinello GARAGE ATTENDANT 1. Tim Wielinga PARA TRANSPO 1. 7150 Brian Ferguson 2. 7313 Hussein Suleiman reparations have been underway for some requirements that come with the transition to that have been created and how they will con- time for the highly anticipated launch a multi-modal transit system, made up of bus, tribute to the success of our new light rail line. PCONVENTIONALof O-Train Line 1. Many positions have diesel rail and light rail. Continue reading on been created and filled to meet the changing page 4 for an in-depth look at some of the roles 1. 2883 Manjit Nagra 2. 5833 Kulwinder Sidhu he 2017 Roadeo competition and weather competition this year. Manjit will compete in the In this issue was HOT! Competitors, spectators, staff and 2018 International Roadeo in Tampa, Florida. He 3. 2643 Terry Claesson Tvolunteers came out on a beautiful will be joined by William Castillo, Derek Stevens September Sunday for this year’s annual Roadeo. and Tony Spinello, who will compete in the Mechanical competition. Another successful OperatorPriority Manjit Seating Nagra, who Cards was runner-up in6 past years, won first place in the Conventional Transit Food Drive! 2 2017 ROADEO cont’d P. 4-5 Transecure stories 7 InThe charter this experience issue 2 Accessible entrances NewTraining Nova - onebuses track at at andNew parking Employee at OC Passes Transpo 7 4 OC Celebrates Ottawa cominga
    [Show full text]
  • 10.0 Environmental Effects, Significance and Mitigation
    10.0 ENVIRONMENTAL EFFECTS, SIGNIFICANCE AND MITIGATION To a large degree, environmental effects were avoided or minimized to the extent possible due to the nature of the project (i.e., conversion from BRT to LRT); and during the evaluation of the alternatives and the selection of the preferred alternative. Moreover, many mitigation measures have been directly incorporated into the recommended plan. This section describes the environmental benefits and potential environmental effects of the proposed project and mitigation measures for the effects that cannot be avoided. Sections Include: 10.1 Assessment Approach 10.2 Project Benefits 10.3 Impact Assessment Results, Mitigation, Significance and Residual Effects 10.4 Cumulative Effects 10.5 Accidents and Malfunctions 10.6 Municipal, Provincial, Federal or Other Approvals or Permits 10.7 Future Commitments 10-1 • the magnitude, spatial extent, and duration of the effects; irregularities, but would have no measurable effect on the 10.1 Assessment Approach • the proportion of a species population or the number of population, entity or group as a whole. An assessment was undertaken to describe the potential people affected; environmental effects, both positive and negative of the • direct or indirect effects; Positive (P): An effect that exhibits a beneficial outcome. planning, construction and operational activities associated with • the degree to which the effect responds to mitigation; and the proposed DOTT project. The definitions of significance were adopted for use in this • the level of uncertainty about the possible effect. assessment because many of the impacts cannot be quantified in The assessment of effects involves applying the following steps: absolute terms, although changes and trends can be predicted.
    [Show full text]
  • Ottawa Welcomes the Confeder
    OTTAWA WELCOMES THE CONFEDERATION LINE After delays and increasing political frustration, Ottawa’s first electrified light rail line is finally open – marking a new chapter for this Canadian transit pioneer. Vic Simons reports. aturday 14 September 2019 saw Mulroney said: “Ottawa residents deserve a passenger operations would be unachievable, the introduction of Ottawa’s latest world-class transportation system that gets by late 2016 enough track and overhead light rail service to the public – it both them and the economy moving… had been completed to allow LRV testing. was a day that many in the city had Today, that’s exactly what they are getting.” Coupled to infrastructure delays, the coming waited a long time for. winter months saw a number of problems SAlthough the city’s bus-served Transitways Approvals and delays identified with the chosen Alstom rolling have performed a valuable service for over 30 Approved by the city in late 2012, the current stock – a new ‘European-style’ low-floor years, planning for a more robust solution for CAD2.1bn (EUR1.5bn) east-west scheme was platform for the North American market, cross-city travel dates back to the early years originally scheduled to open to coincide with albeit based on a proven design – in the of the 21st Century. Indeed, a north-south the 150th anniversary of Canada becoming an form of heating and communications light rail route was designed, and contracts independent nation in 2017. This is reflected systems failures and carbody and brake awarded, in 2006. This project would have in the choice of the Confederation Line system issues.
    [Show full text]
  • APPENDIX a Transportation Reference Materials
    LRT TRANSIT ORIENTED DEVELOPMENT STUDY AREAS SERVICING OVERVIEW Final Report, November 2013 APPENDIX A Transportation Reference Materials LRT TRANSIT ORIENTED DEVELOPMENT STUDY AREAS SERVICING OVERVIEW Final Report, November 2013 Existing Conditions 370000 375000 ± 5035000 5035000 Blair Rd. Montreal Rd. Macdonald Cartier Br. St. Laurent Blvd. ^_ Blair A Cyrville v i a 4 t 7 i 1 o d. n R P al k n w io y eg . R Train ^_ Lees ^_Hwy. 417 ^_Hwy. 417 ^_ St. Laurent Hw y. 417 ^_ Innes Rd. Main St. 5030000 Hurdman 5030000 Cycling Capture Area and Cycling Routes Smyth Rd. ^_ Future LRT Platform Bike Lane Multi-use Pathway Servicing Overview Study - Transportation Analysis Boundary Cycling Capture Area 0 500 1,000 Study Area Boundary m 1:50,000 V:\01225\active\other_pc\163401180\GIS\MXD\Powerpoint_Figures_08022013\163401180_PP_LRT_Cycling.mxdRevised: 2013-11-27 By: ncruikshank 370000 375000 370000 375000 74 . 1 Rd al ion eg ± R 5035000 5035000 ! ! ! ! Blair Rd. Montreal Rd. Macdonald Cartier Br. 4 17 d. l R St. Laurent Blvd. ! na io eg ! ! R ! ! ! Blair ^_ ! A Cyrville v i a !t io ! n P ! k w ! y ! !! . ! Train ! ^_ ! ! ! ! wy. 417 ! Lees ^_ H ! ! ! ! ! Hwy. 417 ! ^_ ! ^_ ! ! St. Laurent Hw ! y. 417 !! ^_ !! ! Innes Rd. Main St. ! 5030000 Hurdman 5030000 LRT Intersections ! Smyth Rd. ^_ Future LRT Platform ! ! TOD Study 1 Intersections ! TOD Study 2 Intersections Future LRT Cycling Capture Area Servicing Overview Study - Transportation Analysis Boundary Study Area Boundary 0 500 1,000 Approved TOD Area m 1:50,000 V:\01225\active\other_pc\163401180\GIS\MXD\Powerpoint_Figures_08022013\163401180_PP_LRT_Intersections.mxd Revised: By:2013-11-01 ncruikshank 370000 375000 City of Ottawa LOS A = 0.00 – 0.60 LOS B = 0.61 – 0.70 LOS C = 0.71 – 0.80 LOS D = 0.81 – 0.90 LOS E = 0.91 – 1.00 LOS F = > 1.00 All Intersections signalized unless otherwise noted.
    [Show full text]
  • Robert Bateman School Council Meeting
    Hunt Club Park Community Association Board of Directors Meeting Minutes January 22, 2020 at 7 pm 2 Lorry Greenberg, 2nd floor, Room 350 Board Members’ Attendance Paul Norris, President & School Liaison Present Connie Ford, Secretary Present Kathy Fisher, Content Editor Absent Louise Pilon, Social Media Present Frank Gualtieri, Treasurer Present Andrew Tomayer, Communications Present (required to leave early) Austin Kattackal Absent Others in attendance Jana Atkinson (Councillor Deans’ Office), Michella Maragoni, Sylvain Bourdeau, Dr. Vineet Sidhu, Theodore Tomayer ITEM SUMMARY OF DISCUSSION Call to order The President called the meeting to order. Five of seven board members were present constituting a quorum and the meeting was declared duly constituted. The agenda for the meeting was approved. 1. Minutes of meeting Paul Norris moved to approve the Board of Director meeting minutes as of October 29, 2019 and December 10, 2019. Frank Gualtieri and Louise Pilon respectively, seconded the motion. All members agreed. 2. Councillor’s Report Diane Deans is doing well. She has completed three rounds of chemotherapy and is recovering from surgery before beginning her second round of chemotherapy. International Women’s Day – The date for Councillor Deans’ Annual International Women’s Day Breakfast is Thursday, March 5, 2020 at the Infinity Convention Centre. Email the Councillor’s office for tickets. LRT Stage 2 Construction Impact Meeting - Councillor Deans has been advised that the City is tentatively planning to host a meeting on February 13 to discuss impacts as a result of construction of Stage 2 of the LRT. Details will be circulated to the association once available. The O-Train is to be shut down as of May for 18 months.
    [Show full text]
  • JUNE-JULY 2018 VINCENT MASSEY PUBLIC SCHOOL by Sofian Tarfas, Anthony Gellatly, Sam Rayment Photos by Thomas Cormier and Greg Mckean (Teacher)
    JUNE 2018 A Voice of Riverview Park JULY 2018 Will our new LRT be this good? by Geoff Radnor itting in my seat in an almost empty train early on a recent Sunday morning, slowly and Ssilently I started to move. My train was leaving on a trip from a capital city in Europe on its three hour trip to another city in another country. It was due to depart at 8:12 am, and it did, exactly to the minute. I had ordered and paid for my tick- et on line here in Canada, and was instructed to pick up my ticket at the station prior to boarding. Hav- ing found the railway service desk, my two tickets were in my hand in seconds, they were for a trip there and back in one day. I was advised by email a week in advance that the journey would take about 30 min- utes less than originally planned as the train was to be diverted onto One of our new trains going under the Belfast Road Bridge on a training run, May 8th 2018. The train is head- CONTINUED ON PAGE 11 ing east; there is Tremblay Road on the left and the Queensway on the right. PHOTO: JAMES RADNOR Hi, I’m Dalia! am a Grade 5 student at Riv- ership, teamwork and treating erview Alternative. I love to others with respect and kindness. write and to socialize with When a student gets a Howl Imy friends. Speaking of writing, About, their name and what they I would like to tell you about my are recognized for is put on the school and what we have been morning announcements and as doing.
    [Show full text]
  • 1.0 Introduction
    1.0 INTRODUCTION This Environmental Project Report assesses the effects of the proposed Downtown Ottawa Transit Tunnel (DOTT) project on the social, physical and natural environments. The City of Ottawa, as proponent, has prepared this Environmental Project Report in accordance with the Province of Ontario’s Transit Project Assessment Process (Regulation 231/08 under the Ontario’s Environmental Assessment Act). This section provides the background and overview of the study including location and rationale for the proposed project, relationship of the proposed project to other transportation-related studies and an outline of the entire report contents. Sections Include: 1.1 Project Description 1.2 Purpose of the Project 1.3 Study Background 1.4 Relationship with Other Studies, Projects and Future Undertakings 1.5 Report Organization 1-1 1.1 Project Description and vehicles to service these lines, as well as bus rapid transit electric light rail transit from Tunney's Pasture Station to Blair Ottawa's Transportation Master Plan (TMP) contains a vision technology and additional bus lanes. Figure 1-1 illustrates the Station along the Transitway and through a tunnel underneath for transit to be developed by 2031. In the first phase, the City planned rapid transit network for the City of Ottawa, out to the the downtown core. of Ottawa will invest in 40 km of new light rail transit (LRT) year 2031. The cornerstone and first phase of this plan is to run Figure 1-1: TMP Rapid Transit Network 1-2 The Downtown Ottawa Transit Tunnel (DOTT): Tunney’s The most important feature of the project involves construction this segment of the City’s rapid transit network to the year 2031 Pasture to Blair Station via a Downtown LRT Tunnel, will see of a new LRT tunnel to replace the existing on-street BRT and beyond.
    [Show full text]