Resettlement Plan PHI: EDSA Greenways Project (Taft Station)

Total Page:16

File Type:pdf, Size:1020Kb

Resettlement Plan PHI: EDSA Greenways Project (Taft Station) Resettlement Plan February 2020 PHI: EDSA Greenways Project (Taft Station) Prepared by Department of Transportation for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (As of 30 January 2020; Central Bank of the Philippines) Philippine Peso (PhP) (51.010) = US $ 1.00 ABBREVIATIONS ADB Asian Development Bank AH Affected Household AO Administrative Order AP Affected Persons BIR Bureau of Internal Revenue BSP Bangko Sentral ng Pilipinas CA Commonwealth Act CGT Capital Gains Tax CAP Corrective Action Plan COI Corridor of Impact DA Department of Agriculture DAO Department Administrative Order DAR Department of Agrarian Reform DAS Deed of Absolute Sale DBM Department of Budget and Management DDR Due Diligence Report DED Detailed Engineering Design DENR Department of Environment and Natural Resources DILG Department of Interior and Local Government DMS Detailed Measurement Survey DO Department Order DOD Deed of Donation DOTr Department of Transportation DPWH Department of Public Works and Highways DST Documentary Stamp Tax EA Executing Agency EJS Extra Judicial Settlement EM Entitlement Matrix EMP Environmental Management Plan EO Executive Order FS Feasibility Studies GFI Government Financial Institution GOP Government of the Philippines GRM Grievance Redress Mechanism HH Household Head HLURB Housing and Land Use Regulatory Board HUDCC Housing and Urban Development Coordinating Council IA Implementing Agency IEC Information, Education, and Communication IMA Internal Monitoring Agent IOL Inventory of Loss IPA Independent Property Appraiser IR Involuntary resettlement IRR Implementing Rules and Regulations ISF Informal Settler Family ii LA Land Acquisition LAP Land Acquisition Plan LGU Local Government Unit LMB Land Management Bureau LRA Land Registration Authority, an agency under the Department of Justice MC Memorandum Circular MMDA Metro Manila Development Authority MOA Memorandum of Agreement MOU Memorandum of Understanding NEDA National Economic and Development Authority NGO Non-Government Organization NHA National Housing Authority NoT Notice of Taking OCT Original Certificate of Title PCM Public consultation meeting PD Presidential Decree PhP Philippine Peso PIB Public Information Booklet RA Republic Act RAP Resettlement Action Plan RCS Replacement Cost Study RIC Resettlement Implementation Committee RROW Road Right-of-Way ROWSAM Right-of-Way and Site Acquisition Manual RP Resettlement Plan RPT Real Property Tax SA Social Assessment SES Socioeconomic Survey SIA Social Impact Assessment SPS Safeguard Policy Statement TCT Transfer Certificate of Title TOR Terms of Reference USD United States Dollar VLD Voluntary Land Donation iii DEFINITIONS OF TERMS Affected persons (APs)/ Refers to entities (Government, private individual and corporate) Households (AHs) and vendors, ambulant or semi-sedentary, who are displaced (physical or economic) as result of project impacts. Ambulant vendors Ambulant vendors are either itinerant or semi-static. Itinerant vendors are those who go around shouting their wares while semi-static ones are those who are semi-fixed positions but may move about as the situation necessitates (Nario, Jasmin Galace, 2000). Compensation Payment in cash or in kind (e.g. land-for-land) to replace losses of land, housing, income and other assets caused by the Project. All compensation is based on the principle of replacement cost, which is the method of valuing assets to replace the loss at current market value, and any transaction costs such as administrative charges, taxes, registration and titling costs. In the absence of functioning markets, a compensation structure is required that enables affected people to restore their livelihoods to level at least equivalent to those maintained at the time of dispossession, displacement, or restricted access. Cut-off date Cut-off date for land-taking will be set on the first day of census undertaken as part of the of RP preparation after both the project approval by the IA and Detailed Engineering Design. Persons not covered at the time of census-taking will not be eligible for claims of compensation entitlements. Displaced Persons (DPs) In the context of involuntary resettlement, displaced persons are those who are physically displaced (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas (ADB IR Source Book, 2012). Donation Donation is an act of liberality whereby a person disposes gratuitously of a thing or right of another, who accepts it. [Art 725, New Civil Code (NCC)] Economic displacement Loss of land, assets, access to assets, income sources, or means of livelihoods as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Eligibility Refers to any person who has settled in the subproject area before the cut-off date that suffers from (i) loss of shelter, (ii) loss of assets (land, space above and below the surface of the land, buildings, plant, and objects related to the land) and/or or ability to access such assets, permanently or temporarily, or (iii) other losses that can be appraised. such as transaction costs, interest, on loss of residual land, loss of income sources or livelihood regardless of relocation, profession shift, and other types of loss stated by the assignor, will be entitled to compensation and/or assistance). iv Entitlement A range of measures comprising compensation, livelihood restoration support, transfer assistance, income substitution, relocation support, etc. which are due to the AHs, depending on the type and severity of their losses, to restore their economic and social base. Expropriation The power of eminent domain is an inherent and indispensable power of the State. Also called the power of expropriation, it is described as the highest and most exact idea of property remaining in the government that may be acquired for some public purpose through a method a compulsory sale to the State. Expropriation is the least favorable mode of acquisition for public usage of land as it is based on active compulsory dispossession of private citizens of their significant asset. It represents and should be the last resort. Expropriation is mandated if a negotiated sale is not feasible. Livelihood restoration This involves re-establishing productive livelihood of the displaced persons to enable income generation equal to or, if possible, better than that earned by the displaced persons before the resettlement (ADB IR Source Book, 2012). Inconvenience allowance It is the compensation amount given to each AP who are classified as any of the following vulnerable groups: poor (based on the poverty income threshold), elderly and single women- headed households, and persons with disabilities. Inventory of loss The listing of assets as a preliminary record of affected or lost assets during the preparation of the RP where all fixed assets (i.e., land used for residence, commerce, agriculture; dwelling units; stalls and shops; secondary structures, such as fences, tombs, wells; standing crops and trees with commercial value; etc.) and sources of income and livelihood inside the Subproject boundaries are identified, measured, their owners identified, their exact location pinpointed, and their replacement costs calculated. The severity of impact on the affected assets and the severity of impact on the livelihood and productive capacity of the APs are likewise determined. Involuntary resettlement Refers to physical and economic displacement as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Such displacement can be full or partial, permanent or temporary. When the displaced persons have no right to refuse the land acquisition by the state that result in their displacement. This occurs when land is acquired through (i) expropriation by invoking the eminent domain power of the state, or (ii) land is acquired through negotiated settlement when the pricing is negotiated in a process where expropriation will be the consequence of a failure in the negotiation. (ADB IR Source Book, 2012) v Land acquisition It is the process of acquiring land from the current owners pursuant to the provisions of RA 10752 modes of acquisition, i.e., Donation, Negotiated Sale, Expropriation, Acquisition of Properties under Commonwealth Act (CA) NO. 141, Exchange of Barter, Easement of Right-of-way, Acquisition of Subsurface Right-of-way and other modes authorized by Law. Marginally affected person The impact is only partial and the remaining portion of the property or asset is still viable for continued use. Meaningful consultation A process that
Recommended publications
  • Assessment of Impediments to Urban-Rural Connectivity in Cdi Cities
    ASSESSMENT OF IMPEDIMENTS TO URBAN-RURAL CONNECTIVITY IN CDI CITIES Strengthening Urban Resilience for Growth with Equity (SURGE) Project CONTRACT NO. AID-492-H-15-00001 JANUARY 27, 2017 This report is made possible by the support of the American people through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of the International City/County Management Association (ICMA) and do not necessarily reflect the view of USAID or the United States Agency for International Development USAID Strengthening Urban Resilience for Growth with Equity (SURGE) Project Page i Pre-Feasibility Study for the Upgrading of the Tagbilaran City Slaughterhouse ASSESSMENT OF IMPEDIMENTS TO URBAN-RURAL CONNECTIVITY IN CDI CITIES Strengthening Urban Resilience for Growth with Equity (SURGE) Project CONTRACT NO. AID-492-H-15-00001 Program Title: USAID/SURGE Sponsoring USAID Office: USAID/Philippines Contract Number: AID-492-H-15-00001 Contractor: International City/County Management Association (ICMA) Date of Publication: January 27, 2017 USAID Strengthening Urban Resilience for Growth with Equity (SURGE) Project Page ii Assessment of Impediments to Urban-Rural Connectivity in CDI Cities Contents I. Executive Summary 1 II. Introduction 7 II. Methodology 9 A. Research Methods 9 B. Diagnostic Tool to Assess Urban-Rural Connectivity 9 III. City Assessments and Recommendations 14 A. Batangas City 14 B. Puerto Princesa City 26 C. Iloilo City 40 D. Tagbilaran City 50 E. Cagayan de Oro City 66 F. Zamboanga City 79 Tables Table 1. Schedule of Assessments Conducted in CDI Cities 9 Table 2. Cargo Throughput at the Batangas Seaport, in metric tons (2015 data) 15 Table 3.
    [Show full text]
  • Designing Employee Shuttle Service for Employees of Makati CBD Rodney Asinas Urban and Transport Planner, Senior Associate Ayala Land, Inc
    Designing Employee Shuttle Service for Employees of Makati CBD Rodney Asinas Urban and Transport Planner, Senior Associate Ayala Land, Inc. Previously presented at the 12th International Conference of the Eastern Asia Society for Transportation Studies (EASTS) in September 2017 at the Sheraton Hotel, Ho Chi Minh, Vietnam Table of Contents • Introduction • Problem & Objectives • Hypothesis • Scope and Limitations • Methodology • Sample Size • Survey Results • Potential Routes • Summary & Recommendations INTRODUCTION Estimated Number of Trips per Day Modal Split in Makati CBD 0% 20% 40% 60% 80% 100% Vehicles 67,369 7,735 Private Public Year Pax 80,843 329,619 • Around 12.8 million person trips are made per day in Metro Manila (JICA Dream Plan,2014) • Around 78% of road occupancy is taken up by private vehicles, while only transporting 31% of total person trips • In Makati CBD, road occupancy of private vehicles at Makati CBD goes up to 90% (ALI internal traffic study, 2008) PROBLEM: Due to worsening traffic conditions in Metro Manila, commuter and driving experience continue to deteriorate affecting employee productivity OBJECTIVE: Identify a feasible alternative transportation modes that would be acceptable to the company, employee, and transport provider o Understand demand side by • Origins and Destinations • Mode Preference analyzing current travel patterns • Trip Chain • Estimated Travel Demand • Willingness to Pay o Determine routes to be served and identify appropriate alternate • Based on demand, identify routes which will be served mode of transportation which will • Identify parameters which satisfy employee best serve both the company and preferences employees HYPOTHESIS: Numerous factors affect employees’ decision in choosing his/her way of travel : • Socio-economic • Travel preferences o Rank in the company o Convenience and o Gender Comfort o Travel Cost o Promptness o Seating • Geography-related o Cost o Location of residence o Frequency of trips o Travel time o Number of transfers SCOPE AND LIMITATION: Study limited to Makati CBD employees.
    [Show full text]
  • SEVENTEENTH CONGRESS of the REPUBLIC of the PHILIPPINES First Regular Session '.7 O F
    SEVENTEENTH CONGRESS OF THE REPUBLIC OF THE PHILIPPINES First Regular Session '.7 o f SENATE Introduced by Senator Poe RESOLUTION DIRECTING THE SENATE COMMITTEE ON PUBLIC SERVICES TO REVIEW THE DISCRETION AND POWER GIVEN TO THE LAND TRANSPORTATION FRANCHISING AND REGULATORY BOARD TO PRESCRIBE ROUTES FOR UV EXPRESS VEHICLES, WITH THE END GOAL OF FORMULATING MEASURES TO ENSURE THAT DUE PROCESS, PROPER CONSULTATION WITH ALL STAKEHOLDERS, AND REASONABLE CRITERIA AND PARAMETERS SHALL BE OBSERVED IN THE PROCESS OF ROUTE SELECTION AND/OR ALTERATION OF THE SAME WHEREAS, the 1987 Philippine Constitution provides that the State shall promote a rising standard of living and an improved quality of life for all;1 WHEREAS, the worsening traffic congestion in urban areas, particularly in Metro Manila, has led to excessively long commute times for public and private commuters and a deterioration of the overall quality of life; WHEREAS, the productivity cost of the current transportation crisis has been estimated to be within the region of Php2.4 Billion per day, or more than PhpSOO Billion per year; WHEREAS, a prevalent mode of public transportation in Metro Manila and its nearby cities, munieipalities or provinces is the “UV Express” vehicle that caters to a vast group of commuters from Bulacan, Cavite, Rizal and all around Metro Manila, among the urban areas afflicted with traffie; WHEREAS, the Land Transportation Franchising and Regulatory Board (LTFRB) has the authority to: (a) prescribe and regulate routes of service, economically viable capacities and zones or areas of operation of public land transportation services provided by motorized vehicles;2 and (b) issue, amend, revise, suspend or cancel Certificates of Public Convenience or permits authorizing the operation of public Land Transportation services provided by motorized vehicles, and to prescribe the appropriate terms and conditions therefore, among others;3 1 Section 9, Article II of the Constitution.
    [Show full text]
  • A Case Study on Philippine Cities' Initiatives
    A Case Study of Philippine Cities’ Initiatives | June – December 2017 © KCDDYangot /WWF-Philippines | Sustainable Urban Mobility — Philippine Cities’ Initiatives © IBellen / WWF-Philippines ACKNOWLEDGMENT WWF is one of the world’s largest and most experienced independent conservation organizations, with over 5 million supporters and a global network active in more than 100 countries. WWF-Philippines has been working as a national organization of the WWF network since 1997. As the 26th national organization in the network, WWF-Philippines has successfully been implementing various conservation projects to help protect some of the most biologically-significant ecosystems in Asia. Our mission is to stop, and eventually reverse the accelerating degradation of the planet’s natural environment and to build a future in which humans live in harmony with nature. The Sustainable Urban Mobility: A Case Study of Philippine Cities’ Initiatives is undertaken as part of the One Planet City Challenge (OPCC) 2017-2018 project. Project Manager: Imee S. Bellen Researcher: Karminn Cheryl Dinney Yangot WWF-Philippines acknowledges and appreciates the assistance extended to the case study by the numerous respondents and interviewees, particularly the following: Baguio City City Mayor Mauricio Domogan City Environment and Parks Management Officer, Engineer Cordelia Lacsamana City Tourism Officer, Jose Maria Rivera Department of Tourism, Cordillera Administrative Region (CAR) Regional Director Marie Venus Tan Federation of Jeepney Operators and Drivers Associations—Baguio-Benguet-La Union (FEJODABBLU) Regional President Mr. Perfecto F. Itliong, Jr. Cebu City City Mayor Tomas Osmeña City Administrator, Engr. Nigel Paul Villarete City Environment and Natural Resources Officer, Ma. Nida Cabrera Cebu City BRT Project Manager, Atty.
    [Show full text]
  • Proximity Indexing of Public Transport Terminals in Metro Manila
    sustainability Article Proximity Indexing of Public Transport Terminals in Metro Manila Krister Ian Daniel Roquel *, Raymund Paolo Abad and Alexis Fillone Civil Engineering Department, De La Salle University, Manila 1004, Philippines; [email protected] (R.P.A.); alexis.fi[email protected] (A.F.) * Correspondence: [email protected] Abstract: Despite the extensive transit network in Metro Manila, intermodal connections between public transportation services are still fragmented. In response, authorities proposed various mul- timodal transport terminals around the periphery of the metropolis. However, there is a need to understand how these proposed terminals will impact existing transportation infrastructure and services as well as the current travel demand. This paper proposes a method that quantifies the nearness of any subject to any metric of interest, or in this case, the location of the terminal based on its proximity to existing transit supply and demand at different points in the transport network. It involves a simple methodology that requires only the spatial distribution of relevant transport planning data (e.g., public transport services, public transport passenger activity). It was found that the spatial distribution of the transport terminals in the study area is more closely related to the transit supply. Using the same methodology, several potential locations in Metro Manila (e.g., central terminal, terminal along a major junction) were assessed to see whether these are viable sites for a multimodal terminal. One scenario configuration was found to be better integrated with where trips start and/or end, while another seemed to improve integration of the existing railways. Keywords: intermodal; transit demand; transit supply; Metro Manila Citation: Roquel, K.I.D.; Abad, R.P.; Fillone, A.
    [Show full text]
  • City of General Santos LOCAL PUBLIC TRANSPORT ROUTE PLAN
    City of General Santos LOCAL PUBLIC TRANSPORT ROUTE PLAN 1 | G S C L o c a l P u b l i c T r a n s p o r t R o u t e P l a n 2 0 1 7 1 | GSC LOCAL PUBLIC TRANSPORT ROUTE PLAN 2017 CONTENTS I. INTRODUCTION a. Vision and Mission b. Profile c. Geography d. Demography e. Economy II. COMPOSITION OF THE LPTRP TEAM III. STUDY AREA / CORRIDOR a. Road Infrastructure b. Routes c. Terminals IV. STATEMENT OF THE PROBLEM V. SETTING UP OF OBJECTIVES VI. REVIEW OF EXISTING CONDITIONS AND DATA a. Congestion b. Modal Shares c. Users Perception on Public Transport d. Self-Assessment Results on Public Transport e. Road Safety VII. DATA GATHERING VIII. ANALYSIS OF DATA IX. RECOMMENDATION TO LTFRB a. List and Map of Existing Public Transport Routes b. List and Map of Proposed Transportation Routes c. Proposed Transportation Facilities V. ANNEXES 0 | GSC LOCAL PUBLIC TRANSPORT ROUTE PLAN 2017 I. INTRODUCTION Vision and Mission The aspirations of the citizens of General Santos City are articulated in its vision and mission statements, as follows: Vision: “Gensan, the Green City of the South, the Financial Center of Region XII, Regional Agri-Industrial and Transshipment Hub of SOCCSKSARGEN, and Model of a Harmonious Multi-cultural City; blessed with a healthy, disciplined and educated citizenry; driven by diversified, competitive and resilient economy; endowed with a balanced, sustainable and well-managed environment; equipped with efficient, hazard-resistant, and world class infrastructures and governed by a responsive, participatory and transparent leadership.” Mission: To pursue a stable local economy supportive of development and growth, environmental protection, and security for all people in General Santos City.
    [Show full text]
  • LTFRB: More PUV Routes to Be Opened
    LTFRB: More PUV routes to be opened Additional transport options to be offered weekly based on passenger demand By: Krixia Subingsubing - Reporter / @KrixiasINQ ​ ​ ​ Philippine Daily Inquirer / 05:18 AM July 30, 2020 ​ BACK ON THE ROAD Plastic dividers help passengers maintain physical distancing in a jeepney plying the Tandang Sora-Quezon City Hall route. An additional 1,943 passenger jeepneys returned to the streets on Wednesday to ply 17 new routes across Metro Manila. (Photo by GRIG C. MONTEGRANDE / Philippine Daily Inquirer) MANILA, Philippines — The Land Transportation Franchising and Regulatory Board (LTFRB) plans to offer more routes “every week or every other week” for all modes of transport in Metro Manila depending on commuter demand. Zona Tamayo, LTFRB-National Capital Region director, said on Wednesday this was part of the agency’s “partial, calibrated and gradual approach” to reopening public transport. The more open approach to mobility was announced after the House committee on Metro Manila development asked both the LTFRB and the Department of Transportation to hike the number of public utility vehicles (PUVs) in the streets to up to 30 percent, and then by 10 percent every week. “At the moment, only 10 percent of all public transport are allowed to resume operations but the directive from the different agencies and local government units is to increase transport in different areas,” Tamayo said. So far, around 212 routes for all modes of public transport, including buses, UV Express vans and jeepneys, have been opened since the Inter-Agency Task Force for the Management of Emerging Infectious Diseases eased quarantine restrictions in the metropolis.
    [Show full text]
  • Manila Is 3Rd City with Worst Traffic in Asia
    102 INFRASTRUCTURE Manila is 3rd city with worst traffic in Asia Manila now ranks 3rd city with the worst traffic in Asia where people spend the 3rd longest average time being stuck in traffic each day at 66 minutes, according to a study by Uber. Bangkok topped the list with 72 minutes and Jakarta is 2nd with 68 minutes. hen it comes to the length of time people spend daily battling the traffic, Manila ranks among the worst cities Win Asia at no. 3, according to a study commissioned by ride-sharing company Uber. Uber Philippines general manager Laurence Cua’s presentation showed the results of the latest Uber- commissioned survey, which indicates that people in Manila spend the 3rd longest average time being stuck in traffic every day at 66 minutes as against Bangkok with 72 minutes (rank 1st) and Jakarta with 68 minutes (rank 2nd). Hanoi ranks 4th where people spend an average of 58 minutes stuck in the traffic, and Kuala Lumpur ranks 5th with 53 minutes. In a year, Uber estimated Metro Manila residents spending 402 hours stuck in traffic, or about 25 days. The study also measured the average time spent every day looking for parking across major Asian cities. Manila ranked 4th worst in this category, sharing the slot with Bangkok with an average time of 24 minutes. Hanoi had the longest time at congestion. But a preliminary 2017 study from the same agency 45 minutes, followed by Ho Chi Minh at 31 minutes, and Hong estimated economic loss due to traffic now at P4.1 billion daily, Kong and Kuala Lumpur at 25 minutes each.
    [Show full text]
  • An Inventory and Assessment of National Urban Mobility in the Philippines
    An Inventory and Assessment of National Urban Mobility in the Philippines A Project of the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with the Philippine Department of Transportation (DOTr) 1 Contents List Of Acronyms and Abbreviations ............................................................................................................. 6 Executive Summary ....................................................................................................................................... 9 1. Introduction ............................................................................................................................................ 14 1.1. Background of the Study ............................................................................................................. 14 1.2. Objectives and Scope .................................................................................................................. 15 1.3. Methodology ............................................................................................................................... 15 2. Inventory and Assessment of Mobility Indicators .................................................................................. 17 2.1. Socio-demographic and economic accounts .............................................................................. 17 2.2. State of Passenger and Goods Transport .................................................................................... 20 2.2.1. Public Transport Infrastructure
    [Show full text]
  • PPA Revises Cargo, Revenue Forecast to at Best Flat This Year
    PPA revises cargo, revenue forecast to at best flat this year The Philippine Ports Authority (PPA) is overhauling its growth forecast for this year despite registering a banner year in 2016. The state-owned corporation now anticipates growth to be nominal this year from the previous year’s exponential growth due to vital developments over the past three months. PPA General Manager Jay Daniel R. Santiago explained that the tapered expectation is attributable to the continuing volatility of the Philippine currency as well as the expected drop in the operation of the mining industry in the Philippines. “Last year was a great year for the agency as we were able to post significant figures in terms of cargo volume and revenues,” Santiago said. “This year, however, will be different as we anticipate it to be nominal due to several developments particularly in the mining industry, which has been one of JOINT COOPERATION our growth areas during the past couple The Philippine Ports Authority and the City of Kobe forged a mutual agreement to promote of years,” Santiago stressed. stable and sustainable development of ports. turn to page 7 Manila ranks 36th among top 100 Container ports The Port of Manila jumps two notches higher to number 36 in the ranking of the top 100 Container Ports, according to a report released by Lloyd’s List and Containerization International in 2016, covering container ports’ performance for 2015. The report showed that the Philippines was able to anchored on the 6.1% pace posted in the third quarter for increase its ranking after the country was shielded from the period in review.
    [Show full text]
  • The Project for Capacity Development on Transportation Planning and Database Management in the Republic of the Philippines
    Japan International Cooperation Agency (JICA) Department of Transportation and Communications (DOTC) The Project for Capacity Development on Transportation Planning and Database Management in the Republic of the Philippines MMUTIS Update and Enhancement Project (MUCEP) Manual vol. 4 Policy Formulation December 2015 ALMEC Corporation Oriental Consultants Global Co., Ltd PREFACE The acceleration of economic activities and population concentration in Metro Manila and other cities in the Philippines has caused severe social problems such as traffic congestion, traffic accidents, and deterioration of the living environment. The development of the public transportation network is crucial in tackling these problems. In addition, investment in infrastructure development is essential to realize a sustainable economic growth. Metro Manila, in particular, requires a transportation policy to facilitate a modal shift from private cars to public transportation by developing and integrating transportation networks and strengthening linkages between transportation modes. It is within this context that the Government of Japan has provided technical assistance to the Philippines’ Department of Transportation and Communications (DOTC) and other related agencies through the Japan International Cooperation Agency (JICA) in conducting a capacity development project entitled “The Project for Capacity Development on Transportation Planning and Database Management in the Republic of the Philippines.” MUCEP, as the project is known (short for MMUTIS Update and Capacity Enhancement Project), has been carried out for more than four years, starting on 27 September 2011 and completing on 30 November 2015. The overall project goal of MUCEP is to enable the DOTC to prepare a public transportation plan for Metro Manila for strategic corridors by strengthening their capacity in transportation database management and public transportation network planning.
    [Show full text]
  • Accredited Transport Cooperatives As of January 2021
    Office of Transporatation Cooperatives Accredited Transport Cooperatives as of January 2021 # Transport Cooperative Name Region Province/ Sector City Address Chairperson 1 1700 Islands Transport Service Cooperative NCR Central Sector Quezon City 33E Makisig St., Brgy. Pinyahan, Dilaman, Quezon City, Victor M. Arriola Distric Iv, Metro Manila 2 997 Sandigan Transport Service NCR Central Sector Quezon City 56 B Regalado Ave. Ext., East Fairview, Quezon City-V, Ferdinand M. Cooperative Metro Manila Lupangosy 3 A. Roces Transport Service Cooperative NCR Central Sector Quezon City 4Th Floor 9D Pasda Bldg. G Araneta Corp Florentino Jose Alberto Timola Sto. Domingo, Quezon City 4 Ampang Transport Cooperative NCR Central Sector Quezon City 065 Kasunduan St. Brgy. Commonwealth, Quezon City- Aminollah T. Cornell Ii, Metro Manila 5 Araw Transport Service Cooperative NCR Central Sector Quezon City 915 Aurora Blvd. Cor. Albany St., Brgy. Silangan, Cubao, Samson Mendoza Quezon City-Iii, Metro Manila 6 Asper Ever Transport Service Cooperative NCR Central Sector Quezon City 13 St Mary St., Campsite Brgy. Payatas, 1119 Quezon Rolando Doragos City 7 Associated Taxi Operators Of Metro Manila NCR Central Sector Quezon City 37 Eustaquio Building, Makisig St., Brgy. Pinayahan, Florendo P. Tinio Transport Service Cooperative Quezon City 8 Bagong Silangan Transport Service NCR Central Sector Quezon City 80 General Geronimo St., Brgy. Bagong Silangan, Mr. Mario D. Arcangel Cooperative Quezon City-Ii, Metro Manila 9 Belmont Transport Service Cooperative NCR Central Sector Quezon City Bautista Compound, Quirino Hi-Way, Brgy. Greater Edwin M. Feliciano Lagro, Quezon City 10 Breakthrough Transport Cooperative NCR Central Sector Quezon City Lot 18 Block 128 Neopolitan 5, Casa Milan, Greater Mr.
    [Show full text]