中國鐵路通信信號股份有限公司 China Railway

Total Page:16

File Type:pdf, Size:1020Kb

中國鐵路通信信號股份有限公司 China Railway Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. 中國鐵路通信信號股份有限公司 China Railway Signal & Communication Corporation Limited* (A joint stock limited liability company incorporated in the People’s Republic of China) (Stock Code: 3969) ANNOUNCEMENT ON BID-WINNING OF IMPORTANT PROJECTS IN THE RAIL TRANSIT MARKET This announcement is made by China Railway Signal & Communication Corporation Limited* (the “Company”) pursuant to Rules 13.09 and 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited (the “Listing Rules”) and the Inside Information Provisions (as defined in the Listing Rules) under Part XIVA of the Securities and Futures Ordinance (Chapter 571 of the Laws of Hong Kong). From May to June 2020, the Company has won a total of seven important projects in the rail transit market. Among which, four are acquired from the railway market, namely four power and the related works for the “weak electricity integration” tender section of the newly built Huanggang- Huangmei Railway (“Huang Huang High-speed Railway”) with a tender amount of RMB255 million, “four power” and the related works for the ZJHSD-2 tender section of the newly built Zhangjiajie-Jishou-Huaihua Railway (“Zhang Ji Huai High-speed Railway”) with a tender amount of RMB670 million, relocation works for the second tender section of the newly built Henghuang section of Shihengcang Port Intercity Railway (“Second Tender of Shihengcang Port Intercity Railway Relocation”) with a tender amount of RMB581 million, and four power and the related works for the DRSD-2 tender section of the newly built Dali-Ruili Railway (“Darui Railway”) with a tender amount of RMB419 million. The other three are acquired from the city rail transit market, namely signal, comprehensive monitoring, access control, BAS and security system installation and construction project for Phase I engineering of Nantong Urban Rail Transit Line 1 with a tender amount of RMB153 million, tendering project of the signal system of the engineering of Zhengzhou Airport-Xuchang Suburban Railway (Zhengzhou Section) with a tender amount of RMB363 million, and general contracting project of electromechanical equipment procurement and installation of Fenghuan Maglev Culture and Tourism Project (Phase I Engineering) with a tender amount of RMB425 million. 1 Details of the projects awarded are hereby announced as below: I. RELEVANT INFORMATION OF THE PROJECTS WON IN THE RAILWAY MARKET Project One Project Two Project Three Project Four I. General information 1. Name of the project Hu ang Huang High- Zh ang Ji Huai High- Se cond Tender of Darui Railway speed Railway speed Railway Shihengcang Port Intercity Railway Relocation 2. Bid originator Wu han-Jiujiang Hu ai Shao Heng Ch ina Railway Beijing Yu nnan-Guizhou Passenger Railway Railway Co., Ltd. Group Co., Ltd. Railway Yunnan Hubei Co., Ltd. Co., Ltd. 3. Tender amount 2.55 6.70 5.81 4.19 (RMB100 million) 4. Overview of the project Th e main line of Huang Th e main line of Th e main line of the Th e main line of Huang High-speed Zhang Ji Huai High- Second Tender of Darui Railway is Railway is 125.160km speed Railway is Shihengcang Port 330.103km long, the long, the designed 243.265km long, the Intercity Railway designed running running speed of designed running Relocation is speed of the line is the line is 350km/h. speed of the line is 149.003km long. 140km/h. A CTCS-0 The main line will 350km/h. The main level train operation be equipped with a line will be equipped control system is CTCS-3 level high- with a CTCS-3 level selected. Individual speed train operation high-speed train locomotive signaling control system. operation control equipment is used system. in combination with LKJ-2000 locomotive operation monitoring device. Th e Company will Th e Company will Th e Company will Th e Company will be responsible for be responsible be responsible for be responsible system debugging for equipment the relocation of for equipment and other system procurement, all communication procurement, integration work for system debugging lines, system debugging all communications, and other system communication and other system signaling and other integration work for bases and their integration work for projects of Huang all communications, cables, relocation all communications, Huang High-speed signaling and other of power circuit, signaling, disaster Railway, and will projects of Zhang relocation of pipes monitoring, spare cooperate with joint Ji Huai High-speed and other works of rooms for ancillary debugging, trial Railway, and will the Second Tender facilities and other operation and other cooperate with joint of Shihengcang Port relevant projects of tasks. debugging, trial Intercity Railway Darui Railway, and operation and other Relocation. will cooperate with tasks. joint debugging, trial operation and other tasks. 2 Project One Project Two Project Three Project Four II. Information of the counterparty 1. Name of the enterprise Wu han-Jiujiang Hu ai Shao Heng Ch ina Railway Beijing Yu nnan-Guizhou Passenger Railway Railway Co., Ltd. Group Co., Ltd. Railway Yunnan Hubei Co., Ltd. Co., Ltd. 2. Nature of the enterprise State-owned enterprise St ate-owned enterprise St ate-owned enterprise St ate-owned enterprise 3. Legal representative Wang Zhijian Kong Wenya Zhao Chunlei Wu Min 4. Registered capital (RMB) 39,612.5 million 100 million 248,959.69 million 28,862 million 5. Date of incorporation 10 March 2015 2 November 2012 22 April 1993 31 December 2009 6. Main office location 1 W enhua Avenue, 10 01 Qutang Road, 6 F uxing Road, Haidian 43 8 Shilong Road, Jiangxia District, Yuhua District, District, Beijing Chenggong District, Wuhan Changsha, Hunan Kunming, Yunnan Province Province 7. Major shareholders Ch ina Railway Wuhan Ch ina Railway Ch ina State Railway Yu nnan Provincial Group Co., Ltd. Development Fund Group Co., Ltd. Railway Investment Co., Ltd. Co., Ltd. Hu bei Passenger Railway Hu nan Railway Ch ina Railway Investment Co., Ltd. Construction Development Fund Investments Co., Co., Ltd. Ltd. Ch ina Railway Ch ina Railway Guangzhou Group Kunming Group Co., Co., Ltd. Ltd. 3 Project One Project Two Project Three Project Four 8. Principal business Pr oject construction Co nstruction and Ra ilway passenger and Co nstruction and management, railway passenger and cargo cargo transportation passenger and transportation transportation of business; cargo transportation business (where Huihua-Shaoyang- employment of the Yunnan licensed business Hengyang Railway of construction Section of Yunnan- items are involved, and Zhangjiajie- projects; Guizhou Railway; operation is subject Jishou-Huaihua coordination and material supply; to permission by Railway; management of agency of railway relevant departments); comprehensive project surveying, passenger and procurement and development of design and cargo transportation sale of material land; engineering construction; rail services; collection and equipment; technology transit management of utility bills. transportation services and services; business consulting other professional construction services; advertising technical services; and installation; and catering real estate architectural services (where development; design; professional licensed business catering and tourism technical services; items are involved, services; property technological operation is subject management; exchange and to permission by advertising operation promotion services; relevant authorities); and commercial ticket agents for comprehensive trading (excluding tourists; enterprise development and dangerous chemicals management operation of real and monitored services; estate; property items). (Businesses comprehensive management; logistics that require approval development and management. according to the utilization of railway law can only be land. conducted with approval from relevant authorities.) 4 Project One Project Two Project Three Project Four III. Major terms and conditions of the contract to be signed 1. Amount of the contract 2.55 6.70 5.81 4.19 (RMB100 million) 2. Payment schedule Pa yments of the Pa yments of the Pa yments of the Pa yments of the project will be made project will be made project will be made project will be made based on advance based on advance based on advance based on advance payments, progress payments, progress payments, progress payments, progress payments, payments payments, payments payments, payments payments, payments on completion and on completion and on completion and on completion and acceptance and acceptance and acceptance and acceptance and warranty payments. warranty payments. warranty payments. warranty payments. 3. Place of performance Within Hubei Province Within Hunan Province Wi thin Hebei Province Wi thin Yunnan Province 4. Term for performance Fr om the date of signing Fr om the date of Fr om the date of Fr om the date of of the contract to the signing of the signing of the signing of the end of the project contract to the contract to the contract to the warranty period, of end of the project end of the project end of the project which, the project warranty period, of warranty period, of warranty period, of execution cycle which, the project
Recommended publications
  • CSR CORPORATION LIMITED (A Joint Stock Limited Company Incorporated in the People’S Republic of China with Limited Liability)
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. 中 國 南 車 股 份 有 限 公 司 CSR CORPORATION LIMITED (a joint stock limited company incorporated in the People’s Republic of China with limited liability) (Stock code:1766) Overseas Regulatory Announcement Announcement on Entering into Major Contracts This overseas regulatory announcement is made pursuant to Rule 13.09(2) of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited. CSR Corporation Limited (hereafter as the “Company”), has recently entered into certain material contracts, with an aggregate value of approximately RMB7.5 billion. Details of such contracts are set out below: 1. CSR Nanjing Puzhen Rolling Stock Co., Ltd. (“南車南京鋪鎮車輛有限公司”), a wholly-owned subsidiary of the Company, has entered into a contract with China Railway Construction Investment Company (“中國鐵路建設投資公司”) in relation to the sale of passenger carriages with a value of RMB1.91 billion. The delivery of the aforementioned passenger carriages will expect to complete within the year of 2011. 2. CSR Qingdao Sifang Locomotive & Rolling Stock Co., Ltd. (“ 南車青島四方機車車 輛股份有限公司”), a non wholly-owned subsidiary of the Company, has entered into a contract with Guangzhou Metro Corporation (“廣州市地下鐵道總公司”) in relation to the sale of rapid transit vehicles with a value of RMB1.41 billion.
    [Show full text]
  • The Operator's Story Case Study: Guangzhou's Story
    Railway and Transport Strategy Centre The Operator’s Story Case Study: Guangzhou’s Story © World Bank / Imperial College London Property of the World Bank and the RTSC at Imperial College London Community of Metros CoMET The Operator’s Story: Notes from Guangzhou Case Study Interviews February 2017 Purpose The purpose of this document is to provide a permanent record for the researchers of what was said by people interviewed for ‘The Operator’s Story’ in Guangzhou, China. These notes are based upon 3 meetings on the 11th March 2016. This document will ultimately form an appendix to the final report for ‘The Operator’s Story’ piece. Although the findings have been arranged and structured by Imperial College London, they remain a collation of thoughts and statements from interviewees, and continue to be the opinions of those interviewed, rather than of Imperial College London. Prefacing the notes is a summary of Imperial College’s key findings based on comments made, which will be drawn out further in the final report for ‘The Operator’s Story’. Method This content is a collation in note form of views expressed in the interviews that were conducted for this study. This mini case study does not attempt to provide a comprehensive picture of Guangzhou Metropolitan Corporation (GMC), but rather focuses on specific topics of interest to The Operators’ Story project. The research team thank GMC and its staff for their kind participation in this project. Comments are not attributed to specific individuals, as agreed with the interviewees and GMC. List of interviewees Meetings include the following GMC members: Mr.
    [Show full text]
  • Research on Decision-Making of Service Quality Improvement In
    2019 International Conference on Advanced Education and Management (ICAEM 2019) ISBN: 978-1-60595-635-0 Research on Decision-making of Service Quality Improvement in Xiamen Metro Based on IPA and PZB Model Ju-Xiang ZHANGa and Ming-Hui JIAb Tan Kah Kee College, Xiamen University, Zhang Zhou, China [email protected], [email protected] Keywords: Xiamen Metro; Service Quality; IPA Analysis Model; PZB Service Quality Gap Model. Abstract. Urban public transportation plays a very important role in contemporary social travel, which means one the social development and progress of a public transport is urban rail transit -- metro. This study from Xiamen city metro which was just in the beginning, it took the selection from the service quality as a measure, it effective combined the PZB service quality gap model with the model of IPA, it first found out its quality elements by using PZB service quality gap model, and then analyzed the service quality evaluation through the IPA model. The problems in the service process are found out, in order to solve these problems, the decision methods that can improve these problems are proposed. Introduction Urban rail traffic not only meets the needs of residents, but also represents the development level of a city and the living standard of local residents. Quality service can improve customer perception, to meet the psychological needs of passengers and generate positive effects such as customer loyalty. Xiamen metro is in the service of urban rail transit system in Xiamen, Fujian province, China. Xiamen metro’s line 1, with a total length of about 267 kilometers, opened on December 31, 2017.
    [Show full text]
  • Beijing Subway Map
    Beijing Subway Map Ming Tombs North Changping Line Changping Xishankou 十三陵景区 昌平西山口 Changping Beishaowa 昌平 北邵洼 Changping Dongguan 昌平东关 Nanshao南邵 Daoxianghulu Yongfeng Shahe University Park Line 5 稻香湖路 永丰 沙河高教园 Bei'anhe Tiantongyuan North Nanfaxin Shimen Shunyi Line 16 北安河 Tundian Shahe沙河 天通苑北 南法信 石门 顺义 Wenyanglu Yongfeng South Fengbo 温阳路 屯佃 俸伯 Line 15 永丰南 Gonghuacheng Line 8 巩华城 Houshayu后沙峪 Xibeiwang西北旺 Yuzhilu Pingxifu Tiantongyuan 育知路 平西府 天通苑 Zhuxinzhuang Hualikan花梨坎 马连洼 朱辛庄 Malianwa Huilongguan Dongdajie Tiantongyuan South Life Science Park 回龙观东大街 China International Exhibition Center Huilongguan 天通苑南 Nongda'nanlu农大南路 生命科学园 Longze Line 13 Line 14 国展 龙泽 回龙观 Lishuiqiao Sunhe Huoying霍营 立水桥 Shan’gezhuang Terminal 2 Terminal 3 Xi’erqi西二旗 善各庄 孙河 T2航站楼 T3航站楼 Anheqiao North Line 4 Yuxin育新 Lishuiqiao South 安河桥北 Qinghe 立水桥南 Maquanying Beigongmen Yuanmingyuan Park Beiyuan Xiyuan 清河 Xixiaokou西小口 Beiyuanlu North 马泉营 北宫门 西苑 圆明园 South Gate of 北苑 Laiguangying来广营 Zhiwuyuan Shangdi Yongtaizhuang永泰庄 Forest Park 北苑路北 Cuigezhuang 植物园 上地 Lincuiqiao林萃桥 森林公园南门 Datunlu East Xiangshan East Gate of Peking University Qinghuadongluxikou Wangjing West Donghuqu东湖渠 崔各庄 香山 北京大学东门 清华东路西口 Anlilu安立路 大屯路东 Chapeng 望京西 Wan’an 茶棚 Western Suburban Line 万安 Zhongguancun Wudaokou Liudaokou Beishatan Olympic Green Guanzhuang Wangjing Wangjing East 中关村 五道口 六道口 北沙滩 奥林匹克公园 关庄 望京 望京东 Yiheyuanximen Line 15 Huixinxijie Beikou Olympic Sports Center 惠新西街北口 Futong阜通 颐和园西门 Haidian Huangzhuang Zhichunlu 奥体中心 Huixinxijie Nankou Shaoyaoju 海淀黄庄 知春路 惠新西街南口 芍药居 Beitucheng Wangjing South望京南 北土城
    [Show full text]
  • Hunan Flood Management Sector Project
    Social Monitoring Report Project Number: 37641 May 2009 PRC: Hunan Flood Management Sector Project External Monitoring and Evaluation Report on Resettlement (Prepared by Changsha Xinghuan Water & Electricty Engineering Technology Development Co.) No.4 Prepared by Changsha Xinghuan Water & Electricity Engineering Technology Development Co., Changsha City, Hunan Province, People's Republic of China For the Hunan Provincial Water Resources Department This report has been submitted to ADB by the Hunan Provincial Water Resources Department and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB. Loan No.: 2244-PRC Hunan Flood Control Project for Hilly Areas Utilizing ADB Loans Resettlement External Monitoring & Evaluation Report (No. 4) Changsha Xinghuan Water & Electricity Engineering Technology Development Co., Ltd. Apr. 2009 Chief Supervisor: Qin Lin Deputy Chief Supervisor: Huang Qingyun Chen Zizhou Compiler: Huang Qingyun Chen Zizhou Qin Si Li Yuntao Min Tian Qin Lin Main Working Staff: Qin Lin Huang Qingyun Chen Zizhou Qin Si Li Yuntao Min Tian Xia Jihong Ren Yu Li Jianwu Li Tiehui Resettlement External Monitoring & Evaluation Report on the Hunan Flood Control Project for Hilly Areas Utilizing ADB Loans Contents 1. Monitoring & Evaluation Tasks and Implementations of this Period...........................2 2. Project Description...........................................................................................................3 3. Construction
    [Show full text]
  • IPDP: PRC: Fenghuang County Subproject, Hunan Flood
    Ethnic Minority Development Plan November 2011 People’s Republic of China: Hunan Flood Management Sector Project (Fenghuang County Subproject) Prepared by the Hunan Provincial Government for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 1 November 2011) Currency unit – Yuan (CNY) CNY1.00 = $0.1572 $1.00 = CNY6.3595 NOTE (i) In this report, "$" refers to US dollars. This ethnic minority development plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Fenghuang County Urban Flood Control Subproject ETHNIC MINORITY DEVELOPMENT PLAN Fenghuang County PMO 1 Table of Contents I. INTRODUCTION ................................................................................................................................... 3 II. BACKGROUND ................................................................................................................................... 4 A. PROJECT DESCRIPTION………………………………………………………………………………………4 B. ETHNIC MINORITIES IN HUNAN……………………………………………………………………………….5 C. LEGAL FRAMEWORK………………………………………………………………………………………….5 1. Policy, Plans and Program ..................................................................................................
    [Show full text]
  • A Case Study of Suzhou
    Economics of Transportation xxx (2017) 1–16 Contents lists available at ScienceDirect Economics of Transportation journal homepage: www.elsevier.com/locate/ecotra Tram development and urban transport integration in Chinese cities: A case study of Suzhou Chia-Lin Chen Department of Urban Planning and Design, Xi'an Jiaotong-Liverpool University, Room EB510, Built Environment Cluster, 111 Renai Road, Dushu Lake Higher Education Town, Suzhou Industrial Park, Jiangsu Province, 215123, PR China ARTICLE INFO ABSTRACT JEL classification: This paper explores a new phenomenon of tram development in Chinese cities where tram is used as an alternative H7 transport system to drive urban development. The Suzhou National High-tech District tram was investigated as a J6 case study. Two key findings are highlighted. Firstly, the new tramway was routed along the “path of least resis- P2 tance”–avoiding dense urban areas, to reduce conflict with cars. Secondly, regarding urban transport integration, R3 four perspectives were evaluated, namely planning and design, service operation, transport governance and user R4 experience. Findings show insufficient integration in the following aspects, namely tram and bus routes and services, O2 fares on multi-modal journeys, tram station distribution, service intervals, and luggage auxiliary support. The paper Keywords: argues there is a need for a critical review of the role of tram and for context-based innovative policy reform and Tram governance that could possibly facilitate a successful introduction and integration of tram into a city. Urban development Urban transport integration Suzhou China 1. Introduction so instead began planning tram networks. There has been relatively little research examining how new trams have been introduced into cities and The past decade has seen rapid development of urban rail systems in whether these tramways provide an effective alternative to private car use.
    [Show full text]
  • Status of External Contracts Signed from January 2018 to December 2018
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. China Railway Signal & Communication Corporation Limited* 中國鐵路通信信號股份有限公司 (A joint stock limited liability company incorporated in the People’s Republic of China) (Stock Code: 3969) STATUS OF EXTERNAL CONTRACTS SIGNED FROM JANUARY 2018 TO DECEMBER 2018 This announcement is made pursuant to Rule 13.09 of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited and the Inside Information Provisions under Part XIVA of the Securities and Futures Ordinance (Chapter 571 of the Laws of Hong Kong). In order to enable the shareholders and potential investors of China Railway Signal & Communication Corporation Limited* (the “Company”) to have a better understanding on the recent business performance of the Company and its subsidiaries (the “Group”), the Company hereby announces the status of external contracts signed from January 2018 to December 2018. As of 31 December 2018, the total aggregate amount of external contracts signed by the Group was RMB68.29 billion, representing an increase of 12.4% over the same period in 2017. In particular, the total amount of external contracts signed by the Group in the railway sector was RMB25.08 billion, representing
    [Show full text]
  • People's Republic of China: Hunan Roads Development III Project
    Completion Report Project Number: 37494 Loan Number: 2219 September 2014 People’s Republic of China: Hunan Roads Development III Project This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS Currency unit – yuan (CNY) At Appraisal At Project Completion (15 June 2005) (31 Dec 2012) CNY1.00 = $0.1210 $0.1587 $1.00 = CNY8.2700 CNY6.3026 ABBREVIATIONS ADB – Asian Development Bank EIRR – economic internal rate of return EMDP – ethnic minority development plan EMP – environmental management plan FIRR – financial internal rate of return GDP – gross domestic product HPTD – Hunan provincial transportation department ICB – international competitive bidding JECC – Hunan Jicha Expressway Construction and Development Co. O&M – operation and maintenance PRC – People’s Republic of China SEIA – summary environmental impact assessment TA – technical assistance WEIGHTS AND MEASURES ha – hectare km – kilometer m2 – square meter m3 – cubic meter mu – Chinese unit of measurement (1 mu = 666.67 m2) pcu – passenger car unit NOTE In this report, “$” refers to US dollars, unless otherwise stated. Vice-President S. Groff, Operations 2 Director General A. Konishi, East Asia Department (EARD) Director H. Sharif, People’s Republic of China Resident Mission (PRCM), EARD Team leader G. Xiao, Senior Project Officer (Transport), PRCM, EARD Team members H. Hao, Project Analyst, PRCM, EARD F. Wang, Senior Project Officer (Financial Management), PRCM, EARD W. Zhu, Senior Project Officer (Resettlement), PRCM, EARD Z. Ciwang, Associate Social Development Officer, PRCM, EARD N. Li, Environment Consultant, PRCM, EARD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • Analysis and Evaluation of the Beijing Metro Project Financing Reforms
    Advances in Social Science, Education and Humanities Research, volume 291 International Conference on Management, Economics, Education, Arts and Humanities (MEEAH 2018) Analysis and Evaluation of the Beijing Metro Project Financing Reforms Haibin Zhao1,a, Bingjie Ren2,b, Ting Wang3,c 1Ministry of Transport Research Institute, Chaoyang, Beijing, China,100029; 2Beijing Urban Construction Design & Development Group Co., Limited, Xicheng, Beijing, China,100037; 3School of Civil Engineering, Beijing Jiaotong University, Haidian, Beijing, China, 100044. [email protected], [email protected], [email protected] Keywords: metro; financing; marketisation; reform Abstract. The construction and operation of a metro system are costly, and the sustainable development of a metro system is difficult using government funding alone, particularly for developing countries. The main source for metro system financing in China is, currently, government budget and bank debt. Many cities have begun to seek new ways to attract funds from finance markets, which is increasing the need for the evaluation of metro financing. This study uses Beijing as a case study that utilises various financing modes with impressive results. As participants of the financing reform, the authors collected all the relative government documents and interviewed stakeholders to accomplish this work. This article reviews the development of financing modes for the Beijing Metro system during the last four decades and analyses the role of the government in the reformed financing system within the Chinese social political environment. The study addresses the advantages and challenges of the reforms in this context. To further analyses the technical processes of typical financing modes, the public-private partnership mode of Line 4, the BT mode of Olympic Branch Line, the insurance claim mode of Line 10 and the failure of the market oriented financing for Capital Airport Line are analysed and evaluated in detail.
    [Show full text]
  • The Urban Rail Development Handbook
    DEVELOPMENT THE “ The Urban Rail Development Handbook offers both planners and political decision makers a comprehensive view of one of the largest, if not the largest, investment a city can undertake: an urban rail system. The handbook properly recognizes that urban rail is only one part of a hierarchically integrated transport system, and it provides practical guidance on how urban rail projects can be implemented and operated RAIL URBAN THE URBAN RAIL in a multimodal way that maximizes benefits far beyond mobility. The handbook is a must-read for any person involved in the planning and decision making for an urban rail line.” —Arturo Ardila-Gómez, Global Lead, Urban Mobility and Lead Transport Economist, World Bank DEVELOPMENT “ The Urban Rail Development Handbook tackles the social and technical challenges of planning, designing, financing, procuring, constructing, and operating rail projects in urban areas. It is a great complement HANDBOOK to more technical publications on rail technology, infrastructure, and project delivery. This handbook provides practical advice for delivering urban megaprojects, taking account of their social, institutional, and economic context.” —Martha Lawrence, Lead, Railway Community of Practice and Senior Railway Specialist, World Bank HANDBOOK “ Among the many options a city can consider to improve access to opportunities and mobility, urban rail stands out by its potential impact, as well as its high cost. Getting it right is a complex and multifaceted challenge that this handbook addresses beautifully through an in-depth and practical sharing of hard lessons learned in planning, implementing, and operating such urban rail lines, while ensuring their transformational role for urban development.” —Gerald Ollivier, Lead, Transit-Oriented Development Community of Practice, World Bank “ Public transport, as the backbone of mobility in cities, supports more inclusive communities, economic development, higher standards of living and health, and active lifestyles of inhabitants, while improving air quality and liveability.
    [Show full text]
  • Annual Report 2019 COMPANY OVERVIEW
    ANNUAL SPEEDYY DEVELOPMENT 2019 REPORT Corporate Information 2 Company Overview 3 Financial Highlights 6 Chairman’s Statement 7 Management Discussion and Analysis 13 Risk Factor Analysis 26 Investor Relations 28 Biographical Details of Directors and 30 CONTENTS Senior Management Directors’ Report 36 Corporate Governance Report 54 Definitions 69 Independent Auditor’s Report 72 Consolidated Statement of Profit or Loss 82 Consolidated Statement of Profit or Loss and 83 Other Comprehensive Income Consolidated Statement of Financial Position 84 Consolidated Statement of Changes in Equity 86 Consolidated Cash Flow Statement 88 Notes to the Financial Statements 90 CORPORATE INFORMATION BOARD OF DIRECTORS LEGAL ADVISERS TO THE COMPANY Executive Directors Chiu & Partners Mr. Cao Wei (Vice Chairman) Ms. Xuan Jing (Chief Executive Officer) PRINCIPAL BANKER The Hongkong and Shanghai Banking Corporation Non-Executive Directors Limited Mr. Zhang Yanyou (Chairman) Mr. Guan Jifa REGISTERED OFFICE Mr. Zheng Yi Cricket Square Mr. Ren Yuhang Hutchins Drive P.O. Box 2681 Independent Non-Executive Directors Grand Cayman, KY1-1111 Mr. Bai Jinrong Cayman Islands Mr. Luo Zhenbang (CPA) Mr. Huang Lixin HEAD OFFICE AND PRINCIPAL PLACE OF BUSINESS IN THE PRC AUTHORISED REPRESENTATIVES Jingtou Plaza, No.6 Xiaoying North Road PURSUANT TO RULE 3.05 OF THE Chaoyang District, Beijing, China LISTING RULES Ms. Xuan Jing PRINCIPAL PLACE OF BUSINESS Ms. Cheung Yuet Fan IN HONG KONG Unit 4407, 44/F, COSCO Tower COMPANY SECRETARY 183 Queen’s Road Central Ms. Cheung Yuet Fan Sheung Wan, Hong Kong AUDIT COMMITTEE PRINCIPAL SHARE REGISTRAR AND Mr. Luo Zhenbang (CPA) (Chairman) TRANSFER OFFICE IN CAYMAN ISLANDS Mr. Bai Jinrong SMP Partners (Cayman) Limited Mr.
    [Show full text]