Design Standard Ds 80
Total Page:16
File Type:pdf, Size:1020Kb
Assets Delivery Group Infrastructure Design Branch DESIGN STANDARD DS 80 WCX CAD Standard Water Corporation eXternal (WCX) Manual VERSION 7 REVISION 2 NOVEMBER 2015 Design Standard DS 80 WCX CAD Standard FOREWORD The WCX CAD Standard DS 80 is prepared to ensure that the Water Corporation’s staff, external designers, Alliance partners and contractors are informed as to the Water Corporation’s design standards and recommended practices. Design standards are intended to promote uniformity so as to simplify design and drafting practice and have as their ultimate objective the provision of safe and functional plant at minimum whole of life cost. The Water Corporation design standards and recommended practices described in this design standard have evolved over a number of years as a result of design and field experience and these have been investigated and documented. Users are invited to forward submissions for continuous improvement to the Drawing Management System Manager who will consider these for incorporation into future revisions. Manager, Infrastructure Design This document is prepared without the assumption of a duty of care by the Water Corporation. The document is not intended to be nor should it be relied on as a substitute for professional engineering design expertise or any other professional advice. It is the responsibility of the user to ensure they are using the current version of this document. © Copyright – Water Corporation: This standard and software is copyright. With the exception of use permitted by the Copyright Act 1968, no part may be reproduced without the written permission of the Water Corporation. Ver 7 Rev 2 Page 2 of 122 © Copyright Water Corporation 1996-2015 Design Standard DS 80 WCX CAD Standard REVISION STATUS The revision status of this standard is shown section by section below. It is important to note that the latest revisions including additions, deletions and changes to this version of the standard are also identified by the use of a vertical line in the left hand margin, adjacent to the revised section. REVISION STATUS SECT. VER./ DATE PAGES REVISION DESCRIPTION RVWD. APRV. REV. REVISED (Section, Clause, Sub-Clause) All 7/1 12.11.14 All Preliminaries to Works changed KM MH to Prerequisites to Works All 7.1 12.11.14 All Reference to WCX CD removed KM MH All 6/3 14.03.11 10,11 Client Consultant title amended GC AK 1 7/2 12.11.15 12 1.revised KM MH 1 7/1 12.11.14 12 1.revised KM MH 1 7/1 12.11.14 13 1.1 revised KM MH 1 7/0 12.04.13 12 1.revised KM MH 1 7/0 12.04.13 12 1.1 revised KM MH 1 6/3 14.03.11 10 AutoCAD version revised GC AK 1 6/3 14.03.11 11 1.1 revised KM AK 1 6/2 30.06.10 10 1 Reference to Briscad added GC AK 1 6/2 30.06.10 11 1.1 revised GC AK 2 7/2 12.11.15 20 2.6.2 revised KM JB 2 7/1 12.11.14 22,23 2.8 MSWA plansets added KM MH 2 7/0 12.04.13 14-24 2.2. Drawing Titles Added KM MH 2 7/0 12.04.13 21,22 2.8. AWA Planset Titles Added KM MH 2 7/0 12.04.13 19 2.6.2 IWSS added BS MH 2 6/1 30.04.09 12 2 Alliance Partners added GC AK 2 6/1 30.04.09 12 2.1 Preliminary, Engineering & GC AK Detail Design added 2 6/2 30.06.10 12 2.1 Preliminary, Engineering & GC AK Detail Design removed 2 6/2 30.06.10 14 2.3.3.6 & 2.3.4.6 revised GC AK 2 6/2 30.06.10 16 2.4.4.3 revised GC AK 3 7/2 12.11.15 35 3.12.2 revised KM JB 3 7/1 12.11.14 35 3.12.2.2 South Coastal District JB MH moved to Great Southern Region 3 7/0 12.04.13 25 3. Revised KM MH 3 7/0 12.04.13 26 -39 3. ESR & CDR bundles added KM MH 3 7/0 12.04.13 28 3.4 Air Vent Arrangement KM MH added 3 7/0 12.04.13 35 3.12.2.5 revised KM MH 3 7/0 12.04.13 37 3.15 & 3.16 AWA bundles KM MH added 3 6/1 30.04.08 22 – 35 3.1, 3.2, 3.4, 3.6, 3.8, 3.9, 3.10, GC AK 3.12.1, 3.13, 3.18 Bundle 72 added Ver 7 Rev 2 Page 3 of 122 © Copyright Water Corporation 1996-2015 Design Standard DS 80 WCX CAD Standard REVISION STATUS SECT. VER./ DATE PAGES REVISION DESCRIPTION RVWD. APRV. REV. REVISED (Section, Clause, Sub-Clause) 3 6/1 30.04.08 26 3.7 Bundle 7 added GC AK 3 6/1 30.04.08 26 3.14 heading revised GC AK 3 6/1 30.04.08 26 3.15 heading revised GC AK 3 6/2 30.06.10 22 – 35 3.1 to 3.18 Bundle 14 added SS AK 3 6/2 30.06.10 22 – 35 3.1 to 3.18 Bundle 69 added AM AK 3 6/2 30.06.10 22 – 35 3.1 to 3.18 Bundles 95-99 KW AK revised 3 6/2 30.06.10 24 3.3 revised GC AK 3 6/2 30.06.10 25 3.5 Bundle 7 removed GC AK 3 6/2 30.06.10 34 3.14 Bundles 105 & 107 revised CW AK 3 6/2 30.06.10 34 3.15 Bundle 207 revised GC AK 3 6/2 30.06.10 34 3.16 Bundle 7 revised GC AK 3 6/2 30.06.10 34 3.16 Bundle 0 added GC AK 4 7/1 12.11.14 41 CAD_Layers 4.1 revised SM MH 4 6/1 30.04.09 37 CAD_Layers 4.1 revised GC AK 4 6/1 30.04.09 38 CAD_Layers 4.2 revised GC AK 4 6/2 30.06.10 38 CAD_Layers 4.1 revised GC AK 5 7/0 12.04.13 49 5.4.1 revised BS MH 5 7/0 12.04.13 53 5.7.2 revised KM MH 5 6/3 03.0.11 48 5.4.2 revised GC NH 5 6/3 14.03.11 50 5.7.2 revised AM AK 5 6/1 30.04.09 42 5.3.1 TB added LR AK 5 6/1 30.04.09 44 5.4.1 09 amended LN AK 5 6/1 30.04.09 45 5.4.1 77 added & 99 amended MF AK 5 6/1 30.04.09 47 5.5 revised MF AK 5 6/1 30.04.09 45 5.5.1 revised MF AK 5 6/1 30.04.09 47 5.6 revised GM AK 5 6/1 30.04.09 48 5.6.1 revised GM AK 6 7/0 12.04.13 55 6. revised KM MH 6 7/0 12.04.13 56 EG71-1-1 revised KM MH 7 7/2 12.11.15 56-62 Drain additions and deletions KM SD 7 6/3 14.03.11 54 - 60 7 revised MD AK 8 7/2 12.11.15 69 GB72-60-83.2 revised KM MH 8 7/0 12.04.13 64 8 revised BS MH 8 7/0 12.04.13 68 GB72-60-1 revised SM MH 8 7/0 12.04.13 69 GB72-60-2 revised SM MH 8 6/2 30.06.10 65 GB72-60-1 revised SM AK 8 7/2 12.11.15 71 9 revised KM MH 9 7/1 12.11.14 72 9 revised KM MH 9 7/1 12.11.14 74 9 PTW and D&C removed KM MH 9 7/1 12.11.14 74 9.1.1.6 Rev Y instructions added KM MH 9 7/1 12.11.14 9.Design and Construct Title KM MH block removed Ver 7 Rev 2 Page 4 of 122 © Copyright Water Corporation 1996-2015 Design Standard DS 80 WCX CAD Standard REVISION STATUS SECT. VER./ DATE PAGES REVISION DESCRIPTION RVWD. APRV. REV. REVISED (Section, Clause, Sub-Clause) 9 7/0 12.04.13 72 9. revised KM MH 9 7/0 12.04.13 75 9.1.3 Hold points added SE MH 9 7/0 12.04.13 76 Sample drawing updated KM MH 9 6/3 14.03.11 69 AutoCAD version revised GC AK 9 6/1 30.04.09 68 9 AutoCAD version amended GC AK 9 6/1 30.04.09 69 9.1.1.5 revised GC AK 9 6/1 30.04.09 71 9.1.1.8 added GC AK 10 7/1 12.11.14 79-87 10 Flow charts revised KM MH 10 6/1 30.04.09 74 10 DMS / aquaDRAW GC AK definition added 10 6/1 30.04.09 77 - 85 10 Reference to microfilming GC AK removed 11 7/1 12.11.14 82 11.1 Table 5 revised KM MH 11 6/1 30.04.09 95 11.3 Table revised & note 5 LN AK added 11 6/2 30.06.10 90 & 92 11.1 Tables 2 & 9 removed KR AK 11 6/2 30.06.10 93 11.2 Part A revised KR AK 12 7/2 12.11.15 94 12 revised KM MH 12 7/0 12.04.13 96 12.1.2 Local removed KM MH 12 6/3 14.03.11 95 12.1.2 MGA94-48 added GC AK 14 7/2 12.11.15 102 14.3 revised KM MH 14 7/2 12.11.15 106 Non Drinking Water added KM CW 14 7/1 12.11.14 106 14.3.3 revised KM MH 14 7/1 12.11.14 107,108 14.3.6 Drainage requirements KM MH added 14 7/0 12.04.13 103 14.1 & 14.2 revised KM MH 14 7/0 12.04.13 108 14.3.8 revised KM MH 14 6/3 14.03.11 102 14.1 revised KM AK 14 6/1 30.04.09 104 - 105 14.3.1 b) & c) revised WE AK 14 6/1 30.04.09 105 14.3.2 revised GC AK 14 6/1 30.04.09 106 14.3.3 revised GC AK 14 6/1 30.04.09 106 14.3.4 revised GC AK 14 6/2 30.06.10 102 14.1 revised GC AK 15 7/2 12.11.15 107,116 Wickham & Morowa planset KM MH amended 15 7/1 12.11.14 109,118 15 Bridgetown scheme renamed KM MH to Warren Blackwood 15 6/3 14/03/11 108 15 Bridgetown titles amended GC AK 16 7/0 12.04.13 117 16 revised BS MH Ver 7 Rev 2 Page 5 of 122 © Copyright Water Corporation 1996-2015 Design Standard DS 80 WCX CAD Standard DESIGN STANDARD DS 80 WCX CAD Standard CONTENTS Section Page 1 INTRODUCTION .....................................................................................................................