ENGLISH

HERITAGE 2008/09 & ACCOUNTS REPORT ANNUAL

English Heritage Offices

Head Office Swindon Office 1 Waterhouse Square (including National Monuments Record Centre) 138-142 Holborn Kemble Drive EC1N 2ST Swindon SN2 2GZ Telephone: 020 7973 3000 Telephone: 01793 414 700

Regional Offices East Midlands North East South West 44 Derngate Bessie Surtees House 29 Queen Square Northampton NN1 1UH 41-44 Sandhill Bristol BS1 4ND Telephone: 01604 735 400 Newcastle Upon Tyne NE1 3JF Telephone: 0117 975 0700 East of England Telephone: 0191 261 1585 West Midlands Brooklands North West 8th Floor 24 Brooklands Avenue Suites 3.3 & 3.4 The Axis Cambridge CB2 8BU Canada House 10 Holliday Street Telephone: 01223 582 700 3 Chepstow Street Birmingham B1 1TG London Manchester M1 5FW Telephone: 0121 625 6820 1 Waterhouse Square Telephone: 0161 242 1400 Yorkshire 138-142 Holborn South East 37 Tanner Row London EC1N 2ST Eastgate Court York YO1 6WP Telephone: 020 7973 3000 195-205 High Street Telephone: 01904 601 901 Guildford GU1 3EH Telephone: 01483 252 000 Other Offices Exeter Fort Cumberland Stonehenge Administration Office 5 Marlborough Court Fort Cumberland Road Wyndham House Manaton Close Eastney 65 The Close Exeter EX2 8PF Portsmouth PO4 9LD Salisbury SP1 2EN Telephone: 01392 824 901 Telephone: 023 9285 6700 Telephone: 01722 343 830 ISBN 978-0-10-295906-2 Annual Report and Accounts

9 780102 959062 2008/09 Published by TSO (The Stationery Office) and available from:

Online www.tsoshop.co.uk

Mail, Telephone Fax & E-Mail TSO PO Box 29, Norwich, NR3 1GN Telephone orders/General enquiries 0870 600 5522 Order through the Parliamentary Hotline Lo-Call 0845 7 023474 Fax orders: 0870 600 5533 E-mail: [email protected] Textphone: 0870 240 3701

The Parliamentary Bookshop 12 Bridge Street, Parliament Square, London SW1A 2JX Telephone orders/General enquiries 020 7219 3890 Fax orders: 020 7219 3866 E-mail: [email protected] Internet: http://www.bookshop.parliament.uk

© English Heritage TSO@Blackwell and other Accredited Agents This Annual Report and Accounts is primarily being published Designed by Creative Services electronically. Further copies are therefore available via our website Printed by Park Communications Customers can also order publications from www.english-heritage.org.uk. The website is also the place to start on recycled paper TSO Ireland if you would like further information about English Heritage or July 2009 16 Arthur Street, Belfast BT1 4GD please contact our customer services team on 0870 333 1181. Product code: 51518 028 9023 8451 Fax 028 9023 5401 NATIONAL HERITAGE ACT 1983 Presented pursuant to Section 13(4) of Schedule 3 to the National Heritage Act 1983

English Heritage Annual Report and Accounts 2008/09

Ordered by the House of Commons to be printed on 20 July 2009

HC 643 London: The Stationery Office £19.15 © Crown Copyright 2009 The text in this document (excluding the Royal Arms and other departmental or agency logos) may be reproduced free of charge in any format or medium providing it is reproduced accurately and not used in a misleading context. The material must be acknowledged as Crown copyright and the title of the document specified. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. For any other use of this material please write to Office of Public Sector Information, Information Policy Team, Kew, Richmond, Surrey TW9 4DU or e-mail: [email protected] ISBN: 9780102959062 Contents Annual Report 1 Introduction 2 Achievements of 2008/09 14 Facts and Figures 16 Chief Executive’s Management Commentary 20 Progress Against Funding Agreement 2008/09

Accounts 36 Directors’ Report 38 Remuneration Report 40 Statement of Commissioners’ and Chief Executive’s Responsibilities 41 Statement on Internal Control 44 Audit Certificate 46 Financial Statements 50 Notes to Financial Statements 73 Donors, Sponsors & Contributors

Interim Chairman Interim Professor Cunliffe CBE SirBarry heritage. country’s ofthe whotogetherdosuchatremendous jobinsupport Committee andPanel members It only remainsfor metothankSimon andhisstaff,Thurley my fellow Commissioners, it inthefollowing pages. highlightsofabusy andsuccessfulyear.These arebut personal Ihopeyou enjoy readingabout treasurehunting. irresponsible setsoutways inwhichwe canprotectarchaeologicalremainsfromillegaland The report onnighthawking inFebruary. pleasedtobeable tolaunchourreport very I waspersonally all whocareaboutasustainableenvironment. futurefor thehistoric betterandhardevidenceisavailable meansthatresourcescanbetargeted This information for inEuropetohave acomprehensive knowledgecountry ofthestateitsprotectedheritage. treasures.neglected ordecaying historic projectwillmake Englandtheonly AtRisk The Heritage stepstowardsIn Julyanall-encompassingregisterofthecountry’s 2008we announcedthefirst without legislation.Findingalegislative slotstill, however, remainsapriority. Government, we believe thatweprotectionreform canstillmake significantprogressinheritage Protection Billwasunable toproceedduemorepressinglegislation. Yet, withthe working of ofState,Andy Burnham, thatdespitethebestefforts theHeritage ourSecretary sorry market. andinstabilityintheproperty Webackground ofeconomicuncertainty were very England’s environment inthelastyear, tremendoushistoric thathasgoneonagainsta work gives asnapshotoftheprogresswe have madeinprotectingandpromoting This report Chair, Baroness Andrews OBE, whowilltake uptheposton27thJuly. enjoyable ninemonthsIampleasedtobehandingover andhardworking a very toournew abetterthanexpectedsettlementinthe2007SpendingReview.especially insecuring After twelve Sandymadearealimpact, monthsatEnglish Heritage Inashort Lord Bruce-Lockhart. Accounts for 2008/09. The year wasovershadowed by thedeathlast August ofourChairman Chairman,In my roleasinterim IamdelightedtopresentEnglishHeritage’s and Annual Report Introduction

ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 1 2008 / 09 Achievements of 2008/09 2008 / 09 AIM 1: Help people develop their understanding of the 2 historic environment Understanding the historic environment is essential to prioritising and managing its conservation and maximising the cultural, social and economic benefits this brings. English Heritage has a vital role in developing such understanding, both through its own work and through supporting others. English Heritage’s research support takes many forms but it is all guided by a Research Strategy in line with our overarching objectives for the historic environment. Our Historic Environment Enabling Programme awarded 258 project grants this year totalling £5.7 million. Examples included Durham and Northumberland Rock Art which trained volunteers to record prehistoric rock art using cutting-edge photographic techniques and a national programme of Rapid Coastal Zone Assessment Surveys, building a detailed picture of historic buildings, sites and landscapes along the English coast to help plan for the impacts of climate change. Overall 101 research reports have been produced this year on subjects such as the heritage of ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS & REPORT ANNUAL ENGLISH HERITAGE the Lea Valley prior to the area’s transformation for hosting the 2012 Olympics and on work at English Heritage’s properties in support of conservation, development and display initiatives, for example, at Carisbrooke, Kenilworth and Dover Castles and at Richborough Roman Fort and Amphitheatre and Chiswick House. An important outlet for our research is the Informed Conservation series in which new information and analysis of significant historic areas facing major challenges is brought to a wide audience. In 2008 we published the Liverpool Informed Conservation series, six books on topics characterising the city which formed part of English Heritage’s contribution to the Capital of Culture. We also worked with Liverpool Football Club to produce the Anfield Breckfield book which recorded local sporting history and reached completely new audiences. We also continued the Survey of London series, publishing two volumes on Clerkenwell in April 2008. As part of our role to inform and raise standards in the historic environment sector, English Heritage publishes a wide range of guidelines and guidance notes. This year these included Luminescence Dating: Guidelines on using luminescence dating in archaeology and Investigative Conservation which explains how the detailed examination of artefacts from archaeological sites can shed light on their manufacture and use. Three editions of Research News were also published, each concentrating on a theme and presenting highlights of our research and its applications. Developing understanding is also at the heart of the many training programmes English Heritage supports. In October 2008 we launched the new Historic Environment Traineeship Scheme, a two year programme to develop the next generation of historic environment managers who will be well placed to meet the challenges presented within a local authority or one of the many other agencies and organisations managing the historic environment. Our Professional Placements in Conservation programme also continued, and in total 1,266 people attended English Heritage professional training events this year. Achievements of 2008/09 2008 / 09

3

In March English Heritage was a signatory to a Memorandum of Understanding to extend craft skills training and improve standards on conservation projects around the country. Launched under the auspices of the Arts and Heritage All Party Parliamentary Group and in collaboration with the construction industry, it was also signed by the National Heritage Training Group and ConstructionSkills. English Heritage’s online resources continue to expand and be utilised by a growing range of people. The National Monuments Record (NMR) purchased at auction a unique photographic record of the work of the London Metropolitan Board of Works, including the Crossness Pumping Station and Bazalgette’s drainage infrastructure along the Embankment. We now have 1.4 million records online, including approximately 400,000 images and in 2008/09 2.5 million unique user sessions were recorded.

The Heritage Gateway (heritage.gateway.org.uk) also provides an important point of access to ACCOUNTS & REPORT ANNUAL ENGLISH HERITAGE English Heritage data and now, for the first time, statutory listed buildings data can be searched online. All statutory data is to be made available online during 2010. As at 31 March, 20% of Local Authority Historic Environment Records were available via the Heritage Gateway, with a target of 50% by 2010. Alongside research, standard setting, training and making our data available, English Heritage also offers a wide range of learning opportunities for children and adults. In 2008/09 English Heritage hosted 445,320 free educational visits at its sites. Discovery Visits, interactive tours and workshops designed to tie in with a range of subjects and themes in the national curriculum, continue to grow in popularity. The programme attracted 39,300 participants this year. Our education volunteers programme is now in place at ten sites across the country and the team of over 70 volunteers lead or assist with many of the Discovery Visits. In total the Education Volunteers recorded over 3,000 hours of voluntary work. In January the Engaging Places project was launched at the British Education and Training Technology conference, the world’s largest educational technology event. Led jointly by English Heritage and the Commission for Architecture and the Built Environment (CABE) with support from DCMS, Engaging Places is an online resource for teachers using the built environment to teach a range of subjects and skills. The education section of the English Heritage website has been refreshed and navigation made easier as stage one of a two stage project to improve accessibility to information about education programmes and supporting resources. The high standard of our educational work was recognised in 2008 when Osborne House, Goodrich Castle, Bolsover Castle, Wroxeter Roman City, Kenwood House and Estate, Farleigh Hungerford Castle and Birdoswald Roman Fort all won Sandford Awards for quality and excellence in educational services and facilities. 4 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 seventh edition of our annual survey of the state of the historic environment, ofthestatehistoric seventh editionofourannual Counts survey Heritage One ofthemostpressing issuesofourtimeisclimatechange. Thiswasthethemeof Beauty.Natural and future researchintoprotectedlandscapeswithinNational Parks Areas ofOutstanding to build onthisevidencebase. We our tohelpstructure have alsoproducedaframework inEnglandand withinNational Parks benefits ofheritage Wales. Projectswillnow bedeveloped andCadwhaveEnglish Heritage completedastudytoevaluatethesocial andeconomic environmentOlympiad. whenplanningforinto accountthewiderhistoric theCultural own guidanceonTemporary for Events. take Structures andothers Bothwillhelplocalauthorities DigitalScreensinPublic Spaces andpublishedCABE onLarge our finalised jointguidancewith future management; itwon theLandscapeInstitute’s LandscapePolicy Award inNovember. We View guidance on Asset ManagementPlansthisyear. inthe We alsocompletedSeeingtheHistory Assetswhichprovides national to Government departments,completingManagingHistoric advice EstatesUnitcontinues tobeasourceofconservation The Government Historic science. for heritage strategy ofa draft Committee by groupandgoingouttoconsultationonafirst establishing asteering responded totherecommendationsofHouseLords’ Scienceand Technology Select environment. environment alongside thatofthenatural ofthehistoric consideration We also lobbied andCoastal for amendmentstotheMarine Access Bill, whichnow incorporates andsuccessfully andorganisations ofconsultationsfromGovernment departments a range on how objectives tomake sureWorldaremet. ClassPlaces’strategic We alsorespondedto and work. We have withCABE, beenworking CLGandtheHomesCommunities Agency environment anddomoretocreategreat placestolive thehistoric architecture, conserve for Improving theQualityofPlacewhichwilllay outhow Government willpromotegood In May 2009theGovernment willlaunchWorld ClassPlaces- The Government’s Strategy protectionsystem. theheritage toreform This representsamajorstepforward inourwork ofanewPlanningPolicyproduce aconsultationdraft Environment. Statementfor theHistoric for Communities andLocalGovernment (CLG)andDCMSto closely withtheDepartment to nationalpolicieswhichhaveWe environment. animpactonthehistoric have beenworking Much ofouractivityinvolves withGovernment andotheragenciestosecurechanges working ofthebackdropaswe for develop2010-2015. ourstrategy part views willform working, environment. andtoengagemorepeopleinthehistoric extend partnership These want ustoprovide moreevidenceofthesocio-economicbenefitsinvesting inheritage, to Alongside this, environment. thehistoric ourstakeholders core roleofprotectingandconserving our inPractice were bothwelcomed assupporting Conservation the publication ofConstructive regional andnationallevels andinproviding sectorleadership. atRiskinitiative and TheHeritage anddecisionsat toldusthatmorepeopleseeasbeingsuccessfulininfluencingstrategy survey stakeholders’We needs.viaasurvey. two years therefore seektheirviewsevery Thisyear’s andrespondingtoour environment meansunderstanding Raising theprofileofhistoric AIM 2: environment onotherpeople’s Getthehistoric agendas 2008/09 of Achievements , viewsandhow guidanceonhow toensuretheir toassessthesignificanceofhistoric Achievements of 2008/09 2008 / 09

5 2008, launched in October. Heritage Counts 2008 made the case that the re-use and recycling of older buildings is in itself sustainable and that energy efficiency can be improved without destroying their distinctive character and value. In July 2008 we launched Climate Change and Your H ome (english-heritage.org.uk/climatechangeandyourhome), an interactive website which gives practical advice on how to adapt traditional houses without compromising their historic character. The website has already received 25,000 visitors. We have also developed a productive relationship with the new Mayor of London and the Greater London Authority on sustainability and climate change, and are collaborating on the Mayor’s Empty Homes Initiative using our Heritage At Risk Register. Following the DCMS led review into how culture is supported and promoted in the regions, English Heritage, Sport England, Museums, Libraries and Archives Council and the Arts Council have developed regional action plans which set out how they will work together on joint priorities. Each regional group will coordinate working under four priority areas around ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS & REPORT ANNUAL ENGLISH HERITAGE improving relationships and developing services with local authorities, place shaping, and 2012 and the Cultural Olympiad. We published Local Area Agreements and the Historic Environment in May 2008 which encourages communities to capitalise on their distinctive local heritage. In Northumberland, English Heritage worked alongside the Northumberland Strategic Partnership to include heritage at risk as a target in its Local Area Agreement, a step which will help to promote the issue to local partners. English Heritage is a member of the Yorkshire and Humber Historic Environment Forum which published the Regional Historic Environment Strategy this year. It provides a framework for the management of the historic environment and a basis to guide regional policy and decision-making. English Heritage jointly funded the Heritage Tourism Initiative with the North West Development Agency this year to strengthen links between the historic environment and tourism sectors. Run with the Historic Houses Association and the National Trust, the Heritage Tourism Initiative is regarded by the Secretary of State as an exemplar project for getting the historic environment on other people’s agenda. We organised four sub-regional historic environment summits on behalf of the East Midlands Heritage Forum this year to build understanding of, and support for, heritage protection reform. Over 200 people took part, from local authority leaders to civic societies and parish councils. Feedback showed that delegates valued the district based workshops in particular as they enabled local partners to work together on the practicalities of managing and investing in specific historic places. One of the ways we can tell if we are being successful in influencing others is the degree of financial support we secure from third parties and in 2008/09 we successfully completed the fundraising needed for the project we are participating in with the London Borough of Hounslow and the Chiswick House and Gardens Trust, for the restoration of Chiswick House Gardens. Income from legacies and donations was £777,000 and corporate partnerships were renewed with Ecclesiastical Insurance and Wells Bombardier, bringing much needed income to support the Heritage at Risk campaign and our events programme. 6 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Development Agency andLiverpool Planning ofaSupplementary Vision inthepreparation cores ofthesecities.historic CityCouncil, alsoassistedLiverpool EnglishHeritage North West projectsinthe majorregeneration tohelpinform andwithChester andCarlisle properties buildings whichwillaidthefuturemanagementof City Councilonitsregisterofhistoric intheareaofplanningadvice. Thisyear we have withManchester particularly beenworking aroundthecountry collaborativelywithlocalauthorities continues towork English Heritage community development. regeneration, place-makingand placestosupport increase confidenceintheuseofhistoric thatfocuses onactively managingchange.conservation This publication isalsodesignedto for adoptedbyapositive approachto English Heritage andcollaborative the broadterm conservation, awareness ofconstructive projectstoraise conservation-led volume ofexemplary inPractice aroundthecountry.We in2008,of seminars Conservation launchedConstructive a of SignificantPlacesandpromoteditwithaseries on Enabling Development andtheConservation building.sufficient resourcestolookafterahistoric thelast year During we updatedourpolicy where thiswouldbeallowed notnormally ifthedevelopment istheonly way ofgenerating adequately. todevelop inplaces arepermitted Insometightly-defined circumstances owners tofindtheresourceslookafterthem properties ofhistoric It canbedifficult for owners to findasustainable future withtheowners forsite.continue towork goodreasonnottodoso.Wedesignation orgrade, shouldberetainedunlessthereisvery that buildings whichhaveArea andconfirmed beenidentifiedasinteresting, whatever the oftheSmithfieldConservation andappearance significant positivetothecharacter contribution building atSmithfieldinLondon. concludedthatthe of themarket buildingsmadea Theinquiry ontheproposeddemolitionofpart public inquiry In won animportant August EnglishHeritage helpusdirectresourcestotheareasofgreatest need. inthefutureandwillparticularly our work many It willbeusedtoinform areasof areasandplacesofworship. toincludeconservation years of thenation’s expandedincoming scheduledmonuments areatrisk. TheRegisterwillbe further Gardens, ShipwreckSites. RegisteredBattlefields andHistoric Itshowedtimethat21% for thefirst nation’s assetsat risk: heritage ListedBuildings, Scheduled Ancient Monuments, and Parks Historic stepstowardsThis year atRisk acomprehensive we Heritage tookthefirst continue over years. several arebetterequippedtofulfiltheirrole. andensurelocalauthorities information will This work protection, theresponsibilitiesofEnglishHeritage, toclarify andtoprovide betteraccessto plannedbut muchoriginally andeffective canbedonetoachieve moretargeted heritage two-thirds ofthemeasures proposed. willnow protectionreform take longerthan Heritage legislation–about now implementingthose elementsoftheBillthatdonotrequireprimary but doesnotprevent progress. stafftogetherwithDCMSandCLGare EnglishHeritage ProtectionBillfromtheQueen’sThe exclusionoftheHeritage Speechwasdisappointing environment historic AIM 3:Enable andpromotesustainable changetoEngland’s 2008/09 of Achievements Register ofallthe Achievements of 2008/09 2008 / 09

7

Document to guide future development in the World Heritage Site. We advised on a very significant development in Bath and offered this advice to the UNESCO World Heritage Committee mission to the city. In turn this process played a part in the development of appropriate policies for urban World Heritage Sites everywhere. The Urban Panel, which brings together the expertise of CABE and English Heritage, also continues to share advice and expertise on strategies and developments bringing significant change to towns and cities. We are working with Newcastle City Council to pilot a Heritage Partnership Agreement for the future management of the Grade II* listed Byker Estate in Newcastle. The potential offered by the pilot has formed an important part of a bid for Private Finance Initiative funding for refurbishment of the whole estate. English Heritage’s commitment to responding swiftly and helpfully to requests for advice is reflected in our performance figures. In 2008/09 an average of 96% of formal consultations ACCOUNTS & REPORT ANNUAL ENGLISH HERITAGE were returned within the agreed deadline. Some of the key developments which came to fruition over the past year for which English Heritage provided advice were: • St Pancras Station, London: adaptation of the Grade I station buildings to provide an international Eurostar terminal. • Cooper’s Studios, Newcastle upon Tyne: conversion of an 1897 auction room for horses and carriages which later became an early car showroom. Saved from demolition, it is now a prestigious office. • St Martin in the Fields, London: completion of the refurbishment of the Grade I listed church and the adaptation and conversion of the vaults to social and community use. • Block Mills, HM Dockyard, Portsmouth: refurbishment of the Grade I listed Building At Risk by Defence Estates. • Blenkinsopp Castle, Northumberland: the repair of an at risk Scheduled Ancient Monument and Grade II listed early 19th century house which incorporates the remains of a 14th century tower. • Great Yarmouth, Norfolk: changes negotiated with the promoters of a proposed casino scheme so that the setting of Nelson’s Monument, a local icon erected between 1817-19, would not be compromised by the new development. Our responsibility for advising Government on proposed designations continues to command considerable attention. We received 2,028 requests for changes to the statutory list and DCMS listed 440 buildings on our recommendation. Some high profile campaigns both for and against the listing of buildings have been run, particularly over modern buildings. Work on the designation of schools, churches and cemeteries and into areas facing particularly high levels of redevelopment pressure continues. 8 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 management oftheirbuildings. withlocalcommunities toenable are themtotakeworking fullerresponsibility for the officers Association have beenestablished following asuccessfulpilotprojectinManchester. Both Places of andtheNorth Officer posts for Cumbria WorshipWest Multi-Faith Support Tourism towards thecostofemployinggrant stafftoprovide local,tocongregations. hands-onsupport thosewholookafterthem. a50% a majornewschemetosupport Thenewschemeoffers In December,buildings. of ofState,Andy Burnham, withthesupport we launched our Secretary over Ilisted forming 45%ofGrade ofourheritage areamajorpart places ofworship Historic grants.of EnglishHeritage in listed NostellPriory Wakefield toofficespacewiththeaid have beenrepairedandconverted building inBristol.complete Norman Two II* medievalmonasticbuildings attheGrade rare sit withintheruins. of£150,000hasenabled therepairofSt.A grant JamesPriory, themost in the West toanexcitingschemeinwhichawholly newbuilding will Midlandsasaprecursor £300,000 totheLandmark Trust, enabling themtotake forward thestabilisationof Astley Castle repairofthemainmansionbuilding’stowards theemergency We roof. of alsooffered agrant computer, ofthemodern the birthplace of£330,000 grant wasawarded anEnglishHeritage Bletchley Park, secretcode-breakingactivitiesintheSecond thesiteofBritish World War and East, towardsstation complexes essentialrepairs. intheNorth andagrant II* listed Tynemouth StationinNorth Tyneside, regardedasoneofthemostimpressive Victorian We and community asset. attraction tourist have alsooffered adviceonthereuseofGrade ‘Wilderspin’ SchoolinQueenStreet,onHumber, Barton hasbeenfully restoredcreatinganew was offered to113 buildingsOneofthese, ontheBuildingsatRiskRegister. II*National theGrade million to177Of this, secularbuildings andmonuments tohelpsecuretheirfuture. £9.5million In 2008/09we totalling£13.3 offered schemes. grants isthroughourgrant provides support Beyond helpinglocalauthorities, ways inwhichEnglishHeritage oneofthemostpractical assets. to helplocalgovernment maximisethepotentialofheritage jointLocalGovernment thefirst conference washeld AssociationandEnglishHeritage February we have bodyofwork considerable completedonsensitive streetscapemanagement. In projects thisyear. Allcasestudiestoaddthe We Streetsfor alsoproducedpractical buildings, development Environment, andLEADERtheHistoric rural toinspireheritage-led Guidance for LocalPlanning ,Authorities adviceonways ofinvestigating andrecordinghistoric publications initsguidance library. We Buildings: Historic published Understanding Policy and around 350,000uniquevisits; andthereareover and700Local 200EnglishHeritage Authority over undertheHELMbannertraining 1,300people;were run theHELMwebsite received ofsubjects covering abroadrange Management (HELM)programme. In2008/09 47courses Environment Champion.forLocal championsistheHistoric a Heritage Themainsupport development proposals; by hadappointed theendofyear 76%oflocalplanningauthorities hardtohelplocalgovernment tomake welldecisionson works informed English Heritage Most ofEngland’s environment isregulatedby protectedhistoric Local Authorities. AIM 4: Helplocalcommunitiesenvironment carefor theirhistoric 2008/09 of Achievements Achievements of 2008/09 2008 / 09

9 The joint English Heritage and Heritage Lottery Fund Repair Grants for Places of Worship scheme, the largest single source of funding for repairs to places of worship in England, has offered over £156 million to over 1,700 projects since 2002. In 2008/09 206 grants were offered, including £108,000 to the New West End Synagogue in London for roof repairs and £46,000 to All Saints Church, Herstmonceux, East Sussex, to replace cedar roof shingles which had been badly attacked by woodpeckers. Awards in the joint English Heritage and Wolfson Foundation Grants for Cathedrals scheme saw 24 grants totalling £2.7 million offered to 23 cathedrals. As well as individual buildings, English Heritage recognises the importance of maintaining the integrity of areas and streetscapes. A grant of £1 million has been pledged to High Street 2012, the improvement of groups of historic buildings at risk on the A11 corridor linking the City of London to the Olympics site. We also carried out an appraisal which led to the designation of a conservation area around a complex of industrial buildings near the Olympic site thus ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS & REPORT ANNUAL ENGLISH HERITAGE preserving them in this major development area. English Heritage disburses the Aggregates Levy Sustainability Fund on behalf of the Department for the Environment, Food and Rural Affairs. This year we gave £1.4 million to projects to identify, protect and conserve the historic environment from the impact of aggregates extraction on land and at sea. Three vulnerable monuments associated with aggregates received repair grants: a church in Buxton, Derbyshire, and two historic quarrying areas in Portland, Dorset. From time to time, English Heritage also intervenes directly to provide solutions where no other organisation is able to do so. One such case was with the acquisition of the JW Evans silver factory in Birmingham’s Jewellery Quarter which English Heritage secured for the nation last year. A contract has now been let for the stabilisation of the building and we are undertaking essential research to understand this important site better. English Heritage’s London Squares Campaign also continues to improve local places and lever investment. Fitzroy Square opened this year following joint funding with Camden Council. As a founder member and funder of Hadrian’s Wall Heritage Ltd, English Heritage has supported the company to produce the latest Management Plan for the Hadrian’s Wall World Heritage Site. English Heritage has also supported the development of proposals for the Lake District World Heritage Site. As part of our national programme to encourage and stimulate development of traditional craft skills we support the North East Heritage Skills Project. This year it organised the second North East Heritage Skills Fair at the National Trust’s Gibside Estate which saw over 4,000 people attend over three days and try out new skills. The project also offered 24 practical training courses on a range of traditional skills such as cobble laying, lime and hair plastering and dry stone walling. 10 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 proportion of adults from priority groups attending heritage sites. While attendanceofadults sites. groupsattendingheritage ofadultsfrompriority proportion toincreasethe againsttheDCMSPublicAgreement (PSA)target measure performance Service totheinterview.environment siteinthe12monthsprior 2008 showed that70%ofadultsresidentinEnglandmadeatleastonevisittoanhistoric national dataonpeople’sResults published environment. in engagementwiththehistoric towards continues tocontribute theDCMSTakingEnglish Heritage whichprovides Part survey toenjoying ourproperties. will helptoremove barriers Separately, Allpolicywhichwe hope Scopetoprepare anAccessfor wewiththecharity worked rescue.website, at RiskprojectandtheJWEvanssilver factory includingontheHeritage have engaged withthepublic innew ways, films whichcanbeviewed on our makingshort Castlethisyear. Grange, SilchesterandBerkhamsted new display panelsatNorthington We atfreesiteshasincluded toimprove andthevisitorexperience Our programme interpretation number ofcottagesto14. created atPeverell’s Tower atDover CastleandPeacock Cottage, Kirby Hall, takingthetotal continues.work Newvisitorfacilitieswere openedat Tintagel Castleandnewholiday cottages Abbey, the Lookout atDoverAdmiralty Castle, Pendennis Castleandat where Wrest Park club. We have alsocompletedmajorimprovements at Tynemouth Castle andPriory, Hailes andanoutreachprojectwithalocalschoolyouth oftheramparts by are-interpretation Wein May 2008. developed anewexhibitionatBerwick-on-Tweed whichwasaccompanied of Technology’ wingat Audley EndHouseopened Award.Our representationoftheservice for aMuseumsandHeritage increased by 45%onthepreviousyear anditwasshort-listed ‘Use ofLullingstoneRoman A majorreinterpretation haveVisitors Villa inKentopenedJuly 2008. monument andthevisitorfacilitieshasbeendeveloped andwillbeimplementedby 2012. DCMS following apublic consultation. A newschemetoimprove theenvironment ofthe arevised In January World SiteManagementPlanfor Stonehengewassubmittedto Heritage among thehighlights. withpheasantsandcanaries,An aviary andamarbleQueen ElizabethIin1575. fountain are Dudley, ofthepleasuregarden whichRobert reconstruction Leicester, of Earl createdtoimpress Castle willbereadyin Castlewe completedour In August 2009. 2009atKenilworth April seasideresorts. run-down admissionsbuilding for the The Keepandanewpermanent Castle, madepossible by SeaChangefunding, tohelpcultureregenerate Government support capitalprojectoftheyearEnglish Heritage’s hasbeenthedisplay largest oftheKeepatDover the Beaglecollection, Darwin’s fieldnotebooksanddiary, available online. of Species, andanewshopcaféhave revitalisedthehouse. We have tomake alsobeenworking a re-creationofDarwin’s ofhow hecametowrite cabinontheBeagle, tellthestory displaying Down HouseinKent, years. hishomeforNewdisplays forty andinterpretation, including by re- inFebruary ofhisbirth Darwin. thebi-centenary than Charles marked EnglishHeritage therecouldhardly beabetterproponent couldbepersonified If enthusiasmandpassionfor enquiry environment AIM 5: enthusiasmfor StimulateEngland’s andharness historic 2008/09 of Achievements Taking Part dataalsoenables usto On the Origin On theOrigin Achievements of 2008/09 2008 / 09

11 from Black and Minority Ethnic groups more than met the target of a three percent increase, attendance by adults from lower socio-economic groups or who have a limiting disability did not meet this target. To understand why fewer people from lower socio-economic groups visit historic places English Heritage hosted a conference, Missing Out?, in March. New research will explore the attitudes and expectations families have about English Heritage sites and heritage in general. The findings will be shared widely and will inform English Heritage’s operational strategy. We continue to create community engagement projects which inspire new connections with the historic environment. This year 41,289 people from under-represented groups participated, learning new skills, making links with others in their community or gaining a new perspective on heritage. Highlights of this year’s programme include an initiative on the architectural significance and future regeneration potential of Manningham in Bradford. A publication was produced and a film made

by the local community in which they shared their memories and voiced their opinions on what ACCOUNTS & REPORT ANNUAL ENGLISH HERITAGE is and isn’t significant in the area. The project Traditions to Transitions in Penwith, Cornwall, enabled young people and their families to learn about sustainable lifestyles and traditional craft skills. Working with Age Concern, the young people interviewed older members of their community about using traditional heritage skills. They then had an opportunity to try out these skills and think about the relevance to their lives in a sustainable, less oil-dependant future. We share our outreach work on the Our Place website (ourplacenetwork.org.uk) which now includes over 1,000 members. The site supports people working to broaden engagement in the heritage sector. One initiative this year has been to create an area within YouTube in which people can post videos produced through community engagement projects. The number of people coming to events at our properties reached 534,737, a 9% increase on last year. Our flagship event, the Festival of History, attracted 17,784 visitors over two days. The National Monuments Record staged 11 exhibitions of its material at 22 venues across the country, attracting 170,000 visitors. Among these was an exhibition of the photographs of the German émigré John Gay (1909-99) at Kenwood House which was visited by over 24,000 people. It was accompanied by a publication, England Observed: John Gay (1909-99) on his life and work. English Heritage’s Publishing team, an increasingly important outlet for our research and expertise, was re-structured in May 2008 since when 12 new titles have been published and promoted in a new-style catalogue formally launched at the London Book Fair. The third English Heritage Historical Review was published in December and we produced six new volumes in our ‘Red’ Guidebook series this year for sites ranging from Castle Acre Priory and Castle to Witley Court. Blue Plaques were erected to honour 11 notable individuals this year, including those to actors Alastair Sim, Dame Celia Johnson and Sir Ralph Richardson, landscape architect Sir Geoffrey Jellicoe, and James Smithson, founder of the Smithsonian Institute. 12 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 of March 235 surveys hadbeencompleted.of March235surveys We have beendeveloping theskillsandknowledge programme. maintenance andconservation At theend anew prioritised condition andtoinform initscaretoestablish their ofalltheproperties conditionsurveys isundertaking English Heritage properties. plans toreducecarbonemissionsatourofficesand historic office, ofourlargest pilot assessmentofthecarbonfootprint inSwindon, our whichwillinform We areimplementingourSustainable Development andClimateChangeStrategy, includinga home andothermoreflexible ways of working. includingtosupport achieved ISO20000re-accreditationandequipmenthasbeenupgraded regional officestoincreasecapacityandimprove processingspeeds.again TheICTdepartment were provided toseven moved fromLondonandnewfileservers Swindon tohouse40servers To thesemoves, support ourITsystemshaveroomwasbuilt in beenimproved.A new server over started. 230sincetheprogramme London officebasedpostsstillfurther. The number ofpostsbasedinLondonhas reduced by hascontinued andhasreducedLondonoffice accommodation and The Relocationprogramme changes.structural London toSwindon. Various business processimprovements arebeingintroducedalongsidethe The overall Financerelocatedfrom size oftheFinancefunctionhasbeenreducedandcentral for theorganisation, atlowerwas toachieveaddvalueandoperate cost. bettersupport hasbeenimplemented. ofEnglishHeritage’s Financedepartment Itsaim A majorrestructure managementinournewpay theincreasedemphasisonperformance arrangements. supports and Behaviours thenewEnglishHeritage managementwhichincorporates to performance moreeffectively. eachotherinourwork support This year hasalsoseenarevisedapproach hasbeendeveloped Behaviours tohelpus asetofEnglishHeritage our 2007staffsurvey market. withtheexternal raised in flexible Buildingonissues andtoalignusmoreclearly proposals have beendeveloped toaddressanomaliesintheoldsystem, tomake usmore ofitspay amajorreform structure. New hasundertaken theyear EnglishHeritage During Finance function. London, changeofour office spaceincentral andimplementingmajorstructural continued tofocus onefficiency; theseinitiatives includedreducingourofficecostsanduseof well; incomealonereached£42.9million, earned also EnglishHeritage up5.4%onlastyear. However hospitalitydid incomefrommembership, andfromcorporate retailandcatering areas whichreducedourtotalincometo£48.1millionthisyear from£49.2millionin2007/08. were 967,000member visits tosites. We felt theeffects insome oftheeconomic downturn members). There reached687,000(972,800includingcorporate and thisyear membership tocarefor theproperties ourefforts supports ofEnglishHeritage properties. Membership as aresultofbadweather over thesummerof2008, intotal5millionvisitedourstaffed English Heritage’s sitesare itsmostvisiblewere assetsandwhilepayingdown visitor numbers AIM 6: Make themosteffective useoftheassetsinourcare 2008/09 of Achievements Achievements of 2008/09 2008 / 09

13 of staff involved in the conservation of our estate, from the hands-on technical side to those in property management via a series of bespoke training courses at West Dean College. As part of our drive to rationalise the storage of our historic artefact collections, in the interests of economy, public access and conservation, we have installed state-of-the-art powered pallet racking systems at our store in Helmsley, Yorkshire. Our work has been recognised in many ways this year. We were delighted to achieve several awards for our sites, for example, Goodrich and Bolsover Castles winning regional visitor attraction of the year awards. ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS & REPORT ANNUAL ENGLISH HERITAGE 14 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Facts and Figures and Facts Management Agreement sites which were received after publication in July 2008. July in publication after received were which sites Agreement Management Local to visits educational free for figures final the reflect to adjusted been has figure 2007/08 * The Number of visitors tostaffed Number ofvisitors Number offreeeducationalvisits Number ofmembers properties Number of children taking part in Number ofchildrentakingpart Number ofapplicationsreceived to scheme 2006/07) Discovery fullyearVisits (first of Number ofrecommendationsto (including changestoexistingentries) list make changestothestatutory Numbers of participants in ofparticipants Numbers Number ofoutreachprojects Risk Register from 1999Baseline Percentage removed ofentries to DCMS make additionstothelistpassed Properties taking part in takingpart Properties outreach projects Number ofNationalMonuments HELM website tothe Number ofuniquevisitors OpenDays Heritage available electronically Record Centrerecords Buildings at Buildings at

040 20/6 060 20/8 2008/09 2007/08 2006/07 2005/06 2004/05 5.3 million 555,000 475,850 2,055

46 36.4% 491 54,386 1.1 million 114,000 2,800 595,000 4.7 million 485,000 Programme Programme 2,096 launched 78 40.5% 425 46,751 127,000 3,019 1.2 million

630,000 5.3 million 481,000 10,400 1,876 85 43.8% 353 49,495 232,250 3,509 1.3 million 665,000 5.2 million 430,630* 27,000 2,068 88 45.5% 564 33,477 351,000 3,526 1.34 million 687,000 5.0 million 445,320 39,300 2,028 82 48.0% 440 41,289 354,681 3,717 1.4 million

Total ■ ■ ■ ■ ■ Investment Income(£m) Earned, Operatingand and MembershipIncome(£m) Increase in Admissions, Retail&Catering, Figures and Facts ■ 03/04 27.1 Interest Income Operating Other and Grants Donations, Other Earned Income Earned Other Membership Income Membership Income Catering and Retail Admission Income 5.6 15.3 04/05 29.1

4.1 1.1 05/06 30.1 10.4 5 11.

06/07 33.2 48.1 15.3 10.4 1 5 11. 5.6 4.1 1.1 07/08 Total ■ ■ ■ ■ ■ ■ ■ 35.4 rn xedtr £) Total Expenditure (£m) Grant Expenditure (£m) 1. Other Other Historic Environment Environment Historic Levy Aggregates Historic Environment Environment Historic Other Places of Worship of Places Worship Other Cathedrals Areas Conservation and Monuments Buildings Secular 4 5.3 08/09 37.2 4.7

7.7

7.1

■ ■ Total IncomeandGrantin Aid (£m) 29.3 5.3 1.8 4.7 1.8 1.3 1.4 7.7 7.1 Grant in Aid Grant Total Income 1. 3 Total ■ ■ ■ ■ ■ ■ ■ ■ 132.7 Notional Cost of Capital of Capital Cost Notional Support Historic Environment Environment Historic Corporate Outreach and Education Properties Research and Standards Standards and Research Grants 5.9 9 76

13.5 48.1

1.7 29.3 21.9 132.7 48.1 48.1 22.9 180.2 22.9 76.0 3 5 13. 29.3 21.9 5.9 9.0 1.7 15 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 16 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Chief Executive’s Commentary Management our strategy for 2010to2015. our strategy environment. ofthebackdropaswe develophistoric anessentialpart Theseviewswill form andengagemorepeopleinthe benefits ofinvesting in heritage, develop morepartnerships the sector. would like ustoprovideOur stakeholders moreevidenceofthesocio-economic for and decisionsatboththeregionalandnationallevel andinprovidingstrategy leadership in2009,early isseenasbeingmoresuccessfulininfluencing revealed thatEnglishHeritage two years. every Themostrecent, astakeholder survey conducted undertakes English Heritage Counts 2008. Heritage from acoordinatedapproachthesector. tothesuccessfulpublication Itcontributed of Committee (HEREC). HERECwasestablished in2001toidentifyactivitiesthatwould benefit Environment ReviewExecutive theHistoric rolesincludingchairing various undertake environment istheleadbodyforsector. thehistoric English Heritage In thiscapacitywe allovermakers England. decision whichisusedby localauthority portal Environment LocalManagement(helm.org.uk) anddevelopment initiatives.training EnglishHeritage’s main vehicle for thisistheHistoric public initiatives. toimprove knowledge andskillsthroughvarious theirefforts We alsosupport plans, onlocalandstrategic guidance tolocalplanningauthorities policystatementsandother consulteeintheplanning process, ofourroleasastatutory we provide adviceand As part acrossEngland. iswiththelocalauthorities relationshipfor EnglishHeritage Another central created HomesandCommunities Agency. Government England,Agencies suchasNatural theEnvironment Agency andtherecently Schools andFamilies, Innovation, andSkillsfor Universities Transport, aswell aswithmany Agreement issetoutonpage20. for Children,We closely withtheDepartments alsowork for ourwork.context andframework A reviewofprogressmadethisyear againstourFunding andfive Management StatementandFinancialMemorandum year Strategy, provide the English Heritage’s Funding Agreement, signedwithDCMS, CLGandDefra, alongwithour Outreach andResearchStandards. Services, Planningand Development,and Corporate Policy andCommunications, and Properties ofEnglish Heritage’s theExecutive groups: fiveBoard comprising operational Directors Finance Accounting OfficeronbehalfofDCMS. by anExecutive TheChiefExecutive issupported management toaChiefExecutive appointedby them. as The ChiefExecutive alsoserves whichdelegatesoperational by directionisoverseen aBoardofCommissioners Our strategic onpage2. inthe against themissummarised Achievements of2008/09sectionwhichstarts objectives aresetoutin ourStrategy, MakingthePast Part ofOurFuture andprogressmade understand, value, carefor andenjoy environment. England’s historic rich Ouraimsand environment andourroleistohelppeople adviseronthehistoric Government’s statutory Public Bodysponsoredby DCMS. ‘English Heritage’ name. isitsinformal isthe EnglishHeritage andisanExecutive ofStatefor Culture, Non-Departmental by MediaandSport theSecretary on 1 1984by theNationalHeritage April Act 1983. appointed Ithasupto17Commissioners established BuildingsandMonuments Commissionfor Englandisabodycorporate The Historic Introduction 2010 to2015. Future, aimsandobjectives, itwillsetouttheorganisation’s strategic andwillcover theperiod whichwillbuild onwhatweis inpreparation have achieved. As withMakingthePast Part ofOur five willcometoanendin2010.English Heritage’s yearstrategy first Another strategy five year canbecompleted. so that thereforms opportunity legislation canbeintroducedattheearliest shouldbefor listingandstreamliningsystemsprocesses.what ourpriorities We hopethat alongside many otheractivitiesincludingbuilding capacityinthesector, involving thepublic in Policy Environment Statementfor tobepublished theHistoric in2009willplay amajorpart protectionreform.English Heritage’s biggestcommitmentremainstoheritage ThenewPlanning sites includingcontinuing ourfocus onavalueday outfor families. improve incomeatsomeothersites. toour visitors We toattract willstrengthenourefforts increase income, but otherprojectshave hadtobeputon hold thusreducingthescopeto at Down Housewillmake majorimprovements tovisitorfacilitiesandaredesignedhelp coming year andbeyond. Ourinvestment inDover, Castlesand andCarisbrooke Kenilworth challenging inthe In thiswidercontext, improving ourcommercialpositionwill beparticularly that competitionfor public fundswillbehighinsuchadifficulteconomicenvironment. case isalreadybeingmadefor investing inculturetimesofeconomichardship, we areaware While the willgatherpaceforOver thenextSpendingRound. thecomingmonthspreparations income.generate A changeofGovernment may alsoaffect ourprogrammes. savings towhichwe arealreadycommitted. This increasespressureonbudgets andtheneedto and SpendingRoundontopoftheadministrative final year ofthecurrent ‘value for money’ withfindingadditionalsavings hasbeencharged of£0.5millionin 2010/11,English Heritage the Trends andfactorslikely toaffect EnglishHeritage’s future performance toensurethatmomentumisnotlost. legislation andsowe areworking can, ofthereforms however, proportion A considerable beimplementedwithoutprimary pieceoflegislation.Speech, onthisimportant ablow whohadbeenworking for everyone ProtectionBillcouldnotbeincludedintheQueen’seconomic situationwasthattheHeritage disappointmentresultingfromtheneedfor government toaddressthe One particular prices. for andextensionspossibly conversions in responsetotheslumpproperty far fromconsistentacrossthecountry. Inwealthier areas, for example, applicationscontinued which we were asked toprovide advicebut thismasked thepictureongroundwhichwas Nationallywe therewasadeclineinthenumber hadpredicted. ofplanningapplicationson were alsoaheadofexpectationsthisyearnumbers with32,000morepeoplevisitingsitesthan membership, wasaheadofbudget andachieved a5.4%increaseonthepreviousyear.Visitor ofwhichcomesfrom Howeverthis year. income, ourselfgenerated proportion thelargest Alongside therestofcountry, felt theeffects EnglishHeritage oftheeconomicdownturn Trends andfactorsunderlying EnglishHeritage’s performance during2008/09 Chief Executive’s Commentary Management 17 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 18 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Chief Executive’s Commentary Management • • • • • • • ofprogressmadeintheseareas. The following isasummary matters. onEnglishHeritage’sAs ChiefExecutive policiesoncertain Ialsohave adutytoreport Chief Executive’s Statement related incidentstoreport. willbedeveloped by theendof2009. data Priorities hashadnopersonal EnglishHeritage improvementWeControl. anddevelopment. recognisethatoursystemsrequirefurther RiskRegisterand the annual Statement onInternal isincludedintheCorporate security Information procedures. ofareviewitsdatasecurity at thebeginningof2008aspart ofitssensitive information conductedasurvey EnglishHeritage anddatasecurity Information within the Achievements of2008/09sectionthisreport,onpage4. areas isreported and has dutiestopromoteNationalPark AONB andbiodiversity. purposes Activity inthese Biodiversity, NationalParks and Areas ofOutstanding Natural Beauty(AONB) EnglishHeritage inthepreviousyear.375 with24whichwere reportable regulations, reporting comparedtoatotalof the HealthandSafety Executive understatutory to Safety ManagementIn2008/09therewere 362incidentsofwhich17were reportable 2008. during to develop EnglishHeritage’s ClimateChangeand Your Homewebsite whichwaslaunched be measuredagainstISO14001,We theenvironmental management standard. alsocontinue at theNationalMonuments RecordCentreinSwindongotunderway inlate2008; theywill A reviewofenvironmental managementprocedures carbon emissionsarebeingconsidered. 2008and anumberuseand of initiatives tookplaceinSpring toreduceenergy footprint A scoping exercise 2009.toquantifyourcarbon Action Planwillbepublished inSpring management boards. A newSustainable and Development andClimateChangeStrategy 2008,Change Board(SDCCB)during oftwo previously combiningthework separate aSustainableSustainable formed Development Development andClimate EnglishHeritage declaredthattheyhavepeople whohadformally adisability. in May 2009. comprised workforce At March20091.3%ofEnglishHeritage’s permanent ontheSchemewillbe published onourwebsiteScheme. Thesecondannual progressreport Heritage’s Disability Action GrouptohelpimplementandreviewtheDisabilityEquality Institute for theDeaf, Royal ofEnglish NationalInstitutefor theBlindandScopeasmembers by peoplewithdisabilities. Thisyear MindandPeople joinedtheRoyal National First Disability equalityEnglishHeritage’s DisabilityEqualitySchemeaimstoincreaseparticipation remaining 9.2%. inMarch2008. isnotavailable from2.2%asreported Information has risen for the that 88%arefrom White ethnicgroupsand2.7%arefromnon-Whitegroups. This figure staffidentified 2009/10.by permanent be completedduring InMarch2009self-reporting in2008andwill Race equality started A reviewofEnglishHeritage’s RaceEqualityStrategy staffwas57.5% female and42.5%male. EnglishHeritage gender profileofpermanent andrevisedactionplanwillbepublished onourwebsite shortly.report InMarch2009, the ofanactionplan andanupdated GenderGrouphasmonitoreddelivery English Heritage Gender equalityEnglishHeritage’s Gender EqualitySchemewaslaunchedin2008. The Chief Executive Thurley Dr Simon and theBluePlaquesScheme. around thecountry, hasprovided adviceandguidance, planningissuesonwhichEnglishHeritage Information Act. Requestscovered ofissuesincludingapplicationstolistbuildings awiderange oftheDataProtection terms Act whiletheremainderwere processedundertheFreedomof underthe some elementoftherequestor’s dataandsowere handledinpart own personal under requests for information legislation.Access toInformation Five oftheserequestsinvolved thatismadeproactivelyof information available stillfurther. In2008/09we processed331 In Decemberwe launchedapublicationCommittees. schemewhichhasincreasedtheamount its website (english-heritage.org.uk), includingopenminutes oftheCommissionand Advisory Government accountability. volumeavailable makesofinformation alarge English Heritage via thepublic andenhancing interestby promotingopendiscussionofpublic affairs in serving roletheFreedomofInformation Act 2000plays recognisestheimportant English Heritage Open Government andFreedom ofInformation Chief Executive’s Commentary Management 19 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 20 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Heritage Protection Reform ProtectionReform Heritage Progress Funding Against 2008/09 Agreement Policy Guidance15 &16 Statement toreplacePlanning Planning PolicyDraft enhancement Environment Records Historic Local Authority programme Training andcapacity building programme designation National strategic all assettypes Published selectionguides for Gateway public accessviatheHeritage designation system, and Unified published List, unified Deliverable seminars during theconsultationperiod. during seminars We inSummer2009. willbeholdingdissemination starts website whenthe PPSconsultation English Heritage Policy Guidancewhichwillbe madeavailable onthe Environment Planning Historic ’LivingDraft‘ supporting Weby lateMarch. withthemonthe areworking of thePPSwithCLGandDCMSwascompleted Drafting funding hasbeenallocated. of HERenhancementsisbeingpreparedand£400,000 A programme withDCMS.HER arenow inpreparation expected tobereissuedinmid2009. for Benchmarks Environment Recordswhichis Guidance onHistoric to amended DCMS hascontributed English Heritage 2009 withexcellentfeedback fromtheparticipants. Management Agreements were completedinFebruary has beendrafted. onHeritage An initialfour courses strategy isresourcedandatraining The programme thenextsteps.via focus groupswhichwillinform consultationhastaken place A preliminary wider context. designationinthe engagement toseekviewsonstrategic ofpublic consultation ofthesectorandaprogramme phasesisunderway:in two complementary aformal Commission inNovember. A consultationprogramme were approved priorities by EnglishHeritage’sDraft PPSislaterin2009.be published whenthedraft Policy Environment. StatementontheHistoric They will are beingpreparedinconjunctionwiththenewPlanning SelectionGuides ofSelectionandIntegrated Principles order tomeetthestandardsofnewList. is underway toreviewexisting listingsandschedulingsin for its2010 track ‘go live’ date. A sixmonthprogramme English Heritage’s ITsystem isunderdevelopment andon Progress Sustainable Development &ClimateChange Progress Funding Against 2008/09 Agreement project andHomeresearch Hearth Development ActionPlan ofitsSustainable delivery DCMSinthe Supporting Deliverable Progress Development of guidelines and practice specifications • Developing an agreed protocol for • Developing a decision making matrix to enable • Developing a database of measured thermal • Fast tracking ongoing research to study the real • meet thenewtimetable. Recentactivitiesinclude: ensure thatsufficiently is robust information available to insteadofanindividualresearchprojectandshould work andHome. Itisnowof anoverallfor programme Hearth torecastitsplans refurbishment hasledEnglishHeritage enhancing performance massive existinghousingthermal place of ‘Carbon 60’ plansfor combinedwithcurrent The requirementtoachieve ‘Carbon 80’ reductionsin timescalethanwasthecasesixmonthsago.shorter the pressurefor substantialchangeover amuch existing domesticbuilding stockhave greatly increased useandCO2emissionsfrom relating totheenergy andaspirations Recent changesinGovernment targets onprogresstoExecutive Board. and reports relating tosustainable development andclimatechange todeliver targets,English Heritage projectsandactions bi-monthly, throughout theBoardcoordinatesefforts Groups.from eachofthefive English Heritage Meeting Climate ChangeBoardwhichincludesrepresentatives reviewed byregularly theSustainable Development and isimplementedthroughan Strategy Action Planwhichis DCMS’s supports Action Plan.Change Strategy The English Heritage’s Sustainable Development andClimate for a range of refurbishmentinterventions;for a range national refurbishmentinitiatives; of enable consistentdatatobegatheredfromarange environment ofexistingdomestichousingto internal enhancing improvements; decisionsonenergy totake informed homeowners andsystems; building materials traditional oftypical, for arange characteristics performance interest; historic particular enhanced withoutlosingthequalitiesthatinfer their and thewaysmay inwhichtheirperformance be glazingoptions oftraditional ofarange performance monitoring the 21 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 22 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Progress Against Funding Agreement 2008/09 Progress Funding Against 2008/09 Agreement Sustainable Development &ClimateChange and Your Homewebsite theClimateChange Delivering performance Heritage’s own environmental English Benchmarking project andHomeresearch Hearth Deliverable over 25,000 visits. over 25,000 construction. Sinceitslaunch thewebsite hasreceived suitedtotraditional particularly on insulationmaterials buildings andadvice Ltotraditional application ofPart will beaddedincludingmore detailedguidanceonthe information practical Further simple tothemorecomplex. saving ofenergy measuresfromthe through arange include a plan’‘whole homeenergy whichwillguideusers functionality andcontent. contentwill Newinteractive of development isunderway whichwilldeliver enhanced phase character.Following areviewofthesitefurther andspecial be madewithoutcompromisingperformance posed by ourolderbuilding stockandhow changescan saving energy guidanceonthespecificchallenges practical aswell asproviding climate changeontheirproperties theimpactsof tobetter understand developed for users houses.live constructed intraditionally Thesitehasbeen who websiteforis aninteractive homeowners principally The CCAYH website, 2008, whichwaslaunchedon1July management standard. to achieve ISO14001 accreditation, theenvironmental the proceduresrequiredtoenable theSwindonsite remainder oftheestate. The studyfocussed onidentifying thebasisfor environmentalform managementfor the environmental managementfor alloffices. Itwillalso out oftheSwindonsitethatwillbetemplatefor environmental issues. An assessmenthasbeencarried in May 2008, hasbeenextendedtolookatwider scopingexercise,An initialcarbonfootprint completed ‘ Bricks and mortar’ demonstration project/s to develop • Developing a survey which will link into the paper • A paper based study of a) the profile of the existing • Progress study and inform the demonstration project; thedemonstration study andinform stock; and identifyany datagaps relevanttothepre-1919 environment andclimate), toprovide abroadpicture of datasets(energy, buildings, occupants, internal of5broadcategories analysis andintegration use,stock anddomesticenergy andb)data collation, Heritage case studies and collaborations withothers. casestudiesandcollaborations Heritage best practice. These willbeacombinationofEnglish Sustainable Development &ClimateChange Progress Funding Against 2008/09 Agreement bodies by 2011 and atleast10otherpublic adoption by EnglishHeritage andmanagers: owners property for usebycontract historic for a Works and Training Creating amodelframework Deliverable contractors working on English Heritage sites. onEnglishHeritage working contractors sector, for all therequirementwillbecomeobligatory intheconservation operatives CSCS cardcarrying wherepossible.card holders When therearesufficient touseregistered requirements onitsown contractors projects. istakingaleadby placing EnglishHeritage heritage ongrant-aided andcraftspeople contractors carded from 2010torequiretheuseofappropriately fundingagencies allheritage commitment toencourage anda programmes training standards linked torigorous 2010. schemewillimposenational The certification Scheme(CSCS)Cardedby workforce Certification Skills towards aConstruction a commitmenttowork workforce.built heritage includes The memorandum inthe the highestpossible standards andbestpractice Group launchingasharedcommitmenttopromote andtheNationalHeritage English Heritage Training Groupby ConstructionSkills, Parliamentary All Party andHeritage March 2009undertheauspicesof Arts wassignedon31 ofUnderstanding A Memorandum Progress 23 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 24 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Better Places/Sustainable Communities Progress Funding Against 2008/09 Agreement LEADER programme including guidanceonthe for England,Programme Development of theRural environment components todeliver thehistoric support Advice, and information agenda and sport cultural acrossthe of sharedpriorities in placetodeliver acoreset areput regional arrangements England) toensurethatnew agencies (ACE, MLAandSport DCMS’s otherkey regional with working Collaborative development sector used asamodelfor thewider make sustainable places, tobe to character using historic and Communities Agency on Guidance for theHomes in 10/11 09/10 andplacesofworship areasin conservation 08/09; Wrecks andBattlefieldsin Monuments, Designated Ancient include Scheduled Heritage At Riskto Deliverable building conservation. farm fundingfor ofagri-environment traditional targeting May 2009willpublish research intendedtoimprove the Environment andin LEADER inandtheHistoric September 2008we guidanceon published bestpractice and Defra’s Group. Stakeholders Agri-environment In Committee Monitoring RDP(E) throughtheProgramme ofthe thedelivery continues tosupport English Heritage East andNorth West. intheNorth rotate, chairs English Heritage but currently by DCMS. oftheseregionalgroupswill The chairmanship outlined andarebased uponthefour priorities Consortia following thewindingupofRegionalCultural how thecoregroup, together willwork pluspartners, Executive andnotedby Ministers. The plansoutline Action Planswhichhave beenagreedby eachChief of jointinterest. The regionalgroupshave produced togetheronareas regionalgroupingstowork formalised English Heritage, MLA, EnglandhaveACE andSport has beenprepared. by amoredetailed web-based toolkit leaflet supported has beendistilledfromthepilotsandahighlevel draft staffandplanning anddesignconsultants aimed atHCA in One ofthem, Graylingwell inChichester, wasfeatured andregeneration). (masterplanning uk/characterisation website atenglish-heritage.org. the EnglishHeritage ofallthreeareavailable on Reports been completed. has inmasterplanning characterisation use ofhistoric ondisusedhospital sitestoexplorethe Agency (HCA) withtheHomesandCommunities out inpartnership The lastofthethreeplannedpilotprojectscarried /11. 2010 Work onPlacesof Worship for inclusionin isontrack Monuments, Battlefields, andGardens. Wrecksand Parks launch. HAR2009willalsoincludetrendupdateson and willbethefocus ofthe2009Heritage At Risk hasbeencompleted Areas atRisksurvey Conservation Wrecks andBattlefields were allpublished in2008. The Statistics for Scheduled Ancient Monuments, Designated Progress Constructive Conservation inPractice. Conservation guidance Constructive Generic Progress Against Funding Agreement 2008/09 Progress Funding Against 2008/09 Agreement Better Places/Sustainable Communities ‘Strategies for Change’ ‘Strategies tolocalauthority to contribute nationallyincluding by working environments,future learning in decisionmakingabout environment isembedded PfS toensurethehistoric Programme, withDCSF/ work Capital for theFuture/Primary oftheBuildingSchools As part Scheme Levy SustainabilityFundGrant ofthe Delivery Aggregates Deliverable well advanced. schoolbuildings are staffonhistoric authority stages.in theearly for local Plansfor futuretraining authority’s schoolestateinconjunctionwithPfSare a scheme toundertake assessment’‘heritage ofalocal withDCSF,buildings, inpartnership andalsoonapilot school of guidanceonrefurbishingandreusinghistoric haveFuture programme beenpositive. The development totheBuilding Schoolsfor the cancontribute Heritage & Families(DCSF), anddiscussions astohow English for Children,Schools (PfS)andtheDepartment Schools for meetingshaveSeveral beenheldwithPartnerships researchprogramme. adaptation withinaDefra-managed building historic andnew-build versus aggregates extraction hasagreedtoincludecarbonefficiency,suggestion Defra areasinPortland, Dorset. quarrying and two historic At our associated withaggregates: a church inBuxton, Derbyshire, havegrants beenprovided formonuments threevulnerable assetsinaggregates-producingareas.protect historic Repair Research andDevelopment projectstohelpidentifyand Local Planning, Minerals Authority ofinnovative andarange including 10Resources Assessments tofeed directly into ofprojectshaverange been commissionedthisyear Development, onprotectionandmitigation. An exceptional on identificationandcharacterisation, andii)Research themes:two principal andMarine, withthefocus i)Quarries £1.4millionin2008/09on hasdisbursed English Heritage Progress 25 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 26 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Support for Placesof Support Worship Progress Funding Against 2008/09 Agreement end of2010/11 by the Officers 15 Support by theendof 2009/10 Officers 9 Placesof Worship Support Deliverable On target. website. the EnglishHeritage andthepresentationshavesubscribed beenpublished on Continuing EducationDepartment,wasover-University A studyday inFebruary, offered throughthe Oxford Officerpost.Association hasalreadyagreedaSupport being discussed. The North West MultiFaith Tourism the project, UKis andaproposal from JewishHeritage faithscanbeinvolvedthrough whichnon-Christian in toidentifymediaandagencies has beenundertaken contact andpresentationsatconferences. Research throughdirect Officers been invited toapply for Support were senttoallarchdeacons. Otherdenominationshave all bishops(AnglicanandRomanCatholic)copies andChiefExecutive to The Chairman wrotepersonally widespreadpublicity.December 2008whichattracted in Officerprogramme State launchedtheSupport potentialpartners. of with 41further The Secretary discussionshave taken place posts andpreliminary haveJob descriptions been beingagreedfor three Progress The Natural Environment The Natural Progress Funding Against 2008/09 Agreement wood andforests environment oftrees,historic sustainable managementofthe onthe and EnglishHeritage Commission the Forestry a StatementofIntentbetween Developing andimplementing by 2009 Environment Agency withthe Understanding of A Memorandum use ofland policy positiononthefuture Producing anEnglishHeritage actionplan Heritage including producinganEnglish Landscape Convention, implementing theEuropean in Defra Supporting Deliverable

Forestry Commission’s strategies. Forestry mainstreaming oftheresultsHeritage At Riskintothe ofthis. willbe part Itwillbuild uponthesuccessful work England Trees, andthis Woods Strategy andForestry hasajointcommitmentunderthe English Heritage completion.nearing oftheMOU The year endedwiththepreparation followingcirculationandcomment.Heritage internal Environmental andrevisedby English Assessment Service was preparedby theEnvironment Agency National approved by Executive BoardinSeptember. draft A first withtheEnvironment Understanding Agency was of ofdeveloping aMemorandum The principle implications ofthefutureusecoastalland. environmentus todevelop apositiononthehistoric Coastal the Defra Adaptation Strategy, whichrequires has, however, beenclosely involved of inthedrafting onthefutureuseofland. report EnglishHeritage awaits thepublicationThis work oftheDefra/Foresight on theHELMwebsite inFebruary. agreed by Executive BoardinSeptemberandpublished totheimplementationofELC.contributing Thiswas EnglandhaveNatural produced ourown Action Planfor Defra’s Framework for Implementation oftheELCandlike We andupdate helpedtowrite implementing theELC. project toestablish abaseline for policy and capacityfor ofDefra’sand by research jointfundingand steering Council ofEurope’s ELCConference inMarch2009; and theEngland Working Group; by attendingthe Committee ofDefra’s UKMonitoring membership European LandscapeConvention (ELC)through: implementationofthe supports English Heritage Progress 27 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 28 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Coastal and Marine issues Coastal andMarine Progress Funding Against 2008/09 Agreement and strategic coastalplanning and strategic shorelinemanagement inform to Rapid CoastalZoneSurvey statement Government’s policy marine ofthe 2008/09 insupport environment by theendof development andthehistoric policy statementonmarine A newEnglishHeritage Deliverable · · · · · dating. There hasbeenthefollowing progressthisyear: andscientific subsequently by moredetailedsurvey (Phase2).and FieldSurvey The resultsmay beenhanced two mainphasesofDesk-Based Assessment (Phase1) The RapidCoastalZone comprise Assessment Surveys Policythe Marine StatementinMay 2009. on workshop Defra willattendthefirst English Heritage planningsystems. strategic andterrestrial between marine therelationship toclarify work infurther to take part reference objectives tohighlevel andwe marine expect MPSinDecember setoutinadraft broad principles Heritage, inliaisonwithDCMS, for the offered support sustainable area. development oftheUKmarine English inonedocumentpoliciesfor the (MPS) thatwillintegrate Policy ofaMarine stage beingthepreparation Statement Bill provides planning, for anewsystemofmarine thefirst andCoastal progress ofDefra’s Marine Access Bill. The governed, andaffected by theresourcestoengagein, the ofthepolicystatementisbeing Ongoing drafting Progress to Gloucestershire CountyCouncil. to Gloucestershire haveplan for pilotPhase2Fieldwork beenreturned Severn: EnglishHeritage’s commentsontheupdated North-West: Phase1continues accordingtoschedule. is inpreparation. Telegraph 2009. inearly The updatedplanfor Phase2 inthe media coverage, includingarticles Times and wascompletedandreceived considerable report North-East: The Phase1(Desk-Based Assessment) Archaeology. by HumberField isinpreparation 2 (Fieldwork) Yorkshire andLincolnshire: An updatedplanfor Phase revision by Norfolk Landscape Archaeology. of hasbeenreceived andisincourse 2 (Fieldwork) Norfolk: An updatedplanfor enhancementofPhase Coastal and Marine issues Coastal andMarine Progress Funding Against 2008/09 Agreement the marine the marine scheme ALSF grant componentof English Heritage ofthe Continued delivery coastalplanning and strategic shorelinemanagement inform to Rapid coastalzone survey Deliverable · · · Protection: Heritage support; detailedassetdescription · Projects commissionedthisyear include: £0.437millionin2008/09.Sustainability Funddisbursed componentofthe The marine Aggregates Levy website. English Heritage received areavailable fromthe All RCZASreports · · Progress

Placements InConservation. Professional geophysics EnglishHeritage marine Training: nationalmarine programmes;ALSF training exclusion zones; methodology seabedgrab-sampling Framework; archaeologygeophysics, marine and Research &Development: Research Marine for aggregates dredgezones Seascape Characterisation Mapping: seismicmappingof seabedlandscapes; Historic wooden wreckpilotproject get underway late2010. coasts have beenfinalised. isexpectedto The work andsouth forbeen receivedthenorth andbriefs South-West: All inputfromLocal hasnow Authorities willbein2009/10. main phaseofthework following a Tender BoardmeetinginFebruary. The aPhase1survey toundertake by EnglishHeritage South-East: Wessex Archaeology wascommissioned 29 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 30 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Progress Against Funding Agreement 2008/09 Progress Funding Against 2008/09 Agreement Capacity Building in the Heritage Sector Capacity BuildingintheHeritage Environment Managers 2010/11 –7Trainee Historic Environment Managers 2009/10 –7Trainee Historic Environment Managers 2008/09 –7Trainee Historic Deliverable in July with a start dateofOctober.in July withastart appoint seven more Trainee Environment Managers Historic processisunderway.The recruitment Unit. throughaStatutory Protection Unitandwillbepart-way will have completedaFoundationUnitandHeritage inOctober.with EnglishHeritage ByJunethetrainees Seven Trainee started Environment Managers Historic Progress

We expectto Education Progress Funding Against 2008/09 Agreement the Humber) South East, and Yorkshire and in threepilotregions(London, development work network EngagingPlaces’and support for theEngagingPlacesUnit of resources, inmoneyorkind, share provide anappropriate in discussionwithDCMS, to withCABE, and In partnership Deliverable magazine magazine Learning The March2009editionofHeritage · · · · · · · · over theyear inthefollowing ways: theEngagingPlacesproject hassupported English Heritage Progress circulation of38,000. resource posterontheproject. Themagazinehasa included afeature onEngagingPlacesandafreeteaching

board andsourceofcontentadvicefor theproject. using EnglishHeritage’s Teachers’ asasounding Forum articles, casestudies, newsitemsandeditorial. Learning Engaging Placeswebsite includingHeritage for the ofmaterial and uploadingarange preparing Culture 24. development, withtheEngagingPlacesteamand working totheEngagingPlacesweb contributing taxonomy people have visitedtheEngagingPlaceswebsite. educationaltechnologyevent.largest To dateover 60,000 Education and Training Technology conference, theworld’s theEngagingPlaceslaunchatBritish supporting Board. Partnership and attendingtheStrategic theEngagingPlacesManagementBoardmeetings chairing Needs schoolwasstillinprogressastheyear ended. between Down HouseandalocalSpecialEducational Media andSport.TheLondonproject, apartnership ofStatefor Culture, in Marchaddressedby theSecretary event heldatthe celebration Museum and Victoria Albert presenting itsSouthEastprojectattheEngagingPlaces Mathematics Network, links. toexpandcross-curricular with STEMNET, theScience, Technology, and Engineering willbefollowed by anewpartnership partnerships QCA and Yorkshire andtheHumber. It isanticipatedthatthe built inLondon, environment providers theSouthEast were and brokered between 26teachers Partnerships co-development networks.Authority’s curriculum implementation oftheQualificationsandCurriculum inthedevelopment and playing anactive part will increaseto£50,000. £20,000towardscontributing theproject. In2009/10this

31 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 32 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Progress Against Funding Agreement 2008/09 Progress Funding Against 2008/09 Agreement Education qualitative indicator(s) development ofappropriate and evaluation strategy Review ofthenational families of schoolaudiencesand account ofthechangingneeds totake Education Strategy Review ofEnglishHeritage’s offer the 5hourcultural aspectof assure theheritage Development Groupto quality Work withtheFind Your Talent Deliverable of the evaluation will inform futureprogramming. of theevaluation willinform positive feedback wasreceived. and very sectors The results and The findings volunteering were sharedwiththeheritage a tangible difference toEnglish Heritage’s education offer. ofeducationvolunteers,training andthatithasalreadymade well-designed proceduresfor therecruitment, selectionand by managed inaclearandconsistentmannersupported acrossseven sitesinits pilotyear,programme thatitwas had successfully implementedtheeducationvolunteering It concludedthatEnglish Heritage completed inMay 2008. by theInstituteof was undertaken Volunteering Research and programme national evaluationoftheeducationvolunteering toimprove rates. return Thisyear totry a are beingtrialled is obtainingfeedback techniques fromparticipants.Several methods. A key challengeinevaluatingeducationalactivities session content, toteacherfeedback, bookingsanddelivery for example, marketing,anddeveloping deliverers training evaluating theprocessesrequiredtosetupprogramme, andthefocususing theILFAhasprogressedfrom framework going. The Discovery isreviewed regularly Visits programme for useacrossallareasofeducationalactivity ison- indicators Heritage’s Discovery tocreateappropriate Visits andwork wasdeveloped forThe nationalevaluationstrategy English reviewand thenewdiplomas.curriculum amended KeyStage3curriculum, theSirJimRoseprimary needs ofschoolaudiencesandfamilies, for example, the Directortotake accountofthechanging new Learning willbedeveloped aftertheappointmentofa Strategy A newfive (now at10sites).programme year Education (now active at62sites)andtheeducationvolunteering including expandingtheDiscovery Visits programme objectives Strategy its2005-2010Learning delivering English Heritage’s Education teamhasfocused on OutsidetheClassroominitiative. theLearning supporting project’s Professional Board.Affairs isalso EnglishHeritage the country. isrepresentedonthe EnglishHeritage a cultureoffer for childrenandyoung peopleacross West) setuptoestablish thetemplatefor developing and Telford, LeicesterandLeicestershire, andtheSouth (Wrekin been involved ofthepathfinders withseveral thisinitiative andhas fully supports English Heritage Progress Cultural Olympiad Cultural Engagement withthepublic Progress Funding Against 2008/09 Agreement series by 2012 series Britain titlesinthePlayed in 6 further OpenDays via Heritage heritage highlighting sporting by 2011including for delivery wide proposalAccessAllAreas thesector Link tosupport Funding for apostatHeritage Deliverable DCMS deliverables indiscussionwith Develop otherappropriate Broadening Accessgroup sector’sChair theheritage Deliverable evidence, includingthe Taking Part Survey. Objectives, Strategic inthelightof and Departmental Public Sector Agreements tosupport develop targets withDCMSto continues towork English Heritage participation, MissingOut?, inwhich130 tookpart. economic status, activitiesandheritage family friendly wastheMarchconference onsocio- sector working andbestpractice.experience A recentexampleofcross- toexchange The groupcontinues tomeetregularly Progress to bepublished in2011. commitment willbePlayed inLondonwhichisexpected 2009. ofresources andtime Thebiggesttitleinterms press. Played atthePubisduetobepublished inMay publicity andgoodreviewsinthenationalsporting andhasachieved widespread published inFebruary indoor swimmingpools, historic concerning was isprogressingtoplan.This work GreatLengths, plan.and delivery the Olympic Development Fundtodevelop thebusiness from 2009. Linkisbiddingfor financialsupport Heritage Placesistobeconvenedgovernance ofDiscovering by July environment sector. the grouptooversee A steering theentirebuilt initiativea multi-strand embracing All AreasisnowPlaces, onecomponentofDiscovering stageprogressmeetinghasbeen held.a first Access and The post-holderhasbeenappointedandbriefed Progress 33 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 34 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Caring for and opening English Heritage properties tothepublic properties for andopeningEnglishHeritage Caring Progress Funding Against 2008/09 Agreement Cultural Olympiad Cultural annum) 2011 (averaging atcirca15per sitesby of EnglishHeritage Re-presentation ofcirca10% programme a costed20year maintenance an Asset ManagementPlanand leadingto properties Heritage ofallEnglish Condition surveys Deliverable the 2012sailingvenue) Castle(adjacentto Portland Improved visitorfacilitiesat aValley Lower Le Local outreachprojectsfor the Deliverable improvements tositefacilitiesareatthefeasibility stage. modest Further designed toprovide counterservice. Castleandthetearoomhasbeenre- at Portland The landscapingoftheevents areahasbeencompleted are underway. aswell asonthecontent,work andtimescales structure inthis on theoutreachprojectswhichwillplay apart picture-rich, accessible format. Discussionswithpartners totheOlympics andwillbeina place intimefor visitors ofthe of thearea. thehistory Thebookletwillcelebrate pastthatshapedthelandscape with itsstrongindustrial oftheeastendLondon of thepeoplethispart London, andlives isplanningapublication onthehistory withtheMuseumof English Heritage, inpartnership Progress Hailes Abbey. Berwick Ramparts, Tynemouth CastleandPriory, and schemeshavethree interpretation beencompletedfor Down House, Darwin. thehomeofCharles A further Roman Villa, Lookout atDoverAdmiralty Castleand new presentationschemeswere completedatLullingstone 2008/09.26 siteswere re-presentedduring Threemajor from thisdata. of 2009; the Asset ManagementPlanwillbedeveloped by and cyclical maintenanceinformation theend surveys datafromthe withimported to befully operational isexpected thiswork The ITsystemwhichwillunderpin March over estatehadbeensurveyed. 50%ofthehistoric sitesby 2010. ofall EnglishHeritage surveys At theendof outcondition Work isunderway andonscheduletocarry Progress Stonehenge Progress Funding Against 2008/09 Agreement centre by summer2012 for anewvisitor Preparation forwarding toUNESCO 2009toDCMSfor January Final ManagementPlanby 31 for public consultation Management Planby 30 June Draft World Site Heritage Deliverable completion in2012 couldbemet. for beganontheschemesothattarget and work this adesignteamandotherconsultantswere appointed of2009.announcement madeintheSpring Aheadof on10December andan was submittedtoMinisters location ofthenewvisitorcentre, arecommendation optionsfor the Autumn onthefour short-listed Following athree-month public consultationinthe 31 January. The ManagementPlanwascompletedon 2008. prepared andissuedfor public consultation on17July The draft World SiteManagementPlanwas Heritage Progress 35 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 36 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Directors’ Report The Annual Report and Accounts will be authorised for issue on 13 on 2009. issue for July authorised be will Accounts and Report Annual The events. sheet balance post no were There Post BalanceSheetEvents 28. note in out set is Instruments Financial to relating policy Heritage’s English Financial Instruments 21. and 20 notes in out set are Assets Fixed in movements The Fixed Assets 19. note (PCSPS), Scheme Pension Service Civil Principal of the amember is Heritage English Pensions £125,773,000). (2008: £134,209,000 was Funds) Restricted and Development the to transfer £588,000 (2008: of £38,000 Funds Restricted and Development the from transfer the after 2009, 31 March ended year the for expenditure net The Result for the Year 2ST. EC1N London, 138-142 Holborn, Square, 1Waterhouse Heritage, English Manager, Secretariat Commission the from available is of Interests Register of the Acopy Commissioners. by made of interest of declarations arecord maintains Heritage English Register ofInterests manner. accountable and responsive open, an in dealings its community the conducts with Heritage English that ensure to and practice; best and legislation employer, as relevant all with Commission, the accordance in that acts Executive, Chief the through ensure, to requirements; regulatory and statutory all acts within Commission the ensure to and governance of corporate standards highest the ensure to good; of use public the for effective and resources efficient economical, the maximise to and of funds administration the in used highest are the ensure to of probity targets; standards and objectives strategic against performance of English planned the monitor direction and oversee to strategic overall the Heritage; establish to matters; heritage on guidance and advice expert provide to are undertaken; Heritage of English responsibilities statutory the that ensure to are of Commissioners responsibilities key The Responsibilities ofCommissioners Report. Remuneration the in given are members Board of 15.Executive note Details in detailed are 2009 June 30 and 2008 1April between Commissioners as served who persons The andExecutive BoardMembers Commissioners Report. Annual the in Commentary Management Executive’s Chief the in included are background and organisational structure Heritage’s of English details Further Bequest. Iveagh the and Limited Trading Heritage English (HBMCE), England for Commission Monuments and Buildings Historic of the consolidation of the name the is Heritage” “English Background Information Disclosure ofRelevant Audit Information 1997. since Bequest Iveagh of the examiners independent been have Saffery Champness 2008. April 1 from Limited Trading Heritage English of auditors as appointed were Office Audit National The that time. at companies limited audit to unable were Office Audit National the as 2008 31 March until 2004 1April from Trading Limited Heritage English for auditors were LLP Mazars 2004. April 1 since auditors been have Office Audit National The Audit Arrangements governance. corporate to relating guidance Treasury of HM requirements relevant the all with complies Heritage English Governance Corporate 21 days). (2008: days 16 to but creditor equated received 2009 31 Invoices at March paid not Code. Practice Payment Better Industry of British Confederation of the principles the which with policy complies apayment established has and scheme Industry of British Confederation of the amember is Heritage English BetterPayment Code Practice Industry ofBritish Confederation Council. Whitley Heritage English of the meetings through place consultation takes Formal employees with activities. our in participation and involvement of employee importance the recognises Heritage English Communications withEmployees ended 2009. 31year March financial the during nil) (2008: £500 exceeding donations charitable any make not did Heritage English Donations Charitable Directors’ Report 30 June 2009 June 30 Executive Chief Thurley Simon Dr unaware. is Office Audit National the of which information audit no is relevant there aware, am as I far So information. that of aware is Office Audit National the that establish to and information audit relevant any of aware myself make to taken been have to ought that steps the all taken have I Officer, Accounting As

37 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 38 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Remuneration Report Remuneration performance relatedbonus.performance oftheir therate andobjectives againsttheirannualanddetermines targets performance Service’s of FinanceandCorporate end ofeachfinancial andHumanResourcesCommitteeassessestheChiefExecutive’syear theRemuneration andtheDirector (2008: Services newpost). for theDirectorofFinanceandCorporate Executive Following the and8percentofbasicsalary (2008: andobjectives andisamaximum targets of20percentbasicsalary specific performance 20percent) for theChief Services. are theChiefExecutive andtheDirectorofFinanceCorporate The bonuses arepayable for the achievement of CompensationScheme. oftheCivilService the rules The only employeesbonus arrangement performance withacontractual ofemployment bytermination aredealtwithinaccordance resignation.by EnglishHeritage ofcontract terminations Early employment by resignation. The ChiefExecutive andisrequiredtogive isalsoonacontinuous6monthsnoticeof contract areemployedExecutive of andarerequiredtogive Boardmembers oncontinuous3monthsnoticeoftermination contracts Executive BoardContracts by theCommitteeinthatcontext. been establisheddata, for eachpostby market reference totherelevantexternal andchangestobasepay arereviewed annually ofExecutiveThe remuneration by andHumanResourcesCommittee. theRemuneration Boardisdetermined Pay have ranges Executive Policy BoardRemuneration oftheCommittee isMrMichaelJolly.Chairman the Commission. oftheCommitteeisaCommissioner,The Chairman oftheCommission. but nottheChairman The current Commissioners, oftheCommission. includingtheChairman of oftheCommitteeareappointedby theChairman Members nofewerThe Committeemeetsatleast3timeseachyear andcomprises than5members, atleast3ofwhommust be public accountability.demonstrate outtheabove, management, to toEnglishHeritage theCommitteeprovidesIn carrying external adviceandoversight necessary ensure that staff are fairly rewarded for • demonstrate that reward and remuneration is considered by • It isalsotheobjective ofEnglishHeritage’s oftheCommitteetoreviewrewardandremuneration staffsoasto: effectivelycontributing tothesuccessoforganisation. The objective toensurethatitis oftheCommitteeistoreviewandadviseonEnglishHeritage’s HumanResourcesstrategy andHumanResourcesCommittee Remuneration and HM Treasury delegatedlimits. of itsadviceandwhichgives dueregardtotheinterestsofpublic andthefinancialhealthoforganisation; and their individual contributions to the organisation’s overall performance within DCMS a Committee which has no personal interest in the outcome

Emoluments oftheExecutive Board Report Remuneration

Steven Bee Chief Executive Simon Thurley

et arsn 121 Keith Harrison and Development Director ofPlanning 1 - 2 - 145105 - 2 - 11 9490 Edward Impey 2008 from 16January Services Corporate Director ofFinanceand 3 - 3 - 443 367 - 3 - 33 9691 Deborah Lamb and Standards Director ofResearch 30 June2009 Chief Executive Thurley Dr Simon isaudited. Report The emolumentssectionoftheRemuneration employees totalled£163,000(2008: £134,000).detailsofthePCSPSschemeareincludedinnote19. Further depending onthepensionoptionchosenby theemployee. Employer’s intothePCSPSinrespectofabove contributions yearThe totalannual pensioniscalculatedaseitherone-sixtiethorone-eightieth ofpensionable ofservice, pay for every frompreviousemploymenttransfers.accumulated but doesinclude thebenefitsresultingfromsuch pensionbenefits transferred 1,043 from otherpensionschemesinrespectofpreviousemployment. The realannual increaseinCETVexcludesthecashvalueof in transferred plusbenefitsresulting fromand any additionalcontributions sums service, benefits fromEnglishHeritage 4 values(CETV)shown60 andtherealincreasesthereoncashequivalenttransfer above, includeaccumulated pension Pension staff areprovided throughthePCSPS. benefits toEnglishHeritage Thevalueoftheannual pensionandlumpsumat Services’ bonus wasconsolidatedfor pay andpensionpurposes. 1 received bonus of£9,000, aperformance (2008: 8percentofbasicsalary nil), noneofthe DirectorofFinanceandCorporate consolidated for(2008: pay andpensionpurposes £3,000, 10percent). Services The DirectorofFinanceandCorporate (2008: £27,000, 20percent). The ChiefExecutive waived hisoptiontohave £3,000, 10percent, bonus ofhisperformance of£136,000(2008:comprise; related bonus basicsalary of£27,000, £133,000)andaperformance 20percentofbasicsalary 144 The ChiefExecutive wasthehighestpaidemployee. Histotalemolumentsfor theyear of£163,000(2008: £160,000) andbonuses. Emoluments includegrosssalary 48 English Heritage’s pensionadministrator. * The CETVfigures for 2008have beenamendedfromthosepreviously published asaresultofrecalculation by Paymaster, 115110 and Outreach Director ofProperties Mark Pemberton and Communications Director ofPolicy 1 2 1 489 431 4 1 92 31 163160 mlmns tae6 a g 0 nraei increase in increase in atage60 atage60 Emoluments £’000 2009 2008 103

£’000 33 98 3 23 Real Real lump accrued annual annual sum pension £’000 2009 oa Total Total ’0 £00 ’0 £’000 £’000 £’000 £’000 09 eso lm u 2009 lumpsum pension 2009 - 2 - 35 - 2 - 2 601524 - 2 - CETV 2008* £’000 928 6 increase in annual CETV £’000 Real 18 28 25 28 30 37 39 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 40 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Executive’s Responsibilities ofStatement Commissioners’ and Chief state whether applicable accounting standards have • make judgements and estimates on a reasonable basis; • observe the Accounts Direction issued by • arerequiredto: theaccountsCommissioners In preparing attheyear endandofitsincomeexpenditurecashflowsHeritage’s stateofaffairs for thefinancial year. consent ofHM Treasury. andfairviewofEnglish basisandmust show atrue The accountsarepreparedonanaccruals ofState, withthe statement ofaccountsforby theSecretary eachfinancial andonthebasisdetermined year inthe form 12(2)ofSchedule3theNational Heritage Act 1983,Under paragraph arerequiredtopreparea theCommissioners 30 June2009 Chief Executive Thurley Dr Simon London, EC1N2ST. A copy ofthe Accounts Directionisavailable fromEnglish Heritage, 1 Waterhouse Square, 138-142Holborn, and for thekeeping ofproperrecords, aresetoutby HM Treasury andpublished in ManagingPublic Money. Accounting Officer, ofthepublic finances andregularity forwhichheisanswerable includinghisresponsibility for thepropriety Buildings andMonuments Commissionfor Englandasthe Accounting Officer for EnglishHeritage. Hisrelevantresponsibilitiesas designatedtheChiefExecutive The forCulture, oftheHistoric MediaandSport Accounting Officer for theDepartment prepare the financial statements on the going concern basis, unless it is inappropriate to presume that the Commission will • requirements, andapply suitable accountingpoliciesonaconsistentbasis; continue inoperation. these inthefinancialstatements; and the Secretary of State, including the relevant accounting and disclosure been followed, and disclose and explain any Interim Chairman Chairman Interim Professor Cunliffe SirBarry material departures from the dateofapproval and ofthe Accounts,Annual Report andaccordswith Treasury guidance. for thefinancial control hascontinued inplaceEnglishHeritage year ended31March2009andupto The systemofinternal toaneffectivealso contribute system. established policiesandprocedures. Staffdevelopment, reporting, accountability andcommunication performance frameworks management, ofcorporate planning,The systemismaintainedthroughanestablished framework review, and monitoring to managethemefficiently, effectively andeconomically. policies, aimsandobjectives, beingrealisedandtheimpactshouldtheyberealised, toevaluatethelikelihood ofthoserisks and totheachievement of therisks controlis basedonanongoingprocessdesignedtoidentify andprioritise system ofinternal achieve policies, aimsandobjectives; it cantherefore only provide ofeffectiveness. reasonable andnotabsoluteassurance The offailureto toareasonable thantoeliminateallrisk level control isdesignedtomanagerisk rather The systemofinternal Control oftheSystemInternal The Purpose the Audit Committee, which is an advisory body with no executive authority. The Committee comprises a Chairman who is • an Executive Board, comprising 5 Group Directors and myself, as the Accounting Officer. Each Group Director is • a governing body, the Commission, as explained in the Directors’ Report and Chief Executive’s Management Commentary; • isexercised through: Accountability withinEnglishHeritage responsibilities assignedtomeinManagingPublic Money. andtheFunding compliancewiththerequirementsofourFinancialMemorandum ensuring Agreement, inaccordancewiththe (DCMS), responsible, assetsfor whichIampersonally and and Sport whilstsafeguarding thepublic fundsanddepartmental English Heritage’s policies, for aimsandobjectives,Culture, Media fromtheDepartment assetoutinstatuteandby Ministers As Accounting Officer, theachievement of Ihave controlthatsupports responsibility for maintainingasoundsystemofinternal Scope ofResponsibility on Internal ControlStatement Treasury and other government departments, our external auditors and participation in appropriate training andseminars. training inappropriate andparticipation Treasury auditors andothergovernment departments,our external withHM aresoughtthroughliaison andnetworking inthemanagementofrisk Examples ofdevelopments inbestpractice managementprinciples. ofrisk guidancetoaidtheunderstanding procedures tobefollowed and supporting Risk managementguidanceisavailable anditincludesastatementonEnglishHeritage’s RiskManagementPolicy, seebelow, monitoring. planning andperformance management islinked tocorporate Governance Directortoensurethatrisk managementpolicyandcoordinationlieswiththeCorporate Responsibility for risk andthateachcontrolhasa named owner atDirector level. risks Board holdscollective responsibilityfor allcorporate which theBoardhastofirefight. riskssothatthe Executive We have alsoamendedtheallocationofresponsibility forcorporate Committee. projectsanda ofcritical This includesasummary ‘hot topicslist’ whichconsistsofissuesthatflareupquickly and registerwhenitisconsideredby Executive risk isnow Boardandthe Additional information provided withthecorporate Audit andtheoverall effectiveness andtofocus ranking attentiononkey areasforofcontrols.and transparent reviewsuchasrisk registertomake itmoreinformative year risk anumber ofchangeshave andcontentofthecorporate beenmadeto theformat meetings. monitoring performance the During attheBoard’s andgrouprisks quarterly This includesregularreviewofcorporate effectively. andassistancetoenable themtomanagetheirrisks The Executive Boardiscommittedtoproviding staffwithsupport level.operational associatedwiththeirareaofauthority. andacceptresponsibilityfor therecognisedrisks All staffmust understand who, lieswithGroupDirectors Responsibility for managingrisk inturn, intheirareasat assignday today responsibilitytomanagers Capacity toHandleRisk enhanced by otherspecialistsupport. on whichtheyarebased. canbe thatitswork whenitconsiders The Committeemayfromothers alsoseekcontributions management, controlsandrisk of internal aredeveloped, theway inwhichtheseassurances andthemanagementpriorities their meetings. Ireceive by ontheeffectiveness testingandchallengingtheassurances outitswork The Committeecarries managementateachof onrisk andtheCommitteereceives reports management inEnglishHeritage the adequacyofrisk oftheCommission.the Chairman The Committee’s ofreference includeresponsibilityfor terms advisingonandmonitoring an independentappointee, and4members, 2ofwhomarenon-executive Commissioners, appointedtotheCommitteeby andtheFinanceManual;Memorandum and Chief Executive toGroupDirectors, andwithineach group, tomake decisionsandincurcostsas specifiedintheFinancial groups. thatfallwithintheiroperational risks the managementofcorporate fromthe There aredelegatedauthorities accountablerelatingtotheirgroupandfor thosecontrolsrelatingto tomefor themanagementofrisks personally 41 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 42 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 - manage risk in accordance with best practice and encourage a culture of risk management acrossEnglishHeritage; acultureofrisk andencourage inaccordancewithbestpractice managerisk - risk managementobjectives, Thepolicydefinesour whichareto: A risk management policy based on a risk appetite for • eliminated. The mainprocesseswhichwe have inplacefor identifying, evaluating, are: andmanagingrisk managed andeithereliminatedorreducedtoanacceptable level, willalways recognisingthatsomerisks existandcannever be inthe identification, seekstoadoptbestpractices risks are well English Heritage risks toensurethat evaluationandcontrolof The RiskEnvironment on Internal ControlStatement - - • Quarterly Performance Monitoring Board meetings, at which Executive Board members monitor corporate performance • Risk monitoring through the Audit Committee, which at each of its 3 meetings a year receives reports on the development • A cycle of risk and control identification, linked to group and departmental plans, ownership recognition and reports on the • A corporate risk register and 5 supporting individual group risk registers, which provide information on significant risks, • although those have reduced since the start oftheprogramme. although thosehave reducedsincethestart its development for the2012Olympics. alsocontinued tocreate Ourrelocation programme wasinvolvedloss atatimewhenEnglishHeritage inkey discussionswiththegovernment aboutthefutureofStonehengeand 2008 meantthatwe lost ahighprofileadvocate whohadbeenhugely committedtoprotectingtheheritage. Thiswasaparticular income.to monitorclosely thepotentialimpactofeconomicclimateonourearned in saddeathofourChairman The very legislation. be implementedwithoutprimary We alsofelt activitiesandwillcontinue theeffects insomeofourincomegenerating can ofthereforms ProtectionBillintheQueen’sinclude theHeritage Speech, proportion aconsiderable althoughfortunately 2008/09arosefromtheeconomicdownturn.risks during Some ofthemostsignificant to Thismeanttherewasinsufficienttime or possibilitythatanactioneventbeneficially affect willadversely theorganisation’s abilitytoachieve itsobjectives.’ judged tooutweigh any negative were impactthatmay tomaterialise. occuriftherisks Riskhasbeendefinedas ‘thethreat An Audit. Internal of added asastandingitemtoensurewe managementprocessesandthework maximisethelinksbetween ourrisk against business objectives, andgrouprisks. have projectsandcorporate alsobeen Internal allmissioncritical Audit reports managementarrangements.and implementationofEnglishHeritage’s risk levels ineachofthe5groupsandfeeds operational backintotheExecutive totheappropriate Boardreports. Directors effectiveness ofthecontrolarrangements. atExecutive Boardlevel andprogressesthroughtheGroup This processstarts measures.minimum statutory improvementactionplanisbeingdeveloped whichwilladdressthe anddevelopment andaprioritised require further procedures. ofareviewitsdatasecurity ofitssensitivein2008aspart information survey We recognisethatoursystems register. risk anddatahandlingareincludedinthe corporate andrecordssecurity Information conducteda EnglishHeritage asappropriate. risk registers risks tobeincludedinthegroupand/orcorporate identified andtoidentifyany new onthemanagementofrisks toseekassurances registers providesofrisk inyear for monitoring periodic framework effectiveness. andviewsontheircurrent their managementcontrolarrangements EachGroupDirector’s reporting risk historic environment;historic and anticipate andmeetchangingsocial, environmental andlegislative requirementsthatenable ustochampionEngland’s risk management. risk anddamagepromoteawareness oftheneedfor for injury safeguard ourassetsandminimiseopportunities annual programme

of risk based audits,

designed to taking only carefully calculated risks, where the potential benefits are focus on key

risks and on ensuring organisational risks andchallenges, risks organisational lessons are learnt and disseminated. 30 June2009 Chief Executive Thurley Dr Simon be reviewed anddeveloped inordertoensure effective control, goodmanagementandaccountability. setoutinourFunding of theobjectives andtargets Agreement. willalsocontinue to Riskmanagementprocedureandpractice planning, andoperational tostrategic Risk managementisanongoingprocessandwillcontinue tobeintegral andtothedelivery thisstatement. oftheireffectiveness.reasonable assurance oftheCommissionsupport Members provided by controlssystemsareinplaceandgive managers, me managementprocessesandcorresponding thattherisk I amsatisfiedfromtheresultsof my reviewoftheeffectiveness control, ofthesysteminternal includingtheassurances to addressweaknesses andensurecontinuous improvement ofthesystems. totheCommission, ofthe exist the Chairman basedonthesereports andarrangements Audit Committeeprovides assurances The resultsfrommy ongoingreviewofeffectiveness arediscussedby mewithExecutive Boardandthe Audit Committee, and ofspecificcommitteesincludingFinanceCommitteeand the Safety Council. from thework gained andtheirindividualaccountabilityreports;assurances framework managementreporting Board memberthroughtherisk advice whichisagreedwithmyself, Executive Boardandthe Audit Committee; provided tomeby theassurances eachExecutive The effectiveness auditreviewsand reviewprocesscomprises; ofinternal gainedfromanannual programme theassurances intheirmanagementletterand otherreports. auditors by theexternal whohaveHeritage responsibilityforcontrolframework, thedevelopment andmaintenanceoftheinternal andcommentsmade withinEnglish andthemanagers auditors oftheinternal byeffectiveness controlisinformed thework ofthesysteminternal As Accounting Officer, Ihave responsibility for reviewingtheeffectiveness control. ofthesysteminternal Myreview ofthe Review ofEffectiveness on Internal ControlStatement 43 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 44 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Houses of Parliament Comptroller and Auditor the to General theand of The Certificate Report information in the financial statements and the part of the Remuneration Report tobeaudited. Report oftheRemuneration inthefinancialstatementsandpart information whichgovern them.to theauthorities my Informing opinionIhave alsoevaluatedtheoverall adequacyofthepresentation conform the expenditureandincomehave andthefinancialtransactions intendedby Parliament beenappliedtothepurposes misstatement, respects tobeauditedarefreefrommaterial andthatin allmaterial orerror whethercausedby fraud Report oftheRemuneration provide mewithsufficientevidencetogive thatthefinancialstatementsandpart reasonable assurance inorderto myandexplanationswhichIconsiderednecessary I plannedandperformed auditsoastoobtainalltheinformation consistently appliedandadequately disclosed. of thefinancialstatements, toEnglishHeritage’s circumstances, andofwhethertheaccountingpolicies aremostappropriate andthe ChiefExecutive assessment ofthesignificantestimatesandjudgementsmade inthepreparation by theCommissioners tobeaudited. Report Italsoincludesan oftheRemuneration includedinthefinancialstatementsandpart transactions Board. Myauditincludesexamination, onatestbasis, ofevidencerelevanttotheamounts, offinancial disclosuresandregularity Standardson I conductedmy auditin accordancewithInternational Auditing (UKandIreland)issuedby the Auditing Practices Basis of Audit Opinion information. inconsistencieswiththefinancialstatements.apparent misstatementsormaterial Myresponsibilitiesdonotextendtoany other andtheChiefExecutive’s ManagementCommentary.Report ifIbecomeaware ofany Iconsidertheimplicationsfor my report statements. excepttheDirectors’ allsectionsofthe comprises Report,theRemuneration This otherinformation Annual Report andconsiderwhetheritisconsistentwiththeauditedfinancial containedinthe I readtheotherinformation Annual Report andcontrolprocedures. governancethe effectiveness proceduresoritsrisk ofEnglishHeritage’s corporate ifitdoesnot. andcontrols, allrisks report Iamnotrequiredtoconsiderwhetherthisstatementcovers anopinion on orform ControlreflectsEnglishHeritage’s compliancewithHMI reviewwhethertheStatementonInternal guidanceandI Treasury’s isnotdisclosed.transactions and explanationsIrequirefor my audit, specified orifinformation byHM andother regardingremuneration Treasury hasnotkeptIn addition,toyou properaccountingrecords, ifEnglishHeritage Ireport ifIhave notreceived alltheinformation whichgovern them.the authorities to conform expenditure andincomehave andthefinancialtransactions intendedby Parliament beenappliedtothepurposes included inthe respectsthe Annual Report,isconsistentwiththefinancialstatements.whetherinallmaterial Ialsoreport andtheChief Executive’s theDirectors’which comprises ManagementCommentary Report Report,theRemuneration toyou whetherinmy ofState. opinion, Ireport Act 1983anddirectionsmadethereunderby theSecretary theinformation tobeauditedhave preparedinaccordancewiththeNationalHeritage beenproperly Report oftheRemuneration and thepart toyou andfairviewwhetherthefinancialstatements my opinionastowhetherthefinancialstatementsgive atrue I report requirements, Standardson relevant legalandregulatory andwithInternational Auditing (UKandIreland). tobeauditedinaccordancewith Report oftheRemuneration My responsibilityistoauditthefinancialstatementsandpart the StatementofCommissioners’ andChiefExecutive’s Responsibilities. offinancialtransactions. theregularity ofStateandfor ensuring thereunder by theSecretary Theseresponsibilitiesaresetoutin andthefinancialstatementsinaccordancewith NationalHeritage Act1983anddirectionsmade Report Remuneration andChiefExecutive as The Commissioners Accounting Officerareresponsiblethe for preparing Annual Report,the and Auditor Respective ResponsibilitiesoftheCommissioners, theChiefExecutive ashavingdescribed beenaudited. under theaccountingpoliciessetoutwithinthem. thatis Ihave Report intheRemuneration alsoauditedtheinformation Statement, theStatementofRecognisedGainsandLossesrelated notes. These financialstatementshave beenprepared Heritage Act 1983. theconsolidatedIncomeandExpenditure These comprise Account, theBalanceSheets, theCashflow thatIhave for the auditedthefinancialstatementsofEnglishHeritage year ended31March2009undertheNational I certify 13 July 2009 SW1W 9SS London Victoria 151 Buckingham Palace Road National Audit Office Comptroller and Auditor General Amyas CEMorse I have and the financial transactions conform to the authorities which govern them. In my Audit Opinion on Regularity the financial statements and the part of the Remuneration Report to be audited have • the financial statements give a true and fair view in accordance with the National Heritage Act 1983 and directions made • In my opinion: Opinion Houses of Parliament Comptroller and Auditor the to General theand of The Certificate Report the information which comprises the Directors’ Report, the Remuneration Report and the Chief Executive’s Management • accordance with the National Heritage Act 1983 and directions made thereunder by for thereunder by Commentary included in the Annual Report is consistent with the financial statements. opinion, in all material respects the expenditure and income have no observations to make on these financial statements. the year then ended; the Secretary of State, of the state of English Heritage’s affairs as at 31 March 2009 and of its net expenditure

by been applied to the purposes intended the Secretary of State; and been properly prepared in Parliament 45 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 46 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Recognised Gains and Losses Relating to the Year the to Relating Losses and Gains Recognised 31 March 2009 Expenditure Account for Year the Ended English Consolidated Heritage Income and Ended 31 March 2009 Recognised Gains and Losses for Year the English Consolidated Heritage of Statement Unrealised LossesUnrealised on the Revaluation of Assets Investment Assets Fixed of Tangible Revaluation the on (Losses)/Gains Unrealised Other Operating Income Income Operating Other Income Earned Income Investment IncomeInvestment Grants Expenditure ncome I Total Research and Standards Research and Net Expenditure for the Financial Year Financial the for Expenditure Net Funds Restricted and Development the /(to) from Transfer Year Financial the for Expenditure Net Adjusted of Capital Cost Notional Items Exceptional Year After Financial the for Expenditure Net Relocation Items Exceptional Year Before Financial the for Expenditure Net Outreach and Education Properties Environment Historic Total Expenditure of Capital Cost Notional Support Corporate

Note Note 1,g 1,g 25 36 10 21 12 11 3 2 4 5 6 7 9 8

(134,209 (134,247 (135,941 (132,113 180,198 48,085 (3,026 42,928 13,509 75,970 22,916 29,247 (2,837 21,927 (3,828 £’000 £’000 4,100 1,057 1,694 1,694 5,921 9,014 2009 2009 (189 38 ) )

)

) ) )

)

)

(125,773 (123,266 (125,185 (126,715 172,496 40,728 32,598 49,230 22,691 68,717 21,267 (3,449 12,197 £’000 £’000 8,285 1,530 1,530 7,082 7,830 7,830 1,420 7,707 2008 2008 211 , 5 (588 (123

)

)

)

) ) )

)

Creditors Overdraft Bank Year One Within Due Falling Amounts Creditors: Hand in and Bank at Cash Term Investments Short Debtors Stocks Assets Current Investments Tangible Assets Assets Intangible Fixed Assets atas 31 March 2009 English Consolidated Heritage Sheet Balance Liabilities Less Total Assets Provisions Year One Than More After Due Falling Amounts Creditors: Liabilities Current Less Total Assets Assets Current Net Capital Reserves Capital Reserves Total Reserves Reserve General Funds Development Restricted and Fund Capital Revaluation Reserve Grant Government 30 June 2009 June 30 Executive Chief Thurley Simon Dr by: behalf their on signed and Heritage of English Commissioners the by approved 43, 1to were notes related the and Statement Flow Cash the Sheets, Balance the and Gains Losses, Recognised of Statement the Account, Expenditure and Income the comprise which statements, financial The

Interim Chairman Interim Cunliffe Barry Sir Professor

Note 25 30 38 38 34 20 36 35 29 28 32 26 27 33 31 21

(41,797 (32,003 66,848 42,092 60,414 60,414 67,143 66,288 10,400 10,400 28,755 14,727 24,812 13,172 (9,794 (2,613 £’000 (4,116 211 , 2 7,771 2009 295 244 342 316 316

) ) )

)

)

(38,602 (30,596 66,830 66,830 73,029 70,634 40,997 (8,006 32,767 15,681 22,135 12,969 1 64 66 11, 69,763 (3,683 (2,516 £’000 2,395 8,925 2,593 2008 366 505 588 505

)

) ) )

)

47 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 48 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09

HBMCE Balance Sheet as at as Sheet 31 Balance HBMCE March 2009 Stocks Assets Current Investments Tangible Assets Assets Intangible Fixed Assets Creditors Overdraft Bank Year One Within Due Falling Amounts Creditors: Debtors Hand in and Bank at Cash Term Investments Short Liabilities Current Less Total Assets /Assets (Liabilities) Current Net Liabilities Less Total Assets Provisions Year One Than More After Due Falling Amounts Creditors: Capital Reserves Capital Reserves Total Reserves Reserve General Funds Development and Restricted Revaluation Reserve Grant Government 30 June 2009 June 30 Executive Chief Thurley Simon Dr by: behalf their on signed and Heritage of English Commissioners the by approved 43, 1to were notes related the and Statement Flow Cash the Sheets, Balance the and Gains Losses, Recognised of Statement the Account, Expenditure and Income the comprise which statements, financial The

Interim Chairman Interim Cunliffe Barry Sir Professor

Note 25 30 38 38 34 20 29 36 28 32 26 27 33 31 21

68,560 68,560 2,028 342 342 40,504

60,098 60,098 60,098 60,098 (42,237 (32,443 66,827 66,827 66,288 (1,733 10,400 28,755 15,801 24,312 13,172 (9,794 (2,613 £’000 (4,116 7,771 2009 244 49

) )

) ) )

)

366 366

(30,648 (38,654 66,325 66,325 66,325 66,325 72,524 16,656 16,656 (8,006 32,767 32,767 72,157 39,021 21,635 12,969 12,969 1 64 66 11, 69,763 (3,683 (2,516 £’000 2,028 8,925 8,925 2008 588 588 367 367 142 142 )

) ) )

)

Payments to acquire Tangible Fixed Assets Expenditure Capital IncomeInvestment Finance of Servicing and Investments on Returns CashNet Outflow from Operating Activities Operating Activities forStatement Year the Ended 31 March 2009 English Consolidated Heritage Flow Cash building. Headquarters deriving London costs previous the on relocation for lease of the surrender the from £3,500,000), (2008: £500,000 included Aid In Grant Government for figure 2008/09 The Decrease in Cash Payments to acquire Fixed Intangible Assets TermPayments into Short Investments Management of Liquid Resources Assets Fixed of Tangible Sale the from Proceeds Grants received credited to the Capital Reserves Reserves Capital the to credited received Grants Aid In Grant Government Financing Term Investments Short from Withdrawals

Note 38 38 37

(123,961 130,443 (273,154 270,477 129,358 129,358 (2,034 (2,677 (7,383 (7,201 1,544 1,544 £’000 1,085 1,085 2009 (186 4

) ) ) ) ) ) )

446 446 2

(282,723 (123,159 275,088 275,088 136,636 137,082 137,082 (10,930 1,026 (11, (3,328 76 5 (7,63 £’000 2008 1,410 1,410 (98 ) ) ) ) ) ) )

49 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 50 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Notes to the Financial the to Notes Statements h) a. 39 note at quantified are g) payable become to yet made offers Grant f) 32). (note Reserve General the to credited is e) receivable Aid in Grant Government years. 25 over Account Expenditure and Income the to d) released is income membership Life c) b) a) Statement of Accounting Policies1

Expenditure on developing the English Heritage brand is charged to the Income and Expenditure Account as it is incurred. is it as Account Expenditure and Income the to charged is brand Heritage English the developing on Expenditure years. of 20 life economic useful its over amortised is goodwill Purchased are they incurred. as Account Expenditure and Income the to charged are software use to licences Annual date. expiry licence no is there where asset related of the life the or licence of the life the over amortised and Assets Fixed Intangible as Sheet Balance the on shown are year one than of more alife with parties third from purchased software use to Licences Intangible Fixed Assets archives. and artefacts historic and funding, lottery including donations Grant, by Government funded non assets year, excluding the during liabilities less assets total average of the cent) per 3.5 (2008: cent per 3.5 at calculated of capital cost anotional charging after at arrived is year the for result Account Expenditure and Income The Costs Notional entitlement. of basis the forms which activity specific the out carries recipient grant the are when for duties and accounted powers statutory its with accordance in Heritage English by bodies and individuals to payable Grants Payable Grants are depreciated. assets the as Account Expenditure and Income the to released are and Reserve Grant Union European of the part as Sheet Balance the on held are Assets Fixed create or enhance purchase, to used Grants Union European depreciated. are assets the as Account Expenditure and Income the to released are and Reserve Asset of the Donated part as Sheet Balance the on held are Assets Fixed create or enhance purchase, to used Grants Lottery are depreciated. assets the as Account Expenditure and Income the to released are and Reserve Grant Government Non of the part as Sheet Balance the on held are Assets Fixed create or enhance purchase, to used Grants Government Non claimable. is grant the and fulfilled been have of grant conditions the when Sheet Balance and Account Expenditure and Income the in recognised are Receivable Grants Other Receivable Grants Other years. financial future until payments cash by to need not may satisfied be which ayear during liabilities incurring thus basis, accruals an on expenditure its for accounts Heritage year.English financial the during due falling payments cash Heritage’s English meet to voted is grant Parliamentary Receivable Aid in Grant Government Sheet. Balance the on Income Deferred as treated is year following the in provided be to benefits to relates that received Income member. the to provided benefit the match to Account Expenditure and Income the in recognised is income membership Annual IncomeMembership Tax. Added of Value net shown is Income Income include a consolidation of HBMCE, English Heritage Trading Limited and the Iveagh Bequest. Iveagh the and Limited Trading Heritage English of HBMCE, aconsolidation include statements financial the Hence Bequest. Iveagh of the Trustee the are Commissioners 31 Heritage ended year English the 2009. March throughout trading continued of HBMCE, undertaking asubsidiary Limited, Trading Heritage English i). (note 1, value current at buildings and land of inclusion the by cost modified as convention, historical the under standards accounting applicable with accordance in prepared are statements financial The Accounting Convention

j) Reserve Grant Government Non grants: other by funded -Assets Reserve Asset Donated donations: or grants lottery by funded -Assets Reserve Grant Union European grant: Union European by funded -Assets Reserve Revaluation Grant Government Aid: in Grant Government by funded -Assets - or assets; heritage -Operational i) Statement of Accounting Policies 1 Financial the to Notes Statements

purchased after 1 April 2001 are recorded in the Balance Sheet at cost. cost. at Sheet Balance the in recorded are 2001 1April after purchased archives and collections historic to additions Manual, Reporting Financial Government the with accordance In Archives and Artefacts Historic Account. Expenditure and Income the to charged are losses unrealised other Any concerned. to which relates the assets relevant Reserve the on Capital balance credit of the proportion the against off written are date Sheet Balance the at losses Unrealised - follows: as Reserves, Capital the to directly taken is date Sheet Balance the at revaluation on gain unrealised Any leasehold. are Sheet Balance the on held buildings and land of the None Capital Reserve. relevant the in reflected is value in change Any Statistics. National of Office the by published indices relevant using annually reviewed are Assets Fixed as held buildings and land of the values The 2009. 31 the March ended during year valuation interim an undertook Neate Dreweatt 2008. 31 March ended year the during an valuation interim undertook LLP Cluttons suspected. is value in change amaterial where only out carried are valuations Interim guidance. Surveyors Chartered of Institution Royal with accordance in Agency, Office Valuation the and Youngs, Thompson, Edwin &Parker, Strutt Storeys:SSP, Prentice, Edward Leisure, Jonas, Humberts Leung, Tie Drivers Debenham DTZ Symonds, Capita &Platts, Vickers Brownill Stephensons, &Cooper Boulton , &Co, Ash external valuers; following the and valuers, internal qualified professionally by 2006 31 at as March undertaken was revaluation full A years. five every valuation professional afull to subject are Sheet Balance the on held buildings and land All use. future intended its and building of the are type the by informed properties vacant of valuations and Classification use. majority the to according classified are buildings use Mixed disposal. its to attached conditions any and use its building, of the type the upon depends used valuation method The Sheet. Balance the on held and valued professionally are buildings and land (non-heritage) Operational disposal. its to attached conditions any and use its building, of the type the upon depends used method valuation The Sheet. held and Balance the on valued professionally are purposes, non-heritage other or generating revenue for used also are overall objectives of its pursuit in Heritage English by held being to addition in which buildings, and land heritage Operational incurred. is it as Account to Expenditure charged is and Income the asset, heritage operational of anew creation the in result not does it where assets, these on Assets. Expenditure Fixed as treated not are they otherwise possible, is valuation areliable where Sheet Balance Fixed the as in included Assets are heritage, of the preservation and enjoyment the to relation in objectives overall of its Heritage, pursuit in English by held buildings and land heritage pure Manual, Reporting Financial Government the with accordance In assets); heritage (non-operational assets - heritage Pure either: as classified are and Manual Reporting Financial Government the with accordance in Assets Fixed as treated are Heritage English of, guardianship by, the in or owned buildings and Land andLand Buildings Assets funded by restricted funds: Restricted Fund Asset Reserve Restricted funds: funded Assets by restricted Operational (non-heritage) assets. (non-heritage) Operational

51 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 52 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Notes to the Financial the to Notes Statements

Assets. Fixed other as way same n) the in revalued are assets Donated m) l) k) Statement of Accounting Policies 1

useful economic life is such that depreciation is not considered to be material. material. be to considered not is depreciation anticipated that such of their is life economic length the useful as depreciated, not are archives and artefacts historic and buildings heritage Operational considered. are assets component for lives economic useful separate such identified, are Where lives. assets economic useful different substantially with components major distinct have which assets identify to 15 requirement Standard Reporting Financial the to had is regard lives, economic useful anticipated considering When fittings and IT, furniture Plant and machinery Plant and infrastructure refurbishment, cottage - Shop/café/holiday Refurbishments - Gardens - Non brick/stone; visitor centres, shops, museums, exhibition buildings 25 years years 25 playgrounds parks, car - Paths, structures brick/stone non - Other buildings exhibition museums, shops, centres, visitor brick/stone; - Non buildings brick/stone or permanent - Other - Dwellings gardens and buildings Non-heritage follows: as are These lives. economic useful anticipated their over value residual estimated their to cost their down write to order in each year amounts equal in construction, under assets and land excluding Assets, Fixed Tangible on provided is Depreciation Depreciation resources. own its from Heritage English by purchased been it had treatment this to subject been have would asset the if Assets Fixed as treated be only will assets Donated receipt. on value current at held and Assets Fixed as treated be will asset, the for of funds way by or asset of the gift by either parties, third by donated Assets Assets Donated use. into brought is asset the when of Fixed Asset category relevant the to construction under assets from made are Transfers date. Sheet Balance into the at use brought not Assets of Fixed enhancement or creation the on expenditure comprise construction under Assets Under Assets Construction material. is adjustment the where made are impairment and adjustments Revaluation appropriate. remains value carrying the that ensure to annually reviewed are assets These asset. the of benefits economic the enhances expenditure the if Sheet is Balance the on expenditure recorded Subsequent at cost. Sheet Balance the in recorded initially are fixtures and equipment vehicles, Plant, Fixtures and Equipment Vehicles, Plant,

20-25 years 20-25 10-20 years 10-20 5-15 years 5-15 4-5 years 4-5 50 years years 50 50 years years 50 years 50 20 years years 20

u) t) s) r) q) cost. at held are p) undertakings subsidiary in Investments o) Statement of Accounting Policies 1 Financial the to Notes Statements

objective to further the heritage aims stated in the National Heritage Act. Heritage National the in stated aims heritage the further to single objective the have and contiguous and inter-related are services all as made been have disclosures reporting segmental No Reporting Segmental Funds held by English Heritage that can only be applied for particular purposes imposed by donors and grant givers are are funds. held as restricted givers grant and donors by imposed purposes particular for applied be only can that Heritage English by held Funds Funds Restricted schemes satisfy the requirements of applicable accounting standards (note 19). (note standards accounting of applicable requirements the satisfy Both schemes Chairmen. previous the for PCSPS the to scheme by-analogy a operates also Heritage English scheme. benefit defined employer amulti is This (PCSPS). Scheme Pension Service Civil Principal of the amember is Heritage English Pension Costs 28). (note policy treasury Heritage’s English with accordance in month one to of up for periods interest of rates fixed at deposit term short on placed is requirements flow cash immediate to surplus Cash Instruments Financial incurred. as charged are costs lease Operating Leases Operating run. print first the over off written are resale for publications produced of costs internally Origination value. realisable net and cost replacement of current lower the at stated are resale for held Goods Stocks Account. Expenditure and Income the to charged are losses unrealised other Any concerned. investment the to relates which Capital the Reserve on balance of credit proportion the against off written are date Sheet Balance the at losses Unrealised reserves. to directly taken is date unrealised Sheet Any Balance value. the at gain market current at held are undertakings subsidiary in those than other Investments, Asset Fixed Investments Asset Fixed

53 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 54 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09

Income Total Earned Income Earned Other Income Catering and Retail

Monuments and Buildings 3 Other Operating Income Operating Other 3 2 Financial the to Notes Statements 5 4

Aggregates Levy Historic Environment Environment Historic Levy Aggregates of Worship Places Other Other Other Levy Aggregates Fund Lottery Heritage Community European Transfer (to)/from Capital Reserves Reserves Capital (to)/from Transfer Income Operating Other Reserves Capital from (to)/ Transfer

Earned Income Earned Grants PayableGrants Income Investment Membership Income Membership Admission Income Total Investment Income Investment Total Dividends Receivable Payable Total Grants Interest Receivable Interest O Environment Historic Cathedrals Areas Conservation Grants Receivable Grants Total Receivable Grants Income Operating Total Other Total Grants Total Grants Donations ther

- - - Capital (1,081 £’000 1,081 1,081 1,081 1,081 2009 (344 344 - - -

) )

Revenue 2,956 2,956 4,100 4,100 £’000 1,550 2,712 2009 777 244 244 472 269 421 421 152 152 215

366 366 -

42,928 42,928 29,247 29,247 Capital 15,328 10,423 1 531 11, 1,057 1,057 £’000 £’000 £’000 £’000 5,646 5,297 1,408 4,732 4,732 1,028 1,255 7,057 1,745 7,753 7,753 2008 2009 2009 2009 (366 (314 366 314 314 29 - - - - -

) ) )

Revenue 40,728 32,598 14,070 1403 11,4 £’000 £’000 £’000 £’000 6,044 4,000 6,820 4,253 5,778 5,334 3,907 4,698 1,392 4,274 7,082 1,420 8,142 2008 2008 2008 2008 9,921 1,142 809 266 757 242 159 141 28 70

Record Monuments National Outreach and Education 8 Properties Expenditure Properties 8 Expenditure Environment Historic 7 Expenditure Standards and Research 6 9 Education and Outreach Expenditure Outreach and Education 9 Notes to the Financial the to Notes Statements

Total Expenditure Properties Conservation Expenditure Outreach and Total Education Expenditure Standards and Total Research Setting Standards Research Total Historic Environment Expenditure Listing Managing Environment the Historic Maintenance Running the Properties

75,970 75,970 22,916 22,916 21,927 21,927 58,355 10,722 10,722 19,084 13,499 12,194 £’000 £’000 £’000 £’000 9,014 9,014 2,843 2,843 6,556 6,556 2,458 2009 2009 2009 2009 4,116 4,116

10,000 52,569 18,583 12,087 22,691 68,717 21,267 12,691 £’000 £’000 £’000 £’000 2,684 8,285 5,964 5,964 4,061 2,321 2,321 2008 2008 2008 2008

55 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 56 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09

Notes to the Financial the to Notes Statements 14 13 12 11 10

English Heritage and HBMCE HBMCE and Heritage English

Support Expenditure Support

Corporate Expenditure Corporate Total Corporate Expenditure Expenditure Total Corporate Governance Legal Services Total Expenditure Support Resources Human Auditors’ Fees Auditors’ Taxation Relocation Costs Relocation Policy and Communications March 2009 to HBMCE under the Gift Aid rules. Hence, it suffered no taxation charge as it had no taxable profits. taxable no had it as charge taxation no suffered it Hence, rules. Aid Gift the under HBMCE to ended 31 2009 year the March for profits its all transferred Limited Trading Heritage English nil). the for (2008: 2009 31 March operations ended year its on expected is liability taxation No purposes. taxation for of acharity status the enjoys HBMCE £368,000). 21 note (2008: Assets, Fixed as addition included In and capitalised were £464,000). (2008: of £260,000 costs of £488,000 depreciation including £3,449,000) (2008: £3,828,000 totalled Finance of the Department restructuring and relocation the including project this to relation in to Expenditure staff of London. outside Headquarters London of its majority the relocate to aproject commenced Heritage English 2005/06 In Finance English Heritage Trading Limited Heritage English work: audit expenses for and statutory remuneration Auditors’ Systems Information The 2008/09 auditors’ remuneration includes additional fees related to the implementation of International Financial Financial Standards. Reporting of International implementation the to related fees additional includes remuneration auditors’ 2008/09 The Total Auditors’ Fees

13,509 5,921 5,921 £’000 £’000 £’000 4,534 1,387 1,387 3,126 3,415 3,415 6,176 2009 2009 2009 792 69 69 62 7

6

12,197 £’000 £’000 £’000 5,302 3,299 3,896 2,724 2008 2008 2008 1,315 211 , 5 872 55 61

15 Financial the to Notes Statements 16

Advisory Committee and Panel Members Panel and Committee Advisory Commissioners including acting as an Advisory Committee Chairman, a full year equivalent of £18,000. His position is non pensionable. non is position His of £18,000. equivalent year afull Chairman, Committee Advisory an as acting including fees basic to wholly related and £10,000 were date that from emoluments his and 2008 16 was on September Commissioner, appointed paid highest the Cunliffe, Barry Sir Professor Chairman, Interim current The fees. basic to wholly related and of £45,000 equivalent year afull £19,000, were 2008 14 on August death of his date the to up Lockhart Bruce- Lord Chairman previous of the emoluments The fees. related performance any received Commissioner No behalf. Commissioners’ the on pays Heritage English which expenses travel office to home on payable any tax includes income also Emoluments Panels. and Committees of Advisory members as and Commissioners as duties their of respect in fees basic to related wholly and £133,000) (2008: £87,000 totalled emoluments Commissioners’ Committee and Panel Members who were not Commissioners received no emoluments during the year (2008: nil). (2008: year the during emoluments no received Commissioners not were who Members Panel and Advisory Committee Commission. to directly report which Panels and Committees of Advisory anumber has Heritage English Commissioners’ emoluments are set by the Department for Culture, Media and Sport. and Media Culture, for Department the by set are emoluments Commissioners’ pensionable. non are appointments the years, of 4 terms fixed for appointed been have Commissioners current All business. Heritage English on spent time working of her lieu in employers, her are of York who University the to paid were Grenville Jane Dr for above shown emoluments The follows: as were Commissioners the of emoluments The Williamson Elizabeth Ms 2007) 9July (appointed Wilkinson Chris Mr 12 2008) May ended of appointment (term Sparks Les Mr of Leicester Earl The Kennedy Jane Ms Jolly Michael Mr 12 2008) May ended of appointment (term Grenville Jane Dr Drummond Gilly Mrs 2007) 31 August ended of appointment (term Douro Lord Chairman) Interim as appointed (up to when 16 2008 September Cunliffe Barry Sir Professor Chande Manish Mr Cannadine David Sir Professor 2007) 19 September ended of appointment (term Cairns Michael Mr 2007) 31 August ended of appointment (term Bryson Bill Mr Bridges Joyce Mrs Adebowale Maria Ms 2008) October 20 (appointed Addison Lynda Ms

£’000 2009

10 4 1 1 1 4 6 4 4 6 3 4 6 4 - - -

£’000 2008 3 9 6 4 6 4 4 6 2 8 4 6 3 2 4 9 - 57 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 58 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 • • • • • •

Notes to the Financial the to Notes Statements 17 Related Party Transactions And Connected Bodies Connected Transactions And Party Related During the year English Heritage had the following material transactions in which there was a related interest: interest: arelated was there which in transactions material following the had Heritage English year the During for Transport Department (Defra) Affairs Rural and Food Environment, for Department Government Local and Communities for Department CITB - ConstructionSkills CITB Cabinet Office Cabinet Board Railways British Architectural Heritage Fund Heritage Architectural Advantage WestAdvantage Midlands 2009: 31 at March of £1,733,000 bodies these with balance debtor amaterial was there and bodies Government Central and Departments Government following the with transactions material had Heritage English year the During ofMuseum London Heritage Lottery Fund Lottery Heritage (CABE) Environment Built the and Architecture for Commission Arts Council England Council Arts parent Department: the as regarded is DCMS which for entities following the with transactions material also were There 2bodies. the between secondment on staff were there addition In Survey. Part Taking the towards of £80,000 Heritage English by payment a and 32) (note Aid in of Grant receipt of the respect in were DCMS with transactions material only The party. arelated as regarded is which (DCMS) Sport and Media Culture, for Department the by sponsored is Heritage English Lord grant payments totalling £98,000. totalling payments grant conservation received which Council Cathedral of Rochester Chairman the also was He Council. County Kent from of £772,000 income grant received also Heritage English £21,000. totalling payments grant received which Professor income totalling £3,000. totalling income other and £1,550,000 totalling grants environment historic levy aggregates comprising of £1,553,000, Defra from project. Conservation Seahenge the towards of £9,000 payments received which Services Archaeological Rose Professor of £40,000. payments grant including £90,000 totalling payments received CABE CABE. at Panel Review Design Crossrail the for Chair is 2008, Mrs Ms payments totalling £296,000. English Heritage also received income of £33,000 from the National Trust. National the from of £33,000 income received also Heritage English £296,000. totalling payments other various and £367,000 totalling payments grant of conservation £1,241,000, grant deficit maintenance Trust National annual of the payment the including Trust National the with transactions numerous has Heritage English Mrs which received historic environment grants totalling £67,000. totalling grants environment historic received which Archaeology Maritime for Trust of Wight Isle and Hampshire of the Chairman Acting is husband Drummond’s Gilly Mrs CHGT. to of £750,000 payment agrant made Heritage English Standards. and of Research Director the Impey, Edward Dr with along (CHGT) Trust Gardens and House of Chiswick aTrustee also is She of £12,000. payments Maria Joyce Gilly Bruce-Lockhart, Drummond, Adebowale, Sir Sir Bridges,

Barry David

a Commissioner, Commissioner Cunliffe, a Cannadine,

the a Commissioner, a Commissioner,

Chairman a Commissioner, is until a Commissioner has is his President worked death and is Interim

a member on of on 14 the of various Chairman August CABE Association of projects and the Yorkshire Forward Scottish Government England Natural National School of Government of Government School National Ministry of Defence of Defence Ministry Government News Network Network News Government Environment Agency Visit Britain Royal Armouries Museum Royal Armouries Museums, Libraries and Archives Council Council Archives and Libraries Museums, National Heritage Memorial Fund Fund Memorial Heritage National 2008, from National Mr of was for Les Gardens 16 Defra. a Member Sparks, September Trust

English Trusts

Eastern a Commissioner

of 2008, which Heritage Kent

Regional is County received a Trustee received Committee. until Council grant 12 of income May Mary

• • 17 Financial the to Notes Statements iss • • • • • • • • • • Related Party Transactions And Connected Bodies Connected Transactions And Party Related transactions with English Heritage during the year. the during Heritage English with transactions party related material any undertaken has party related other or staff managerial key Commissioners, other No Ms £33,000. totalling payments other £118,000 various and totalling payments grant conservation £173,000, totalling payments grant environment historic including of £324,000 payments received Archaeology British for Council The Archaeology. British for Council of the aTrustee is partner Territory’s, West Director, Development and Planning Smith, Chris Mr Archaeology. British for Council of the Committee Casework of the Chair also is She £18,000. totalling payments other various and of £96,000 posts for funding £18,000, of grants £114,000, conservation totalling grants environment historic including of £246,000 payments received Dr payment of £55,000. grant aconservation received Estates Coke Ltd. Estates of Coke aDirector also is of Leicester Earl The £45,000. totalling payments grant conservation received which Society Monuments Ancient of the aTrustee is Standards, £472,000. totalling Dr The Wall Heritage Marketing Campaign. Marketing Heritage Wall Hadrian’s the towards of £15,000 acontribution including £31,000, totalling payments received which Ltd Heritage projects. of research respect in services £11,000 consultancy for totalling payments of £11,000. payment grant aconservation received which Mr Dr Attractions (ALVA) which received payments of £7,000. payments (ALVA) received which Attractions £37,000. totalling payments grant received which M Mr of £61,000. payments grant including £66,000 totalling payments Mr Mr of £8,000. payment grant environment ahistoric received which Society Archaeological Ms of £12,000. grant aconservation received which Church Gabriel’s St Mrs payment of £5,000. Jane Simon Andrew Humphrey Mark Henry Greg Jane Loraine Magdalen Earl Carol Grenville, Kennedy, of Luton, Pemberton, Thurley, Owen-John, Pyrah, Leicester, Knowles, Brown, Fisher, Welfare, Regional a Commissioner, Regional a Commissioner the Regional Visitor Development a Commissioner, the Chief Regional the Director, Director Director, Planning Operations Executive, Director, Director, East of is until Director, North and a Partner Properties South is is of 12 Director, the Development a member North England, May East’s, Vice East, is with a Trustee 2008, and West, President West partner is is Purcell of a Director Outreach, a Board is the Director, is ertry, Territor Pro-Vice of a Board runs Parochial Miller and St Member Gabriel’s a research of is Dr North Chancellor Tritton a Director Member is Culture Edward a Trustee Church of Parish ertry, Territor Architects Shape South consultancy of Impey, Council of of Culture of House the the Cambridge Dorset East is the University Association a Director which of in which North Director business All the Natural received Saint’s, - Architectural same received West, of of of which of York, History Hadrian’s parish Leading King’s Research fee which a grant has which payments Lynn, as and received Visitor received Centre,

Wall and

59 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 60 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Notes to the Financial the to Notes Statements Outreach and Education was: equivalents full-time as expressed year the during employed of persons number average The 19 a) 18 Social Security Costs Costs Security Social Salaries Agency Staff Costs Costs Staff Agency b)

Pension Costs Pension Costs

Employees Costs Total Employee Corporate Properties Environment Historic Research and Standards Employee Numbers rates reflect benefits as they are accrued, not when the costs are actually incurred, and reflect past experience of the scheme. experience past reflect and incurred, actually are costs the when not accrued, are they as benefits reflect rates contribution The revalorised. be will bands pay the and pay of pensionable cent per 24.3 16.7 and between to decrease will year next for Rates 17.1 cent). per 25.5 (2008: to bands salary on pay, based 17.1 of pensionable cent per 25.5 to range the in 1of 4rates at PCSPS the to payable were contributions employers’ 2009, 31 March ended year the For (www.civilservice-pensions.gov.uk). Superannuation Civil Office: Cabinet of the accounts resource the in found be can 2007. 31 Details at as March out carried was valuation actuarial Afull liabilities. and assets underlying of the share its identify to unable is Heritage English scheme, benefit defined multi-employer unfunded an is PCSPS the As PCSPS. of the amember is Heritage English years. financial previous to related £450,000 include 2008/09 for costs Pension capitalised. been have that nil) (2008: costs staff agency no and nil) (2008: costs severance and redundancy no are 21). (note There Assets Fixed within capitalised been have that £36,000) (2008: £21,000) costs pension (2008: nil and costs security social nil £248,000), (2008: costs salaries £3,000 are costs above the within Included Pension Costs Pension Employee Costs Redundancy and Severance Costs 21. note 10), (2008: Assets Fixed as shown projects on working of staff 51) 1member and (2008: staff agency 48 include numbers Employee Total Employee Numbers Support

72,499 72,499

10,278 54,172 1,970 1,970 £’000 2,322 4,082 1,645 2009 2009 882 162 374 159 331 62

68,050 68,050

51,636 £’000 4,024 4,024 9,097 2,173 2,173 1,935 2008 2008 1,120 1,120 354 354 334 334 870 870 160 160 156 156 61 61

At 31 March 2008 2008 At31 March

20 19 Financial the to Notes Statements Charge for the Year the for Charge 2008 At1April

At 1 April 2008 2008 At1April HBMCE and Heritage English

Pension Costs Pension Costs Intangible Fixed Assets Fixed Assets Intangible 2009 31At March Value Book Net 17 principles. Standard Reporting Financial and guidelines Treasury with accordance in Department Actuary’s Government the by valued been has scheme This £250,000). (2008: £218,000 was 2009 31at March liability scheme The chairmen. previous 3of the for PCSPS the to scheme aby-analogy operates Heritage English nil). (2008: nil were date that at prepaid Contributions nil). (2008: nil were date Sheet Balance the at providers pension partnership the to due Contributions employees. these of retirement health ill and service in death on benefits sum of lump provision future of the cost the cover to PCSPS the to payable pay, were of pensionable cent per 0.8 £11,000), (2008: of £9,000 contributions employer pay. addition, In of pensionable cent 3per to up contributions employee match also pay. Employers of pensionable cent per 12.5 3to from range and age-related are contributions Employer £152,000). (2008: providers pension stakeholder appointed of 3 apanel to paid of £157,000 were contributions Employers’ contribution. employer an with pension stakeholder a account, pension apartnership open to opt can 2002 1October after Heritage English joining Employees previous financial years. to relation in £450,000 include and £8,933,000) £10,112,000 were (2008: PCSPS the to contributions Total employer Impairments Amortisation Eliminated on Disposals Eliminated 2009 31At March Additions orCost Valuation 2009 31At March Disposals

Software Licences Software

-

-

£’000 855 669 185 670 186 155 155 156 156 514 514 -

-

- Goodwill £’000 211 211 244 244 244 185 140 140 59 33 12 -

366

- - 1,099 £’000 Total 244 855 547 186 140 168 913

61 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 62 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09

Charge for the Year the for Charge 2008 At1April Notes to the Financial the to Notes Statements 2008 At1April 21 22

At 31 March 2008 2008 At31 March

Tangible Fixed Assets Pure Heritage Land and Buildings and Land Heritage Pure Transfer of assets brought into use into brought of assets Transfer Eliminated on Disposals Eliminated Additions Backlog Depreciation Backlog Depreciation 2009 31At March Impairments Disposals Revaluations 2009 31At March orCost Valuation properties are either in the ownership of English Heritage, other government departments or the . Crown the or departments government other Heritage, of English ownership the in either are properties remaining The owner. the by retained being freehold the with Sport and Media Culture, for of State guardianship the in being Secretary of the majority the with arrangements, various under Heritage English by held are properties These properties. these at buildings main the as recognised be would of what and majority vast the identified been have encompass assets heritage pure 550 Over 1, i). (note (non-heritage), operational or heritage heritage), operational (non-operational heritage pure either as classified been have properties these at buildings and land of the All houses. century twentieth to 3500-2600BC from dating chambers burial Neolithic from range they age In House. Osborne furnished lavishly the to ruins of part prehistoric alarge from and circles range They Wall. stone Hadrian’s forts, abbeys, houses, historic castles, monuments, industrial includes Sites, that Heritage World portfolio adiverse providing England throughout properties historic 400 over manages Heritage English 2009 31At March Value Book Net HBMCE and Heritage English at Dover Castle, Lullingstone Roman Villa, Audley End House, Carisbrooke Castle and Down House. House. Down and Castle Carisbrooke House, End Audley Villa, Roman being Lullingstone projects Castle, Dover at largest the sites, trading our at projects capital comprise mainly year the for transfers and additions The Assets 20). Fixed (Note Intangible to transferred been have that year prior the in Construction under Assets in included been had of £171,000 acost which with licences software include year. These the in completed been have under which Assets of transfer Construction the represent categories asset fixed other to Construction under Assets from transfers The

Buildings 50,059 52,588 52,588 62,867 62,867 10,279 10,279 61,634 61,634 11, 575 575 11, (2,773 Land & Land (2,837 4,535 1,770 1,770 £’000 (158 (158 (316 -

) ) ) )

)

& Archives &

Artefacts 5,635 5,635 5,635 5,538 5,538 £’000 97 ------

&Machinery

2,108 2,108 2,564 2,564 4,009 4,009 6,573 6,573 5,590 5,590 3,482 3,482 £’000 Plant (291 (291 896 896 378 378 818 818 - - - ) )

IT, Furniture

&Fittings 15,861 15,861 13,382 13,382 12,613 12,613 2,372 2,372 11,010 3,248 3,248 1,638 1,638 £’000 2,123 2,123 391 391 (35 (35 - - -

) )

Assets under Assets Construction

(7,725 7,157 7,157 4,782 4,782 4,782 5,350 5,350 £’000 7,157 7,157 ------

)

66,288 94,485 28,197 69,763 94,534 24,771 (2,773 (2,837 4,226 6,216 £’000 (484 (484 Total (316 (171 ) ) )

) )

)

24 Artefacts Historic 23 Financial the to Notes Statements 25 a) 1April at Value Market b) 42. note in given are undertakings subsidiary of the Details Losses Investment Net

Fixed Asset Investments Fixed Asset Archives Assets (2008:£593,000). No donated archives received during the year had a value (2008: nil). (2008: avalue had year the during received archives donated No Fixed to (2008:£593,000). charged Assets was nil and £4,000), (2008: Account Expenditure and Income the to charged was expenditure this of All £597,000). (2008: 2009 31 March ended year the during archives on incurred was of £15,000 Total expenditure staff. own our and organisations heritage other researchers, professional public, of the members by used are archives Our heritage. of England’s record national the is and documents, and texts photographs, modern and Monuments historic 10 over million National holds Our Record books. and reports photographs, plans, maps, comprise archives extensive Heritage’s English nil). (2008: had a value year the during received artefacts donated £113,000). No (2008: Account Expenditure and was Income the £15,000 to and charged £399,000) (2008: Assets Fixed to charged was expenditure of this £97,000 £512,000). (2008: 2009 31 March ended year the during replicas) (including artefacts historic on of £112,000 incurred was Total expenditure properties. our enhance and restore to work part as ongoing of our purchased been have others and properties our on excavations of archaeological results the are some donated, been have 1986,some in Council London Greater the from 1984, some 1April on Environment of the the Department from transferred were some sources; many from come They contents. former recovering curators by and sites excavating archaeologists by or castles and houses of historic owners past the by formed were collections These staff. own our and professionals heritage for resource research avaluable provide public the they to and properties our presenting and interpreting in assist As they right, own their in properties. of significance historic our being of as well part integral an are They furnishings. and art fine pottery, to and remains artefacts, archaeological environmental from ranging artefacts, historic of 500,000 region the in possesses Heritage English 2009 31 and March 2008 1April At HBMCE 31 at Cost March Historical 31 at Value March Market Additions Heritage English Disposals the value in Charifund. in value of the p.a. 0.46% fees, management of investment net is shown value market The Charifund. in units 38,576 comprised and Limited Securities M&G by managed Fund Investment Common asingle in held was investment the 2009 At 31 March

Undertakings 2,028 2,028 Subsidiary £’000

Investments

-

Other £’000 £’000 2008 (189 434 434 316 316 505 - -

)

2,028 £’000 £’000 Total 2009 (123 505 628 434 - -

)

63 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 64 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Notes to the Financial the to Notes Statements e) d) c) b) a) 28 27 26

Undertaking Subsidiary by Owed Amount Tax Added Value

Financial Instruments Stocks Debtors and short term investments held on fixed rate deposit: rate fixed on held investments term short and 25) (note Fund Investment Common ina held investments asset fixed 38), (note cash of consist assets financial The Assets Financial liabilities. and assets of financial values fair and values carrying the between difference material no is There Valuation sterling. in held are liabilities and assets financial All Risk Currency risk. rate interest significant to exposed not are which asset fixed investments and investments term short cash, are assets financial disclosable only 1year. The within due mainly are and bearing interest are which (note of 31)none provisions to solely relate liabilities financial term long Heritage’s English Interest Rate Risk Owing to the nature of its funding and pattern of expenditure, English Heritage does not have any significant liquidity risk. liquidity significant any have not does Heritage English of expenditure, pattern and funding of its nature the to Owing Risk Liquidity Balance Sheet date have not been disclosed as financial instruments. financial as disclosed been not have date Sheet Balance the from 12 months within payable become or mature to due are that creditors and 13, FRS by debtors allowed As ratings. credit risk low with with institutions deposit rate interest fixed term short on funds of surplus and Fund Investment aCommon in held Iveagh the to Bequest related Investments Asset Fixed are investments only its and borrow to powers no has Heritage English 13 applies. mainly (FRS) Standard Reporting Financial which to companies listed of the typical be would than risk changing or creating in role limited more amuch play instruments Financial entities. business by faced normally risk of financial degree the to exposed not is Affairs, Heritage Rural English and Food Environment, for Department the and Government, Local and Communities for the Department Sport, and Media Culture, for Department the with agreement funding a3year has Heritage English As Other Debtors Other and AccruedPrepayments Income Trade Debtors Resale for Items oa ebtors D Total

English Heritage English Heritage

-

14,727 14,727 2 ,211 ,211 2 £’000 £’000 2,684 8,549 1,973 1,521 2009 2009

- 15,681 15,681 £’000 £’000 2,257 2,257 2,593 2,593 8,876 8,876 1,379 1,379 3,169 3,169 2008 2008

15,801 15,801 £’000 £’000 2,684 8,549 1,973 1,521 1,074 2009 2009 49 HBMCE HBMCE

16,656 £’000 £’000 2,257 8,873 1,380 3,169 2008 2008 977 142

29 28 Financial the to Notes Statements 30

Income Tax and Social Security Security Tax Social and Income Fund Investment -Common Investments Asset Fixed Deferred Income Income Deferred Undertaking Subsidiary to Owed Amount Capital Government Grant in Aid Aid in Grant Government Capital Term Deposit Short on -Cash Term Investments Short

Other Creditors Creditors Other Income Deferred Other Creditors includes £2,018,000 (2008: £615,000), held on behalf of the Chiswick House and Gardens Trust. Gardens and House Chiswick of the behalf on held £615,000), (2008: £2,018,000 includes Creditors Other

Creditors: Amounts Falling Due Within One Year One Falling Within Due Amounts Creditors: Creditors: Amounts Falling Due After More Than One Year One Than More Falling After Due Amounts Creditors: Financial Instruments Total Creditors: Amounts Falling Due After More Than One Year One Than More After Due Falling Amounts Total Creditors: Trade Creditors Pensions Pensions Total Creditors: Amounts Falling Due Within One Year One Within Due Falling Amounts Total Creditors: Accruals 0.76 per cent and 1.16 and range between cent 0.76 cent. per per deposits these on rates interest date, Sheet Balance of the 1month within mature above deposits term short The

English Heritage English Heritage English Heritage

-

32,003 25,128 25,128 24,812 24,812 1 237 11, 2,613 2,613 £’000 £’000 £’000 1,343 9,538 3,746 5,781 2,413 2,413 2009 2009 2009 200 340 316 18

-

22,640 30,596 10,858 10,858 10,633 22,135 22,135 £’000 £’000 £’000 2,301 1,302 5,429 5,429 1,968 1,968 2,516 2,516 2008 2008 2008 505 370 370 215 215 36

32,443 24,312 24,312 24,312 24,312 1 231 11, 2,613 2,613 £’000 £’000 £’000 1,343 9,538 3,746 3,746 1,108 2,413 2,413 2009 2009 2009 5,119 200 340 18 - HBMCE HBMCE HBMCE

30,648 10,858 10,627 21,635 21,635 £’000 £’000 £’000 4,734 2,301 1,302 1,968 2,516 2008 2008 2008 370 753 215

36 -

65 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 66 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09

Balance at 1 April 2008 2008 1April at Balance 34) (note Reserve Revaluation from Transfer Disposal Asset Fixed re Transfer Impairment Asset Fixed re Transfer Net Expenditure for the Financial Year Financial the for Expenditure Net Depreciation Asset Fixed re Transfer utilised forward brought Aid in Grant Capital Add Grant in Aid receivable from DCMS for relocation relocation for DCMS from receivable Aid in Grant DCMS from receivable Grant Baseline HBMCE and Heritage English Notes to the Financial the to Notes Statements 32 31

Movement in General Reserve in General Movement previous London Headquarters building. previous London Headquarters the on lease of the surrender the from derives above shown relocation for DCMS from receivable Aid in Grant 2009 31 at March Balance Movement in General Reserve General in Movement Aid in Grant Total Government receivable Aid in Total Grant Provisions Relocation and Restructuring Costs Relocation and Restructuring Claims Obligations Constructive and Legal HBMCE and Heritage English Total Provisions

440

Balance at Balance 1 April £’000 3,683 2008 3 ,113 ,113 3 130 130

Released in Released

the year the £’000 (114 (81 (18 (15

-

-

-

) ) )

)

Capital 42,960 42,960 45,494 45,494 (2,534 (2,534 (3,651

(2,913 £’000 4,000 4,000 Utilised in Utilised 30 the year the - (1,602 (1,073 ) ) )

) £’000

(417 (112 ) )

) )

500 500 80 80

Revenue (134,209 Charged in 132,731 125,358 125,358 124,858 124,858 (14,205 (12,727 (1,478 £’000 4,179 the year the 2,913 281 £’000 1,750 1,750 2,149 2,149 - - 319 319 ) )

) )

130,197 129,358 Balance at Balance

31 March 31 (134,209 128,858 28,755 (4,012 32,767 £’000 £’000 4,116 3,709 Total 2009 500 528 281 319 88 30 - -

)

)

32) Year (note the for Charge Depreciation Asset -Fixed Reserve General to –Transfer 32) (note Disposals Asset -Fixed Reserve General to –Transfer Depreciation Backlog Asset –Fixed Buildings and of Land –Revaluation 2008 1April at Balance HBMCE and Heritage English 34 33 Financial the to Notes Statements 35 Depreciation Backlog Asset –Fixed Year the for Charge Depreciation Asset –Fixed Disposals Asset –Fixed Construction under –Assets Year in Movement HBMCE and Heritage English

Balance at 1 April 1April at Balance Buildings and of Land –Revaluation – Fixed Asset Additions Additions Asset –Fixed 2008 1April at Balance Investments Asset Fixed on losses Investment Net

Analysis of Capital Reserves of Capital Analysis Capital Fund Capital Movement in Government Grant Revaluation Reserve Revaluation Grant in Government Movement Balance at 31 March 2009 2009 31 at March Balance English Heritage English 31 at March Balance 2009 31 at March Balance

Reserve Grant £’000 2,097 2,245 2,245 (83 (81 EU 16 - - -

) )

2,364

Non Govt Non Reserve Grant £’000 1,405 1,405 1,037 1,037 (99 (28 45 4 - )

)

Donated Reserve £’000 Asset 7,788 7,788 7,747 7,747 (164 (168 240 240 104 104 29 -

)

)

Restricted Asset Fund

Reserve £’000 £’000 2009 (189 (114 316 316 505 923 923 585 585 267 267 191 191 (18 12 -

)

)

) )

10,400 10,400 13,172 12,969 (2,542 16 4 11,66 £’000 £’000 £’000 1,468 Total 2008 (280 (458 (297 (123 505 734 253 628 61 - - )

) )

)

)

67 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 68 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Increase in Creditors and Provisions Provisions and Creditors in Increase Decrease / (Increase) in Debtors Debtors in /(Increase) Decrease Stocks in Decrease Reserves Capital from Release Impairments and profit on disposal of Fixed Assets Assets Fixed of disposal on profit and Impairments Notional Cost of Capital of Capital Cost Notional

Net Expenditure before Investment Income Income Investment before Expenditure Net Notes to the Financial the to Notes Statements

36 37 HBMCE and Heritage English

Down House and Gardens Gardens and House Down

The Total Funds were held as pooled investments as follows: follows: as investments pooled as held were Total Funds The

Development and Restricted Funds Restricted and Development Net CashNet Outflow from Operating Activities Depreciation and Depreciation and Amortisation from OperatingActivities from Outflow Cash to Net Reconciliation Expenditure of Net

Kenwood House Term Investments Short and Cash Ditherington Flax Mill Flax Ditherington HouseRangers Foundation) (Wernher oa unds F Total Development Fund Funds Total Restricted London Squares Palace Eltham Wrest Park Wrest

Balance at Balance

1 April 8,925 £’000 2,798 1,257 1,257 1,975 2008 7,015 7,015 1,910 1,910 280 280 655 655 37 13

1

Income £’000 1,162 125 125 851 851 311 311 29 87 55 12 2

Expenditure -

Revenue

(1,200 £’000 (780 (249 (951 (87 (55 (29

- -

) ) ) ) ) ) )

(123,961 (136,998

Expenditure -

£’000 £’000 7,771 7,771 2,909 2,909 4,922 1,694 3,122 3,122 2009 2009

(459 382 467 Capital (1,116 £’000 )

)

) (340 (776 (585 (191

- - - -

) ) ) ) )

Balance at Balance

31 March 31 (123,159 (128,135 (1,877 £’000 £’000 £’000 7,771 5,599 1,390 8,925 8,925 1,257 4,356 1,530 2,172 1,952 2008 2008 2009 (425 100 292 655 339 953 39 14 )

)

) )

c) b) offers of lapsed net year the during made offers Grant New year the during paid Grants 2008 1April at outstanding Balance a) 39 38 Financial the to Notes Statements Within one year year one Within Term Investments Short Hand in and Bank at Cash years five After years five and one Between

Analysis of Net Funds of Net Analysis Commitments in which the commitment expires: expires: commitment the which in ranges following the between analysed year next the during due falling commitments lease Operating Leases Operating £2,017,000). (2008: of £2,570,000 commitments capital including £17,070,000) (2008: £22,836,000 to amounted statements financial the in for provided not but 2009 31 at as March for contracted Expenditure Contracts madeBodies and Offers to Individuals Other Grant factor. inflation agreed an by annually increases and 2010 31 £1,272,000 is March ending year the for commitment The Trust. National the to liability grant annual ongoing an has Heritage English above, shown commitment the to addition In 2009 31 at March Outstanding Commitment Funds Net Net Bank Overdraft Overdraft Bank Net Overdrafts Bank Total Commitments Lease Operating 31 March 2009 payments under operating leases totalled £4,150,000 (2008: £5,212,000). £5,212,000). (2008: £4,150,000 totalled leases operating under payments ended 2009 31 year the March During reviews. rent to subject are and rentals property to relate of leases majority The

15,360 15,360 24,812 (9,794 (9,452 £’000 2009 342

) )

(8,006 22,135 22,135 14,717 14,717 £’000 (7,418 2008 3,543 £’000 588 588 2,714 2009 234 595

) )

54,843 Change (29,247 in year in 34,676 (2,034 49,414 (1,788 £’000 £’000 £’000 2,677 2,529 3,959 2008 (246 643 487 943 )

) )

)

69 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 70 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Notes to the Financial the to Notes Statements 41 There were no other individual losses or special payments that exceeded £250,000 (2008: nil). (2008: £250,000 exceeded that payments special or losses individual other no were There 40

Losses and Special Payments Payments Losses Special and Contingent Liabilities Contingent cannot be found English Heritage may have to undertake the repairs itself. The additional repair cost could be in the the in region be could cost repair of £4,000,000. additional The itself. repairs the undertake to have may abuyer if Heritage English repairs, found be cannot substantial further requires still property The repairs. the complete will who owner asuitable to property the of dispose to is intention The 2005. March ending 31 year financial the during behalf purchased Heritage’s English on compulsorily DCMS aproperty Hall Apethorpe to repairs urgent most the completed has Heritage English £250,000. exceed not will liability total has the it that but estimated required, been be may Heritage English by settlement where claims, remaining the to relating outstanding liability exact the quantify to possible not is it nature, their 31). to Due (note estimated reliably be can the where liability and of the amount Heritage English by settlement require probably will which liabilities outstanding those for 2009 March 31 ended year the for accounts the in made been has Provision 2009. 31 at March existed claims outstanding Various charged to the Income and Expenditure Account as Properties expenditure. Properties as Account Expenditure and Income the to been has charged impairment The 2008/09. in recognised been has land of this value the in of £2,700,000 impairment an above, outlined centre visitor the for plans in change of the aconsequence As purpose. that for DCMS Aid in from Grant received Government additional using 2000/01, in scheme East Countess of the anticipation in purchased was Land loss. constructive of this value exact the quantify to possible not is It loss rules. Treasury HM aconstructive as under recognisable is costs £6,500,000 original of the half approximately that estimated is it accordingly and scheme new the to relevant is work original the of all Not 2009. in confirmed was of which location the centre, visitor anew for plans revised developed has Heritage English this, to Subsequent scheme. improvement road the of cancellation the announced Government 2007, the December In road. of the part tunnelling including A303, the to improvements road on predicated was development This East. Countess at centre develop to visitor aproject on Stonehenge a new £6,500,000 spent Heritage English 2006/07, and 2000/01 between above, the to addition In Payments Special and Total Losses Special Payments Losses

384 384 83 £’000 2009 301

£’000 2008 776 558 558 218

results: consolidated the in included been have Limited Trading Heritage of English results following The 1994. in incorporated Limited, Trading Heritage of English shareholder sole the is HBMCE a) 42 Financial the to Notes Statements Interest Receivable and Similar Income Income Similar and Receivable Interest Profit Operating HBMCE to Aid Gift

Share Capital - Ordinary Shares at £1 each £1 at each Shares -Ordinary Capital Share Year One Within Due Falling Amounts Creditors:

b) Account Loss and Profit

Subsidiary Undertakings Subsidiary Turnover and Expenditure Income Trading Heritage English Limited Expenditure Profit on Ordinary Activities before Gift Aid Aid Gift before Activities Ordinary on Profit Profit on Ordinary Activities before and after Taxation Taxation after and before Activities Ordinary on Profit Net Assets as at 31 March 31 at as March Assets Net Net AssetsNet Assets Current English Heritage Limited was dormant throughout the year. the throughout dormant was Limited Heritage English 1984. in incorporated guarantee by limited acompany Limited, Heritage of English guarantor sole the is HBMCE English Heritage Limited Shareholders’ Funds Shareholders’

-

2,028 - 2,028 1,511 (11, 12,814 2,028 (1,325 (1,742 £’000 2,028 3,770 1,303 1,325 2009 22

)

) )

-

-

1,048 4 0 (11, 12,094 (1,680 (1,076 £’000 2,028 2,028 2,028 3,708 1,046 1,076 2008 30

)

) )

71 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 72 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 43

results: consolidated the in included been have Bequest Iveagh of the results following The c) 42

Investments Asset Fixed

Charitable Expenditure: Distributions to HBMCE HBMCE to Distributions Expenditure: Charitable Losses on the Revaluation of Investment Assets: Unrealised Losses Losses Unrealised Assets: of Investment Revaluation the on Losses Fund balances brought forward 1 April 1April forward brought balances Fund

Landfill Scheme Landfill Credit Tax Subsidiary Undertakings Subsidiary funded by landfill tax credits (2008: nil). (2008: credits tax landfill by grant funded were that progress in projects no were there 2009 March ended 31 year the During regulations. under tax bodies landfill the of environmental regulator the “Entrust”, with Body Environmental an as registered is Heritage English Investment Income: Dividends Receivable Income: Investment Resources Incoming Statement of Statement ActivitiesFinancial TrusteeshipCustodian to English Heritage. transferred 482 No Instrument In Statutory 1997 House. Kenwood of benefit the for Act (Kenwood) Bequest Iveagh 1929 in the by established aTrust Bequest, Iveagh of the Trustee the also are Heritage of English Commissioners The The Iveagh Bequest Fund balances carried forward 31 March 31 March forward carried balances Fund Capital Fund Reserves Capital 31 at as March Assets Net Resources Expended Resources Outgoing Net Funds in Movement Net

505 505 £’000 2009 (189 (189 316 316 316 316 316 (29 29 -

) ) )

£’000 2008 (123 (123 505 505 505 628 (27 27 -

) ) ) Donors, Sponsors and Contributors Sponsors Donors, prefer to remainanonymous. We who alsothankthosenotlisted here-togethertheirgifts constituteasignificantsum- as well asalldonors acknowledging and themallinour Accounts infutureyears. Annual Report andindividualswe frommany lookforward otherorganisations to we alsoreceived pledges offuturesupport listed above,In additiontothedonors, sponsors,andcontributors theyear ended31March2009 during legators Wells Yvonne Mary Miss Smith Jill Ms Rowe Norah Hilda Ms Joanne Richardson Dr Renwick Nancye Pauline Ms Plymen Jack Francis Mr Pegley Charles Leonard Mr Pearcy Muriel Joan Ms Paskins Richard Geoffrey Mr Morgan Cope Hilary Miss Monk Ashby Leonard Mr Miss Mitchell Ruth Margaret Irwin Elsie Norah Miss Gunby Norman Alfred Mr Gill Christine Anne Ms Gibson Watson Clive Mr Gibbs Mabel Eileen Mrs Jacqueline Dorothea Foulds Mrs Ferguson Reginald Edward Mr Farley Mary Ms Dorrington James Reginald Mr Denaro Rosemary Julia Mrs Doreen DeaneMrs Margaret Davis Hancock John Dr Charlton James Sidney Mr Cander Maurice William Mr Burgess Ashbridge Neil Mr Bullock George Ronald Mr Bishop Minnie Phyllis Miss Beckensall Sheila Ms Miss June Rose Bayfield Baron Jack Mr Ashworth Isobel Ann Ms Adams Edgar Robert Mr LEGACIES RichardMr Warren Sparrow John Mr Smalley Donald Mr Shannon Sheila Mrs Jampel Michael Mr Hinton Lisa Mrs Friend Ms Pattie Culhane Hilda Mrs Brown Ray Mr Baird Elizabeth Ms INDIVIDUAL DONATIONS of, orworth, £1,000ormore: theyear ended31March2009. toorsponsoreditsactivitiesduring contributed The following have given amounts thathave organisations andgrant-making toallthebenefactors, grateful trusts charitable isvery English Heritage

Yorkshire Forward Council District Salisbury Surveyors of Chartered Institution Royal Council Borough Newcastle-Under-Lyme National Trust National Museum Maritime Group Training Heritage National The London MLA Britain of Great Church Methodist Council City Lincoln Fund Lottery Heritage Union European Council Borough Metropolitan Doncaster Affairs Rural and Food Environment, for Department Sport and Media Culture, for Department Government Local and Communities for Department Authority Park National Dartmoor - ConstructionSkills CITB Council Borough Morpeth Castle Cadw Environment) Built the and Architecture for (Commission CABE Council City Birmingham Council Borough Berwick England Council Arts West Midlands Advantage BODIES &PUBLIC MAKING GRANT Ltd Company Young’sWells and Brewing Ltd Group Composting TJ Ltd Group Mail Royal RMJM Ltd plc Group Securities Land plc Johnson Matthey plc Partnership Lewis John Channel History The Hanro Group plc UK E.ON plc Group Insurance Ecclesiastical Ltd Partnership Downland CORPORATE PARTNERS &SUPPORT WolfsonThe Foundation Toll Foundation Irene Gage and Philip Rock Foundation Northern Trust Charitable Lawson Blanche and Raymond Osborne of Royal Friends Island ofFriends Audley End EnTour Foundation Durham County House Friends Chiswick Fund Atlas The Fund Art The CHARITABLE TRUSTS 73 ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS 2008 / 09 Donors, Sponsors and Contributors

In addition the following have made donations to the Chiswick House and Gardens Trust of £1,000 or more in support of the joint project with English Heritage, the London Borough of Hounslow and the Trust to restore the fabric and character of Chiswick House Gardens.

2008 / 09 The Alan Evans Memorial Trust 74 American Express Foundation The Ashden Trust The Ashendene Charitable Trust The Atlas Fund Mr and Mrs Charles Brown Mrs Rachel Bryant Mr and Mrs Peter Buckley The Duke of Devonshire’s Charitable Trust Esmée Fairbairn Foundation Mr and Mrs Nicolas Fraser Mr J Dundas Hamilton Mr Charles Howard The George John and Sheila Livanos Charitable Trust Lady Lloyd of Berwick The Manifold Trust The Monument Trust Newton Charitable Trust ENGLISH HERITAGE ANNUAL REPORT & ACCOUNTS & REPORT ANNUAL ENGLISH HERITAGE Mrs Susan Oxley Soho House Group Garfield Weston Foundation The Wolfson Foundation

Printed in the UK for The Stationery Office Limited on behalf of the Controller of Her Majesty’s Stationery Office ID6095054 07/09 Printed on Paper containing 75% recycled fibre content minimum.

Published by TSO (The Stationery Office) and available from:

Online www.tsoshop.co.uk

Mail, Telephone Fax & E-Mail TSO PO Box 29, Norwich, NR3 1GN Telephone orders/General enquiries 0870 600 5522 Order through the Parliamentary Hotline Lo-Call 0845 7 023474 Fax orders: 0870 600 5533 E-mail: [email protected] Textphone: 0870 240 3701

The Parliamentary Bookshop 12 Bridge Street, Parliament Square, London SW1A 2JX Telephone orders/General enquiries 020 7219 3890 Fax orders: 020 7219 3866 E-mail: [email protected] Internet: http://www.bookshop.parliament.uk

© English Heritage TSO@Blackwell and other Accredited Agents This Annual Report and Accounts is primarily being published Designed by Creative Services electronically. Further copies are therefore available via our website Printed by Park Communications Customers can also order publications from www.english-heritage.org.uk. The website is also the place to start on recycled paper TSO Ireland if you would like further information about English Heritage or July 2009 16 Arthur Street, Belfast BT1 4GD please contact our customer services team on 0870 333 1181. Product code: 51518 028 9023 8451 Fax 028 9023 5401 ENGLISH

HERITAGE 2008/09 & ACCOUNTS REPORT ANNUAL

English Heritage Offices

Head Office Swindon Office 1 Waterhouse Square (including National Monuments Record Centre) 138-142 Holborn Kemble Drive London EC1N 2ST Swindon SN2 2GZ Telephone: 020 7973 3000 Telephone: 01793 414 700

Regional Offices East Midlands North East South West 44 Derngate Bessie Surtees House 29 Queen Square Northampton NN1 1UH 41-44 Sandhill Bristol BS1 4ND Telephone: 01604 735 400 Newcastle Upon Tyne NE1 3JF Telephone: 0117 975 0700 East of England Telephone: 0191 261 1585 West Midlands Brooklands North West 8th Floor 24 Brooklands Avenue Suites 3.3 & 3.4 The Axis Cambridge CB2 8BU Canada House 10 Holliday Street Telephone: 01223 582 700 3 Chepstow Street Birmingham B1 1TG London Manchester M1 5FW Telephone: 0121 625 6820 1 Waterhouse Square Telephone: 0161 242 1400 Yorkshire 138-142 Holborn South East 37 Tanner Row London EC1N 2ST Eastgate Court York YO1 6WP Telephone: 020 7973 3000 195-205 High Street Telephone: 01904 601 901 Guildford GU1 3EH Telephone: 01483 252 000 Other Offices Exeter Fort Cumberland Stonehenge Administration Office 5 Marlborough Court Fort Cumberland Road Wyndham House Manaton Close Eastney 65 The Close Exeter EX2 8PF Portsmouth PO4 9LD Salisbury SP1 2EN Telephone: 01392 824 901 Telephone: 023 9285 6700 Telephone: 01722 343 830 ISBN 978-0-10-295906-2 Annual Report and Accounts

9 780102 959062 2008/09