Resolution No. 1189 Gig Harbor, Washington

Total Page:16

File Type:pdf, Size:1020Kb

Resolution No. 1189 Gig Harbor, Washington RESOLUTION NO. 1189 A RESOLUTION OF THE Cinr COUNCIL OF THE CH-Y OF GIG HARBOR, WASHINGTON, EXPRESSING THE CITY'S OPPOSITION TO ANY RECOMMENDATION OF BROAD- SCALE EXPANSION OF THE TACOMA NARROWS AIRPORT WHEREAS,both the Puget Sound Regional Council (PSRC) and the Washington State Commercial Aviation Coordinating Commission (CACC) are conducting studies on the potential for the expansion of commercial aviation in western Washington State; and WHEREAS, both the PSRC and the CACC have identified the Tacoma Narrows Airport as a location with potential for expansion; and WHEREAS,expansion of the Tacoma NarrowsAirport will lead to increased traffic problems to the already highly congested SR 16 corridor. The increase in trafficwill likely overwhelm the infrastructure capacity of the Tacoma Narrows Bridge, SR 16, 36th Street and Olympic Drive; and WHEREAS, increased commercial air traffic will lead to intolerable noise and air pollution for residents in and around the City of Gig Harbor. Such pollution would destroy the City's charm and appeal as working waterfront community and would decimate the City's tourism and real estate industries. The harbor would become an extended airline approach runway path for airplanes at a terrible cost to the City; and WHEREAS,expanded runway length at Tacoma NarrowsAirport may result in the need to condemn public and privatelyowned land; and WHEREAS, Pierce County, in its capacity as the sponsor of the airport, has expressed no interest in pursuing expansion of the Tacoma NarrowsAirport; and WHEREAS,the Washington State Department of Transportation (WSDOT) has identified several limitations of the Tacoma NarrowsAirport's suitabilityfor expansion including runway length, acreage availability, traffic congestion, strong community opposition, and the natural Puget Sound barrierto access; NOW, THEREFORE, THE C\TY COUNCIL OF THE CITY OF GIG HARBOR, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The City Council, with support by the Mayor, hereby adopts the recitals expressed above as Findings of Fact in support of this Resolution. The City Council and Mayor hereby makes known their opposition to any broad-scale expansion, or recommendation of expansion, of the Tacoma Narrows Airport based on these Findings of Fact. Broad-scale expansion is defined as any expansion that includes extending the length of the existing 5,000 foot runway at the airport. Page 1 of 2 Section 2. The City Council hereby directs the Mayor to prepare a letter stating the City's opposition to any broad-scale expansion, or recommendation of expansion, of the Tacoma Narrows based on the Findings of Fact. The letter should be delivered to the Puget Sound Regional Council, the Washington State Commercial Aviation Coordinating Committee, the City's State and Federal representatives, the Pierce County Council and any other governing bodies, organizations, and individualsthat the Mayordeems appropriate. Section 3. The Mayor is hereby directed to reach out to the City's State and Federal representatives and request that they submit comment letters on the City's behalfto the PSRC and the CACC. Section 4. The Mayor, as a delegate to the PSRC General Assembly, is hereby directed to engage directly with the PSRC and its President to convey the City's opposition to expansion based on the Findingsof Fact. Section 5. The Mayor, City Administrator and councilmembers are hereby authorized and encouraged to engage with governing bodies, organizations, and individuals to convey a message of opposition to expansion of the airport consistent with the Findings of Fact on behalfof the City. RESOLVED by the City Council this 26th day of October, 2020. APPROVED: ^x. Kit Kuhn, Mayor ATTEST/AUTHENTICATED: Molly Towsl , City Clerk FILED WITH THE C\7\ CLERK: 10/13/18 PASSED BY THE CIT>' COUNCIL: 10/26/18 RESOLUTIONNO. 1189 Page 2 of 2.
Recommended publications
  • Forecasts of Aviation Activity
    CHAPTER B Forecasts of Aviation Activity: Forecasting is a key element in any airport master planning process. The forecast process is essential for analyzing existing airport facilities and identifying further needs and requirements of the facilities that may arise over the next 20 years. The relationship between aviation activity and projected demand is an indicator as to the type, timing, and allocation of future airport infrastructure, equipment, and service needs. For the purposes of this Airport Master Plan, the most important element of the forecasts chapter is the documentation of existing aircraft operations by type and size of aircraft as well as the future projections of operations by type and size of aircraft. One of the assumed outcomes of this planning process was that the type and size of aircraft using the Airport on a regular basis are larger than what RNT was originally designed for. The trend of more operations by larger design aircraft is forecast to continue and warrants a design standard change for RNT. This change in design standards is further discussed starting on Page B.37 with the conclusion being that the Airport is, in fact, in need of a design standards upgrade in accordance with FAA guidance. Introduction. The RNT aviation activity forecasts in this chapter are developed for a 20-year planning period and are based on historic activity, industry trends, local socioeconomic data, and changes at RNT since the completion of previous planning studies. The forecasts utilize FY2015 (October 2014 through September 2015) as the base year and project future activity through 2035, identified in 5-year increments.
    [Show full text]
  • (Asos) Implementation Plan
    AUTOMATED SURFACE OBSERVING SYSTEM (ASOS) IMPLEMENTATION PLAN VAISALA CEILOMETER - CL31 November 14, 2008 U.S. Department of Commerce National Oceanic and Atmospheric Administration National Weather Service / Office of Operational Systems/Observing Systems Branch National Weather Service / Office of Science and Technology/Development Branch Table of Contents Section Page Executive Summary............................................................................ iii 1.0 Introduction ............................................................................... 1 1.1 Background.......................................................................... 1 1.2 Purpose................................................................................. 2 1.3 Scope.................................................................................... 2 1.4 Applicable Documents......................................................... 2 1.5 Points of Contact.................................................................. 4 2.0 Pre-Operational Implementation Activities ............................ 6 3.0 Operational Implementation Planning Activities ................... 6 3.1 Planning/Decision Activities ............................................... 7 3.2 Logistic Support Activities .................................................. 11 3.3 Configuration Management (CM) Activities....................... 12 3.4 Operational Support Activities ............................................ 12 4.0 Operational Implementation (OI) Activities .........................
    [Show full text]
  • Pierce County Public Works and Utilities Brian J
    Pierce County Public Works and Utilities Brian J. Ziegler, P.E. 2702 South 42nd Street, Suite 201 Director Tacoma, Washington 98409-7322 [email protected] piercecountywa.org/pwu TO: Dan Roach, Chair Pierce County Council FROM: Deb Wallace, Airport and Ferry Administrator DATE: October 28, 2014 SUBJECT: Airport Security The purpose of this briefing paper is to provide an update to Council on the status of security upgrades at Pierce County's airports. Current Situation: The Pierce County Airport and Ferry division is in the process of upgrading gate access, fencing, and security lighting at both airports. In 2015 the division will implement an Airport Watch program to increase the safety and security at each facility. The improvements are being made due to incidents which have occurred at the airports over the last several years and at the request of airport tenants. Currently both airports are fenced with restricted access gates to enhance security, although there are gaps in the fencing allowing unauthorized pedestrian entry. These gaps will be addressed in early 2015. An electronic gate is being added to the north gate at Tacoma Narrows Airport (TIW) and the south gate is being outfitted with a mechanism to allow its use by those who are hearing impaired. Once that improvement is completed, 24 hour security will be implemented at TIW. Thun Field currently operates with 24 hour gate security. Prior to implementation, the airport commissions at each airport discussed airport security measures during the preceding year and staff coordinated the implementation of the security measures with airport tenants.
    [Show full text]
  • B Forecasts of Aviation Activity
    B Forecasts of Aviation Activity INTRODUCTION. The aviation demand projections are documented in the following sections: ▪ Historical and Exiting Aviation Activity ▪ Previous Forecasts ▪ Factors Affecting Aviation Forecasts ▪ Forecast Methodologies ▪ Forecast of Aviation Demand Activity o Commercial Passenger Enplanement & Operations Forecast o Air Cargo Weight & Operations Forecast o General Aviation Operations Forecast o Military Aircraft Operations Forecast o Aircraft Operations Forecast (Mix, Peaking, Critical Planning Aircraft) o General Aviation Based Aircraft Forecast ▪ Runway Design Code (RDC)/Critical Aircraft Analysis ▪ FAA TAF Comparison and Forecast Conclusion Aviation forecasts are time-based projections offering a reasonable expectation of future airport activity. The forecast of activity projections influences nearly every aspect of the MP Update process. The relationship between current activity and forecast demand is an indicator as to the type and timing of future airport infrastructure, equipment, and service needs, as well as funding resource allocation. The forecasts are prepared annually for a 20-year planning period, from 2015 through 2035, identified in five- year increments, and segmented into three planning phases: ▪ ‘Near-term’ (2015-2020) ▪ ‘Mid-term’ (2021-2025) ▪ ‘Long-term’ (2025-2035) The forecasts are developed consistent with FAA forecasting guidance, reflecting the current baseline of airport activity levels, user trends, and industry-wide activity patterns. The forecasts are considered “unconstrained”, in that they assume the Airport is sufficiently able to accommodate the demand either through existing facilities or future improvements. B.1 It should also be understood there are typically year-to-year fluctuations to forecast activity due to various unanticipated factors and unforeseen demand circumstances (e.g., changes in emerging airport markets and national aviation trends, including economic factors, both nationally and regionally.
    [Show full text]
  • Nextgen Airspace Optimization Study
    NextGEN Airspace Optimization Study Puget Sound Regional Council NextGEN Airspace Optimization Study BridgeNet International Team BridgeNet International Tetra Tech AMT Mead & Hunt Synergy Consultants Thales Puget Sound Regional Council Funding for this document provided in part by member jurisdictions, grants from U.S. Department of Transportation, Federal Transit Administration, Federal Highway Administration and Washington State Department of Transportation. PSRC fully com- plies with Title VI of the Civil Rights Act of 1964 and related statutes and regulations in all programs and activities. For more information, or to obtain a Title VI Complaint Form, see http://www.psrc.org/about/public/titlevi or call 206-587-4819. American with Disabilities Act (ADA) Information: Individuals requiring reasonable accommodations may request written materials in alternate formats, sign language interpret- ers, physical accessibility accommodations, or other reasonable accommodations by contacting the ADA Coordinator, Thu Le at 206-464-6175, with two weeks advance notice. Persons who are deaf or hard of hearing may contact the ADA Coordinator, Thu Le through TTY Relay 711. Additional copies of this document may be obtained by contacting: Puget Sound Regional Council Information Center 1011 Western Avenue, Suite 500 Seattle, Washington 98104-1035 206-464-7532 • [email protected] • psrc.org • MAY 2016 NextGen Airspace Optimization Study ______________________________________________ Table of Contents Executive Summary ……………………………………………………………………………….………………………………….…………….v
    [Show full text]
  • List of Sources for Beech Bonanzas
    List of Sources for Beech Bonanzas LIST OF SOURCES FOR BEECH BONANZAS – Provided by Ron Davis PBS Member ACCESSORIES - MISCELLANEOUS........................................................................................................................2 ACCESSORIES REBUILDERS...................................................................................................................................4 Accessories rebuilders – Bendix magneto.................................................................................................................5 Accessories rebuilders – Bendix PS-5C carburetor...................................................................................................6 Accessories rebuilders – Electric motors...................................................................................................................8 Accessories rebuilders – Fuel selector.....................................................................................................................10 Accessories rebuilders – Generators / alternators....................................................................................................11 Accessories rebuilders – Oil cooler tank .................................................................................................................13 Accessories rebuilders – Thompson TF-1900 fuel pump........................................................................................14 Accessories rebuilders - Miscellaneous...................................................................................................................16
    [Show full text]
  • 2005 WPA Toys for Tots Campaign and Fly-Out
    Washington Pilots Association IN THIS ISSUE: Here Comes 2006 . 2 WASAR Report . 3 Airports . 5 WPA Chapters . 6 Classifieds . 7 Crossword Puzzle . 7 ings Events Calendar . 8 ServingW Washington Pilots Since 1960 December 2005 - January 2006 2005 WPA Toys for Tots Campaign and Fly-Out Colleen Turner, Vice President, Greater Seattle chapter During the holiday season, the Greater Seattle, Green River, Paine Field and Harvey Field chapters of the WPA are joining forces to support the U.S. Marine Corps Re- serve Toys for Tots program while promoting the benefits of general aviation. This is the thirteenth consecutive year that WPA has participated in this program. By the time you read this article, WPA members will have placed Toys for Tots collection barrels at various businesses located on airports throughout Puget Sound. Over the next few weeks, please drop a new, unwrapped toy or game into one of the collection barrels and help You can participate in this year’s Toys for Tots pro- many less fortunate children in the greater Puget Sound gram by: area wake up to a brighter and happier Holiday. • Bringing a new unwrapped toy or game to your local Through its Toys for Tots program, the U.S. Marine airport and placing it in a Toys for Tots collection barrel Corps Reserve has been collecting and distributing toys • Volunteering to fly with a Marine to collect toys on to needy children nationwide since 1947. The primary Saturday, December 17 objectives of the Toys for Tots programs are to help • Joining us for the Holiday toy unloading and gather- needy youngsters experience the joy of Christmas and to ing party at Galvin Flying Services (located on the east deliver, through a shiny new toy, a message of hope that side of Boeing Field) on Saturday, December 17 from will motivate them to grow into responsible, productive, Toy collection barrels are ready to receive your donations at airports 11:00am – 2:00pm patriotic citizens and community leaders.
    [Show full text]
  • CPA 18-00495) Attachment C5
    Dickey Pit (CPA 18-00495) Attachment C5 4 2 1 3 5 6 Dickey Pit (CPA 18-00495) Attachment C6 ADMINISTRATIVE MaNUAL AirportsWashington and Compatible State WashingtonWashingtonWashingtonWashingtonAirportsWashington and Compatible State StateState StateLandState Use LandWashingtonWashingtonAirportsWashingtonWashington Use and CompatibleGuidebook StateLandState State State Use AirportsAirportsAirportsAirportsAirports and and and and andCompatible Compatible GuidebookCompatible Compatible Compatible Land Land Land Land Land Use Use Use Use Use AirportsAirportsAirports and and andGuidebook Compatible Compatible Compatible Land Land Land Use Use Use M 3074.00 GuidebookGuidebookGuidebookGuidebook GuidebookGuidebookGuidebookGuidebook January 2011 Aviation Division Draft January 4, 2011 DraftDraft DraftJanuaryDraft January January January4, 2011 4, 2011 4, 4, 2011 2011 DraftDraft January January 4, 2011 4, 2011 DraftDraft JanuaryDraft January January 4, 2011 4, 20114, 2011 Dickey Pit (CPA 18-00495) Attachment C6 An Overview of Airport Land Use Compatibility Planning Chapter 1 Airports and Surrounding Land Uses Evergreen Field What is compatibility? 1959 Most people are familiar with the negatives associated with being located near an airport, particularly such things as noise, vibration, odors, and accident risks. Fewer people understand the effect that adjacent land uses can have on airport activities. Development around an airport can have direct adverse consequences to airport safety, efficiency, operation, and economic viability. Tall buildings, towers, power lines, and even tall trees can be hazardous obstructions for landing and departing aircraft. In addition, development near an airport may reduce property available for aviation operations and safety areas. Indirectly, incompatible development can lead to demands for limitations on the airport activity. Ultimately, incompatible development around public use airports 1996 may result in loss of the facility.
    [Show full text]
  • White Paper Summary
    The Commission developed a preliminary list of six existing airports with the potential to meet some of the projected demand for air passenger service, air cargo, or general aviation. • Arlington Municipal Airport • Bremerton National Airport • Paine Field/ Snohomish County Airport • Shelton/ Sanderson Field • Tacoma Narrows Airport • Toledo Airport Staff elaborated on the attributes of each airport and provided analysis of the possible role each airport could fulfill in providing additional capacity. • Arlington Municipal o The airport sponsor views the future of the airport as a robust GA airport o Substantial infrastructure development on both ends of the runway restricts expansion opportunities o The runway length is well below the length needed for larger planes that provide passenger service and air cargo • Bremerton National Airport o Bremerton is 30 miles from I-5 and beyond a 90-minute travel time for two of the five county communities o Air carrier industry partners have indicated Bremerton travel time is too long, distance too far for both freight and passengers o Bremerton could provide additional general aviation aircraft storage capacity and expand business aviation support • Paine Field/Snohomish County Airport o Paine Field is currently limited on the volume of commercial air passengers o The existing 9,000 foot runway is sufficient for most passenger service and air cargo aircraft, including international flights o The airfield has a robust general aviation presence and numerous T-hangars o With passenger service already provided, it is likely airlines could support additional service and associated belly cargo • Sanderson Field o Shelton is a distance from the population centers and 22 miles from I-5 o Travel times for most passengers and freight are likely to exceed one hour and may be 90 minutes or greater for some communities.
    [Show full text]
  • Washington Electric Aircraft Feasibility Study
    Aviation Division NOVEMBER 2020 Washington Electric Aircraft Feasibility Study Prepared by This page intentionally left blank. WSDOT Aviation Division NOVEMBER 2020 Washington Electric Aircraft Feasibility Study Prepared for Aviation Division Prepared by In conjunction with Washington Electric Aircraft Feasibility Study | November 2020 Table of Contents Acknowledgements . 1 Executive Summary . 2 Introduction . 14 Chapter 1: Environmental Impacts, Economic Benefits, and Incentives . 25 Section 1: Mode Shift Analysis. 26 Section 2: Employment Profiles. .31 Section 3: Framework for Assessing Economic Impact of Electric Aircraft on Airports. 42 Section 4: Environmental Benefit Framework. .51 Section 5: Airport Revenue Impacts. .61 Section 6: Electric Aircraft Funding Opportunities. .62 Section 7: Recommendations. .70 Chapter 2: Transportation Network Assessment . 72 Section 1: Existing Intermodal Network. 76 Section 2: Existing Air Connectivity Analysis. 93 Section 3: Travel Time Cost Analysis. 100 Section 4: Recommendations. 106 Section 5: Conclusion . 107 Chapter 3: Workforce Development . 108 Section 1: Aviation Workforce Development Programs. 112 Section 2: State Government Programs. .119 Section 3: Covid-19 Impacts. .121 Section 4: Recommendations. 121 Chapter 4: Infrastructure and Battery Charging . 124 Section 1: Considerations for Charging Infrastructure for Electric Aircraft . .126 Section 2: Current Technologies Being Deployed. .127 Section 3: Pilot Program Infrastructure Needs. .131 Section 4: Hypothetical Scenario. .133 Section 5: Next Steps for Infrastructure Electrification. 134 Chapter 5: Demand and Deployment . .. 136 Section 1: Electric Aircraft Demand Assessment . .136 Section 2: Deployment. .163 Section 3: Recommendations. 171 Section 4: Summary. 172 Chapter 6: Selection of Beta Test Site Airports . 173 Section 1: Methodology . 174 Section 2: Phase I: Baseline . .179 Section 3: Phase II: Points Analysis.
    [Show full text]
  • Safetaxi US Coverage List - Cycle 21S5
    SafeTaxi US Coverage List - Cycle 21S5 Alabama Identifier Airport Name City State 02A Chilton County Airport Clanton AL 06A Moton Field Muni Tuskegee AL 08A Wetumpka Muni Wetumpka AL 0J4 Florala Muni Florala AL 0J6 Headland Muni Headland AL 0R1 Atmore Muni Atmore AL 12J Brewton Muni Brewton AL 1A9 Prattville - Grouby Field Prattville AL 1M4 Posey Field Haleyville AL 1R8 Bay Minette Muni Bay Minette AL 2R5 St. Elmo Airport St. Elmo AL 33J Geneva Muni Geneva AL 4A6 Scottsboro Muni-Word Field Scottsboro AL 4A9 Isbell Field Fort Payne AL 4R3 Jackson Muni Jackson AL 5M0 Hartselle-Morgan County Rgnl Hartselle AL 5R4 Foley Muni Foley AL 61A Camden Muni Camden AL 71J Ozark-Blackwell Field Ozark AL 79J South Alabama Regional at Bill Benton Field Andalusia - Opp AL 8A0 Albertville Rgnl - Thomas J Brumlik Field Albertville AL 9A4 Courtland Airport Courtland AL A08 Vaiden Field Marion AL KAIV George Downer Airport Aliceville AL KALX Thomas C. Russell Field Alexander City AL KANB Anniston Rgnl Anniston AL KASN Talladega Muni Talladega AL KAUO Auburn University Rgnl Auburn AL KBFM Mobile Downtown Airport Mobile AL KBHM Birmingham - Shuttlesworth Intl Birmingham AL KCMD Cullman Rgnl - Folsom Field Cullman AL KCQF H L Sonny Callahan Airport Fairhope AL KDCU Pryor Field Regional Decatur AL KDHN Dothan Regional Dothan AL KDYA Dempolis Rgnl Dempolis AL KEDN Enterprise Muni Enterprise AL KEET Shelby County Airport Alabaster AL KEKY Bessemer Airport Bessemer AL KEUF Weedon Field Eufaula AL KGAD Northeast Alabama Rgnl Gadsden AL KGZH Evergreen Rgnl/Middleton
    [Show full text]
  • News Release
    City of Yakima News Release Subject: Closure of Yakima Air Traffic Control Tower Contact: Interim Yakima Air Terminal Manager Rob Peterson – 575-6149 Communications & Public Affairs Dir. Randy Beehler – 901-1142 Release Date: Friday, March 22 nd , 2013 Closure of Yakima Air Traffic Control Tower Will Not Curtail Flights Airplane traffic at Yakima’s airport is expected to continue as normal even after the scheduled closure of the Yakima Air Terminal air traffic control tower in the next few weeks. Specifically, the three daily commercial flights to Seattle provided by Horizon Air, a subsidiary of Alaska Airlines, will not be interrupted by the closure of the air traffic control tower. The Yakima tower is one of 149 in the U.S. that the Federal Aviation Administration (“FAA”) has announced will close over a four-week period beginning April 7 th . The tower closures are part of the steps the FAA is taking to meet its cost cutting requirements as part of the federal sequester – the budget reduction measures that began being made on March 1 st because of a stalemate between the Congress and President Obama. “Pilots are trained to be able to coordinate landings and takeoffs without help from ground controllers,” said Interim Yakima Air Terminal Manager Rob Peterson. “Pilots will use a shared radio frequency in order to assure landings and takeoffs are done safely. There should not be any interruption in air traffic at the airport,” said Peterson. Peterson said that, if needed, air traffic control can be provided for the Yakima airport from either the Tri-Cities Airport or the Sea-Tac Airport.
    [Show full text]