Transit Support Division 2009 Operational Plan
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Appendix 5 Station Descriptions And
Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint. -
1357 Baseline Road Transportation Impact Assessment Strategy Report
1357 Baseline Road Transportation Impact Assessment Strategy Report January 17, 2020 Prepared for: Selection Groupe International Inc. Prepared by: Stantec Consulting Ltd. 1357 Baseline Road Transportation Impact Assessment Table of Contents 1.0 SCREENING ................................................................................................................................................... 1 1.1 SUMMARY OF DEVELOPMENT .................................................................................................................... 1 1.2 TRIP GENERATION TRIGGER ....................................................................................................................... 1 1.3 LOCATION TRIGGERS ................................................................................................................................... 2 1.4 SAFETY TRIGGERS ....................................................................................................................................... 2 1.5 SUMMARY ...................................................................................................................................................... 2 2.0 SCOPING ........................................................................................................................................................ 3 2.1 EXISTING AND PLANNED CONDITIONS ...................................................................................................... 3 2.1.1 Proposed Development ............................................................................................................. -
Insert Budget Title Here
Transportation Master Plan Ottawa Cycling Plan Ottawa Pedestrian Plan 2013 Review October Consultation Summary Presentation to: Transportation Committee 15 November 2013 Presentation Overview • Summarize feedback from October 2013 consultation process • Identify proposed changes in response to comments • Present additional transit-related details for extending LRT to the suburban town centres outside the Greenbelt 2 Ottawa Pedestrian Plan October 2013 Consultation Feedback Major Themes: • Comments relating to maintenance, operation and design of pedestrian infrastructure • Specific feedback about intersection design, vehicle speeds, and winter maintenance • Changes to Varley Drive and Halton Terrance in the Kanata North 3 Recommended Changes Affordable Pedestrian Projects 4 Ottawa Cycling Plan October 2013 Consultation Feedback Major Themes: • Accessibility concerns • Paved shoulders policies • Visibility of future cycling infrastructure as part of integrated projects • Rideau Canal Footbridge (Fifth Avenue and Clegg Street) • Changes in Barrhaven, Vanier, Sandy Hill, Lowertown, Old Montreal Road, Prince of Wales Drive 5 Recommended Changes Affordable Cycling Projects 6 TMP - Transit October 2013 Consultation Feedback Major Themes: • Greater emphasis on accessibility and Para Transpo • O-Train extension to the Ottawa International Airport • Rapid Transit through the Fernbank Community • More LRT expansion (i.e. Canada Tire Centre, Trim Road, Barrhaven) • Kanata North Bus Rapid Transit extension • West Transitway (Terry Fox Station to March -
Kanata Light Rail Transit Planning and Environmental Assessment Study (Moodie Drive to Hazeldean Road) – Recommendations
1 Report to Rapport au: Transportation Committee Comité des transports 2 May 2018 / 2 mai 2018 and Council et au Conseil 9 May 2018 / 9 mai 2018 Submitted on April 17, 2018 Soumis le 17 avril 2018 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: Vivi Chi, Director / Directeur, Transportation Planning / Planification des transports, Transportation Services Department / Direction générale des transports (613) 580-2424, 21877, [email protected] Ward: KANATA NORTH (4) / KANATA File Number: ACS2018-TSD-PLN-0002 NORD (4) / STITTSVILLE (6) / BAY (7) / BAIE (7) / COLLEGE (8) / COLLÈGE (8) / KANATA SOUTH (23) / KANATA-SUD (23) SUBJECT: Kanata Light Rail Transit Planning and Environmental Assessment Study (Moodie Drive to Hazeldean Road) – Recommendations OBJET: Étude de planification et d’évaluation environnementale du Train léger sur rail proposé vers Kanata (de la promenade Moodie au chemin Hazeldean) – Recommandations 2 REPORT RECOMMENDATIONS That Transportation Committee recommend that Council: 1. Approve the functional design for the Kanata Light Rail Transit (Moodie Drive to Hazeldean Road), as described in this report and supporting documents one and two; and, 2. Direct Transportation Planning staff to initiate the Transit Project Assessment Process in accordance with the Ontario Environmental Assessment Act (Regulation 231/08), including the preparation and filing of the Environmental Project Report for final public review and comment. RECOMMANDATIONS DU RAPPORT Que le Comité des transports recommande au Conseil : 1. d’approuver la conception fonctionnelle du Train léger sur rail vers Kanata (de la promenade Moodie au chemin Hazeldean), comme présentée dans le présent rapport et dans les documents un à deux; et, 2. -
2019 City Wide Development Charges Background Study
2019 City-Wide Development Charges Background Study Version for Public Consultation HEMSON C o n s u l t i n g L t d. March 15, 2019 Table of Contents List of Acronyms .......................................................................................... 1 Executive Summary ...................................................................................... 2 A. Purpose of 2019 Development Charges (DC) Background Study .. 2 B. City-Wide and Area-Specific DCs Have Been Calculated ............... 3 C. Development Forecast .................................................................... 4 D. Public Transit Ridership Forecast ................................................... 5 E. Calculated Development Charges .................................................. 5 F. Cost of Growth Analysis .................................................................. 6 G. Development Charges Administration & Policy Considerations ...... 7 I Purpose of 2019 Development Charges Background Study ............. 8 A. Introduction and Background .......................................................... 8 B. Legislative Context .......................................................................... 9 C. The 2019 DC Study is Intended to be an Interim Update ................ 9 D. Consultation And Approval Process ................................................ 9 E. Key Steps In Determining DCs for Future Development-Related Projects ......................................................................................... 10 F. Long-Term Capital -
No. 48, Port Lands Flood Protection and Enabling Infrastructure, Page 54 Credit: Waterfront Toronto/Vid Ingelevics/Ryan Walker
2021 No. 48, Port Lands Flood Protection and Enabling Infrastructure, Page 54 Credit: Waterfront Toronto/Vid Ingelevics/Ryan Walker Top100 Projects 2021 Changing the Language of Top100 Projects — 2021 An annual report inserted in Infrastructure ReNew Canada’s had an interesting encounter following the release of last January/February 2021 issue year’s report, and I wanted to share in an effort to get I feedback from the rest of the industry. MANAGING Andrew Macklin We had released the 2020 Top100 Projects report and were EDITOR [email protected] getting set for the Key Players and Owners Dinner, which we host every February in Toronto as a celebration of the accomplishments GROUP Todd Latham PUBLISHER of the industry in developing infrastructure megaprojects. I had heard through one of my colleagues that a couple of well-respected PUBLISHER Nick Krukowski members of the industry wanted to chat with me at the event and I should seek them out. So I did. ART DIRECTOR AND Donna Endacott SENIOR DESIGN My first thought was that, not having nearly the expertise as many of you, that I had somehow managed to royally screw something ASSOCIATE Simran Chattha up. Or perhaps they wanted to tell me that I should try a different EDITOR tact to the report? Maybe a new idea for adding a complementary DIGITAL MARKETING Becky Umweni piece for this report? But as it turned out, they wanted to have a COORDINATOR conversation with me about… language. DIGITAL The language of this report has become, to some, quite convoluted. Connie Vitello EDITOR As different jurisdictions use the language familiar to them, it can often mean that, from one project to the next, different words are EVENT Natasha Mawji MANAGER used to describe the same thing. -
Recommended Plan.Pdf
Blair Station 9-34 Maintenance and Storage Facility Track redundancy within the facility will be provided to ensure The proposed Maintenance and Storage Facility is an integral the ability to move LRVs under vehicle or system failure part of the project, as it will: conditions. • House and service all of the trains needed to operate the The preferred site for the Maintenance and Storage Facility has line been determined based on the following criteria: • Service vehicles to be used on future LRT lines • Site Characteristics (topography, grade, land use compatibility, expansion capability and environmental • House the operations control centre (signalling, considerations) communications) for the line • Facility Operations (turnaround loops, track redundancy, • Be the primary heavy maintenance facility for the LRT layout efficiency and municipal services) network Maintenance of the LRVs is crucial to maintain vehicle • System Operations (connectivity to the line, efficiency and manufacturer's warranties, minimize long term operating costs access to freight rail), and and provide for system safety and reliability. The Maintenance • Relative Costs (capital, operating, maintenance and and Storage Facility will accommodate the following elements property ownership and acquisition) on-site: The proposed Maintenance and Storage Facility for the DOTT 9-35 • Main facility building housing offices, roster areas, meeting project will be located on lands to the west of the existing OC rooms and control equipment Transpo headquarters and bus maintenance facility located on • Storage yard for regular cleaning and minor maintenance the north side of Belfast Road, west of St. Laurent Boulevard and south of the VIA rail corridor. In order to access this • Repair areas for heavy and light maintenance areas for location, a connecting track is required between the DOTT vehicles alignment and the Maintenance and Storage Facility. -
1 Report to Rapport Au
1 Report to Rapport au: Transit Commission Commission du transport en commun 19 June 2019 / 19 juin 2019 Submitted on June 10, 2019 Soumis le 10 juin 2019 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: John Manconi, General Manager / Directeur général Transportation Services Department / Direction générale des transports 613-580-2424 ext./poste 52111, [email protected] Ward: CITY WIDE / À L'ÉCHELLE DE LA File Number: ACS2019-TSD-TS-0002 VILLE SUBJECT: Confederation Line: Customer Service Operational Readiness OBJET: Ligne de la Confédération : Préparation opérationnelle du service à la clientèle REPORT RECOMMENDATION That the Transit Commission receive this report for information. RECOMMANDATION DU RAPPORT Que la Commission du transport en commun prenne connaissance de ce rapport. 2 EXECUTIVE SUMMARY The opening of O-Train Line 1, the Confederation Line, will mark an exciting and historic transformation in the way transit service is delivered in the city of Ottawa. OC Transpo has been working with the Rideau Transit Group (RTG) and partners from across the city to transform the current transit service into a world-class multimodal transit system and ensure a positive end-to-end customer experience starting on day one. The opening of Line 1 and the major changes to the bus route network that will follow, will be the largest service change ever for OC Transpo customers. Because our customers are our priority and their experience through and beyond this transitional period is important to us, OC Transpo staff are committed to ensuring that customers are prepared, comfortable and knowledgeable about these changes and the transition period in which they will occur. -
September 2020 Update
September 2020 Update Transportation Services Department FEDCo September 1, 20201 2 O-Train South Design Progress • The following submissions have been Issued-For- Construction: – Structures throughout the alignment including Rail Bridges at Airport Parkway, Uplands, Leitrim, Bowesville, Earl Armstrong and Lester; and, – Utility Relocations throughout the alignment. 3 O-Train South Design Progress • The City has received construction drawings of the following project elements: – Airport Station; – Guideway for the Airport Link; and, – Structures throughout the alignment including High Road MUP Bridge, Limebank Road Elevated Guideway, Airport Elevated Guideway, VIA Grade Separation, Rideau River Pedestrian Bridge. 4 O-Train South Design Progress • The City has received final design drawings of the following project elements: – Guideway for the South Extension to Limebank; – Guideway for the existing portion of the line; – Landscape design for the existing line and Airport Link; – Dow’s Lake Tunnel, including Tunnel Ventilation; and – Vehicle elements, including the driver’s cab, interior layout and HVAC System. 5 O-Train South Design Progress • The City has received pre-final design drawings of the following project elements: – Walkley Yard Maintenance and Storage Facility (MSF); – Operational Modelling for the Overall System and the MSF; – Signaling and Train Control System; – Greenboro, Carleton, Mooney’s Bay, Gladstone and Walkley Stations; and, – Communication Systems designs for Greenboro and Carleton Stations and interface control documents for several subsystems on the project. 6 O-Train South Construction Progress • Rock excavation started on Gladstone Station; • Walkley Maintenance and Storage Facility structure construction has commenced; • Work has commenced at Ellwood Diamond grade separation. Caisson construction is underway; • Work has begun on Carleton south MUP; and, • Commenced work at South Keys and Bowesville Stations. -
Report Template
1 Report to/Rapport au : Transportation Committee Comité des transports and Council / et au Conseil November 7, 2013 7 novembre 2013 Submitted by/Soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale adjointe, Planning and Infrastructure/Urbanisme et Infrastructure Contact Person / Personne ressource: Vivi Chi, Manager/Gestionnaire, Transportation Planning/Planification des transports, Planning and Growth Management/Urbanisme et Gestion de la croissance (613) 580-2424 x 21877, [email protected] CITY WIDE / À L'ÉCHELLE DE LA VILLE Ref N°: ACS2013-PAI-PGM-0230 SUBJECT: TRANSPORTATION MASTER PLAN, OTTAWA PEDESTRIAN PLAN AND OTTAWA CYCLING PLAN UPDATE – ADDENDUM REPORT OBJET : PLAN DIRECTEUR DES TRANSPORTS, PLAN DE LA CIRCULATION PIÉTONNIÈRE D’OTTAWA ET PLAN SUR LE CYCLISME D’OTTAWA – ADDENDA REPORT RECOMMENDATION That Transportation Committee recommend Council approve the recommended changes identified in this report (Table 1) to the draft Transportation Master Plan, Ottawa Pedestrian Plan and Ottawa Cycling Plan that was tabled on October 9, 2013 at the Joint Transportation Committee and Transit Commission meeting. RECOMMANDATION DU RAPPORT Que le Comité des transports recommande au Conseil d’approuver les modifications recommandées et précisées dans le présent rapport (tableau 1) pour la version provisoire du Plan directeur des transports, le Plan de la circulation piétonnière d’Ottawa et le Plan sur le cyclisme d’Ottawa qui ont été déposé le 9 octobre 2013 lors de la réunion conjointe du Comité des transports et de la Commission du transport en commun. 2 EXECUTIVE SUMMARY Assumptions and Analysis This is an addendum to the October 9, 2013 joint Transportation Committee and Transit Commission staff report (ACS2013-PAI-PGM-0193) to summarize the consultation feedback and proposed changes following the tabling and public release of the draft 2013 Transportation Master Plan (TMP), Ottawa Pedestrian Plan (OPP) and Ottawa Cycling Plan (OCP). -
Appendix E Detailed Case Studies
Guidelines for Providing Access to Public Transportation Stations APPENDIX E DETAILED CASE STUDIES Revised Final Report 2011 Page E-1 Detailed Case Studies Guidelines for Providing Access to Public Transportation Stations TABLE OF CONTENTS Case Study Summary ............................................................................................................................... E-3 Bay Area Rapid Transit (BART) .............................................................................................................. E-7 Los Angeles County Metropolitan Transportation Authority (Metro) ........................................... E-21 Metropolitan Atlanta Rapid Transit Authority (MARTA) ................................................................ E-33 Massachusetts Bay Transportation Authority (MBTA) ..................................................................... E-41 Metro-North Railroad ............................................................................................................................. E-57 New Jersey Transit (NJT) ....................................................................................................................... E-67 OC Transpo .............................................................................................................................................. E-81 Regional Transit District Denver (RTD) ............................................................................................... E-93 Sound Transit ........................................................................................................................................ -
1.0 Introduction
1.0 INTRODUCTION This Environmental Project Report assesses the effects of the proposed Downtown Ottawa Transit Tunnel (DOTT) project on the social, physical and natural environments. The City of Ottawa, as proponent, has prepared this Environmental Project Report in accordance with the Province of Ontario’s Transit Project Assessment Process (Regulation 231/08 under the Ontario’s Environmental Assessment Act). This section provides the background and overview of the study including location and rationale for the proposed project, relationship of the proposed project to other transportation-related studies and an outline of the entire report contents. Sections Include: 1.1 Project Description 1.2 Purpose of the Project 1.3 Study Background 1.4 Relationship with Other Studies, Projects and Future Undertakings 1.5 Report Organization 1-1 1.1 Project Description and vehicles to service these lines, as well as bus rapid transit electric light rail transit from Tunney's Pasture Station to Blair Ottawa's Transportation Master Plan (TMP) contains a vision technology and additional bus lanes. Figure 1-1 illustrates the Station along the Transitway and through a tunnel underneath for transit to be developed by 2031. In the first phase, the City planned rapid transit network for the City of Ottawa, out to the the downtown core. of Ottawa will invest in 40 km of new light rail transit (LRT) year 2031. The cornerstone and first phase of this plan is to run Figure 1-1: TMP Rapid Transit Network 1-2 The Downtown Ottawa Transit Tunnel (DOTT): Tunney’s The most important feature of the project involves construction this segment of the City’s rapid transit network to the year 2031 Pasture to Blair Station via a Downtown LRT Tunnel, will see of a new LRT tunnel to replace the existing on-street BRT and beyond.