SPECIAL Victoria Government Gazette

Total Page:16

File Type:pdf, Size:1020Kb

SPECIAL Victoria Government Gazette Victoria Government Gazette No. S 258 Wednesday 26 June 2019 By Authority of Victorian Government Printer Transport Integration Act 2010 TRANSPORT RESTRUCTURING ORDER (ROADS CORPORATION) NO. 1/2019 Order in Council This Order may be cited as the Transport Restructuring Order (Roads Corporation) No. 1/2019. The Governor in Council under Division 2 of Part 4A of the Transport Integration Act 2010 orders that: 1. Commencement This Order comes into operation on 1 July 2019. 2. Definitions 2.1 In this Order – ‘conferred functions’ means the functions conferred on the Head, Transport for Victoria by paragraph 3 of this Order. 2.2 Terms used in this Order have the same meaning as that term has in the Transport Integration Act 2010, unless the context otherwise requires. 3. Conferred functions The functions specified in Part A of Schedule 1 are conferred on the Head, Transport for Victoria. 4. Ongoing and concurrent conferral 4.1 The conferred functions are conferred on the Head, Transport for Victoria on an ongoing basis. 4.2 The conferred functions are to be performed or exercised concurrently by the Head, Transport for Victoria and the Roads Corporation (meaning that each of the Head, Transport for Victoria and the Roads Corporation may exercise the functions independently of the other). 5. Effect of conferral on the Head, Transport for Victoria The conferred functions are conferred on the Head, Transport for Victoria only to the extent that the exercise or performance of the function does not require the exercise of a function, power or duty conferred exclusively on another person or body by or under another Act. 6. Application of s 87(2) of the Transport Integration Act 2010 6.1 Section 87(2) of the Transport Integration Act 2010 applies to the Head, Transport for Victoria in exercising or performing the conferred functions. 6.2 References to the Roads Corporation in s 87(2) of the Transport Integration Act 2010 are to be construed as references to the Roads Corporation and the Head, Transport for Victoria, or either the Roads Corporation or the Head, Transport for Victoria, as the case requires. 7. Construction of other Transport Integration Act 2010 provisions Other references to the Roads Corporation in the Transport Integration Act 2010, or in instruments made under that Act, are to be construed as references to the Roads Corporation and the Head, Transport for Victoria, or either the Roads Corporation or the Head, Transport for Victoria, as the case requires, to the extent necessary to enable the exercise or performance by the Head, Transport for Victoria of the conferred functions. SPECIAL 2 S 258 26 June 2019 Victoria Government Gazette 8. Saving of Roads Corporation functions and acts Nothing in this Order limits the capacity of the Roads Corporation to perform or exercise functions, powers or duties conferred on it by or under any Act, or affects any act lawfully done by the Roads Corporation. 9. Severability of any provision or part of this Order If any provision or part of this Order is invalid, the invalid provision or part is severed, and the Order otherwise continues to be valid and of legal effect. Dated 25 June 2019 Responsible Minister: HON JACINTA ALLAN MP Minister for Transport Infrastructure PIETA TAVROU Clerk of the Executive Council SCHEDULE 1 DUTIES, FUNCTIONS AND POWERS CONFERRED ON THE HEAD, TRANSPORT FOR VICTORIA Part A: Functions conferred on the Head, Transport for Victoria Section 87(1)(a) 87(1)(b) 87(1)(d) 87(1)(e) 87(1)(f) 87(1)(g) 87(1)(i) 87(1)(m) Victoria Government Gazette S 258 26 June 2019 3 Transport Integration Act 2010 TRANSPORT RESTRUCTURING ORDER (PUBLIC TRANSPORT DEVELOPMENT AUTHORITY) NO. 1/2019 Order in Council This Order may be cited as the Transport Restructuring Order (Public Transport Development Authority) No. 1/2019. The Governor in Council under Division 2 of Part 4A of the Transport Integration Act 2010 orders that: 1. Commencement This Order comes into operation on 1 July 2019. 2. Definitions 2.1 In this Order – ‘conferred functions’ means the functions conferred on the Head, Transport for Victoria by paragraph 3 of this Order. 2.2 Terms used in this Order have the same meaning as that term has in the Transport Integration Act 2010, unless the context otherwise requires. 3. Conferred functions 3.1 The following functions are conferred on the Head, Transport for Victoria: (a) the functions specified in Part A of Schedule 1; (b) the functions specified in Column 1 of the Table in Part B of Schedule 1, to the extent described in Column 2 of the Table. 3.2 The conferred functions specified in Column 1 of the Table in Part B of Schedule 1 are to be construed, for the purposes of the exercise or performance of that function by the Head, Transport for Victoria, as if the text shown in strikethrough in Column 2 of the Table was deleted. 4. Ongoing and concurrent conferral 4.1 The conferred functions are conferred on the Head, Transport for Victoria on an ongoing basis. 4.2 The conferred functions are to be performed or exercised concurrently by the Head, Transport for Victoria and the Public Transport Development Authority (meaning that each of the Head, Transport for Victoria and the Public Transport Development Authority may exercise the functions independently of the other). 5. Transfer Order and transfer of employees 5.1 Transfer of employees from the Public Transport Development Authority to the Secretary will be necessary by reason of this Order. 5.2 A Transfer Order is otherwise required to be made under Division 3 of Part 4A of the Transport Integration Act 2010 in order to transfer property, rights and liabilities: (a) from the Public Transport Development Authority to the Head, Transport for Victoria, insofar as the property, rights and liabilities relate to the conferred functions; and (b) from the Public Transport Development Authority to the Secretary, insofar as the property, rights and liabilities of the Public Transport Development Authority relate to staff to be transferred from the Public Transport Development Authority to the Secretary. 6. Application of s 79AE(2) of the Transport Integration Act 2010 6.1 Section 79AE(2) of the Transport Integration Act 2010 applies to the Head, Transport for Victoria in exercising or performing the conferred functions. 4 S 258 26 June 2019 Victoria Government Gazette 6.2 References to the Public Transport Development Authority in section 79AE(2) of the Transport Integration Act 2010 are to be construed as references to the Public Transport Development Authority and the Head, Transport for Victoria, or either Public Transport Development Authority or the Head, Transport for Victoria, as the case requires. 7. Construction of other Transport Integration Act 2010 provisions 7.1 References to the Public Transport Development Authority in sections 120(1)(a), 125(1)(c), 125(1)(d), 132(1)(a) and s 132(2)(e) of the Transport Integration Act 2010 are amended and are be construed as references to the Head, Transport for Victoria or the Public Transport Development Authority (as the case requires). 7.2 Other references to the Public Transport Development Authority in the Transport Integration Act 2010, or in instruments made under that Act, are to be construed as references to the Public Transport Development Authority and the Head, Transport for Victoria, or either the Public Transport Development Authority or the Head, Transport for Victoria, as the case requires, to the extent necessary to enable the exercise or performance of the conferred functions by the Head, Transport for Victoria. 8. Saving of Public Transport Development Authority functions and acts Nothing in this Order limits the capacity of the Public Transport Development Authority to perform or exercise functions, powers or duties conferred on it by or under any Act, or affects any act lawfully done by the Public Transport Development Authority. 9. Limitation on power of direction 9.1 Nothing in this Order makes the Head, Transport for Victoria subject to direction by the Minister or the Secretary under section 64T of the Transport Integration Act 2010 in relation to the quantum of any amount payable under section 68 of the Rail Management Act 1996 for breach of a civil penalty provision within the meaning of that section. 9.2 The power of direction under section 64T of the Transport Integration Act 2010 is to be construed as excluding a power to make a direction of the type described in paragraph 9.1. 10. Severability of any provision or part of this Order If any provision or part of this Order is invalid, the invalid provision or part is severed, and the Order otherwise continues to apply. Dated 25 June 2019 Responsible Minister: HON JACINTA ALLAN MP Minister for Transport Infrastructure PIETA TAVROU Clerk of the Executive Council Victoria Government Gazette S 258 26 June 2019 5 SCHEDULE 1 DUTIES, FUNCTIONS AND POWERS CONFERRED ON THE HEAD, TRANSPORT FOR VICTORIA Part A: Functions conferred on the Head, Transport for Victoria Section 79AE(1)(a) 79AE(1)(b) 79AE(1)(c) 79AE(1)(d) 79AE(1)(j)(i), (ii), (iii) 79AE(1)(k) 79AE(1)(p) Part B: Functions conferred on the Head, Transport for Victoria Section Extent of function conferred (Column 1) (Column 2) 79AE(1)(g) manage the coordination of trams, trains and buses, including by providing operational advice and assurance to the lead transport agency regarding the implementation of timetabling and connectivity of passenger services 79AE(1)(h) support the development of, and implement, operational policies and strategies to improve
Recommended publications
  • January 2021 Published by the Australian Timetable Association
    TABLE TALK AUSTRALASIAN TIMETABLE NEWS RRP $4.95 No. 341, January 2021 Published by the Australian Timetable Association RAIL & TRAM NEWS Mount Isa line On Wednesday, 30 December, an Aurizon freight train Service capacity tracker hauling fertiliser derailed east of Charters Towers on the Mount Isa line. A workforce of 50 personnel TransLink has released a “service capacity tracker” on worked to repair the line from 31 December to 5 their website (www.translink.com.au) in the form of a January. Despite the completion of repairs, heavy dashboard. After selecting a service from the prompts, rainfall has further delayed the return of both rail traffic. the dashboard provides a forecast of available space onboard the train, tram, bus or ferry service based on According to a report in local newspaper, The North “historical data and forecast changes in travel West Star, the cause was believed to be a very behaviour” for any of the next seven days. localised extreme weather event impacting the track infrastructure, although Queensland Rail has Limitations include that the dashboard provides data in confirmed that there has been no extreme weather 15-minute increments (i.e.: if there is more than one activity being registered on any official weather station bus within a 15-minute period, the data is averaged nearby. across those services), and no data is available for services between 23:00 and 05:00. One example is As of 8 January, the Inlander rail service continues to provided below (shows forecast capacity for 15 be replaced by road coaches, where conditions are December from Fortitide Valley station).
    [Show full text]
  • Metro Trains Melbourne Metrotrains.Com.Au Public
    PTV Contact Centre • Always travel with a valid myki 1800 800 007 Mon-Fri: 6am-Midnight • Do not run at stations or on platforms Sat-Sun: 24 hours • Stand behind the yellow line on platforms Please provide full contact details to enable our team to • Hold the handrail on the escalators fully investigate your correspondence. • Be mindful of other passengers – keep If you’re not satisfied with our response, you can escalate music to a minimum, remove your your feedback to the PTV Customer Relations team – or the backpack before boarding and take your Public Transport Ombudsman, an independent office that litter with you investigates and provides fair, free and fast resolutions to public transport disputes. • Keep a firm hold of your pram at all times • See a staff member if assistance is required Metro Trains Melbourne • All stations and trains are no smoking areas metrotrains.com.au • Assistance animals can travel on our Public Transport Victoria services ptv.vic.gov.au • Pets may travel on trains, with all dogs to Ticketing be muzzled and on leads ptv.vic.gov.au/tickets • Folding bikes only are welcome on Travellers Aid replacement bus services travellersaid.org.au • Petrol powered skateboards and scooters Public Transport Ombudsman are prohibited on all services ptovic.com.au [email protected] Customer service queries SMS: 0428 789 329 Weekdays: 7am-7pm Weekends and public holidays: 9am-5pm Interpreter Service (03) 9610 7512 (03) 9321 5450 Open from 8am-5pm, except public holidays • Consistent and dependable services • Safe, clean and accessible services • Timely, accurate and personalised information We monitor your safety with CCTV cameras at our stations and on our trains and we work closely with While we want your journey to run as smoothly as • Engaged and enabled team members Victoria Police, including having Protective Service possible, sometimes essential maintenance, upgrade Officers (PSOs) visible at stations and on services after works or unexpected events cause us to make changes to Metro’s Customer Charter is our promise to you of how we 6PM.
    [Show full text]
  • AATTC DL Lists 12 E7.Xlsx
    DISTRIBUTION LIST April 2012 The AATTC Distribution Service aims to supply as many current Australian timetables and information brochures as possible. It also provides historical material from Australia and overseas as it becomes available. Some of the main items of interest in this month’s Distribution List include: • ARTC Master Train Plan (Working Timetable) from 1 April 2012 (Item 1). • Some old interstate train timetables (Items 2, 3, 4) • More CityRail and CountryLink train rosters (Item 5-9). • Another set of RailCorp Freight Working Timetables, this time from 31 March 2012 (Item 12). • Possibly the last Travel Guide to be issued for the Sydney Light Rail and Monorail (Item 13). • Timetables from Upper Darling Range Branch railway in Western Australia (Item 22) and a history of the line (Item 100). These came from a presentation by David Hennell to the Melbourne Division meeting in March 2012. • A selection of bus timetables in northern NSW (Items 33 – 39). • The heaviest timetable in this List: Ballarat Transit – it weighs 234 grams (Item 47). • Complete set of the Transperth bus timetables issued on 19 February 2012 (Item 54). • Sets of the Mornington Peninsula Dial a Bus door to door bus services from many localities (Item 87). April 2012 items were supplied by: Steve Bigwood, Barry Blair, Adrian Dessanti, Scott Ferris, Hilaire Fraser, Frank Goldthorpe, Stephen Gray, Robert Henderson, David Hennell, Peter Hobbis, Les Hyland, Victor Isaacs, Tony McIlwain, Len Regan, Lourie Smit, Peter Walhouse, Roger Wheaton, David Whiteford, Sydney Grab Box. Payments for orders or for creating advance credit can be made by: • Postage stamps (any denominations).
    [Show full text]
  • Public Transport Partnerships
    PUBLIC TRANSPORT PARTNERSHIPS An Overview of Passenger Rail Franchising in Victoria March 2005 Department of Infrastructure PUBLIC TRANSPORT PARTNERSHIPS An Overview of Passenger Rail Franchising in Victoria March 2005 Public Transport Division Department of Infrastructure © State of Victoria 2005 Published by Public Transport Division Department of Infrastructure 80 Collins Street, Melbourne March 2005 www.doi.vic.gov.au This publication is copyright. No part may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968. Authorised by the Victorian Government, 80 Collins Street, Melbourne. Minister’s Foreword In February 2004, after the failure of the original privatisation framework, the Victorian Government entered into new franchise agreements with Melbourne’s public transport companies, Yarra Trams and Connex. These partnership agreements find the balance between government support for public transport in Melbourne and the operational expertise provided by experienced private rail operators. Almost one year on, the new arrangements are running smoothly, providing stability across the public transport system and giving a solid foundation for a range of improvements in service delivery. Some of the other benefits to passengers that stem from these agreements include: • Additional front-line customer service staff; • Increased security patrols; • Improved driver training programs; • All night New Year’s Eve services; • Additional rolling stock; and • Improved standards for the upkeep of transport facilities. The key themes of this summary report include the background to the failure of the original contracts, the renegotiations, the nature of the new partnership agreements and the challenges of the refranchising process. You can obtain the latest information about Melbourne’s public transport by visiting www.doi.vic.gov.au/transport I commend this report to you.
    [Show full text]
  • Victorian Ports Corporation (Melbourne) Annual Report 2017-18
    ANNUAL REPORT 2017-18 Victorian Ports Corporation (Melbourne) Street address Level 5, 530 Collins Street Melbourne Victoria 3000 Australia Postal address GPO Box 261 Melbourne VIC 3001 Australia Tel: +61 3 8347 8300 Fax: +61 3 8347 8301 www.vicports.vic.gov.au Annual Report Ports Corporation (Melbourne) 2017-18 Victorian Authorised by the Victorian Government. This publication is produced by Victorian Ports Corporation (Melbourne). Proudly designed and produced by abCreative productions www.abCreative.com Printed on 100% recycled paper. Responsible Body’s declaration The Hon. Luke Donnellan MP Minister for Ports 1 Spring Street Melbourne Victoria 3000 The Hon. Tim Pallas MP Treasurer 1 Treasury Place East Melbourne Victoria 3002 Dear Ministers, Victorian Ports Corporation (Melbourne) 2017-18 Annual Report I have much pleasure in submitting to you the Annual Report of Victorian Ports Corporation (Melbourne) for the period 1 July 2017 to 30 June 2018, in accordance with the provisions of the Transport Integration Act 2010 (Vic) and the Financial Management Act 1994 (Vic). Yours sincerely, James Cain Chairman 29 August 2018 Victorian Ports Corporation (Melbourne) 2017-18 Annual Report 1 2 Victorian Ports Corporation (Melbourne) 2017-18 Annual Report Contents Responsible Body’s declaration 1 Section 1: Year in review 5 From the Chairman 6 From the Chief Executive Officer 7 Mission, vision and values 8 An overview of VPCM 9 Manner of establishment 9 Purpose and responsibilities 9 Functions, objects and powers 10 Significant legislative changes
    [Show full text]
  • Integrated Transport Planning
    Integrated Transport Planning Transport Integrated | August 2021 August Integrated Transport Planning August 2021 Independent assurance report to Parliament 2021–22: 01 Level 31, 35 Collins Street, Melbourne Vic 3000, AUSTRALIA 2021–22: T 03 8601 7000 E [email protected] 01 www.audit.vic.gov.au This report is printed on Monza Recycled paper. Monza Recycled is certified Carbon Neutral by The Carbon Reduction Institute (CRI) in accordance with the global Greenhouse Gas Protocol and ISO 14040 framework. The Lifecycle Analysis for Monza Recycled is cradle to grave including Scopes 1, 2 and 3. It has FSC Mix Certification combined with 99% recycled content. ISBN 9781921060151 Integrated Transport Planning Independent assurance report to Parliament Ordered to be published VICTORIAN GOVERNMENT PRINTER August 2021 PP no 248, Session 2018–21 The Hon Nazih Elasmar MLC The Hon Colin Brooks MP President Speaker Legislative Council Legislative Assembly Parliament House Parliament House Melbourne Melbourne Dear Presiding Officers Under the provisions of the Audit Act 1994, I transmit my report Integrated Transport Planning. Yours faithfully Dave Barry Acting Auditor-General 4 August 2021 The Victorian Auditor-General’s Office acknowledges Australian Aboriginal peoples as the traditional custodians of the land throughout Victoria. We pay our respect to all Aboriginal communities, their continuing culture and to Elders past, present and emerging. Integrated Transport Planning | Victorian Auditor-General´s Report Contents Audit snapshot .......................................................................................................................................
    [Show full text]
  • Annual Report
    ANNUAL REPORT Accessibility 2017 – 2018 If you would like to receive this publication in an accessible format, such as large print or audio, phone 03 9619 5958 or email [email protected] Unless indicated otherwise, this work is made available under the terms of the Creative Commons Attribution 3.0 Australia licence. To view a copy of this licence, visit creativecommons.org/licenses/by/3.0/au It is a condition of this Creative Commons Attribution 3.0 Licence that you must give credit to the original author who is the State of Victoria. ANNUAL REPORT 2017 – 2018 – 2017 REPORT ANNUAL V/LINE Authorised by Transport for Victoria, 1 Spring Street, Melbourne. MSR01744 Annual Report 2017-18_4pp Cover.indd 1 3/12/2018 3:24 PM V/Line Corporation ABN 91 273 289 190 GPO Box 5343 Melbourne VIC 3001 Head Office / Administration Level 9, 750 Collins Street Docklands VIC 3008 Telephone (03) 9619 5900 Facsimile (03) 9619 5000 vline.com.au Customer information, reservations, sales and feedback Freecall 1800 800 007 Project team Rebecca Northeast Scheree Mularczyk Les Lovell Denis Grigolato Printed by Finsbury Green, Port Melbourne. MSR01744 Annual Report 2017-18_4pp Cover.indd 2 3/12/2018 3:24 PM Table of Contents Responsible Body’s declaration 2 Section One: Year in review 3 Section Two: Governance and organisational structure 21 Section Three: Workforce data 31 Section Four: Other disclosures 39 Financial Statements 57 Disclosure Index 134 MSR01744 Annual Report 2017-18_2.indd 1 3/12/2018 3:40 PM 2 V/Line | Annual Report | 2017 – 2018 Responsible Body’s declaration 4 September 2018 The Hon Jacinta Allan MP Minister for Public Transport Level 20, 1 Spring Street Melbourne VIC 3000 The Hon Tim Pallas MP Treasurer Level 4, 1 Treasury Place East Melbourne VIC 3002 Dear Ministers In accordance with the Financial Management Act 1994, I am pleased to present the Annual Report of V/Line Corporation (and its subsidiary V/Line Pty Ltd) for the year ending 30 June 2018.
    [Show full text]
  • Investigation of the Relationship Between Transit Network Structure and the Network Effect – the Toronto & Melbourne Experience
    INVESTIGATION OF THE RELATIONSHIP BETWEEN TRANSIT NETWORK STRUCTURE AND THE NETWORK EFFECT – THE TORONTO & MELBOURNE EXPERIENCE By Karen Frances Woo A thesis submitted in conformity with the requirements for the degree of Master of Applied Science Department of Civil Engineering University of Toronto © Copyright by Karen Frances Woo 2009 Investigation of the Relationship between Transit Network Structure and the Network Effect – The Toronto & Melbourne Experience Karen Frances Woo Master of Applied Science Department of Civil Engineering University of Toronto 2009 Abstract The main objective of this study was to quantitatively explore the connection between network structure and network effect and its impact on transit usage as seen through the real-world experience of the Toronto and Melbourne transit systems. In this study, the comparison of ridership/capita and mode split data showed that Toronto’s TTC has better performance for the annual data of 1999/2001 and 2006. After systematically investigating travel behaviour, mode choice factors and the various evidence of the network effect, it was found that certain socio-economic, demographic, trip and other design factors in combination with the network effect influence the better transit patronage in Toronto over Melbourne. Overall, this comparative study identified differences that are possible explanatory variables for Toronto’s better transit usage as well as areas where these two cities and their transit systems could learn from one another for both short and long term transit planning and design. ii Acknowledgments This thesis and research would not have been possible without the help and assistance of many people for which much thanks is due.
    [Show full text]
  • 2018 19 BP3 Service Delivery
    Victorian Budget 18/19 GETTING THINGS DONE Service Delivery Budget Paper No. 3 Presented by Tim Pallas MP, Treasurer of the State of Victoria The Secretary © State of Victoria 2018 Department of Treasury and Finance (Department of Treasury and Finance) 1 Treasury Place Melbourne, Victoria, 3002 Australia Tel: +61 3 9651 5111 Fax: +61 3 9651 2062 Website: budget.vic.gov.au You are free to re use this work under a Creative Commons Attribution 4.0 licence, provided you Authorised by the Victorian Government credit the State of Victoria (Department of Treasury 1 Treasury Place, Melbourne, 3002 and Finance) as author, indicate if changes were made and comply with the other licence terms. Printed by Doculink, Port Melbourne The licence does not apply to any branding, Printed on recycled paper including Government logos. This publication makes reference to the 2018 19 Copyright queries may be directed to Budget paper set which includes: [email protected]. Budget Paper No. 1 Treasurer’s Speech Budget Paper No. 2 Strategy and Outlook ISSN 2204 9185 (print) Budget Paper No. 3 Service Delivery ISSN 2204 9177 (online) Budget Paper No. 4 State Capital Program Published May 2018 Budget Paper No. 5 Statement of Finances (incorporating Quarterly Financial Report No. 3) Service Delivery 2018-19 Presented by Tim Pallas MP Treasurer of the State of Victoria for the information of Honourable Members Budget Paper No. 3 TABLE OF CONTENTS Chapter 1 – Output, asset investment, savings and revenue initiatives ....................... 1 Whole of Government – Aboriginal Affairs .................................................................... 3 Whole of Government – Child information Sharing Reforms .......................................
    [Show full text]
  • Travelling on Public Transport to Melbourne University – Parkville Campus
    Travelling on public transport to Melbourne University – Parkville Campus myki Concession travel myki is your reusable travel card for trains, If you’re under 19 you can travel on a concession trams and buses in Melbourne and some regional fare with a Child myki. If you’re 17 or 18, you must services across Victoria. Choose myki Money carry government issued proof of age ID (such if you travel occasionally, and top up as you go. as a passport, drivers licence, proof of age card), Choose myki Pass if you travel often, and top or proof of another concession entitlement up with consecutive days. (such as a Health Care Card). For information on public transport fares, and to If you're a tertiary student studying a full time use the fare calculator, visit ptv.vic.gov.au/myki undergraduate course on campus, you can apply for a PTV Tertiary Student ID. This costs $9 Buy your myki and top up at: and allows you to use a Concession myki until 28 February next year. Download an application − over 800 myki retail outlets including all at ptv.vic.gov.au/students 7-Eleven stores − myki machines at train stations, and premium If you’re an international undergraduate student, tram and bus stops (full fare card sales only) you may be eligible to buy an annual iUSEpass which gives you half-price myki fares in the zones − PTV Hubs where you study. Visit ptv.vic.gov.au/iuse for − train station ticket offices more information. − on board a bus ($20 max) If you're a postgraduate or part-time student, − at the Melbourne University Campus Pharmacy you're not eligible for concession fares.
    [Show full text]
  • Visit Us at Metro Tunnel HQ
    Tunnelling with tunnel boring machines Artist impression of The Metro Tunnel Project’s first tunnel boring machine The Metro Tunnel Constructing the tunnels Project will deliver twin nine kilometre Tunnelling between North Tunnelling between the Domain Melbourne and Kensington, and Precinct and South Yarra, and rail tunnels from North Melbourne to the CBD the Domain Precinct to the CBD Kensington to Two tunnel boring machines (TBMs) Two TBMs are assembled in the South Yarra as part are assembled in the station box at station box at the Anzac Station site the Arden Station site. The TBMs in the Domain Precinct (Domain). of a new end-to-end are launched separately, and tunnel The TBMs are launched separately towards the new tunnel entrance and tunnel towards the new tunnel Sunbury to Cranbourne/ at Kensington. entrance at South Yarra. Pakenham line. During tunnelling, the TBMs pipe During tunnelling, the TBMs pipe In addition to the the excavated material (slurry) the excavated material (slurry) back back to the Arden Station site and to site at Edmund Herring Oval in tunnel, five new line the new tunnel with curved Domain, and line the new tunnel underground stations concrete segments. with curved concrete segments. will be built. The TBMs arrive at Kensington The TBMs arrive at South Yarra and are transported back to the and are transported back to the Arden Station site. The TBMs are Anzac Station site. The TBMs are reassembled in the station box reassembled in the station box and and relaunched towards Parkville, relaunched towards the CBD, under before tunnelling towards the CBD.
    [Show full text]
  • RAIL and TRAM NEWS High Speed Railway Fullerton
    AUSTRALASIAN TIMETABLE NEWS No. 256, December 2013 ISSN 1038-3697 RRP $4.95 Published by the Australian Timetable Association www.aattc.org.au RAIL AND TRAM NEWS High Speed Railway Fullerton. “The Australian Rail Track Corporation will, under On 8 November the new Federal government abolished the the guidance of the implementation group, work with High Speed Rail Advisory Committee. interested parties to construct the inland rail project through a staged 10-year schedule,” he said. On 28 November Federal Labor frontbencher, and former Transport Minister, Anthony Albanese, said he would Mr Truss also declared the Federal government's introduce legislation to Parliament to facilitate work on the commitment to looking at a new 24/7 dedicated freight line to proposed Melbourne-Canberra-Sydney-Brisbane high-speed the Port of Brisbane. railway. The former government budgeted the project at $114 billion, to be operational by 2065 with 84 million Infrastructure: promises, promises passengers a year. "If we don't start planning now for the The Victorian Labor Opposition has promised expenditure of possibility of high-speed rail, it will never happen," Mr $300 million to commence work on the Melbourne Metro Albanese said. "When Parliament resumes next week I will cross-city underground rail line and removal of 50 level be introducing a private member's bill that would require the crossings, if elected, and contingent on a Federal Commonwealth to begin work immediately on securing a contribution. corridor for a future high-speed rail line. The bill would Deputy Prime Minister and Minister for Infrastructure and include the establishment of a high-speed rail authority made Regional Development, Warren Truss, has called for a up of federal, state and industry stakeholders.
    [Show full text]